Station auxiliary power source apparatus
10372101 ยท 2019-08-06
Assignee
Inventors
Cpc classification
Y02T90/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B60L7/14
PERFORMING OPERATIONS; TRANSPORTING
B60L1/003
PERFORMING OPERATIONS; TRANSPORTING
B60M3/06
PERFORMING OPERATIONS; TRANSPORTING
Y02E60/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02T90/14
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/126
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02T10/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B60L53/63
PERFORMING OPERATIONS; TRANSPORTING
G05B2219/2639
PHYSICS
Y02T90/12
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B60L55/00
PERFORMING OPERATIONS; TRANSPORTING
Y02T10/7072
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B60L7/14
PERFORMING OPERATIONS; TRANSPORTING
B60L1/00
PERFORMING OPERATIONS; TRANSPORTING
B60L53/63
PERFORMING OPERATIONS; TRANSPORTING
B60M3/06
PERFORMING OPERATIONS; TRANSPORTING
B60L55/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The present invention relates to a station auxiliary power source apparatus that converts power supplied from an overhead cable to generate power to be supplied to a load in a station. The station auxiliary power source apparatus includes a first average calculation unit that calculates the average value of the overhead cable voltage for every predetermined time period; a second average calculation unit that calculates, two or more times, an average value of the overhead cable voltage that is larger than a first average value of the average value among the overhead cable voltages; a third average calculation unit that calculates an average value of the overhead cable voltage per day; and a comparator that selects any one of a second average value of the average value and a third average value of the average value and sets the selected value as the threshold value.
Claims
1. A station auxiliary power source apparatus that converts power supplied from an overhead cable to power to be supplied to a load in a station, the station auxiliary power source apparatus comprising: a control device including: a first calculator to calculate a plurality of first average values of an overhead cable voltage, wherein each of the plurality of first average values of the overhead cable voltage is calculated over a first predetermined period of time, a second calculator to calculate, over a second predetermined period of time, a second average value being an average value of values, from the calculated plurality of first average values of the overhead cable voltage, that are larger than an average value of the calculated plurality of first average values, and a third calculator to to calculate a third average value being an average value of the overhead cable voltage per day; and a comparator to select any one of the second average value and the third average value, and set the selected value as a threshold value, wherein the station auxiliary power source apparatus converts the power supplied from the overhead cable to the power to be supplied to the load when the overhead cable voltage is higher than the selected threshold value.
2. The station auxiliary power source apparatus according to claim 1, wherein the first, the second, and the third average values are respectively calculated by the control device for each day to which the same type of daily schedule is implemented, and the comparator selects the second average value or the third average value corresponding to a daily schedule implemented when the selection is performed.
3. The station auxiliary power source apparatus according to claim 1, wherein the comparator selects whichever is a larger value from the second average value and the third average value as the selected threshold value.
4. The station auxiliary power source apparatus according to claim 1, wherein an output voltage from an electric power substation to the overhead cable is used for the third average value.
5. The station auxiliary power source apparatus according to claim 4, wherein the control device calculates the respective average values for each day to which the same type of daily schedule is implemented, and the comparator selects: the second average value corresponding to the schedule implemented when the selection is performed, or the output voltage from the electric power substation to the overhead cable.
6. The station auxiliary power source apparatus according to claim 4, wherein the comparator selects whichever is a larger value from the second average value and the output voltage from the electric power substation to the overhead cable as the selected threshold value.
7. The station auxiliary power source apparatus according to claim 1, further comprising an inverter that receives a control signal based on the selected threshold value, and converts the power supplied from the overhead cable to the power to be supplied to the load based on the received control signal.
8. The station auxiliary power source apparatus according to claim 7, wherein responsive to receiving the control signal, the inverter starts the conversion of the power supplied from the overhead cable to the power to be supplied to the load responsive to the overhead cable voltage being greater than the selected threshold value.
9. The station auxiliary power source apparatus according to claim 1, wherein the station auxiliary power source apparatus starts the conversion of the power supplied from the overhead cable to the power to be supplied to the load responsive to the overhead cable voltage being greater than the selected threshold value.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
DESCRIPTION OF EMBODIMENTS
(6) Hereinafter, an embodiment of a station auxiliary power source apparatus according to the present invention is described in detail with reference to the drawings. Note that the invention is not limited by the embodiment.
