Method for managing a gas turbine assembly at low speed and corresponding gas turbine assembly
10443432 ยท 2019-10-15
Assignee
Inventors
Cpc classification
F05D2270/304
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D25/36
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2220/32
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C3/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D11/04
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2270/023
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D15/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F01D11/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D21/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C3/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D25/36
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D15/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A method manages a gas turbine assembly during start up or shut down, the gas turbine assembly including a twin shaft gas turbine having an input shaft and an output shaft and a speed sensor for measuring a speed of the output shaft, the gas turbine assembly further having a rotor mounted on said output shaft and provided with at least a dry gas seal for preventing leakage of a process gas. The method includes monitoring the speed of the output shaft, and in parallel, reducing or increasing the speed of the input shaft after the monitored speed of the output shaft has remained above zero and below a predefined slow roll speed limit for a predefined acceptable time.
Claims
1. A method for managing a gas turbine assembly during start up or shut down, the gas turbine assembly including a twin shaft gas turbine comprising an input shaft and an output shaft and a speed sensor for measuring a speed of the output shaft, the gas turbine assembly further comprising a rotor mounted on said output shaft and provided with at least a dry gas seal for preventing leakage of a gas between the rotor and the dry gas seal, the method comprising: monitoring the speed of the output shaft, and in parallel reducing or increasing the speed of the input shaft after the monitored speed of the output shaft has remained above zero and below a predefined slow roll speed limit for a predefined acceptable time.
2. The method according to claim 1, wherein the step of reducing or increasing the speed of the input shaft further comprises in sequence: starting spinning the input shaft, if after a first predefined acceptable time the speed of the output shaft remains below the predefined slow roll speed limit, then increasing the speed of the input shaft, if the speed of the output shaft remains below the predefined slow roll speed limit, then waiting for a second predefined acceptable time before further increasing the speed of the input shaft.
3. The method according to claim 2, wherein the first predefined acceptable time is 10 s to 30 s.
4. The method according to claim 2, wherein the second predefined acceptable time is 60 s to 300 s.
5. The method according to claim 1, wherein the step of reducing or increasing the speed of the input shaft further comprises in sequence: waiting until the output shaft has stopped, waiting for a predefined wait time, spinning the input shaft at a first predefined speed, if the speed of the output shaft remains for a third predefined acceptable time above zero but below the predefined slow roll speed limit, then increasing the speed of the input shaft up to a second predefined speed greater than the first predefined speed, if the speed of the output shaft remains below the predefined slow roll speed limit, then stopping the input shaft, then waiting for a time equal to the wait time, then spinning the input shaft at a third predefined speed lower than the first predefined speed, if the speed of the output shaft is greater than zero, then stopping the input shaft, then waiting for a time equal to the wait time, then periodically spinning the input shaft up to a fourth predefined speed lower than the third predefined speed and stopping the input shaft for an interval time, if the speed of the output shaft is greater than zero, then stopping the input shaft, and preventing the gas turbine assembly to be restarted during a resting time.
6. The method according to claim 5, wherein the third predefined acceptable time is 10 s to 30 s.
7. The method according to claim 5, wherein the first predefined speed is 10 to 20 percent of the nominal power turbine speed.
8. The method according to claim 5, wherein the second predefined speed is 20 to 40 percent of the nominal power turbine speed.
9. The method according to claim 5, wherein the third predefined speed is 5 to 10 percent of the nominal power turbine speed.
10. The method according to claim 5, wherein the wait time is 2 to 3 min.
11. The method according to claim 5, wherein the interval time is 2 to 3 min.
12. The method according to claim 5, wherein the resting time is 10 min to 4 hours.
13. The method according to claim 1, wherein the predefined slow roll speed limit is 200 to 600 rpm.
14. The method according to claim 1, wherein the gas turbine assembly comprises a gas compressor including the rotor and the dry gas seal.
