The present invention relates to a method for operating a wind power plant in a wake situation, said wind power plant being connected to a power grid, the method comprising the steps of operating the wind power plant in a predetermined power mode of operation, terminating said predetermined power mode of operation, and increasing power generation of the wind power plant to a power level that exceeds an optimized wake power level of the wind power plant, and injecting the increased amount of power into the power grid as a power boost. Thus, the present invention is capable of generating a power boost to an associated power grid, said power boost exceeding the power level normally being available in a wake situation. The present invention further relates to a system for carrying out the method.

Claims

1. A method for operating a wind power plant connected to a power grid, the method implemented with a power plant controller programmed with memory-stored instructions which, when executed by the controller, perform the method, comprising: collectively operating a plurality of wind turbine generators (WTGs) of the wind power plant in a predetermined power mode of operation, wherein under current wind conditions at the wind power plant at least a first downwind WTG of the plurality of WTGs is within a wake of at least a first upwind WTG of the plurality of WTGs; and responsive to a predetermined event: communicating control signals to one or more WTGs of the plurality of WTGs, wherein a power output level of at least the first upwind WTG is increased beyond a corresponding power output level in the predetermined power mode of operation, and wherein a power output level that is output to the power grid by the wind power plant exceeds an optimized wake power level representing a maximum steady-state output power of the wind power plant under the current wind conditions.

2. The method according to claim 1, wherein the predetermined power mode of operation comprises a de-rated power mode of operation.

3. The method according to claim 2, wherein the wind power plant, in the de-rated power mode of operation, generates power at one of: below 95%, below 90%, below 80%, below 70%, below 60%, and below 50% of a rated power level of the wind power plant.

4. The method according to claim 1, wherein the predetermined power mode of operation comprises an optimized wake mode of operation where the wind power plant generates the optimized wake power level.

5. The method according to claim 4, wherein the optimized wake mode of operation is based on power calculations from at least the first upwind WTG and at least the first downwind WTG.

6. The method according to claim 1, wherein the increase to the power output level of at least the first upwind WTG comprises an increase in active power.

7. The method according to claim 1, wherein the predetermined event comprises detecting a decreased power grid frequency.

8. The method according to claim 1, further comprising: estimating a size of the increase to the power output level of at least the first upwind WTG.

9. The method of claim 1, wherein the power output level that is output to the power grid by the wind power plant is increased by: increasing the power output level of the first upwind WTG beyond the corresponding power output level in the predetermined power mode of operation; and prior to experiencing wake effects at the first downwind WTG caused by the increase to the power output level of the first upwind WTG, maintaining or increasing a power output level of the first downwind WTG.

10. The method of claim 9, wherein, after experiencing the wake effects at the first downwind WTG, the power output level that is output to the power grid by the wind power plant settles at a steady-state output power level that is less than an output power level of the wind power plant in the predetermined power mode of operation.

11. The method of claim 10, further comprising: when the wind power plant is settled at the steady-state output power level, pitching rotor blades of the first upwind WTG to reduce the wake affecting the first downwind WTG, wherein the power output level of the wind power plant is temporarily reduced to less than the steady-state output power level.

12. The method of claim 11, wherein beginning the pitching of the rotor blades of the first upwind WTG is controlled according to a predefined parameter.

13. The method of claim 11, wherein responsive to reducing the wake affecting the first downwind WTG, the power output level of the wind power plant increases to the output power level in the predetermined power mode of operation.

14. The method of claim 13, wherein the at least a first downwind WTG comprises a second downwind WTG, the method further comprising: pitching rotor blades of the first downwind WTG and of the second downwind WTG at the same time to increase the power output levels of the first downwind WTG and the second WTG.

15. A wind power plant comprising: a plurality of wind turbine generators (WTGs) connected to a power grid; and a power plant controller configured to: collectively operate the plurality of WTGs in a predetermined power mode of operation, wherein under current wind conditions at the wind power plant, at least a first downwind WTG of the plurality of WTGs is within a wake of at least a first upwind WTG of the plurality of WTGs; and responsive to a predetermined event: communicate control signals to one or more WTGs of the plurality of WTGs, wherein a power output level of at least the first upwind WTG is increased beyond a corresponding power output level in the predetermined power mode of operation, and wherein a power output level that is output to the power grid by of the wind power plant exceeds an optimized wake power level representing a maximum steady-state output power of the wind power plant under the current wind conditions.

16. The wind power plant according to claim 15, further comprising: a sensor configured to measure a frequency of the power grid.