Embodiment
(7)
(8) In the station auxiliary power source apparatus 1, the control device 11 receives the regenerative electric power generated by an electric vehicle that is in operation (the electric vehicle 201 and other electric vehicles (not illustrated in the drawing)) through the overhead cable 200, and it determines, on the basis of the overhead cable voltage, whether it is necessary to convert power to supply the load 302. When it is determined that the conversion is necessary, the control device 11 controls the inverter 12 such that it performs the power converting operation. The inverter 12 includes switching elements and turns on or off each of the switching elements according to a command from the control device 11. Thus, the power supplied from the overhead cable 200 is converted into power to be supplied to the load 302. The voltage sensor 13 detects the overhead cable voltage.
(9)
(10) The interface unit 20 performs an averaging operation on the overhead cable voltages output by using the voltage sensor 13 (hereinafter, simply referred to as an overhead cable voltage) so as to remove noise components. The operation-start voltage determination unit 30 includes a first average calculation unit 31 that calculates averages of the overhead cable voltage (that is the overhead cable voltage after removing the noise components) measured by the voltage sensor 13 for each predetermined time period (for example, for every hour) according to weekday/holiday schedules; a second average calculation unit 32 that extracts voltages higher than the average value (a first average value) of the overhead cable voltage calculated by the first average calculation unit 31 and calculates an average value (a second average value) of the extracted voltages; a third average calculation unit 33 that averages the overhead cable voltages that are measured by the voltage sensor 13 and from which the noise components are removed for each day according to the weekday/holiday schedules; and a comparator 34 functioning as a selection unit that compares the second average value and an average value (a third average value) calculated by the third average calculation unit 33 and then selects and outputs the higher average value selected. The operation-start voltage determination unit 30 determines a voltage at which the power converting operation starts (hereinafter, referred to as a converting-operation start voltage). The storage unit 40 stores the first average value, the second average value, and the third average value calculated by the operation-start voltage determination unit 30. The voltage command calculation unit 50 calculates a voltage command value on the basis of the converting-operation start voltage output from the comparator 34 of the operation-start voltage determination unit 30 and the overhead cable voltage output from the interface unit 20. Specifically, when the overhead cable voltage is larger than the converting-operation start voltage, the voltage command value is calculated. The PWM signal generation unit 60 generates a PWM (pulse width modulation) signal to control the inverter 12 on the basis of the voltage command value input from the voltage command calculation unit 50. Further, instead of the third average value calculated by the third average calculation unit 33, a fixed value such as a transferred voltage (a voltage output from the electric power substation 100 to the overhead cable 200) from a rectifier in the electric power substation 100 may be used.
(11)
(12) When it is determined that is it not the time to perform a calculation (Step S13: No), the overhead cable voltage is compared with the first average value stored in the storage unit 40 (Step S14). The first average value to be compared with the overhead cable voltage is set to be a first average value for a given time and date. For example, when Step S14 is performed at 6:10 am on a weekday in a state where the first average value and the second average value are set to be calculated at 00 minutes of every hour, the first average value in the 6 am time zone on a weekday is compared with the overhead cable voltage. When the overhead cable voltage is determined to be larger than the first average value (Step S14: Yes), the overhead cable voltage is stored as data to be used when the second average value is calculated (Step S15). When the overhead cable voltage is equal to or less than the first average value (Step S14: No), the overhead cable voltage is stored as data not to be used when the second average value is to be calculated (Step S16). The overhead cable voltage is, for example, written and stored in a predetermined area of the storage unit 40.
(13) After the overhead cable voltage value is stored at Step S15 or S16, it is determined whether it is the time for calculating the third average value (Step S17). Since the third average value is an averaged value of the overhead cable voltage per day, it is determined whether the current time is, for example, midnight (12 am). When the current time is 12 am, it is determined that it is time to calculate the third average value. In a case where it is time to calculate the third average value (Step S17: Yes), an average value of the overhead cable voltage for the last 24 hours is calculated. When the calculated average value corresponds to an average value of the measured overhead cable voltage on a weekday (i.e., a day when a train runs according to a weekday schedule), it is stored as the third average value on the weekday, and when the calculated average value corresponds to an average value of the measured overhead cable voltage on a holiday (i.e., a day when a train runs according to a holiday schedule), it is stored as the third average value on the holiday (Step S18). Further, the previously stored third average value is deleted. In other words, in a case where the third average value on the weekday is calculated, the stored third average value on the weekday is deleted (rewritten), and in a case where the third average value on the holiday is calculated, the stored third average value on the holiday is deleted (rewritten). In contrast, in a case where it is not time to calculate the third average value (Step S17: No), the procedure returns to Step S11 to continue the operation. Even in a case where Step S18 is performed, the procedure still returns to Step S11 to continue the operation.
