Generation of Electrical Power Offshore
20220411025 · 2022-12-29
Inventors
Cpc classification
F05B2240/97
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B2035/4453
PERFORMING OPERATIONS; TRANSPORTING
F03D9/257
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B35/44
PERFORMING OPERATIONS; TRANSPORTING
B63B2035/446
PERFORMING OPERATIONS; TRANSPORTING
Y02E10/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F03D9/14
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03B13/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B27/29
PERFORMING OPERATIONS; TRANSPORTING
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B2035/4466
PERFORMING OPERATIONS; TRANSPORTING
Y02E60/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F05B2240/93
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B63B21/50
PERFORMING OPERATIONS; TRANSPORTING
F16L1/19
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/727
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B63B21/20
PERFORMING OPERATIONS; TRANSPORTING
International classification
B63B21/50
PERFORMING OPERATIONS; TRANSPORTING
B63B21/20
PERFORMING OPERATIONS; TRANSPORTING
B63B27/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A floating power-generation group comprises a floating hub such as a spar buoy that is anchored to subsea foundations by anchor lines. Floating power producer units such as wind turbines are connected electrically and mechanically to the hub. The power producer units are each moored by mooring lines. At least one mooring line extends inwardly toward the hub to effect mechanical connection to the hub and at least one other mooring line extends outwardly toward a subsea foundation. The groups are combined as a set whose hubs are connected electrically to each other via subsea energy storage units. Anchor lines of different groups can share subsea foundations. The storage units comprise pumping machinery to expel water from an elongate storage volume and generating machinery to generate electricity from a flow of water entering the storage volume. The pumping machinery may be in deeper water than the generating machinery.
Claims
1. A floating power-generation group, comprising: a floating hub that is anchored to subsea foundations by a plurality of anchor lines; and at least two floating power producer units that are connected electrically and mechanically to the hub; wherein the power producer units are each moored by a plurality of mooring lines, at least one of those mooring lines extending inwardly toward the hub to effect mechanical connection to the hub and at least one other of those mooring lines extending outwardly toward one of the subsea foundations.
2. The group of claim 1, wherein the outwardly-extending mooring lines are each joined at a lower end to a lower section of a respective anchor line.
3. The group of claim 1, wherein the outwardly-extending mooring lines are each joined at a lower end directly to a respective subsea foundation.
4. The group of claim 2 or claim 3, wherein each of the outwardly-extending mooring lines shares one of the subsea foundations with one of the anchor lines.
5. The group of any preceding claim, wherein the inwardly-extending mooring lines are each joined at an upper end to an upper section of a respective anchor line.
6. The group of any of claims 1 to 4, wherein the inwardly-extending mooring lines are each joined at an upper end directly to the hub.
7. The group of any preceding claim, wherein each power producer unit is moored between an adjacent pair of the anchor lines radiating from the hub.
8. The group of claim 7, wherein, in top plan view, the power producer units are closer to the hub than the subsea foundations.
9. The group of any preceding claim, wherein each of the mooring lines extending from the power producer units converges with one of the anchor lines.
10. The group of claim 9, wherein each of the mooring lines intersects one of the anchor lines.
11. The group of claim 10, wherein the mooring lines intersect the anchor lines at junctions between a major central wire or rope section of the anchor line and a minor upper or lower chain section of the anchor line.
12. The group of any preceding claim, wherein the power producer units are substantially equidistant from the hub.
13. The group of claim 12, wherein the power producer units are distributed around a substantially circular array that is centred on the hub.
14. The group of claim 13, wherein the power producer units and the anchor lines alternate circumferentially around the hub.
15. The group of any preceding claim, wherein the hub is a spar buoy or a buoyant platform.
16. The group of any preceding claim, wherein the anchor lines and/or the mooring lines are catenaries or taut legs held in tension by buoyant upthrust of the hub and/or the power producer units.
17. The group of any preceding claim, wherein the hub houses switchgear in a dry environment.
18. The group of any preceding claim, further comprising power umbilicals that effect electrical connections between the power producer units and the hub.
19. The group of claim 18, wherein the power umbilicals hang as catenaries between the power producer units and the hub.
20. The group of any preceding claim, wherein the hub comprises a step-up transformer connected to a power export link.
21. A floating power-generation group, comprising: a floating hub; and at least two floating power producer units that are connected electrically to the hub; wherein the floating hub is anchored to subsea foundations that are located between the power producer units and the hub; wherein the power producer units are each moored by a plurality of mooring lines, at least one of those mooring lines extending inwardly toward one of the subsea foundations located between the power producer unit and the hub, and at least one other of those mooring lines extending outwardly toward a further subsea foundation outboard of the power producer unit.
