Higher containment VSS with multi zone stripping
10443000 ยท 2019-10-15
Assignee
Inventors
Cpc classification
B01D45/16
PERFORMING OPERATIONS; TRANSPORTING
C10G11/05
CHEMISTRY; METALLURGY
B01J8/1872
PERFORMING OPERATIONS; TRANSPORTING
International classification
C10G11/05
CHEMISTRY; METALLURGY
Abstract
This patent application discloses engineering design modifications to the VSS exit, stripper entrance and the primary cyclone diplegs that can significantly reduce the underflow of reactor riser products into the stripper and reactor vessel and thereby produce higher desired product selectivities, improved stripping efficiency and a stripper vent gas, that continuously flows through the reactor vessel, with a low coke forming potential due to its low concentration of ethylene and higher molecular weight material, that could, if desired, be recovered separately from the primary riser products.
Claims
1. An improved vortex separation system comprising: a VSS separation chamber; a stripper zone; at least one vent pipe wherein stripper vapers exit the system; a baffle located between the stripper zone and the VSS separation chamber, wherein the baffle is an inverted V-shape having distal ends extended beyond the VSS separation chamber to increase stripper vapor diversion around the VSS separation chamber.
2. An improved vortex separation system that generates significantly higher plug flow containment of primary riser products due to reduced back mixing within the chamber and a lower final vapor product underflow within a catalyst void that comprises of: a VSS separation chamber; a baffle located between an original stripping zone 23 and the VSS separation chamber, creating a three-zone stripping section having stripping zones 31, 33, and 23; wherein the baffle is configured to direct stripper vapors 8, exiting zones 23 and 33, away from the VSS separation chamber; and wherein the stripper vapors from zones 23 and 33 rise through zones 23 and 33, bypassing the VSS chamber and exit the reactor vessel via an at least on vent pipe 7 into a VSS riser.
3. The improved vortex separation system of claim 2 wherein steam is injected in the cracked gas stripping zone 31 to maintain a bubble fluidized bed of 0.2 to 0.5 feet per second superficial gas velocity.
4. The improved vortex separation system of claim 2 wherein an open grid structure, or packing, is located in a fluidized bed free board region 29 to reduce catalyst re-entrainment into the VSS chamber.
5. The improved vortex separation system of claim 2 wherein an open grid structure, or packing, is located in a fluidized bed free board region 33 to reduce catalyst re-entrainment into the VSS chamber.
6. The improved vortex separation system of claim 2 wherein an open grid structure, or packing, is located in a fluidized bed free board regions 29 and 33 to reduce catalyst re-entrainment into the VSS chamber.
7. The improved vortex separation system of claim 2 wherein the baffle is designed to generate additional cross flow catalyst as it flows through zone 31 also improving the residence time distribution and allowing more efficient time for the various highly desirable soft coke cracking reactions to proceed.
8. The improved vortex separation system of claim 2 wherein baffle 41 and its openings for captured of vapor flow extend beyond the circumference of the VSS chamber to direct vapor products from stripping zone 23 into zone 33 and out a vent pipe 7.
9. An improved vortex separation system comprising: a VSS separation chamber; a stripper zone; and a cyclone separator having a dipleg wherein the circumference of the dipleg is expanded such that the flowing catalyst flux lb/ft.sup.2/sec in the dipleg is reduced to produce a flowing velocity less than the bubble rise velocity.
10. An improved vortex separation system comprising: a VSS separation chamber; a stripper zone; at least one vent pipe wherein stripper vapers exit the system a baffle configured to divert vapor from the stripper chamber away from the VSS separation chamber; and a cyclone separator having a dipleg where in the circumference of the dipleg is, configured such that the flowing catalyst flux lb/ft.sup.2/sec in the dipleg is reduced to produce a flowing velocity less than the bubble rise velocity.
11. An improved vortex separation system comprising: a reactor vessel having a bottom section; a VSS chamber within the reactor vessel; a stripping chamber with the bottom section of the reactor vessel a baffle 35 that segregates the stripping chamber into three separate stripping zones, a cracked gas stripping zone 31, a transition zone 33, and a main stripper 23.
