Power connection control system and method
10432019 ยท 2019-10-01
Assignee
Inventors
Cpc classification
Y04S20/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02B70/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J3/0073
ELECTRICITY
Y04S20/248
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S20/242
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02B90/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S20/12
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
H02J13/00
ELECTRICITY
Abstract
For each of consumers, a connection control apparatus is provided that includes an opening/closing device capable of connecting or disconnecting an electric power system and a consumer, that, when a power outage occurs in the electric power system, disconnects the electric power system and the consumer from each other by the opening/closing device at a command from an outage management apparatus or the like, and that connects the electric power system and the consumer to each other by the opening/closing device upon receiving a command from the outage management apparatus or the like at the time of restoration from the power outage. A power supply control apparatus supplies electric power from energy provision equipment to electrical appliances during a power outage in the electric power system.
Claims
1. An outage management apparatus comprising: a processing section that schedules time to establish linkage for every unit of energy provision equipment to an electric power system based on at least either a linkage operation time, which is received from the unit of energy provision equipment, representing a time period from connecting the unit of energy provision equipment to the electric power system to enable a linkage operation of the unit of energy provision equipment with the electric power system or a predicted amount of reverse power flow, which is received from the unit of energy provision equipment, representing an amount of electric power of a reverse power flow from the unit of energy provision equipment to the electric power system, at a time of restoration from a power outage; and a communication section that transmits a linkage command, for linking the unit of energy provision equipment to the electric power system, to each unit of energy provision equipment according to the scheduled time to establish linkage, wherein said processing section schedules a time to establish linkage for every unit of energy provision equipment so that an amount of adjustment of electric power generated by an adjusting power source of the electric power system is minimized.
2. The outage management apparatus according to claim 1, wherein said communication section, when at least either the linkage operation time or the predicted amount of reverse power flow, that are transmitted from the unit of energy provision equipment in response to the restoration of power from the power outage, is received, transmits the linkage command, which is a command to link the unit of energy provision equipment to the electric power system, to each unit of energy provision equipment.
3. The outage management apparatus according to claim 1, wherein said communication section transmits a parallel-off command which is a command to disconnect the unit of energy provision equipment from the electric power system based on at least either outage section information indicating a distribution section where the power outage is occurring or system consumer accommodation information indicating consumers accommodated in the electric power system.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
EXEMPLARY EMBODIMENT
(8) The present invention will be described with reference to the drawings.
(9)
(10) As shown in
(11) As shown in
(12) Electrical appliances 24 are any of various appliances that consumer 2 owns consuming electric power, including home appliances such as an electric light, an air conditioner, a television receiver, a refrigerator, a washing machine, a microwave oven, a rice cooker and a cleaner, office appliances such as a copying machine, a facsimile transmitter and a computer, and factory appliances such as machine tools and manufacturing machines.
(13) On each of electrical appliances 24 in the present exemplary embodiment, power detection means for measuring the power consumption of the appliance and information communication means for transmitting measured values from the power detection means to power supply control apparatus 22, for example, are mounted. As power detection means, a well-known electronic-type electric-power sensor with a current transformer and a voltage transformer, for example, can be used. As information communication means, Zigbee (trademark), WiFi (Wireless Fidelity), UWB (Ultra Wide Band), Bluetooth (trademark) or the like, for example, may be used in the case of using wireless communication, and Ethernet (trademark), PLC or the like may be used in the case of using wired communication. The power consumption of electrical appliances 24 may be measured, for example, with respect to each of receptacles or each molded-case circuit breaker instead of being measured with respect to each electrical appliance 24. In such a case, power detection means and information communication means may be provided that correspond to each receptacle or molded-case circuit breaker instead of being mounted on each electrical appliance 24. In a case where some of electrical appliances 24 are each an appliance called a smart home appliance, the appliance called a smart home appliance is ordinarily provided with power detection means and information communication means. In such a case, the power consumption of each smart home appliance may be transmitted from the smart home appliance at the request of power supply control apparatus 22 or periodically at predetermined intervals. For the power consumption of each electrical appliance 24, the rated power consumption of electrical appliance 24 may be used. The power detection means and the information communication means may be provided according to need. It is not necessarily required that the power detection means and the information communication means be provided on all electrical appliances 24 that consumer 2 owns.
