Method for operating a distribution point unit, respective distribution point unit and CPE device
10397018 ยท 2019-08-27
Assignee
Inventors
Cpc classification
H04L12/40045
ELECTRICITY
H04M11/062
ELECTRICITY
International classification
H04L12/28
ELECTRICITY
H04M11/06
ELECTRICITY
Abstract
The method for operating a distribution point unit comprising a selection switch (17) and a monitor and control logic (15) for providing a first and a second service, comprises the steps of: receiving a switching signal powering the monitor and control logic (68), and switching the selection switch from the first service to the second service by the monitor and control logic (70), after receiving the switching signal. The selection switch has a default state, in which the first service is provided. The first service is in particular an xDSL and/or a PSTN service, and the second service is a G.fast service.
Claims
1. A method for operating a distribution point unit, wherein said distribution point unit comprises a selection circuit comprising monitor and control logic and a selection switch for providing a first service or a second service to at least a customer premises equipment, the selection switch having a default state, in which the first service is provided, and a second state, in which the second service is provided, said method comprising receiving, from said customer premises equipment, a switching signal, the switching signal powering the selection circuit; and the monitor and control logic in the second circuit, when detecting the switching signal, switching the selection switch from the default state to the second state, to provide the second service to the customer premises equipment.
2. The method of claim 1, further comprising the distribution point unit receiving, via the selection switch, a supply of power from the customer premises equipment after the selection switch is switched to the second state; and a logic circuit in the distribution point unit causing the selection switch to remain in the second state and to provide the second service to the customer premises equipment, as long as the supply of power from the customer premises equipment is received.
3. The method of claim 1, comprising applying the switching signal for a time interval t1 to power the monitor and control logic during the time interval t1.
4. The method of claim 1, wherein the switching signal is a DC-free switching signal not including a direct current voltage, for example at least one of a pulse signal and an alternating current.
5. The method of claim 1, wherein the first service Is a Digital Subscriber Line and/or a Public Switched Telephone Network service, and the second service is a G.fast service.
6. A distribution point unit, wherein the distribution point unit comprises a selection circuit comprising a monitor and control logic and a selection switch providing a first service or a second service to at least a customer premises equipment, the selection switch being configured to have a default state, in which the first service is provided, and a second state, in which the second service is provided, the monitor and control logic being configured to receive, from said customer premises equipment, a switching signal, the switching signal powering the selection circuit, the monitor and control logic in the selection circuit, when powered by the selection signal, causing the selection switch to switch from the default state to the second state, to provide the second service to the customer premises equipment.
7. The distribution point unit of claim 6, comprising: a power supply unit configured to provide power to the distribution point unit, the power supply unit being coupled to the selection switch to receive, via the selection switch, a supply of power from customer premises equipment after the selection switch is switched to the second state; and a logic circuit configured to cause the selection switch to remain in the second state and to provide the second service to the customer premises equipment, as long as the supply of the power from the customer premises equipment is received.
8. The distribution point unit of claim 6, wherein the first service is a Digital Subscriber Line and/or a Public Switched Telephone Network service, and the second service is a G fast service.
9. A customer premises equipment device, comprising a power supply for providing a supply of power to a distribution point unit over a copper line, wherein the device comprises: a circuit configured to transmit, to the distribution point unit and over the copper line, a switching signal for powering a selection circuit in the distribution point unit, which switching signal, when received by the distribution point unit, causes a monitor and control logic in the selection circuit of the distribution point unit to switch a selection switch in the selection circuit to switch from a default state, in which a first service is provided to the customer premises equipment, to a second state, in which a second service is provided to the customer premises equipment; the power supply being configured to provide the supply of power to the distribution point unit over the copper line, after the switching signal is switched off by the circuit; the first service being a Digital Subscriber Line service and/or a Public Switched Telephone Network service and the second service being a high-speed copper wire service, the customer premises equipment device further comprising: a service switch connected to the copper line and a service switch drive logic for selecting the Public Switched Telephone Network service; and a broadband analog front end coupled to the copper line for providing the Digital Subscriber Line service and the high-speed copper wire service, the service switch drive logic being configured to disconnect the Public Switched Telephone Network service and to disable the Digital Subscriber Line service, in case the high-speed copper wire service is enabled.
10. The customer premises equipment device of claim 9, wherein the customer premises equipment device is further configured to detect whether a distribution point unit is connected to the customer premises equipment device, and wherein the customer premises equipment device enables the first service, if it is determined that a distribution point unit is not connected.