22. The group of claim 21, wherein each power producer unit is additionally moored by a further mooring line that extends inwardly toward the hub to effect mechanical connection to the hub.
23. A set comprising a plurality of the power-generation groups of any preceding claim, the hub of each of those groups being connected electrically to the hub of at least one other of those groups.
24. The set of claim 23, wherein the power-generation groups of the set are arranged in at least two rows.
25. The set of claim 23, wherein the power-generation groups of the set include a central power-generation group and an array of power-generation groups that at least partially surround the central power-generation group.
26. The set of any of claims 23 to 25, wherein anchor lines extending from hubs of different groups of the set are anchored to the same subsea foundations.
27. The set of any of claims 23 to 26, wherein the hub of at least one group of the set is configured to serve as an electrical substation for the hub of at least one other group of the set.
28. The set of any of claims 23 to 27, further comprising at least one subsea energy storage unit that is electrically connected to at least one of the hubs, the energy storage unit comprising a storage volume in fluid communication with pumping machinery that is arranged to expel water from the storage volume and with generating machinery that is arranged to generate electricity from a flow of water entering the storage volume.
29. The set of claim 28, wherein the storage volume of the energy storage unit is elongate, extends between groups of the set and comprises terminal structures at each end, the terminal structures housing the pumping and generating machinery.
30. The set of claim 29, wherein the pumping machinery is housed in a terminal structure at one end of the energy storage unit and the generating machinery is housed in a terminal structure at an opposite end of the energy storage unit.
31. The set of claim 29 or claim 30, wherein, in top plan view, each terminal structure is located closer to a hub than the power producer units of a group comprising that hub.
32. The set of any of claims 28 to 31, wherein the pumping machinery is positioned at a greater water depth than the generating machinery.
33. The set of any of claims 28 to 32, wherein the energy storage unit comprises at least one cable that effects electrical connection between the hubs of different groups of the set.
34. The set of any of claims 28 to 33, wherein the hub of at least one group of the set is configured to switch power generated by the power producer units of that group to drive the pumping machinery of the at least one energy storage unit.
35. The set of any of claims 28 to 34, wherein the hub of at least one group of the set is configured to combine power generated by the power producer units of that group with power generated by the generating machinery of the at least one energy storage unit.
36. A set of floating power-generation groups each comprising a floating hub and a plurality of floating power producer units that are connected electrically to the hub, wherein the hub of at least one of the power-generation groups is connected electrically to and configured to serve as an electrical substation for the hub of at least one other of the power-generation groups.
37. A set according to claim 36, wherein the power-generation groups of the set are arranged in at least two rows including a first row and a second row, wherein the hub of at least one of the power-generation groups in the first row is connected electrically to and configured to serve as an electrical substation for the hub of at least one of the power-generation groups in the second row.
38. A set according to claim 36, wherein the power-generation groups of the set include a central power-generation group and an array of power-generation groups that at least partially surround the central power-generation group, wherein the hub of the central power-generation group is connected electrically to and configured to serve as an electrical substation for the hub of at least one of the surrounding power-generation groups.
39. An offshore power-generation arrangement, comprising: a plurality of power-generation groups, each group comprising a hub that is connected electrically to a plurality of power producer units; and at least one subsea energy storage unit that electrically connects the hub of one of the groups to the hub of another of the groups.
40. The arrangement of claim 39, wherein the energy storage unit comprises a storage volume in fluid communication with pumping machinery that is arranged to expel water from the storage volume and with generating machinery that is arranged to generate electricity from a flow of water entering the storage volume.
41. The arrangement of claim 40, wherein the storage volume is elongate, extends between the hubs of the groups and comprises terminal structures at each end, the terminal structures housing the pumping and generating machinery.
42. The arrangement of claim 41, wherein the pumping machinery is housed in a terminal structure at one end of the energy storage unit and the generating machinery is housed in a terminal structure at an opposite end of the energy storage unit.
43. The arrangement of claim 41 or claim 42, wherein, in top plan view, each terminal structure is located closer to a hub than the power producer units of a group comprising that hub.