(14) Energy provision equipment 23 is a renewable power source such as a well-known solar power generator or a wind power generator, a storage battery, or the like. Energy provision equipment 23 is not limited to a renewable power source or a storage battery. As energy provision equipment 23, a well-known distributed power source such as a fuel cell, a generator using fossil energy or a cogeneration system may be used.
(15) Energy provision equipment 23 is connected to the above-mentioned distribution panel through a generally well-known power conditioner (not illustrated) to be linked to the power wiring in consumer 2. The power conditioner is a device that enables linkage of electric power generated in the renewable power source or the distributed power source to the electric power system, and that controls the amount of power generation in the renewable power source or in the distributed power source as required. If energy provision equipment 23 is a storage battery, the power conditioner has a function to control charge and discharge of the storage battery. The power conditioner may only be connected to energy provision equipment 23 and may be provided in or outside of energy provision equipment 23.
(16) Energy provision equipment 23 in the present exemplary embodiment includes power measuring means for measuring the amount of output of electric power and information communication means for transmitting the measured value from the power measuring means to power supply control apparatus 22 and for communicating various sorts of information (including command signals or the like) to and from power supply control apparatus 22. The value of the amount of output of electric power from energy provision equipment 23 measured by the power measuring means is transmitted to power supply control apparatus 22. The information communication means transmits the measured value from the power measuring means to power supply control apparatus 22 at a command from power supply control apparatus 22 or periodically at predetermined intervals. The power measuring means and the information communication means may be provided in energy provision equipment 23 or, for example, in the above-described power conditioner. As power measuring means, a well-known electronic-type electric-power sensor with a current transformer and a voltage transformer, for example, may be used. As information communication means, Zigbee (trademark), WiFi (Wireless Fidelity), UWB (Ultra Wide Band), Bluetooth (trademark) or the like, for example, may be used in the case of using wireless communication, and Ethernet (trademark), PLC (Power Line Communication) or the like may be used in the case of using wired communication. While
(17) As shown in
(18) Control device 212 in connection control apparatus 21 can be realized as a well-known LSI or the like including a drive circuit for controlling the operations of a memory and opening/closing device 211, for example. As communication device 213, a device in accordance with a well-known communication protocol using the Internet or a privately used line may be used.
(19) Connection control apparatus 21 shown in
(20) While
(21) Control device 212 in connection control apparatus 21 sets opening/closing device 211 to closed (short) at a command from outage management apparatus 1 when power transmission is performed, and sets opening/closing device 211 to open (disconnection) when a power outage occurs in the electric power system. When opening/closing device 211 is closed (short), consumer 2 is connected to the electric power system. When opening/closing device 211 is open (disconnection), consumer 2 is disconnected from the electric power system. At the time of restoration from a power outage, however, when control device 212 is notified of outage restoration from outage management apparatus 1, it transfers outage restoration to power supply control apparatus 22 while maintaining opening/closing device 211 in the open state. Thereafter, when control device 212 receives from outage management apparatus 1 a linkage command, which is a command to establish linkage to the electric power system, it changes the opening/closing device 211 to closed.
(22) If, at the time of restoration from a power outage, a number of units of energy provision equipment 23, such as renewable power sources, are simultaneously linked to the electric power system, the quality of distributed electric power is reduced due to reverse power flows from the units of energy provision equipment 23 and there is a possibility of the system being, at worst, again driven into a power outage. In the arrangement in which, as described above, connection control apparatus 21 changes opening/closing device 211 to closed at the stage at which a linkage command is notified from outage management apparatus 1 managed by an electric power company or the like, timings of linkages of the units of energy provision equipment 23 held by the consumers to the electric power system can be controlled by outage management apparatus 1. That is, if outage management apparatus 1 performs control so that the units of energy provision equipment 23 are not simultaneously linked to the electric power system, degradation of the quality of distributed electric power due to reverse power flows from the units of energy provision equipment 23 at the time of restoration from a power outage can be limited.
(23) As shown in
(24) Storage section 222 holds information on the amount of electric power that can be output from energy provision equipment 23, the power consumption of each electrical appliance 24 and the degree of importance set for each electrical appliance 24 as described below.
(25) Communication section 223 enables communication of information to or from connection control apparatus 21, energy provision equipment 23 and electrical appliances 24. Communication section 223 may use, for example, Zigbee (trademark), WiFi (Wireless Fidelity), UWB (Ultra Wide Band), Bluetooth (trademark) or the like in the case of performing wireless communication of information, and may use Ethernet (trademark), PLC or the like in the case of performing wired communication of information.