17. The wind power plant according to claim 15, wherein the predetermined power mode of operation comprises a de-rated power mode of operation.

18. The wind power plant according to claim 15, wherein the predetermined power mode of operation comprises an optimized wake mode of operation where the wind power plant generates the optimized wake power level.

19. A method for operating a wind power plant connected to a power grid, the method implemented with a power plant controller programmed with memory-stored instructions which, when executed by the controller, perform the method, comprising: estimating a size of an increased amount of power to be injected into the power grid as a power boost; collectively operating a plurality of wind turbine generators (WTGs) of the wind power plant in an optimized wake mode of operation corresponding to an optimized wake power level of the wind power plant, wherein under current wind conditions at the wind power plant at least a first downwind WTG of the plurality of WTGs is within a wake of at least a first upwind WTG of the plurality of WTGs, wherein the optimized wake power level represents a maximum steady-state output power of the wind power plant under the current wind conditions; and responsive to an input command signal, switching operation of the wind power plant from the optimized wake mode of operation to a boosted power mode of operation, wherein switching operation of the wind power plant comprises communicating control signals to one or more WTGs of the plurality of WTGs to increase power levels of the one or more WTGs, wherein a power output level of at least the first upwind WTG is increased beyond a corresponding power output level in the optimized wake mode of operation, and wherein, after increasing the power levels of the one or more WTGs, a power generation of the wind power plant is increased to a power level that exceeds the optimized wake power level.

20. The method according to claim 19, further comprising: collectively operating the plurality of WTGs of the wind power plant at a sub-optimal power generation level relative to the optimized wake mode of operation; and entering a recovery phase by pitching respective blades of one or more WTGs of the plurality of WTGs, wherein the recovery phase is characterized by increasing power generation of the wind power plant relative to the sub-optimal power generation level.

Description

BRIEF DESCRIPTION OF THE DRAWINGS

(1) The present invention will now be described in further details with reference to the accompanying figures, wherein

(2) FIG. 1 shows a schematic of power injection sequence,

(3) FIG. 2 shows examples of power levels for a power injection sequence,

(4) FIG. 3 shows power injection levels (relative to rated power) for different wind speeds,

(5) FIG. 4 shows power production levels for up-wind and down-wind wind turbine generators, and

(6) FIG. 5 shows a comparison between traditional curtailment and curtailment when the present invention is applied.

(7) While the invention is susceptible to various modifications and alternative forms, specific embodiments have been shown by way of examples in the drawings and will be described in detail herein. It should be understood, however, that the invention is not intended to be limited to the particular forms disclosed. Rather, the invention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

DETAILED DESCRIPTION OF THE INVENTION

(8) Generally, the present invention is applicable in situations where an up-wind wind turbine generator may reduce the wind speed for one or more down-wind wind turbine generators, i.e. in a wake situation.

(9) The present invention is generally applicable in the following two wake-based scenarios: 1. Optimized wake mode of operation (maximum output power at the actual wind speed) 2. Curtailed mode of operation (de-rated output power in wake situation)

(10) The present invention aims at providing a primary power reserve by switching an optimized wake mode of operation off, or alternatively by terminating a curtailed mode of operation.

(11) The power injection according to the present invention is intended for situations where the wind direction causes wake losses. If no wind turbine generators are in the wake of other wind turbine generators, the present invention offers only minor advantages. Moreover, power injection according to the present invention is primarily intended for partial-load wind conditions as wake optimization is most effective at lower wind speeds.

(12) The present invention is based on the following understanding of wind propagation within wind power plants. A wind power plant comprises a plurality of wind turbine generators. Imagine that some or all of the wind turbine generators of a wind power plant are operating with reduced efficiency according to a given wake optimization method. Each wind turbine generator will then experience that it could increase its power production simply by increasing the local efficiency. This is certainly true, at least for a short period of time. When an up-wind wind turbine generator increases its efficiency the wind speed behind it decreases. However, as the decreased wind speed propagates with the wind, the next wind turbine generator (down-wind wind turbine generator) will not experience this decrease immediately. Therefore, there will be a short period of time where the generated power from the wind power plant will actually increase and thus form a power boost. However, as the wake propagates through the wind power plant the total amount of generated power will settle at a power level that is lower than the original power level.

(13) The present invention relies on the above-mentioned capability to make a power boost available, and use this power boost as a primary power reserve. In order to utilize the boosting for primary reserve knowledge of the boosting level is needed. That is, the owner of the wind power plant must be able to supply an accurate estimate of the level of additional power which can be temporally supplied in case of grid problems. Also, it could be beneficial to know the power levels which may be obtained when the wakes have fully propagated and steady-state operation is regained.