44. A method of generating electrical power offshore, the method comprising: generating electrical power using a plurality of power-generation groups, each group comprising a hub that is connected electrically to a plurality of power producer units; and conveying the generated electrical power from the hub of one group to the hub of another group via at least one subsea energy storage unit.
45. The method of claim 44, comprising: converting the generated electrical power to potential energy by pumping water from a storage volume of the at least one subsea energy storage unit; and converting the potential energy to recovered electrical power by admitting a flow of water into the storage volume.
Description
[0048] In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which:
[0049]
[0050]
[0051]
[0052]
[0053]
[0054]
[0055]
[0056]
[0057]
[0058]
[0059]
[0060]
[0061]
[0062] Referring firstly to the offshore floating wind turbine unit 10 shown in
[0063] Whilst the wind turbine 12 shown in
[0064] The turbine 12 is supported by a buoyant raft 22 that, in this example, comprises three parallel upright tubular legs 24 connected by a triangular lattice frame 26. The tower 20 of the turbine 12 extends upwardly and coaxially from one of the legs 24. The other two legs 24 contain ballast tanks to counter tilt forces arising from wind acting on the turbine 12. One of the three legs 24, which may be the leg 24 that supports the tower 20, houses switchgear controls and ballast pumps.
[0065] The turbine 12 and the raft 22 are apt to be fabricated, assembled and tested on shore or near shore, for example in a dry dock. The turbine 12 and the raft 22 may then be towed out together to, or reassembled at, an offshore windfarm site.
[0066]
[0067] As will be explained, the floating hub of the invention could be defined by a buoyancy-supported structure other than a spar buoy 28, such as a tower or a tension leg platform (TLP).
[0068] Advantageously, the spar buoy 28 or other floating hub houses high-voltage equipment in a dry environment, thereby avoiding the need for such equipment to be positioned subsea and especially in deep water. An example of high-voltage equipment is a boost transformer and its associated switchgear. As will be explained, a boost transformer may be used to raise generation voltage from, say, 6.6 kV to a transmission voltage of, say, 132 kV for export of electrical power to an onshore grid.
[0069] The use of a spar buoy 28 or other floating hub employs existing, proven technology to minimise vertical and horizontal movement under the action of wind, waves and currents when installed offshore in deep water. This enables the use of static riser elements to convey electrical power and also avoids the limitations of high-voltage dynamic umbilicals, for which the current maximum depth limit is regarded as being around 200 m. In particular, the invention mitigates the problem of designing deep-water high-voltage dynamic umbilicals by reducing dynamic motions and associated stresses.
[0070] A spar buoy 28 or other floating hub has various other advantages. For example, it enables various dynamic umbilicals of the system to have standardised cross-sections, which reduces engineering costs and minimises the need for spares. In this respect, the spar buoy 28 or other floating hub may be configured for conventional pull-in and dry termination of umbilicals and risers using a central pull-in arrangement. Tie-in of umbilicals and risers during installation can therefore be achieved with a low-specification vessel that is less expensive and that has greater availability than a higher-specification vessel. Widening the range of available installation vessels is a particular benefit for installation in remote areas.
[0071] Turning next to
[0072] The optimal mutual spacing between the wind turbine units 10 is based upon the rotor diameters of their turbines 12 and is determined by the effects of turbulence between the rotating blades 14 of adjacent turbines 12. If the turbines 12 are too close to each other, this could result a reduction of between 5% and 8% in the overall power generated by the installation.
[0073] Assuming eight 12 MW turbines 12 each with a rotor diameter of 200 m, the pitch circle 36 has a diameter of 2200 m around the central hub defined by the spar buoy 28. This reflects optimal spacing between the turbines 12, regarded as a minimum of seven rotor diameters in line with the principal expected wind direction and four rotor diameters between adjacent turbines 12 in a direction transverse to that wind direction.
[0074] In the anchor pattern arrangement of the generating group 34 shown in
[0075] In this example, the hub anchor lines 40 are equal in number to the wind turbine units 10. Consequently, there are eight hub anchor lines 40. In plan view, each wind turbine unit 10 is interposed between an adjacent pair of hub anchor lines 40 such that the wind turbine units 10 and the hub anchor lines 40 alternate with each other, moving circumferentially around the spar buoy 28.