(26) Processing section 221 manages supply of electric power from energy provision equipment 23 that consumer 2 owns to electrical appliances 24. For example, when consumer 2 is disconnected from the electric power system by connection control apparatus 21 at a command from outage management apparatus 1, processing section 221 makes energy provision equipment 23 enter an autonomous operation mode to supply electric power to electrical appliances 24. When outage restoration is notified from outage management apparatus 1 through connection control apparatus 21, processing section 221 stops the operation with energy provision equipment 23 in the autonomous operation mode and establishes linkage to the electric power system.
(27) Processing section 221 also performs powering on/off of each electrical appliance 24. Powering on/off of electrical appliances 24 may be controlled with respect to each electrical appliance 24 or may be controlled with respect to each receptacle, earth leakage circuit breaker or molded-case circuit breaker. For powering on/off of each electrical appliance 24, if electrical appliance 24 has a function to permit control from the outside, such a function may be used. If electrical appliance 24 has no such function, it may be controlled by providing an opening/closing switch on the power supply line. It is not necessary that processing section 221 perform powering on/off of all electrical appliances 24 that consumer 2 owns. Some of electrical appliances 24 may be exempted from the objects to be controlled.
(28) When a power outage occurs in the electric power system, processing section 221 obtains the value of the amount of electric power providable from energy provision equipment 23, such as a predicted amount of electric power that will be generated from a renewable power source or an amount of electricity stored in a storage battery, and also obtains the power consumption of electrical appliances 24. Then, based on the amount of electric power providable from energy provision equipment 23, the power consumption of electrical appliances 24 and on the degree of importance set for electrical appliances 24 in advance, processing section 221 starts supply of electric power from energy provision equipment 23 to electrical appliances 24 that has a higher degree of importance within a range in which electric power can be provided from energy provision equipment 23.
(29) When processing section 221 receives a predicted outage time period from outage management apparatus 1 through connection control apparatus 21, it maintains supply of electric power to electrical appliances 24 that has a higher degree of importance and that is operable according to the predicted outage time period, and stops supply of electric power to the other electrical appliances 24. A predicted amount of power generation, for example, with respect to a solar power generation unit, may be computed by considering the relationship between atmospheric phenomena data on a regional basis and the expected amount of power generation, provided from the manufacturer of the solar power generation unit, a loss due to installation conditions or the like, and other factors. If a public institution, a company or the like that provides a predicted amount of power generation exists, the predicted amount of power generation may be obtained from the institution, company or the like through a communication line in the Internet or the like. The arrangement may alternatively be such that a database is prepared by obtaining and storing the value of the amount of power generation from the renewable power source periodically at predetermined intervals through power supply control apparatus 22, and a predicted amount of power generation is determined based on the database. In such a case, an amount of power generation in a past time period matching or close to the weather condition in the predicted outage time period may be set as a predicted amount of power generation. An amount of electricity stored in a storage battery may be obtained from the power conditioner that controls charge and discharge of the storage battery. A predicted amount of power generation or an amount of stored electricity may be obtained when a predicted outage time period is received or may be periodically obtained and stored (updated) at intervals set in advance.
(30) Further, when processing section 221 in power supply control apparatus 22 receives outage restoration from outage management apparatus 1 through connection control apparatus 21 and stops the autonomous operation with energy provision equipment 23, it notifies outage management apparatus 1 of linkage ready through connection control apparatus 21, and notifies outage management apparatus 1 of linkage operation time indicating the time period from receiving the above-mentioned linkage command to actually enabling linkage of energy provision equipment 23 to the electric power system and predicted amount of reverse power flow indicating the amount of electric power of a reverse power flow to the electric power system that is expected to be caused at the time of linkage.
(31) The linkage operation time is a time period required for processing (including frequency adjustment and phase adjustment) from connecting energy provision equipment 23 to the electric power system to enabling the linked operation of energy provision equipment 23. The linkage operation time may be set in advance, for example, according to the characteristics of energy provision equipment 23 and the power conditioner. As the predicted amount of reverse power flow, a surplus amount of electric power (predicted value) computed from the predicted amount of power generated from the renewable power source at the time of linkage and a predicted total power consumption of electrical appliances 24 at the time of linkage may be used.