12. The improved vortex separation system of claim 11 wherein the cracked gas stripping zone 31 has a 0.2-0.5 Ft/sec superficial gas velocity.
13. The improved vortex separation system of claim 12 wherein the transition zone 33 has an increased residence time.
14. The improved vortex separation system of claim 13 wherein the net product underflow is reduced from 8.46 wt % Fresh Feed to 2.50 wt % Fresh Feed.
15. The improved vortex separation system of claim 11 wherein stripper packing 36 is added at stripping zone 31 to further suppress freeboard activity and J values.
16. A cyclone separator comprising: a cyclone separator; and a dipleg wherein the circumference of the dipleg is expanded such that the flowing catalyst flux lb/ft.sup.2/sec in the dipleg is reduced to produce a flowing velocity less than the bubble rise velocity.
17. The cyclone separator of claim 16 wherein the cyclone separator is used in a high containment Direct Coupled Cyclone, Rough-Cut Cyclone, RS2, or VSS application.
18. The cyclone separator of claim 16 wherein the catalyst flux is reduced to less than 20 pounds/ft2/sec.
19. An improved crossflow vortex separation system comprising: a chamber 27; a baffle 41 that segregates a stripper into three zones 31, 33 and 23; a VSS separation chamber 1 having at least one outer wall; and at least one deflection shield 43 engaged with at least one outer wall and angularly disposed with the at least one outer wall, the defection shield acting to deflect catalyst falling through the VSS separation chamber 1 toward the center of the VSS separation chamber.
20. The improved crossflow vortex separation system of claim 19 wherein the baffle 41 is angularly disposed in an opposing direction to engage with and deflect the falling catalyst toward the walls of the chamber 27.
21. The improved crossflow vortex separation system of claim 20 wherein catalyst continues to fall into a main stripping zone 23 where it is further stripped by steam from a pipe 13 rising through chamber 23 and engaging with the baffle 41 and being directed away from the VSS chamber 1.
22. An improved vortex separation system comprising: a chamber 27; a baffle that segregates the stripping chamber into three separate stripping zones, a cracked gas stripping zone 31, a transition zone 33, and a main stripper 23; a VSS separation chamber 1 having at least one outer wall; and wherein as catalyst falls from the VSS chamber 1, the baffle directs the falling catalyst into the cracked gas stripping zone 31, which is then directed into the transition zone 33, before entering the main stripper 23.
23. The improved vortex separation system of 22 wherein the three stripping zones increase the residence time of the falling catalyst in the cracked gas stripping zone 31 and the transition zone 33.
24. The improved vortex separation system of claim 23 having at least one deflection shield 43 engaged with at least one outer wall and angularly disposed with the at least one outer wall, the defection shield acting to deflect catalyst falling through the VSS separation toward the center of the VSS separation chamber 1.
25. The improved vortex separation system of claim 24 having a cyclone separator wherein the dipleg is expanded, such that the flowing catalyst flux lb/ft.sup.2/sec in the dipleg is reduced to produce a flowing velocity less than the bubble rise velocity.
26. The improved vortex separation system of claim 25 wherein the catalyst bed level is raised or lowered to control residence time in the cracked gas stripping and the transition zones.
27. The improved vortex separation system of claim 26 wherein the increased resonance time reduces soft coke cracking reactions.
28. The improved vortex separation system of claim 26 wherein the net product underflow is reduced from 9.14 Wt. .sup.% on a fresh feed to 2.27 wt. .sup.% on a fresh feed.
29. The improved vortex separation system of claim 26 wherein the vent gas composition flowing through the reactor vessel contains less than 7 Vol % ethylene and C2 and heavier hydrocarbons.
30. An improved vortex separation system having multiple stripping zones comprising: a reactor vessel; a VSS separation chamber located within the reactor vessel; a stripping chamber located beneath the VSS separation chamber in the bottom of the reactor vessel; a baffle located between the stripping chamber and the VSS separation chamber creating multiple stripping zones 31, 33, and 23; and wherein the baffle is configured to direct stripper vapors exiting stripping zones 23 and 33 away from the VSS separation chamber.