[0076] Most of the length of each hub anchor line 40 comprises an intermediate central section 40C that may be made of steel wire or, preferably, a synthetic rope of a polymer such as polyester. Each hub anchor line 40 further comprises upper and lower sections 40U, 40L that are suitably made of steel chain for wear resistance. The upper section 40U extends from the central section 40C to the spar buoy 28. The lower section 40L extends from the central section 40C to the associated subsea foundation 42. Where the foundation 42 is embedded in the seabed 38, part of the lower section of the hub anchor line 40 may also be embedded in the seabed 38.
[0077] Each wind turbine unit 10 is moored, in turn, by a set of turbine mooring lines 44 in the form of taut legs or catenaries. Again, all or most of the turbine mooring lines 44 may be made of steel wire or of a synthetic rope of a polymer such as polyester.
[0078] In the example shown in
[0079] In the variant shown in
[0080] In the examples of
[0081] Moving on to
[0082] As the turbine mooring lines 44 share the hub anchor lines 40 via link interfaces, and as at least some of the foundations 42 are also shared between hub anchor lines 40, the installation requires fewer deep-water anchors. This beneficially declutters the seabed 38 and helps to protect the installation from fishing or other marine activities. A further benefit of this arrangement is to make space for terminal modules such as towheads 50 of energy storage bundles 52 to be located on the seabed 38 within the anchor pattern, as shown in
[0083] In this respect,
[0084] Conveniently, in the example shown in
[0085] For example, electricity may be generated in a subsea pumped-storage system by employing the principles described in UK Patent Application GB2578473, which discloses an underwater turbo-generator unit that comprises a pressure-resistant shell defining a sealed internal chamber. At least one water inlet extends through the shell to effect fluid communication between the chamber and the sea surrounding the shell. A turbine is supported within the chamber to turn on a spin axis in response to admission of a flow of water into the chamber via the or each water inlet. The shell may be arranged to maintain a gas-filled space within the chamber, facilitating the use of a Pelton turbine that turns about a vertical spin axis. The chamber communicates with, and drains water into, a fluid storage volume such as a pipeline or bundle positioned at a level beneath the chamber.
[0086]
[0087] A further dynamic power umbilical 64 hangs as a catenary between the raft 22 of the wind turbine unit 10 and the spar buoy 28.
[0088] One of the turbine mooring lines 44 extends from the wind turbine unit 10 radially inwardly, with respect to the spar buoy 28, to the junction between the central section 40C and the upper section 40U of the hub anchor line 40. The other of the turbine mooring lines 44 extends from the wind turbine unit 10 radially outwardly, with respect to the spar buoy 28, to the junction between the central section 40C and the lower section 40L of the hub anchor line 40.
[0089] By way of example, the top of the hub anchor line 40 may be at a depth of about 50 m beneath the surface 62 and the tops of the turbine mooring lines 44 may be at a depth of about 40 m beneath the surface 62. Conversely, the seabed 38 may be at a depth of several hundred metres, for example 600m to 1000 m or more.
[0090]
[0091] Specifically: [0092] a first energy storage bundle 52A extends from generating group 34A to generating group 34C; [0093] a second energy storage bundle 52B extends from generating group 34B to generating group 34C; [0094] a third energy storage bundle 52C extends from generating group 34B to generating group 34E; and [0095] a fourth energy storage bundle 52D extends from generating group 34D to generating group 34E.
[0096] It will be noted that the towheads 50 of the energy storage bundles 52 are disposed close to the vertical longitudinal axes of the spar buoys 28 at the centres of the generating groups 34 and indeed may, as shown in
[0097] Conveniently, the energy storage bundles 52 are apt to be used not only for energy storage but also to effect subsea electrical connections between the spar buoys 28 of the rows 48 of generating groups 34. For example, the spar buoys 28 of the first row 48A of generating groups 34 may conveniently serve as substations for the spar buoys 28 of the second row 48B of generating groups 34, with the first energy storage bundle 52A providing an electrical connection between the spar buoy 28 of generating group 34A and the spar buoy 28 of generating group 34C, the second energy storage bundle 52B providing an electrical connection between the spar buoy 28 of generating group 34B and the spar buoy 28 of generating group 34C and so on.
[0098] It will be apparent that the three generating groups 34A, 34B and 34D of the first row 48A provide for generation of power via their wind turbine units 10 and also for consumption of power via the pumps in the pumping towheads 50P of the associated energy storage bundles 52. In other words, the three generating groups 34A, 34B and 34D together provide a focal point for generation of electricity, effected by conveying their electrical output to the substations provided by the two generating groups 34C and 34E of the second row 48B, or for energy storage, effected by switching their output to the pumps that consume that electrical output and convert it to potential energy.