(14) The power boosting capacity is dependent on the single turbine generator's capability to maximize the local power according to the wind scenario it sees at the time of boosting. The power boosting is only obtained in the time interval from boost is enabled until the wakes have propagated. Therefore, the wake interaction has no effect on the boosting capability, assuming the boosting is initiated from a steady wake situation. Hence, the boosting capability can be estimated from local turbine variables alone.

(15) For instance, it can be found from measuring the wind speed and make a table look-up in a power curve. Alternatively, the boosting estimate can be found by evaluating the basic power equation

(16) P = 1 2 AC p V 3
where P is the power estimate, p is the air density, A is the area swept by the rotor, Cp is the best obtainable efficiency for the given circumstances, and V is the wind speed. It should be noted that other estimation methods could also be used, for instance, involving pitch and rotor-speed dependent Cp, and/or expressions involving the dynamics of the rotor system.

(17) The estimation of the power levels reached after the wakes have propagated and settled require more detailed models involving the wake themselves. Simple easy-to-execute examples of such models could be the so-called N. O. Jensen model or the S. Fransen model. However, any suitable model can be used. The models should take into account the fact that the local wind speed at the wind turbine generators depends on the power production of the up-wind turbine generators.

(18) The estimated power levels may be used as follows:

Example #1: Wake Optimized Operation

(19) Assume a wind power plant is operating according to some (here unspecified) wake optimized method. That is, the target is to make the wind power plant produce as much power as possible. Any boosting capacity can then be used to provide a primary reserve. In this scenario the local boosting estimate is used to indicate the level of power available for primary reserve. The owner can use this estimate to trade/negotiate a payment for the reserve from the TSO.

(20) On the contrary without the boosting estimate, the owner would not be able to know the boosting level and could not sell the primary reserve.

Example #2: Curtailed Mode of Operation

(21) Assume the wind power plant can produce as much power as it can (and get paid accordingly) but have to provide a specific amount of primary reserve (for instance 5 MW). This can be done in two ways: 1): Slowly reduce the power production while monitoring the local boosting estimate. Adjust the power production until the difference between the current production and the boosting estimate is equal to the required level of primary reserve. 2): Based on the model from the stable power level and the equation for the estimated local boosting level the combination of power production and boosting level, which gives the required level of primary reserve, is determined. This could be implemented as a search algorithm or as a look-up table.

(22) In either way, by using the above-mentioned power estimates the owner is able to run the power plant at a higher power level while still providing the required primary reserve. The higher pre-boost equals higher revenue for the owner. Without the estimate it would not be possible for the owner to know to what level the wind power plant should be curtailed in order to utilize the boosting capability and the wind power plant would have to be curtailed by the full primary reserve level.

(23) Reference is now made to FIG. 1 where the scenario of a wake-optimized operation will be explained in detail. In the pre-injection period (1) all wind turbine generators produce power according to a wake-optimized operation. At a given time, the wind power plant is being requested to inject power into the power grid. All wind turbine generators pitch their rotor blades to obtain the most power capture from the wind. As a result, the power production of all wind turbine generators increase relative fast (2) and stay constant for a short while (3). This increase in power production will cause a lower wind speed behind the up-wind wind turbine generators, and this lower wind speed will travel with the wind to down-wind wind turbine generators. Thus, after a while, a down-wind wind turbine generator will experience the wind speed decrease, and even if the rotor blades are pitched to extract as much power as possible the power production will decline (4). After all wind speeds have settled, the wind power plant will deliver a new steady-state power production (5) which is lower than the power production prior to the power injection (1).

(24) At some stage, the power plant owner would like to get the full potential out of the wind power plant and thus choose to bring the power plant back to an optimized wake mode of operation. This is done by pitching the rotor blades out of the wind to let wind through to the down-wind wind turbine generators. As this is non-optimal seen from the local wind turbine generator perspective, the power generated by the individual wind turbine generators will decreases further (6) and cause a drop in the overall power generation (7). As the wind speed at the down-wind wind turbine generators starts to increase (8), the overall plant power returns to its original level, and finally, the full power production has been recovered and the wind power plant is back to its optimal power production (9).

(25) The power injection and recovery periods are both initiated by control means, i.e. it is a deliberate choice to initiate both of them. The decline (4) in power in the injection period is driven by the propagation of wind and is therefore not to be controlled. Likewise, the power increase (8) during the recovery period is uncontrolled.