(32) In this case, when outage management apparatus 1 receives the linkage operation time and predicted amount of reverse power flow through connection control apparatus 21, it schedules a time to establish linkage to the electric power system for each consumer based on the linkage operation time and predicted amount of reverse power flow and transmits linkage command to connection control apparatus 21 of consumer 2 according to the scheduled time. At this time, outage management apparatus 1 may schedule the time in the linkage command to be transmitted to connection control apparatus 21 in each consumer 2 so that the adjustment load on the electric power system is minimized, for example, the amount of adjustment of power generation by an adjusting power source (a thermal power plant or the like) necessary for stabilizing the distributed voltage and the distributed frequency is minimized.
(33) Power supply control apparatus 22 shown in
(34) The information processor shown in
(35) Input device 200 is, for example, a keyboard or a pointing device such as a mouse, a touch pad or a touch panel.
(36) Output device 300 includes a display device such as a liquid crystal display and a printing device such as a printing machine.
(37) Processing device 100 includes CPU 110, main storage device 120 that temporarily holds information necessary for processing in CPU 110, recording medium 130 on which a program for making CPU 110 execute the processing according to the present invention is recorded, data accumulation device 140 that stores information, for example, on the amount of electric power providable from energy provision equipment 23, the power consumptions of electrical appliances 24 and the degrees of importance of electrical appliances 24, memory control interface section 150 that controls data transfer with respect to main storage device 120, recording medium 130 and data accumulation device 140, I/O interface section 160, which is a device for interfacing with input device 200 and output device 300, and communication control device 170 for communication of information to or from connection control apparatus 21 and electrical appliances 24 through the communication line. These components are connected through a bus 180.
(38) Processing device 100 executes processing in accordance with the program recorded on recording medium 130 to realize a power connection control method described in the description of the present exemplary embodiment. Recording medium 130 may be a magnetic disk, a semiconductor memory, an optical disk or any other recording medium. It is not necessary to provide data accumulation device 140 in processing device 100. Data accumulation device 140 may be an independent device. Functions of processing section 221 shown in
(39) As shown in
(40) To outage management apparatus 1, a distribution automation system (not illustrated) that controls, for example, the operation of the electric power system is connected through a communication line. When a power outage in the electric power system occurs, outage section information indicating a distribution section where the power outage is occurring and system consumer accommodation information indicating consumers 2 accommodated in the electric power system are provided from the distribution automation system through communication section 13. Outage section information and system consumer accommodation information provided from the distribution automation system are stored in storage section 12. The distribution automation system is described, for example, in Internet electric power lecture for university students, 4. Power distribution techniques, Distribution automation system (Internet URL: http://www.tepco.co.jp/kouza/haiden/haiden-j.html).
(41) When a power outage occurs in the electric power system, processing section 11 in outage management apparatus 1 obtains the current outage section information from the above-described distribution automation system, extracts consumers 2 accommodated in the outage section based on system consumer accommodation information provided from the distribution automation system, and transmits parallel-off command to connection control apparatus 21 for extracted consumers 2 through communication section 13 to make connection control apparatus 21 perform disconnection (paralleling off) from the electric power system. At this time, processing section 11 transmits information on an expected outage time period (predicted outage time period) to power supply control apparatus 22 through connection control apparatus 21. As predicted outage time period at this stage, a value from past actual restoration time periods corresponding to details of accidents prepared as a database by the electric power company, for example, may be used. Outage management apparatus 1 is arranged so that a predicted outage time period corresponding to the last restored state can be input to outage management apparatus 1 by the operator of outage management apparatus 1. When the predicted outage time period is updated by the operator, processing section 11 in outage management apparatus 1 transmits this predicted outage time period to connection control apparatuses 21 that consumer 2 owns in the outage section.
(42) When the electric power system is restored from the power outage that has occurred in the electric power system, processing section 11 in outage management apparatus 1 notifies connection control apparatuses 21 for consumers 2, to which the above-mentioned parallel-off command has been transmitted, of outage restoration indicating restoration from the outage, and thereafter transmits linkage command to establish linkage to the electric power system.
