METHOD AND PLANT FOR PRODUCING FLAT ROLLED PRODUCTS
20240157418 · 2024-05-16
Inventors
- Gianpietro BENEDETTI (Tricesimo, IT)
- Paolo BOBIG (San Canzian D’Isonzo, IT)
- Matteo Remy BULFONE (Colloredo di Monte Albano, IT)
Cpc classification
B21B39/18
PERFORMING OPERATIONS; TRANSPORTING
B21B1/466
PERFORMING OPERATIONS; TRANSPORTING
B21B1/463
PERFORMING OPERATIONS; TRANSPORTING
B21B1/46
PERFORMING OPERATIONS; TRANSPORTING
International classification
Abstract
The invention concerns a method and a plant for obtaining strips (S), wherein the plant has at least three casting lines (11, 12, 13) disposed in parallel, of which two are lateral (11, 13) and one is central (12), and at least two rolling lines (14, 15) aligned with two of said at least three lateral casting lines (11, 12 13).
Claims
1. Method for producing flat rolled products, to obtain strips in a plant configured to operate in endless, semi-endless or coil-to-coil mode, having at least three casting lines disposed in parallel, of which two are lateral and one is central, and at least two rolling lines aligned with said lateral casting lines, comprising in sequence: a casting step in which at least two of said casting lines simultaneously produce a respective continuously cast product, a first cutting step performed downstream of the casting when one or more of said casting lines operate in semi-endless or coil-to-coil mode, in which said cast product is cut into slabs of suitable length by means of a first shear, a movement step in which said slabs or said cast product are moved downstream through and/or by means of a respective tunnel furnace, each provided with one or more respective fixed modules and at least one respective mobile module which is suitable to selectively cooperate, in an alternate manner, when one or more of said casting lines operate in semi-endless or coil-to-coil mode, with at least another one of said at least one mobile module of an adjacent tunnel furnace in order to define a transfer path along which said slabs are conveyed in a desired manner toward one of the two tunnel furnaces associated with the lateral casting lines, and then toward one or both of the rolling lines, depending on the specific needs of the process, a rolling step provided in sequence, for each of said rolling lines, by a respective roughing train and by a respective finishing train, a temperature restoring being possibly provided by a respective induction furnace located between said roughing train and said finishing train, and a second cutting step performed downstream of the rolling when one or more of said casting lines operate in semi-endless or endless mode, in which said strip just rolled is cut by means of a second shear once the length that determines the desired weight of the coil to be produced has been reached.
2. Method as in claim 1, wherein said at least one mobile module of the tunnel furnace associated with the central casting line cooperates in an alternate manner with at least one mobile module of the tunnel furnaces associated with the lateral casting lines.
3. Method as in claim 1, wherein said casting step occurs simultaneously in said at least three casting lines and the slabs produced in the central casting line are conveyed toward the rolling lines, which operate in semi-endless or coil-to-coil mode.
4. Method as in claim 1, wherein said casting step occurs simultaneously in the lateral casting lines which are in direct engagement with the respective rolling lines in endless mode while the central casting line is stopped.
5. Method as in claim 4, wherein during said casting steps, the tunnel furnace associated with the central casting line is used to heat previously produced and stored slabs.
6. Method as in claim 1, wherein the casting step occurs in endless mode in one of the two lateral casting lines which is in direct engagement with the respective rolling line, while the other lateral casting line and the central casting line operate in semi-endless or coil-to-coil mode with the other rolling line.
7. Method as in claim 1, wherein if it is necessary to interrupt the casting in one of the lateral casting lines, which are aligned with the respective rolling line, the casting step proceeds in endless mode in the lateral casting line still in operation, while the slabs produced in the central casting line are conveyed toward the rolling line located downstream of the stopped lateral casting line which rolls in coil-to-coil mode.
8. Method as in claim 1, wherein if it is necessary to interrupt the casting of the central casting line and one of the rolling lines is stopped, the casting step occurs simultaneously in the other lateral casting lines and the slabs produced in the lateral casting line having the downstream rolling line stopped are conveyed toward the operating rolling line that operates in semi-endless or coil-to-coil mode.
9. Method as in claim 1, wherein if one of the rolling lines is stopped, the casting step occurs simultaneously in all the casting lines and the slabs produced in the central casting line and in the lateral casting line having the downstream rolling line stopped are conveyed toward the operating rolling line that operates in semi-endless or coil-to-coil mode.