11. A device configured to be connected via a copper line to a distribution point unit for a switchable connection to either a copper line connection or to a fiber optic connection, comprising: a circuit configured to transmit, to the distribution point unit and over the copper line, a pulse signal for temporarily powering a selection circuit in the distribution point unit and to cause the selection circuit to switch from a first state, in which the distribution point unit is connected to the copper line connection for providing a Public Switched Telephone Service and a Digital Subscriber Line Service over the copper line connection of the distribution point and over the copper line between the distribution point unit and the device, to a second state in which the distribution point unit is connected to the fiber optic connection for providing a high-speed service to the device over the fiber optic connection of the distribution point unit and over the copper line between the distribution point unit and the device; a power supply configured to provide a supply of power to the distribution point unit over the copper line between the distribution point unit and the device, when the selection circuit is switched to the second state by the transmission of the pulse signal, the selection circuit being kept in the second state when the power is supplied to the distribution point unit by the power supply in the device.
12. The device according to claim 11, wherein the high-speed service is a G.fast service.
13. The device according to claim 11, wherein the device is a gateway.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Preferred embodiments of the invention are explained in more detail below by way of example with reference to schematic drawings, which show:
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
(8) In the following description, example methods for powering a DPU by at least one CPE device are described. The DPU is designed for providing a first and a second service, the first service being for example an xDSL and/or a PSTN service, and the second service being a G.fast service. For purposes of explanation, various specific details are set forth in order to provide a thorough understanding of preferred embodiments. It will be evident, however, to one skilled in the art that the present invention may be practiced without these specific details.
(9) The DPU includes in a preferred embodiment a controller, e.g. a microprocessor, a memory for the operation of the DPU and in which an operating system is stored, a power supply for receiving supply power from a CPE device and for powering the DPU, a port for an optical fiber connection, e.g. with a central office, and two ports for copper lines, in particular for copper wire pairs. The DPU may include in particular a multitude of G.fast channels for providing the G.fast service to a multitude of CPE devices located in a the homes of customers.
(10) The CPE device includes in a preferred embodiment a controller, e.g. a microprocessor, a memory for the operation of the CPE device and in which an operating system is stored, a power supply for powering the DPU and a port for a copper line, in particular a port for a copper wire pair for an xDSL connection and a G.fast connection. A CPE device of this kind is for example an access gateway, a residential gateway, a business gateway, a router or an Internet switch.
(11) A preferred embodiment of a system comprising a DPU 10 and a CPE device 20, e.g. an access gateway 20 (AGW), is depicted in
(12) The selection circuit 11 includes a selection switch 17, for example a dual 2-to-1 port switch, for connecting the xDSL and PTSN services or the G.fast service with the AGW 20. The selection switch 17 has to be robust enough to handle the safety requirements due to the external copper line 6 and has to be designed such that its characteristics do not interfere with the services it can switch.
(13) The AGW 20 has an AGW drive logic 21 to manage the selection of the services via the selection switch 17. The switching is performed in a preferred embodiment by sending pulse signals by the AGW drive logic 21, and via these pulse signals the selection circuit 11 is temporarily powered. The selection circuit 11 is adapted such that it only reacts to the pulse signals sent out by the AGW drive logic 21, and the selection circuit 11 does not react to or cause interference with the xDSL and PSTN services. Before a selection, the selection switch 17 is in a default state, in which the xDSL and PSTN services are connected to the AGW 20. The AGW 20 is therefore enabled for xDSL and PTSN services when it is connected the first time with the DPU 10.
(14) In case the G.fast service is made available by a service provider to a user of the AGW 20, the AGW 20 automatically sets the DPU 10 to select the G.fast service by means of the AGW drive logic 21 of the AGW 20. After the pulse signals have been sent to the DPU 10 for selecting the G.fast service, a reverse powering of the DPU 10 is enabled via the AGW 20 for the operation of the G.fast service. The selection of the G.fast service is therefore performed such that no interference occurs with the xDSL and PSTN services. In particular, the reverse powering of the DPU 10 is not enabled before the selection circuit 11 has been switched to the G.fast service. The pulse signals for selecting the G.fast service are driven only before the G.fast service is activated, and will not be on the copper line 7 during activation of the G.fast service.