(43) Outage management apparatus 1 can be realized, for example, by means of the information processor (computer) shown in
(44) In this arrangement, information on the degrees of importance of electrical appliances 24 set by consumer 2 in advance is stored in power supply control apparatus 22. The degree of importance is set in a plurality of steps. The highest degree of importance may be set, for example, for a security system, disaster prevention equipment such as emergency lights, fire-fighting facilities, or the like. Other degrees of importance may be attached to electrical appliances 24 in order of decreasing priority with which consumer 2 wants to operate in the event of a power outage. Electrical appliances 24 to which the highest degree of importance is attached are assumed to include the above-described power supply control apparatus 22, connection control apparatus 21, and the power conditioner provided on energy provision equipment 23. It is not necessarily required that the degree of importance be attached to each electrical appliance 24. For example, the degree of importance may be set with respect to each receptacle or with respect to each earth leakage circuit breaker or molded-case circuit breaker, or may be set with respect to each of predetermined areas including a plurality of loads (electrical appliances) or each of predetermined places. For example, in a case where consumer 2 is formed of commercial facilities or hotel facilities having a plurality of floors, a higher degree of importance may be set for lights in an emergency stair case, emergency lights on common passageways on the floors, or the like.
(45) Power supply control apparatus 22 is assumed to collect, by predetermined timing or periodically, the values of the power consumptions of electrical appliances 24 and the amount of electric power providable from energy provision equipment 23, and store the collected values in storage section 222.
(46)
(47)
(48) As described above, when a power outage occurs in the electric power system, connection control apparatus 21 sets opening/closing device 211 to open at parallel-off command from outage management apparatus 1, for example. Connection control apparatus 21 also notifies power supply control apparatus 22 of the parallel-off state from the electric power system and transfers a predicted outage time period received from outage management apparatus 1 to power supply control apparatus 22. When connection control apparatus 21 receives an updated predicted outage time period from outage management apparatus 1 during the power outage, it transfers the predicted outage time period to power supply control apparatus 22.
(49) On the other hand, when connection control apparatus 21 is notified of outage restoration from outage management apparatus 1 at the time of restoration from the power outage, it transfers outage restoration to power supply control apparatus 22 while maintaining opening/closing device 211 in the open state. Thereafter, when linkage command is transmitted from outage management apparatus 1, connection control apparatus 21 sets opening/closing device 211 to closed and notifies power supply control apparatus 22 of linkage to the electric power system.
(50) As shown in
(51) When energy provision equipment 23 is in the autonomous operation mode, power supply control apparatus 22 first determines whether or not the outage restoration has been notified (step S3). When the outage restoration is notified, the process proceeds to processing in step S12.
(52) If the outage restoration has not been notified, power supply control apparatus 22 determines whether or not a predicted outage time period or an updated predicted outage time period has been notified (step S4). If no predicted outage time period or updated predicted outage time period has been notified, processing from step S3 is repeated.
(53) If a predicted outage time period or an updated predicted outage time period has been notified, power supply control apparatus 22 obtains information on the amount of electric power providable from energy provision equipment 23 in the predicted outage time period, e.g., a predicted amount of power generation from the renewable power source or an amount of electricity stored in the storage battery (step S5).
(54) Next, power supply control apparatus 22 compares the amount of electric power providable from energy provision equipment 23 in the predicted outage time period and the total amount of electric power to be consumed by the load or loads (electrical appliances 24) with the degree of importance [A] in the predicted outage time period to determine whether or not electrical appliances 24 with the degree of importance [A] can be operated within the predicted outage time period (step S6). If electrical appliances 24 with the degree of importance [A] can be operated, electric power is supplied to the same electrical appliances (step S7), and the process proceeds to processing in step S8.
(55) If electrical appliances 24 with the degree of importance [A] cannot be operated, power supply control apparatus 22 repeats processing from step S3 without executing supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of importance [A]. Even in the case where electrical appliances 24 with the degree of importance [A] cannot be operated through the predicted outage time period, they may be operated within a time period in which electric power can be supplied from energy provision equipment 23.
(56) In step S8, power supply control apparatus 22 compares the amount of electric power providable from energy provision equipment 23 in the predicted outage time period and the total amount of electric power to be consumed by electrical appliances 24 with the degrees of importance [A] and [B] in the predicted outage time period to determine whether or not electrical appliances 24 with the degrees of importance [A] and [B] can be operated within the predicted outage time period. If electrical appliances 24 with the degrees of importance [A] and [B] can be operated, electric power is supplied to the same electrical appliances (step S9), and the process proceeds to processing in step S10.