10. Plant for producing flat rolled products, in order to obtain strips starting from a continuously cast product possibly divided into slabs, comprising: at least three casting lines, of which two lateral ones and one central one, disposed in parallel, at least three respective tunnel furnaces disposed downstream of the corresponding casting lines and comprising one or more respective fixed modules and at least one respective mobile module configured to cooperate in an alternate manner with at least one other mobile module of an adjacent tunnel furnace in order to define a transfer path for said slabs toward one or both tunnel furnaces disposed laterally, at least two rolling lines aligned with two of said casting lines disposed laterally and comprising respective roughing and finishing trains between which a corresponding temperature restore system provided by a respective induction furnace is disposed, at least one respective first shear disposed between the casting line and the tunnel furnace configured to allow the plant to operate in semi-endless or coil-to-coil mode, and at least one respective second shear disposed downstream of the rolling line and configured to allow the plant to operate in endless or semi-endless mode.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0043] These and other aspects, characteristics and advantages of the present invention will become apparent from the following description of some embodiments, given as a non-restrictive example with reference to the attached drawings wherein:
[0044]
[0045]
[0046]
[0047] To facilitate comprehension, the same reference numbers have been used, where possible, to identify identical common elements in the drawings. It is understood that elements and characteristics of one embodiment can be conveniently combined incorporated into other embodiments without further clarifications.
DESCRIPTION OF SOME EMBODIMENTS
[0048] With reference to
[0049] We wish to clarify that the example described must not be considered as limiting, in any sense whatsoever, the applicability of the present invention, since the concepts set forth are applied in many other plant configurations, and in any case in all those situations in which the aim is to perform endless or semi-endless or coil-to-coil rolling in a plant 10 which has at least three casting lines and two rolling lines, maximizing overall production in all operating modes on the basis of production and maintenance needs, or unexpected stoppages.
[0050] Even the thickness sizes of the strip S produced in the plant 10, which can be comprised between about 0.6 mm and about 25 mm and obtained starting from a slab that has a thickness comprised between about 90 mm and about 160 mm, must not be considered as limiting the applicability of the present invention in any sense whatsoever.
[0051] In this specific case, the plant 10 comprises three casting machines or lines 11, 12, 13 disposed in parallel side by side with their respective casting axes X1, X2, X3 parallel to each other.
[0052] A first and a second casting line 11, 13, which are the most external ones, that is, disposed laterally, hereafter also referred to as lateral casting lines 11, 13, are followed downstream respectively by a first and a second rolling line 14, 15 which develop along respective rolling axes Y1, Y2 parallel to each other and aligned respectively with the casting axes X1, X3 of the lateral casting lines 11, 13.
[0053] A third casting line 12, hereafter also referred to as central casting line 12, is disposed centrally with respect to the first two and is configured to supply the slabs B produced to the rolling lines 14, 15, as will be explained in more detail below.
[0054] The two rolling lines 14, 15, during use, can therefore receive and roll the cast products arriving from all three casting lines 11, 12, 13. This configuration guarantees a high flexibility of the plant, which can operate in combined endless, semi-endless or coil-to-coil mode, as will be described below.
[0055] In this specific case, the rolling lines 14, 15 comprise a respective roughing train 16, 17, having in this specific case three stands 16a-16c, 17a-17c, and a finishing train 18, 19 comprising in this specific case five stands 18a-18e, 19a-19e.
[0056] Between the roughing train 16, 17 and the finishing train 18, 19 there is a temperature restore system, for example an induction furnace 20, 21, which brings the bar exiting from the roughing train 16, 17 back to the correct rolling temperature.
[0057] Downstream of the casting machines 11, 12, 13 there is a respective tunnel furnace 22, 23, 24 having a length sufficient to contain at least a number of slabs comprised between 2 and 5.
[0058] The tunnel furnaces 22, 23, 24, in a known way, allow both to act as a buffer in the event of even a momentary interruption of the rolling line(s) 14, 15, and also to operate in semi-endless mode.
[0059] In particular, the tunnel furnace 23 of the central casting line 12, hereafter also referred to as central tunnel furnace 23, can act as an accumulation buffer for the entire plant 10 since, as will be better explained below, it allows the passage of the slabs B from and toward the tunnel furnaces 22, 24 of the lateral casting lines 11, 13, hereafter also referred to as lateral tunnel furnaces 22, 24, and therefore toward the rolling lines 14, 15.
[0060] In particular, the lateral tunnel furnaces 22, 24 are disposed aligned between the respective lateral casting line 11, 13 and the corresponding rolling line 14, 15 located downstream.
[0061] Upstream of the tunnel furnaces 22, 23, 24 there is a respective first pendular shear 25, 26, 27 which cuts to size the cast product into slabs B, when the respective casting line 11, 12, 13 operates in semi-endless or coil-to-coil mode.
[0062] Downstream of the finishing trains 18, 19 there is a respective second flying shear 28, 29 which intervenes if rolling in endless or semi-endless mode in order to transversely cut the strip S obtained to the winding size in order to alternatively feed the downcoilers 32a-32c, 33a-33c, after the parts cut to size have passed through a respective cooling unit 30, 31. The second flying shears 28, 29 are therefore disposed respectively between the cooling unit 30, 31 and the downcoilers 32a-32c, 33a-33c.