31. The improved vortex separation system of claim 30 having at least one vent pipe wherein the stripper vapors exit the reactor vessel.
32. The improved vortex separation system of claim 31 wherein the catalyst bed level is adjusted to control residence time in stripping zones 31 and 33.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT(S)
(12)
(13)
(14) TABLE-US-00007 TABLE 6 TYPICAL FCC PROCESSING CONDITIONS BASE CONDITIONS lbSTM/1000 lb CAT 2.0 STRIPPING STEAM 1.4 wt % ff CAT/OIL 7.0 REACTOR TEMPERATURE 1000 F. REACTOR PRESSURE 20PSIG STRIPPER CATALYST FLUX 20 lb/ft2/sec J VALUE 20 lb/ft2/sec STRIPPER CSA 0.35 ft2/lbff Catalyst Flowing Density 30 lb/Ft3 Catalyst Emulsion Density 50 lb/Ft3 SOFT COKE Dry Gas 0.81 wt % ff Production Dry Gas Molecular Weight 9
(15) TABLE-US-00008 TABLE 7 HYDROCARBON AND STEAM ENTRAINMENTS STRIPPER/DIPLEG HCBN'S HCBN'S STEAM STM/HCBN DENSITY ACF/lbFF Wt % FF ACF/lbFF Vol % 50 0.0973 2.16 0.3506 3.61 40 0.1326 2.93 0.3506 2.64 30 0.1907 4.23 0.3506 1.84 20 0.3073 6.81 0.3506 1.14
(16)
(17)
(18) Voidage Balance (ACF/lb Ff):
0.3506+2(0.1907)+0.406=2(0.0973)+0.3506+0.406+2(0.0973)
(19) Voidage Percent Hydrocarbon Balance:
2(0.1907)100+(0.406)100=2(0.0973)X+0.3506X+0.406X+2(0.0973)X X=69.17 Vol.sup.% HCBN's
(20) Without the J flow and dry gas reactions a single theoretical backmixed stage, with a catalyst inlet density of 30 lb/ft.sup.3 and a 1.84 steam/hydrocarbon volume ratio, would have a much higher stripping efficiency and produce a significantly lower hydrocarbon mix. X=35.20 Vol.sup.% HCBN's
(21) The J bubble wake and freeboard entrainment not only effects the stripper efficiency; but, more importantly, the Wt.sup.% of riser products or underflow that's going into the stripper, where it will rapidly undergo the undesirable secondary reactions that were illustrated in Table 1. Table 7, shows that with a 30 lb/ft.sup.3 flowing density into the stripper and a 20 lb/ft.sup.2/sec J, the VSS underflow, stream 21 in
(22) Also, the dry gas production that is being generated from the soft coke and additional conversion reactions, now combines with the steam to produce a much higher superficial velocity of 2.16 Ft/sec in the upper section of the commercial stripper. STEAM VELOCITY 1.0 Ft/sec LIGHT GAS VELOCITY 1.16 Ft/sec COMBINED VELOCITY 2.16 Ft/sec
(23) In an actual commercial stripper, operating at these much higher combined superficial velocities in the upper stripper section, the bubbling bed model no longer applies. The upper bed has become very turbulent with an extensive freeboard region and high catalyst entrainment into the lower section of the VSS. If the system was to be designed and operated at even higher catalyst fluxes, like 30 lb/ft.sup.2/sec, and some are, the combined superficial velocity would be 3.24 ft/sec. As shown in
(24)
(25) Unfortunately, in the VSS reactor stripper system the J catalyst voids will always leave the stripper 23 via the freeboard 29 partially stripped but return 100% loaded with riser products as unwanted underflows 21 or 25.
(26) With the prevailing upper stripper velocities, J values and freeboard activity the VSS catalyst separation efficiency will probably drop significantly from 95% to say 90%. At 90% separation efficiency and a 20 lb/ft.sup.3 dipleg density, this would generate a 0.681 wt.sup.% ff hydrocarbon underflow in stream 25, bringing the total underflow in streams 21 and 25 to 9.141 wt.sup.% ff.