15. A gas turbine assembly, comprising a twin shaft gas turbine comprising an input shaft and an output shaft, a variable speed electrical motor connected to the input shaft, a speed sensor for measuring a speed of the output shaft, a controller which controls the variable speed electrical motor, and a rotor mounted on said output shaft and provided with at least a dry gas seal for preventing leakage of a gas between the rotor and the dry gas seal, wherein the speed sensor is configured to measure the speed of the output shaft, and wherein the controller is configured to monitor the speed of the output shaft measured by sensor and to reduce or increase the speed of the input shaft via the variable speed electrical motor after the monitored speed of the output shaft has remained above zero and below a predefined slow roll speed limit for a predefined acceptable time.
16. The gas turbine assembly according to claim 15, wherein, for reducing or increasing the speed of the input shaft, the controller is further configured to, in sequence: start spinning the input shaft, if after a first predefined acceptable time the speed of the output shaft remains below the predefined slow roll speed limit, then increase the speed of the input shaft, if the speed of the output shaft remains below the predefined slow roll speed limit, then wait for a second predefined acceptable time before further increasing the speed of the input shaft.
17. The gas turbine assembly according to claim 16, wherein the first predefined acceptable time is 10 s to 30 s, and/or wherein the second predefined acceptable time is 60 s to 300 s.
18. The gas turbine assembly according to claim 15, wherein, for reducing or increasing the speed of the input shaft, the controller is further configured to, in sequence: wait until the output shaft has stopped, wait for a predefined wait time, spin the input shaft at a first predefined speed, if the speed of the output shaft remains for a third predefined acceptable time above zero but below the predefined slow roll speed limit, then increase the speed of the input shaft up to a second predefined speed greater than the first predefined speed, if the speed of the output shaft remains below the predefined slow roll speed limit, then stop the input shaft, then wait for a time equal to the wait time, then spin the input shaft at a third predefined speed lower than the first predefined speed, if the speed of the output shaft is greater than zero, then stop the input shaft, then wait for a time equal to the wait time, then periodically spin the input shaft up to a fourth predefined speed lower than the third predefined speed and stop the input shaft for an interval time, if the speed of the output shaft is greater than zero, then stop the input shaft, and prevent the gas turbine assembly being restarted during a resting time.
19. The gas turbine assembly according to claim 18, wherein the third predefined acceptable time is 10 s to 30 s, and/or wherein the first predefined speed is 10 to 20 percent of the nominal power turbine speed, and/or wherein the second predefined speed is 20 to 40 percent of the nominal power turbine speed, and/or wherein the third predefined speed is 5 to 10 percent of the nominal power turbine speed, and/or wherein the wait time is 2 to 3 min, and/or wherein the interval time is 2 to 3 min, and/or wherein the resting time is 10 min to 4 hours.
20. The gas turbine assembly according to claim 15, wherein the predefined slow roll speed limit is 200 to 600 rpm.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The aspects defined above and further aspects of the present invention are apparent from the examples of embodiment to be described hereinafter and are explained with reference to the examples of embodiment. The invention will be described in more detail hereinafter with reference to examples of embodiment but to which the invention is not limited.
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION
(7)
(8) The method 100, 200 comprises:monitoring the speed of an output shaft 21 of the gas turbine assembly 10, and in parallelreducing or increasing the speed of an input shaft 13 of the gas turbine assembly 10, after the monitored speed of the output shaft 21 has remained above zero and below a predefined slow roll speed limit n.sub.L for a predefined acceptable time T1, T2, T3.
(9)
(10) The gas turbine 5 comprises a gas generator 11 and a power turbine 12. Power turbine 12 has a nominal speed of 10000 rpm. According to other possible embodiments, a power turbine with a different nominal turbine speed may be used.
(11) The gas generator 11 comprises an inlet compressor 15, a compressor turbine 16 and an inlet shaft 13, on which the inlet compressor 15 and the compressor turbine 16 are mounted. The gas turbine 5 further comprises a variable speed electrical motor 17, which is connected to the inlet shaft 13, at an axial end proximal to the inlet compressor 15. The electrical motor 17 is operated as a starter system for the gas generator 11.