(26) The recovery period does not have to be as dramatic as illustrated in FIG. 1. The wake optimized operation could be put back graduallyeither by pitching slowly on all wind turbine generators or by changing one wind turbine generator at a time. However, the energy lost will be approximately the same as it will take longer time to regain optimality.

(27) The length of the post-injection period (5) is therefore a design parameter. To gain most production for the owner it should be conducted immediately after the injection period. However, as the power injection is initiated to compensate a general lack of power in the grid, the grid would not like a sudden power drop from the wind farm. Therefore, the recovery period would be initiated after the stability of the grid has been regained.

(28) FIG. 1 further indicated zones A, B and C. In zones A and C the wind power plant is operated in accordance with an optimized wake mode, whereas in zone B all of the wind turbine generators are allowed to produce maximum power.

(29) The principle underlying the present invention is by no means bound to any specific wake optimization scheme. The present invention only assumes that the individual wind turbine generators operate with reduced efficiency compared to their respective rated power levels.

(30) As previously mentioned advantages could also be gained if no optimized wake mode of operation is applied. Consider the situation where a wind power plant has de-rated a first wind turbine generator in order to curtail the overall power plant power level. If a power injection to the power grid is then requested changing the first wind turbine generator to optimal power production would increase the power production of this wind turbine generator very fast, and the power from the wind power plant would increase to a level above normally available power. As the wake propagates down the row of wind turbine generators, the power from the wind power plant will decrease to a steady-state level corresponding to 100% of available power.

(31) In the following the optimized wake mode of operation and the curtailed mode of operation will be explained in further details.

Example #1: Wake Optimized Operation

(32) To show the potential of the present invention in an optimized wake scenario, power levels of a real wind power plant have been investigated. The wind power plant in question consists of five wind turbine generators positioned along a straight line with a distance corresponding to four rotor diameters.

(33) Referring now to FIG. 2 a power injection sequence is illustrated. As seen the injection sequence has the same overall shape as depicted in FIG. 1. Thus, the injection sequence comprises a pre-injection level, an injection level, a post-injection level, a recovery level and a back to normal level.

(34) It can be seen in FIG. 2 that at the selected ambient wind speed the wind power plant is capable of injecting 500 kW (injection level) into the power grid as a power boost. This corresponds to around 9% of the actual power production. Typically, active power boosts of between 5% and 10% of the rated power plant level are achievable.

(35) FIG. 3 shows the power injection capacity (relative to rated power) of a real wind power plant for various wind speeds (from 4-20 m/s). As seen, power injection is only available for partial-load wind. Moreover, FIG. 3 shows that a power injection peak of around 6% of the rated power plant level should be achievable. In the simulation shown in FIG. 3 the power injection peak is reached at a wind speed of around 10 m/s.

(36) FIG. 4 shows typical power levels of the individual wind turbine generators of a wind power plant in the following four modes of operation: 1. Pre-boost power level (left bar), 2. Boosted power level (second left bar), 3. Post-boost power level (second right bar), and 4. Recovered power level (right bar).

(37) In FIG. 4 the generated power level of the up-wind wind turbine generator is shown to the left (left group of columns) whereas the generated power levels of the remaining four down-wind wind turbine generators are depicted to the right thereof as four groups of columns.

(38) As seen in FIG. 4 the power boost is primarily generated by the up-wind wind turbine generator and the three down-wind wind turbine generators closest to it. The fourth down-wind wind turbine generator does not contribute significantly to the power boost.

Example #2: Curtailed Mode of Operation

(39) As stated previously the present invention is also applicable for wind power plants not being operated in an optimized wake mode of operation. Imagine the scenario where a wind power plant is requested to provide a power injection capacity of for example 3 MW. Applying traditional methods, the wind power plant thus needs to be curtailed 3 MW during continuous operation. That is, the wind power plant has to operate 3 MW below what the actual wind allows. According to the present invention the wind power plant need less curtailment. For example, in a wake situation a 1 MW curtailment can provide a 2 MW boosting. In this case, the wind power plant produces additional 2 MW in continuous operation giving the owner more revenue.

(40) FIG. 5 shows a relationship between the level of curtailment and the power injection capacity using traditional techniques (dashed line) and the present invention (solid line). For instance, it shows that in order to provide a 3 MW power injection capacity the wind power plant has to curtail only 1 MW of power if the principle underlying the present invention is applied. Thus, by using the present invention, the owner can produce 2 MW more power during the curtailment period. Using traditional techniques a 1:1 relationship applies between the power injection capacity and the curtailment level.