(27) Unlike the DCC, the VSS reactor vessel is essentially 100% full of relatively stagnant, high molecular weight, hydrocarbons with little or no steam. A perfect environment for coke formation.
(28) The present day high containment VSS stripper configuration shown in
(29) The design modifications can vary but most can be easily incorporated into existing VSS units and eliminate all of the issues discussed throughout this review. The three zone stripper modifications actually utilize the significant soft coke dry gas production to the reactor stripper's advantage.
(30)
(31)
(32)
(33)
(34) TABLE-US-00009 TABLE 8 VAPOR COMPOSITION IN RX VESSEL Wt % Vol % Rx Vol % In Rx Mol Wt FF Eff Vessel STRIPPING STEAM 18 1.40 7.77 59.64 CRACKED DRY GAS 9 0.41 4.44 34.08 HCBN UNDERFLOW 100 0.81 0.81 6.28
(35) With such a vapor composition and flow, vapor stream 8 now as the potential for a separate cyclone/condensation and recovery system: STEAM 59.6 Vol .sup.% H.sub.2/CH.sub.4 34.1 Vol .sup.% UNDERFLOW 6.3 Vol .sup.% TOTAL FLOW 13.028 Vol.sup.% Rx effluent
(36)
(37)
(38)
(39) Other embodiments of this invention are:
(40) If a high ZSM-5, petrochemical operation is desired, one should still use these design innovations but increase the steam flow 38 to zone one 31. Thereby, in a controlled fashion, increasing the J valve and lowering the LHSV in the VSS chamber and increasing the catalyst entrained to the primary cyclone system 5. This would effectively increase the catalytic severity and light olefin yields for a given reactor temperature. The cracked gas from the reactor vessel could still be recovered separately and sent to a combustion chamber in the regenerator to augment the enthalpy coke.
(41) The catalyst residence times in stripping zones 31 and 33 can be controlled via the reactor level 19 and the spent slide valve opening. The residence time in zone one 31 is now particularly significant in that it will set the degree of dry gas production from the soft coke which will also vary with, and be dependent on, reactor temperature. This improved RTD in the three zone stripper also leads to lower regenerator SO.sub.x levels via the increased conversion of soft coke sulfur to hydrogen sulfide followed by its higher removal efficiency from within the catalyst voidage going to the regenerator.
(42) In summary, it will be understood by those skilled in the art that the present invention shows how the addition of stripper baffles 35 or 41 and 43 and a modified, low catalyst flux, primary cyclone dipleg 37 can significantly reduce the underflow of reactor riser products 21, and 25 into an existing VSS stripper and reactor vessel. The addition of these baffles establishes three distinct stripping zones 31, 33 and 23 with no backmixing of catalyst between the zones. Zone 31 is a low velocity bubbling bed that uses the soft cokes light cracked products to displace and strip the VSS underflow 21. The soft coke reactions are completed in zone 33 prior to a conventional stripping in zone 23. This increased containment and multi zone stripping will produce higher desired product selectivities, improved stripping efficiency, lower regenerator SO.sub.x levels and a stripper vent gas 8, that continuously flows through the reactor vessel 27, that now has a significantly lower coke forming potential due to its low concentration of ethylene and higher molecular weight material, shown in table 8, that could, if desired, be recovered separately from the primary riser products. These stripper baffles could be used with or without the packing 40 at the freeboard zone 29 or the modified diplegs 37. The modified, low catalyst flux, primary cyclone dipleg 37 can be used independently on either a DCC or Rough Cut cyclone system to significantly reduce their underflow of reactor riser products 25, shown in Table 1, into the reactor vessel. The catalyst bed level in zone 31 can be further controlled to achieve the desired residence time and more conversion of the soft coke material to hydrogen and methane. A high ZSM-5, petrochemical type operation can now be established by controlling the J values, LHSV in the VSS chamber and increasing the catalyst to oil ratio in the vapor line to the primary cyclone. With a separate recovery and treatment, another option for the hydrogen and methane cracked gas 8 from the reactor vessel 27 could be in a combustion chamber in the regenerator to augment the enthalpy coke.