Hydrocarbon production field layout
11542790 ยท 2023-01-03
Assignee
Inventors
Cpc classification
F17D3/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E21B23/08
FIXED CONSTRUCTIONS
E21B43/00
FIXED CONSTRUCTIONS
F16L2101/30
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L55/46
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B08B9/055
PERFORMING OPERATIONS; TRANSPORTING
International classification
E21B43/017
FIXED CONSTRUCTIONS
Abstract
A hydrocarbon production field layout comprising a first pipeline (1) with a first inner diameter and a second pipeline (2) with the first inner diameter. A cut off valve (20) with an inner bore with the first diameter, is arranged in a connecting arrangement between an end of the first pipeline (1) and an end of the second pipeline (2). At least one dual main header manifold (3) is in fluid connection with at least one hydrocarbon well (8, 9). A first branch pipe (16, 18) with a first valve (5, 6) is branched off from the first pipeline (1) and a second branch pipe (17, 19) with a second valve (5, 7) is branched off from the second pipeline (2). The branch pipes are connected to the at least one manifold (3, 4).
Claims
1. A hydrocarbon production field layout allowing round trip pigging, comprising; a first pipeline defining a bore having a first inner diameter; a second pipeline defining a bore having an inner diameter equal to the first inner diameter; a cut off valve (20) with an inner bore having a third diameter equal to the first diameter, the cut off valve arranged in a connecting arrangement between an end of the first pipeline and an end of the second pipeline; at least one dual main bore manifold in fluid connection with at least one hydrocarbon well, the at least one dual main bore manifold defining two main bores having an inner diameter; a first branch pipe with a first valve branched off from the first pipeline to the at least one dual main bore manifold, the first branch pipe defining a bore having an inner diameter; and a second branch pipe with a second valve branched off from the second pipeline to the at least one dual main bore manifold the second branch pipe defining a bore having an inner diameter, wherein the respective inner diameters of the two main bores of the at least one dual main bore manifold are smaller than the first inner diameter.
2. The hydrocarbon production field layout, of claim 1, wherein the connecting arrangement comprising the cut off valve is a dual in-line tee (ILT), the first valve is located in the dual ILT and controls a flow in the first branch pipe, and the second valve is located in the dual ILT and controls a flow in the second branch pipe.
3. The hydrocarbon production field layout, of claim 1, wherein the first valve controlling a flow in the first branch pipe is located in a first ILT; and wherein the second valve controlling a flow in the second branch pipe is located in a second ILT.
4. The hydrocarbon production field layout of claim 1, including a first and a second dual main bore manifold; wherein the first branch pipe of the first dual main bore manifold is branched off from a dual ILT, connecting the first dual main bore manifold to the first pipeline; wherein the second branch pipe of the first dual main bore manifold is branched off from the dual ILT, connecting the first dual main bore manifold to the second pipeline; wherein the first branch pipe of the second dual main bore manifold is branched off from a first ILT, connecting the second manifold to the first pipeline; and wherein the second branch pipe of the second dual main bore manifold is branched off from a second ILT, connecting the second manifold to the second pipeline.
5. The hydrocarbon production field layout of claim 1, including a plurality of dual main bore manifolds, wherein each additional dual main bore manifold beyond two is branched off from the two pipelines with two additional ILTs.
6. The hydrocarbon production field layout of claim 1, wherein the respective inner diameters of the first branch pipe and the second branch pipe are smaller than the first diameter.
7. The hydrocarbon production field layout of claim 6, wherein the first valve and the second valve each define a respective inner bore having a respective inner diameter that is smaller than the first inner diameter.
8. The hydrocarbon production field layout of claim 1, wherein each well includes a Xmas tree and a wellhead.
Description
SHORT DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
DETAILED DESCRIPTION OF AN EMBODIMENT OF THE INVENTION WITH REFERENCE TO THE DRAWINGS
(5)
(6) Four jumpers connect a first dual main header manifold 3 with four wells 8 through wellheads. A flow path is provided by a branch pipe 18 between the first ILT 6 and the first manifold 3, and by a branch pipe 19 between the second ILT 7 and the manifold 3.
(7) A further dual main header manifold 3 is shown to illustrate that the number of dual main header manifolds not is limited to one or two.
(8) Four further jumpers connect a second manifold 4 with four further wells 9 through wellheads. Two individual flow paths are provided by two branch pipes 16, 17 between the dual ILT 5 and the second manifold 4.
(9) The dual ILT 5 is a full bore ILT allowing a pig to pass from the first pipeline 1 to the second pipeline 2 when a cut-off valve in the dual ILT is open. The first ILT 6 and the second ILT 7 are also full bore ILTs allowing a pig to pass.
(10) Accordingly, a pig can be circulated through the pipeline 1, past the first ILT 6 further through the first pipeline 1, through the dual ILT 5 into the second pipeline 2, through the second ILT 7 and further through the second pipeline 2. The first and the second ILTs 6, 7 also include cut-off valves to cut the flow of fluids between the pipelines 1, 2 and the branch pipes 18, 19 while maintaining the flow through the pipelines.
(11) The pig will not be circulated through any of the manifolds, and each manifold will only handle fluids from the wells that specific manifold is connected to.
(12) During normal operation (not pigging), the valve connecting the first pipeline 1 and the second pipeline 2 in the dual ILT is closed, isolating first pipeline 1 from the second pipeline 2.
(13)
(14) The manifolds 3 are dual main header manifolds as each manifold is connected to two pipelines, and each main header convey well fluids. The manifolds may also include auxiliary headers for other purposes but these headers are not considered as main headers.
(15) The dual main header manifolds not connected to other manifolds, and no fluid flow occurs from one manifold to another.
(16)
(17) Four further jumpers connect a second manifold 4 with four further wells 9 through wellheads. Two individual flow paths are provided between the first manifold 3 and the second manifold 4 through second pipeline end terminations (PLET) 11.
(18) A loop 12 across the two bores of the second manifold 4 allows a pig to pass between a first and a second bore in the second manifold 4. The second manifold 4 or the bypass pipeline 12 includes one or several valves to isolate the first and second bore in the second manifold 4 during normal operation.
(19) The flow of fluids from the second manifold 4 flows through the first manifold 3 before the fluids are brought further. Accordingly, the first manifold 3 handles fluids from both of the manifolds 3,4. The pigable configuration in
(20)
(21)
(22) In the above description, the well fluid has been considered to flow from the wells and into the pipelines. In some cases, however manifolds and pipelines are used for injecting fluids into the wells, and the present invention does not exclude such injection of fluids.