[0099] Conversely, the two generating groups 34C and 34E of the second row 48B provide for generation of power via their wind turbine units 10 and also via the turbo-generator units 56 in the generating towheads 50G of the associated energy storage bundles 52. The generating groups 34C and 34E also provide for switching their output either to an onshore power grid or to the pumps of the pumping towheads 50P that are located among the generating groups 34A, 34B and 34D.
[0100]
[0101] In this example, the spar buoys 28 of the two generating groups 34C and 34E of the second row 48B serve as substations for the three generating groups 34A, 34B and 34D of the first row. The two spar buoys 28 that serve as substations are connected to an onshore power grid 72 by respective high-voltage links 74 that cross the coastline 66. The high-voltage links 74 are suitably located underwater and may, on land, be located underground.
[0102] Turning next to
[0103] In the electrical block diagram of
[0104] The switchgear 76 of generating groups 34A and 34B is connected, via the first and second energy storage bundles 52A and 52B, to the switchgear 76 of generating group 34C, which serves as a substation for generating groups 34A and 34B. Conversely, the switchgear 76 of generating group 34D is connected, via the fourth energy storage bundle 52D, to the switchgear 76 of generating group 34E, which serves as a substation for generating group 34D.
[0105] The switchgear 76 of generating groups 34A, 34B and 34D is also connected to respective sets of pumps 78, serving as subsea power consumers, located in the pumping towheads 50P of the associated energy storage bundles 52. Specifically, the switchgear 76 of generating group 34A is connected to the pumping towhead 50P of the first energy storage bundle 52A. The switchgear 76 of generating group 34B is connected to the pumping towheads 50P of the second and third energy storage bundles 52B and 52C. The switchgear 76 of generating group 34D is connected to the pumping towhead 50P of the fourth energy storage bundle 52D. Whilst dry splice connections are made to the switchgear 76, wet-mate connections 80 are made to the pumps 78 of the pumping towheads 50P.
[0106] The switchgear 76 of generating groups 34C and 34E is also connected to respective sets of turbo-generator units 56, serving as subsea power producers, located in the generating towheads 50G of the associated energy storage bundles 52. Specifically, the switchgear 76 of generating group 34C is connected to the generating towheads 50G of the first and second energy storage bundles 52A and 52B, whereas the switchgear 76 of generating group 34E is connected to the generating towheads 50G of the third and fourth energy storage bundles 52C and 52D. Again, whilst dry splice connections are made to the switchgear 76, wet-mate connections 80 are made to the turbo-generator units 56 of the generating towheads 50G.
[0107] The wind turbine units 10 and turbo-generator units 56 of generating groups 34C and 34E are connected via their switchgear 76 to respective busbars and to respective step-up transformers that raise the voltage from 6.6. kV to 132 kV for export of power along the high-voltage links 74 leading to shore.
[0108]
[0109] Each wind turbine unit 10 comprises a generator 82, a transformer 84 and switchgear 86 for controlling a ballast pump 88 to keep the wind turbine unit 10 level under wind loading as explained previously.
[0110] In generating group 34B shown in
[0111]
[0112] In generating group 34C shown in
[0113]
[0114] The spar buoy 28 of generating group 34C houses a busbar 98 and a boost transformer 100 in a dry environment. The generating outputs of the wind turbine units 10 of generating groups 34A and 34B and the turbo-generator units 56 of energy storage bundles 52A and 52B are aggregated at the busbar 98. The boost transformer 100 steps up the voltage of those aggregated generating outputs to 132 kV for export to shore along one of the high-voltage links 74.
[0115] The design philosophy of the example shown in
[0116] As the pumps 78 and turbo-generator units 56 of the energy storage bundles 52 preferably have a modular design for ease of maintenance, wet-mate connectors 80 are particularly apt for the power cables or umbilicals 54 that lead to and from those components. Qualified wet-mate connectors are limited to 11 kV and 200 A, which informs the choice of a voltage of 6.6 kV within the windfarm 66 with step-up to 132 KV for onward transmission via the high-voltage links 74 to shore.
[0117] Thus, the spar buoys 28 of the generating groups 34C and 34E serve as substations for all electrical power generated in the windfarm 66, including stepping-up the voltage from 6.6 kV within the windfarm 66 to 132 kV for onward transmission to shore. As noted above, the spar buoys 28 of the generating groups 34C and 34E provide a dry environment for the requisite boost transformers 100 and the associated high-voltage switchgear 76 and splice connections.