(57) If electrical appliances 24 with the degrees of importance [A] and [B] cannot be operated, power supply control apparatus 22 repeats processing from step S3 without executing supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of importance [B].
(58) In step S10, power supply control apparatus 22 compares the amount of electric power providable from energy provision equipment 23 in the predicted outage time period and the total amount of electric power to be consumed by electrical appliances 24 with the degrees of importance [A], [B], and [C] in the predicted outage time period to determine whether or not electrical appliances 24 with the degrees of importance [A], [B], and [C] can be operated within the predicted outage time period. If electrical appliances 24 with the degrees of importance [A], [B], and [C] can be operated, electric power is supplied to the same electrical appliances (step S11), and the process proceeds to processing in step S3.
(59) If electrical appliances 24 with the degrees of importance [A], [B], and [C] cannot be operated, power supply control apparatus 22 repeats processing from step S3 without executing supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of importance [C].
(60) When, in step S4, power supply control apparatus 22 receives an updated predicted outage time period from connection control apparatus 21, repeats processing in the above-described steps S5 to S11 to execute supply of electric power to electrical appliances 24 having higher degrees of importance operable within the predicted outage time period on the basis of the amount of electric power providable from energy provision equipment 23 at the current point in time.
(61) When, in step S3, outage restoration is notified from outage management apparatus 1 through connection control apparatus 21, power supply control apparatus 22 stops energy provision equipment 23 in the autonomous operation mode, notifies outage management apparatus 1 of linkage ready through connection control apparatus 21, and notifies outage management apparatus 1 of linkage operation time indicating the time period from receiving the above-mentioned linkage command to actually enabling linkage of energy provision equipment 23 to the electric power system and predicted amount of reverse power flow indicating the amount of electric power of a reverse power flow to the electric power system that is expected to be caused at the time of linkage (step S12).
(62) Thereafter, when linkage command is notified from outage management apparatus 1, power supply control apparatus 22 enters a linked operation mode (step S13) and thereafter repeats processing from step S1.
(63) In the present exemplary embodiment, when a power outage occurs in the electric power system, connection control apparatus 21 sets opening/closing device 211 to open at the parallel-off command from outage management apparatus 1 to disconnect energy provision equipment 23 from the electric power system. At the time of restoration from the power outage, connection control apparatus 21 sets opening/closing device 211 to closed at the linkage command from outage management apparatus 1 to link energy provision equipment 23 to the electric power system, thus enabling automatic switching between the autonomous operation and the linked operation of energy provision equipment 23. Thus, the autonomous operation of energy provision equipment 23 in a power outage is enabled while the need for a burdensome switching operation at the time of occurrence of the power outage and at the time of restoration from the power outage is eliminated.
(64) Power supply control apparatus 22 starts the autonomous operation of energy provision equipment 23 after disconnection from the electric power system made by connection control apparatus 21 in a power outage in the electric power system. When the electric power system is restored from the power outage, power supply control apparatus 22 links energy provision equipment 23 to the electric power system after establishing connection with the electric power system, so that no adverse influence on the electric power system is caused.
(65) Thus, adverse influence on the electric power system can be reduced while switching of the autonomous operation function with energy provision equipment 23 performed by consumer 2 at the time of occurrence of a power outage and at the time of restoration from the power outage is facilitated.
(66) Further, outage management apparatus 1 can schedule, at the time of restoration from the power outage, a time for a linkage command to be transmitted to connection control apparatus 21 for each consumer 2 based on a linkage operation time and a predicted amount of reverse power flow transmitted from power supply control apparatus 22 so that the load on the electric power system is minimized, for example, the amount of adjustment of power generation by an adjusting power source (a thermal power plant or the like) necessary for stabilizing the distributed voltage and the distributed frequency is minimized, thus enabling linkage of energy provision equipment 23 for each consumer 2 while reducing the adjustment load on the electric power system.
(67) The present invention has been described by referring to the exemplary embodiment thereof. However, the present invention is not limited to the above-described exemplary embodiment. Various changes and modifications understandable by those skilled in the art can be made in the configuration and details of the present invention within the scope of the present invention.
(68) This application is based upon and claims the benefit of priority from the prior Japanese Patent Application No. 2011-209371, field on Sep. 26, 2011; the entire contents of which are incorporated therein by reference.