(12) In the gas generator 11, a combustor 18 is provided between the inlet compressor 15 and the compressor turbine 16. In the combustor 18 a fuel 19 is injected burnt with the aid of the compressed air, working as a combustive, coming from the inlet compressor 15. After the burning process, a hot gas comprising combustion products exits the combustor 18 and enters the compressor turbine 16 where the gas is expanded. From an outlet 16a of the compressor turbine 16 the expanded gas is delivered to an inlet 12a of the power turbine 12, which is mounted on a first axial end 21a of an output shaft 21. In the power turbine 12 the gas is further expanded in order to generate a mechanical power output which is transferred to the gas compressor 30 mounted on a second axial end 21b of the output shaft 21. After the expansion in the power turbine 12, the gas is released to the atmosphere through an exhaust outlet 12b. The gas turbine 5 further comprises a speed sensor 40 for monitoring the speed of the output shaft 21. The value of the rotary speed of the output shaft 21, measured by sensor 40, is received by a controller 50, which controls the electrical motor 17, as better explained further below with reference to
(13) Gas compressors 30 comprises one or more rotors 31 which are mechanically linked to the outlet shaft 21 and a plurality of dry gas seals 35 between the rotor(s) 31 and the output shaft 21 to prevent leakage of the process gas.
(14)
(15)
(16) Method 100 comprises a sequence of steps 110 to 130 which are executed in parallel with the step of monitoring the speed of the output shaft 21.
(17) Method 100 comprises a first step 110 during which the electrical motor 17 starts spinning the input shaft 13. In a second step 140 of method 100, the speed of the output shaft 21 is continuously monitored, in order to verify the following relation:
0<n.sub.OUT<n.sub.L (A)
where n.sub.OUT is the speed of the output shaft 21 and n.sub.L is the predefined slow roll speed limit.
(18) The value of n.sub.L depends on each installation, being typically below 400 rpm for a 5-15MW gas turbine assembly. According to other exemplary embodiments of the present invention, the predefined slow roll speed limit is between 200 and 600 rpm.
(19) If relation A is satisfied the method 100 repeats iteratively the second step 140, until a predefined condition is met, e.g. the speed of the output shaft 21 has reached a final predefined value, and method 100 is ended.
(20) If relation A is not satisfied after a first predefined acceptable time T1, method 100 comprises a third step 120 of increasing the speed of the input shaft 13, in order to increase also the speed of the output shaft 21.
(21) The first predefined acceptable time T1 is typically between 10 s and 30 s.
(22) More advantageously, according to possible embodiments of the present invention, the first predefined acceptable time T1 is between 10 s and 20 s.
(23) In a following fourth step 150 of method 100, the speed of the output shaft 21 is continuously monitored, in order to verify the following relation:
n.sub.OUT>n.sub.L (B)
(24) If relation B is satisfied the method 100 repeats iteratively the fourth step 150, until a predefined condition is met, e.g. start-up has completed, and method 100 is ended.
(25) If relation B is not satisfied, method 100 comprises a fifth step 130 of waiting for a second predefined acceptable time T2 before further increasing the speed of the input shaft 13.
(26) The second predefined acceptable time T2 is typically between 120 s and 300 s and is coincident with the purge time, i.e. with a time that, at a speed of the output shaft 21 below n.sub.L, is sufficient to displace 3 to 5 times the inner overall volume of the gas turbine assembly 10.
(27) More advantageously, according to possible embodiments of the present invention, the second predefined acceptable time T2 is between 60 s and 300 s.
(28) At the end of the fifth step 130 the method 100 is completed.
(29)
(30)
(31) Method 200 comprises monitoring the speed of the output shaft 21, by means of the sensor 40. The controller 50 receives from the sensor 40 the value of the speed of the output shaft 21 and operates the electrical motor 17 for the execution of method 200.
(32) Method 200 comprises a sequence of steps 205 to 295, which are executed in parallel with the step of monitoring the speed of the output shaft 21.
(33) Method 200 comprises a first step 205 of waiting until the output shaft 21 has come to a complete stop after normal operation. Subsequently, method 200 comprises a second step 210 of waiting for a predefined wait time Tw. According to exemplary embodiments of the present invention, the predefined wait time Tw is 2 to 3 min, the exact value depending from the size and characteristics of the gas turbine 5 and gas compressor 30.