[0118] Electrical power generated by the windfarm 66 can be routed either directly to shore or to storage in the energy storage bundles 52. In principle, all electrical power generated by the windfarm may be stored by activating the pumps 78 with 6.6 kV 50 Hz supplies. Alternatively, the energy storage bundles 52 could be replaced by one or several export cables eventually bundled together to convey electrical power to successive hubs, then to a main export cable extending towards an onshore substation.
[0119] If there is a base load onshore, the amount of subsea equipment could be reduced by directing the outputs of individual wind turbine units 10 directly to shore to support that base load.
[0120] The windfarm 66 may be controlled from onshore, for example via a fibre-optic communication system that can control power distribution, start-up routines, synchronisation of the individual wind turbines 12, energy storage and generation systems. Additionally, monitored data from the pump s 78 and turbines 12 may be transmitted onshore and a digital twin may be produced from that data. This facilitates life-of-installation monitoring, predictive maintenance and condition monitoring.
[0121] When installing the windfarm 66, especially in a remote location, the use of costly installation vessels must be optimised. Preferably, the main infrastructure may be installed by a specialised vessel in one campaign so that subsequent tow-out and tie-in operations can be performed by a lower-specification anchor-handling vessel with ROV capability.
[0122] An initial campaign using a specialised vessel may, for example, involve: installing substation spar buoys 28 and other structures; installing anchors and wet-parking the main mooring system for the spar buoys 28; pulling-in and laying high-voltage links 74 to shore from spar buoys 28 serving as substations; and installing the first wind turbine units 10. Subsequent installation of spar buoys 28 and umbilicals 54 could be achieved by a lower-specification vessel to connect lines and umbilicals as wind turbine units 10 become available.
[0123] Installation of the energy storage bundles 52 is optional and in any event could be delayed because, for example, towing such bundles 52 to the installation site would not require a high-specification vessel. Indeed, initially at least, power generation would be possible without adding energy storage to the windfarm. This would enable the windfarm to generate revenue at an early stage, potentially contributing to the cost of manufacturing and installing energy storage bundles 52 in the future.
[0124]
[0125] The generating groups 34 of the windfarm 67 illustrated in
[0126] As in the windfarm 66 of
[0127] As shown in
[0128] Advantageously, the subsea foundations 42 to which the hub anchor lines 40 of the central group 34′ are attached are each shared by a hub anchor line 40 of one of the surrounding groups 34″, and the surrounding groups 34″ also each share subsea foundations 42 with the adjacent groups 34″ in the outer ring, thereby further reducing the total number of subsea foundations 42 required by the windfarm 67 and decluttering the seabed 38. In the embodiment illustrated in
[0129] The spar buoy 28 of each of the surrounding groups 34″ is electrically connected to the spar buoy 28 of the central group 34′, which is configured to act as a substation for the spar buoys 28 of the surrounding groups 34″. The spar buoys 28 of the surrounding groups 34″ may each be connected to the spar buoy 28 of the central group 34′ using direct connections 73 as shown in
[0130] Turning finally to
[0131] In
[0132]
[0133] In
[0134]
[0135] The tension-leg platform 102 shown in
[0136] Again,
[0137] Many other variations are possible without departing from the inventive concept. For example, it would be possible for a turbine mooring line 44 to extend to a subsea foundation 42 and to be fixed to the subsea foundation 42 in parallel to a hub anchor line 40, or to be fixed to a separate subsea foundation 42. Similarly, it would be possible for a turbine mooring line 44 to extend to a central hub such as a spar buoy 28 and to be fixed to that hub in parallel to a hub anchor line 40. In those cases, each turbine mooring line 44 may comprise a central section 40C of steel wire or synthetic rope and upper and/or lower sections 40U, 40L of steel chain.
[0138] The invention could be used with wind turbines 12 that turn about a substantially vertical axis rather than a substantially horizontal axis. The invention could also be used with other power-generating machines driven by tides or waves, such as tidal turbines, instead of or in addition to wind turbines 12. For example, the spar buoy 28 or other central hub and/or the supporting rafts 22 of the wind turbines 12 could support such other power-generating machines. An additional wind turbine 12 could be installed on the spar buoy 28 or other central hub. Similarly, the spar buoy 28 or other central hub and/or the surrounding wind turbine units 10 could additionally support equipment for solar power generation.