[0063] The strip S can be divided longitudinally, in such a way as to obtain portions of strip with a width submultiple of the width of the starting cast product. To this end, the strip S can be rolled with double or multiple crowns so that the subsequent half-strips, or pluri-strips, which will be obtained from the strip S each have a correct crown, as if they had been rolled individually.
[0064] We wish to clarify that the longitudinal subdivision of the strip S can occur immediately downstream of the finishing unit 18, 19, or directly during the winding on the downcoilers 32a-32c, 33a-33c with special dedicated devices, or in a step that follows the removal of the coil, for example in a different plant where the strips S are to be used.
[0065] The method for producing a strip S therefore provides a casting step in which at least two casting lines 11, 12, 13 simultaneously produce a respective continuously cast product which can be sectioned into slabs B of suitable length by means of the first pendular shear 25, 26, 27 if they are fed to the two rolling lines 14, 15 in semi-endless or coil-to-coil mode, or remain in the form of a continuous slab if fed to the two rolling lines 14, 15 in endless mode.
[0066] The casting step is followed by a movement step in which the slabs B are moved downstream through and by means of the tunnel furnace 22, 23, 24 present downstream of the respective casting line 11, 12, 13.
[0067] Each tunnel furnace 22, 23, 24 provides one or more respective fixed modules 22a, 23a, 24a and at least one respective mobile module 22b, 23b, 24b which can cooperate in an alternate manner with at least one other mobile module 22b, 23b, 24b of an adjacent tunnel furnace 22, 23, 24 in order to define a transfer path along which the slabs B are conveyed in a desired manner first toward one or both of the lateral tunnel furnaces 22, 24, and then toward the rolling line 14, 15 located downstream, depending on the specific needs of the process.
[0068] In this specific case, the mobile module 23b of the central tunnel furnace 23 can cooperate in an alternate manner with at least one mobile module 22b, 24b of the lateral tunnel furnaces 22, 24. This configuration, which we wish to clarify is not limiting in any way whatsoever, is particularly advantageous because the central tunnel furnace 23 is equidistant from the two rolling lines 14, 15 and therefore allows it to act as a connection between the two more external lines, guaranteeing reduced times for moving the slabs B.
[0069] In the solution shown in
[0070] In turn, the terminal module 23b is mobile in rotation at least between a position aligned with the respective casting axis X2 in order to receive the slabs B directly produced by the central casting line 12, or from a warehouse for storing the cold slabs, and an angled position aligned with one of the penultimate mobile modules 22b, 24b of the lateral casting lines 11, 13.
[0071] A similar solution can be obtained by translating the mobile modules 22b, 23b, 24b, laterally and parallelly, in a shuttle-like manner, in a direction orthogonal to the casting axes X1, X2, X3 until obtaining the alignment necessary to define a linear path for the transfer of the slab/s B.
[0072] In the solution described, the plant 10 also comprises two intermediate connection furnaces 34, 35 for equalization disposed in a fixed position and angled in such a way that the mobile modules 22b, 23b, 24b, when they rotate to cooperate with each other as described above, also align with the respective intermediate furnace 34, 35 which acts as a connection and partly as a buffer.
[0073] However, it is also possible to provide configurations in which the mobile modules 22b, 23b, 24b that cooperate with each other can define a passage line directly without the aid of intermediate components.
[0074] At the sides of the tunnel furnaces 22, 23, 24, emergency roller conveyors 36, 37, 38 can be provided which can receive one or more slabs B if it is necessary to carry out maintenance or other. The slabs B are conveyed onto the emergency roller conveyors 36, 37, 38 directly by means of the mobile modules 22b, 23b, 24b which can therefore rotate in order to align with the roller conveyors 36, 37, 38.
[0075]
[0076] According to a first operating mode, shown in
[0077] In this first operating mode, the plant 10 can reach a total nominal capacity of about 7.5 Mton/y ear.
[0078] In accordance with a second operating mode, shown in
[0079] Similarly to the previous case, also in this case downstream of the finishing units 18, 19 the strip S is cut transversely with the second flying shear 28, 29 before the winding on the downcoilers 32a-32c, 33a-33c. In this second operating mode, the plant 10 can reach a total nominal capacity of about 5 Mton/year.
[0080] Here and hereafter in the description, to make the interpretation of the drawings clear, when one of the casting lines 11, 12, 13 or one of the rolling lines 14, 15 is stopped for any reason, it is identified with the symbol STP.
[0081] According to a third operating mode, shown in
[0082] In a fourth and fifth operating mode, respectively shown in
[0083] As shown in
[0084] An eighth and ninth operating mode are shown in
[0085] An additional tenth and eleventh operating mode are shown in
[0086] It is clear that modifications and/or additions of parts or steps may be made to the method and plant for producing flat rolled products as described heretofore, without departing from the field and scope of the present invention as defined by the claims.
[0087] In the following claims, the sole purpose of the references in brackets is to facilitate reading and they must not be considered as restrictive factors with regard to the field of protection claimed in the specific claims.