(34) Subsequently, method 200 comprises a third step 215 of spinning the input shaft 13 at a first normal predefined speed n1. The first predefined speed is typically in the range of 1000 to 3000 rpm. More particularly, according to another embodiment of the present invention, first predefined speed is typically in the range of 1000 to 2000 rpm, i.e. 10 to 20 percent of the nominal power turbine speed.
(35) In a fourth step 206 of method 200, the speed of the output shaft 21 is continuously monitored, in order to verify relation A. If relation A is satisfied (
(36) If relation A is not satisfied for a third predefined acceptable time T3, method 200 comprises a fifth step 218 of increasing the speed of the input shaft up to a second predefined speed n2 greater than the first predefined speed n1. The third predefined acceptable time T3 is typically between 10 s and 20 s and the second predefined speed n2 is typically in the range of 2000 to 4000 rpm, 20 to 40 percent of the nominal power turbine speed.
(37) More advantageously, according to possible embodiments of the present invention, the third predefined acceptable time T3 is between 10 s and 20 s.
(38) In a sixth step 207 of method 200, the speed of the output shaft 21 is continuously monitored, in order to verify relation B.
(39) If relation B is satisfied (
(40) If relation B is not satisfied, method 200 continues with a seventh step 220 of stopping the input shaft 13 and with a subsequent eighth step 230 of checking that the output shaft 21 has come to a complete stop.
(41) Subsequently, method 200 comprises a ninth step 240 of waiting for a time equal to the wait time Tw and a tenth step 250 of spinning the input shaft 13 at a third predefined speed n3 lower than the first predefined speed n1.
(42) The third predefined speed n3 is in the range of 500 to 1000 rpm (i.e. 5 to 10 percent of the nominal power turbine speed), being this the lowest allowable spin speed for the gas turbine 12. The third predefined speed n3 should allow the input shaft 13 to spin, in order to prevent temperature distortions, while the output shaft 21 should remain still, in order to avoid wear of the dry gas seal 35.
(43) In a following eleventh step 260 of method 200, the speed of the output shaft 21 is continuously monitored, in order to verify the relation A.
(44) If relation A is not satisfied (
(45) If relation A is satisfied, meaning that the output shaft 21 is spinning at a speed lower than slow roll speed limit n.sub.L, method 200 continues with a twelfth step 270 of stopping the input shaft 13 and with a subsequent thirteenth step 280 of checking that the output shaft 21 has come to a complete stop.
(46) Subsequently, method 200 comprises a fourteenth step 282 of waiting for a time equal to the wait time Tw and a fifteenth step 285 of periodically spinning the input shaft 13 up to a fourth predefined speed n4 lower than the third predefined speed n3. The fourth predefined speed is typically 50 to 100 rpm, i.e. less than 1 percent of the nominal power turbine speed.
(47) Each burst of the input shaft 13 at speed n4 is followed by a stop for an interval time Ts, which is comprised between 2 and 3 min.
(48) The fifteenth step 285 should ensure that distortions due to temperature are minimised by changing the angle of the input shaft 13 relative to the temperature gradient, while the output shaft 21 remains still, thus avoiding wear of the dry gas seal 35.
(49) In a following sixteenth step 290 of method 200, the speed of the output shaft 21 is continuously monitored, in order to verify the following relation:
n.sub.OUT=0 (C)
(50) If relation C is satisfied (
(51) If relation C is not satisfied, meaning that the output shaft 21 is spinning at a speed lower than slow roll speed limit n.sub.L, method 200 continues with seventeenth step 292 of stopping the input shaft 13 and a final eighteenth step 295 of preventing the gas turbine assembly 10 to be restarted during a resting time Tr, which is comprised between 10 min and 4 hours, i.e. if not restarted within a short pre-defined interval (typically 10 to 15 minutes), the gas turbine assembly 10 is prevented from restarting for an extended longer period, typically of the order of 4 hours.
(52) At the end of the eighteenth step 295 the method 200 is completed.