(15) Relevant circuits of the DPU 10 are depicted in more detail in
(16) When the xDSL and PSTN services are in operation and the monitor and control logic 15 detects switching pulses of the AGW drive logic 21 on the copper line 7, it switches the selection switch 17 via the switch drive logic 16 to the broadband analog front end 14 and to the DPU power supply unit 13 for enabling the G.fast service. The DPU 10 includes further a DPU drive logic 12 being coupled with the switch drive logic 16, via which the selection switch 17 is kept in the G.fast selection mode, when a reverse supply power is provided by the AGW 20 and the DPU control pulses are switched off by the AGW 20.
(17) When the reverse supply power for the DPU 10 is switched off during operation of the G.fast service, the DPU 10 switches automatically to the xDSL and PSTN services. This can be provided for example by using a selection switch 17, which switches automatically to the xDSL and PSTN services in a powerless state.
(18) Relevant parts of the AGW 20 are depicted in more detail in
(19) For the G.fast service, the AGW 20 includes a reverse power supply 22 for providing the reverse supply power to the DPU 10. The reverse power supply 22 and the AGW drive logic 21 are both coupled with the copper line 7. The reverse supply power is in particular a DC supply power.
(20) The operation of the DPU 10 and the AGW 20 is illustrated in a flow chart depicted in
(21) In case no xDSL or PSTN service is detected by the AGW 20, the CPE 20 starts a procedure to detect whether there is a DPU connected to the AGW 20. The AGW 20 switches the service switch 26 to disconnect the low pass filter 25 from the copper line 7. The AGW drive logic 21 then generates signal pulses being applied to the copper line 7 to power up a DPU, e.g. DPU 10. In case the DPU 10 is available, the signal pulses provide sufficient power to operate the monitor and control logic 15 and to set the selection switch 17 to the G.fast service via the switch drive logic 16. The signal pulses are applied for a time interval t1.
(22) After t1, the signal pulses of the AGW drive logic 21 are switched off, and the monitor and control logic 15 is operating at least for a time interval t2, during which the monitor and control logic 15 switches the selection switch 17 via the switch drive logic 16 to connect the analog front end 14 and the DPU power supply unit 13 with the copper line 7, step 70.
(23) In a further step 72, the AGW 20 switches on the reverse power supply 22 after a time t3 for providing power via the copper line 7 to the DPU 10. The reverse power supply 22 then checks whether there is a DPU available, step 74. If the DPU 10 is detected within a time t2 minus t4, the reverse power supply 22 remains switched on.
(24) The DPU power supply 13 then starts up to provide power for the operation of the DPU 10, and the DPU drive logic 12 triggers the switch drive logic 16 to keep the connection of the copper line 7 with the DPU power supply 13 and the analog front end 14 via the selection circuit 11, step 76. The DPU 10 is then enabled for the G.fast service.
(25) In case the AGW 20 does not detect the DPU 10, the reverse power supply 22 is switched off after t2, also at the end of t2 the selection circuit 15 no longer has power, causing the switch 17 to revert to the xDSL and PSTN services. The procedure then continues with step 62, line 78. If xDSL and PSTN services are detected, these services are then provided to the customer, step 66.
(26) When the AGW 20 is switched off at any time during the G.fast operation of the DPU 10, the DPU 10, respectively the G.fast channel of the DPU 10 associated with the AGW 20, switches off accordingly, because the reverse power from the AGW 20 is interrupted. The procedure returns then to step 60, via line 80, in which the copper line 7 is connected to the copper line 6 for providing xDSL and PSTN services. The procedure returns also to step 60, in case the AGW 20 is switched off after step 66.
(27) With the DPU 10, therefore existing copper lines can be reused to offer both legacy services, xDSL and PTSN services, and a G.fast service to a customer. The legacy services and the new service can be provided with the same AGW 20 and a transparent migration between the new service and the legacy services is possible. A POTS service for the telephone 3 may be maintained, until the migration to the G.fast service is enabled. In case the G.fast service is enabled, a Voice-over-IP (VoIP) service can be provided without reconnecting the port of the telephone 3, or changing the handset. An early installation of a DPU in the field is possible by only including the selection switch 17: a G.fast service card including the modules 12-16 can be added later to the DPU. The operation of the DPU with the AGW 20 can be provided always without affecting another customer being connected to the DPU.
(28) Also other embodiments may be utilized by one skilled in the art without departing from the scope of the present disclosure. The disclosure resides therefore in the claims herein after appended.