(14) Meanwhile, in a case where it is determined that it is time to calculate the first average value and the second average value at Step S13 (Step S13: Yes), the first average value and the second average value are calculated and stored (Step S19). For example, in a case where the first average value and the second average value are set to be calculated once every hour, the first average value is acquired by averaging the latest overhead cable voltage and the overhead cable voltages within latest period of one hour, i.e., the overhead cable voltage acquired at Step S12 and the overhead cable voltages stored at Steps S15 and S16 performed within the latest period of one hour. The acquired average value is then set as the first average value. Further, in a calculation process of the second average value, the latest overhead cable voltage and the first average value are compared, and in a case where the latest overhead cable voltage is larger than the first average value, the average value is calculated by using the latest overhead cable voltages and each of the overhead cable voltages that are stored to be used when acquiring the second average (i.e., the overhead cable voltages stored at Step S15 performed within latest period of one hour). The acquired average value is then set as the second average value. Further, in a case where the latest overhead cable voltage is equal to or less than the first average value, the average value is calculated by using each of the overhead cable voltages stored as the data to be used for the calculation of the second average value among the overhead cable voltages within latest period of one hour. The acquired average value is then set as the second average value. When the average value of the overhead cable voltage is set on a measurement taken on a weekday, the calculated first and second average values are stored in the storage unit 40 as the first and second average values on the weekday, and when the average value of the overhead cable voltage is set on the measurement taken on a holiday, the calculated first and second average values are stored in the storage unit 40 as the first and second average values on the holiday. Further, the first and second average values previously stored are deleted. For example, in a case where the first average value and the second average value are calculated from 7 am to 8 pm on the weekday, the first average value and the second average value from 7 am to 8 pm on the weekday previously stored are deleted (rewritten).
(15) After the first and second average values are calculated, the converting-operation start voltage is determined (updated) (Step S20). Specifically, the third average value is compared with the second average value corresponding to the current time among the stored second average values, and the voltage of the larger one is determined to be the converting-operation start voltage. For example, after the first and second average values are calculated at 8 pm on a holiday in a state where the first average value and the second average value are set to be calculated every 30 minutes, the second average value from 8 pm to 8:30 pm on the holiday (the second average value calculated and stored in the past) and the third average value on the holiday are compared. Then, when the second average value is larger, the voltage indicating the second average value is determined to be the converting-operation start voltage, and when the third average value is larger, the voltage indicating the third average value is determined to be the converting-operation start voltage.
(16)
(17)
(18) In this way, the station auxiliary power source apparatus according to the present embodiment calculates the average value (the first average value) of the overhead cable voltage once in every given short period (for example, for one hour). Then it sets a threshold value for starting the conversion of the overhead cable voltage into the voltage to be supplied to the load in the station on the basis of the first average value and the average value of the overhead cable voltage (the average value per day). Specifically, the average value (the second average value) of the overhead cable voltage exceeding the first average value in the short time period is calculated, and the average value whichever is the larger of the second average value and the average value of the overhead cable voltage is determined and then used as the threshold value. Therefore, because the threshold value can be set according to the interchangeable state of the regenerative electric power among the electric vehicles, the station auxiliary power source apparatus can accurately determine the state where the regenerative electric power is not interchangeable among the electric vehicles, and it can accurately time the consumption of the regenerative electric power. As a result, it is possible to efficiently use the regenerative electric power and thus prevent the occurrence of cross currents. In addition, since the average value is calculated separately on the basis of one of the weekday schedule and the holiday schedule, and the threshold value is set on the basis of each average value respectively, it is possible to more accurately determine the state where the regenerative electric power is not fully interchangeable among the electric vehicles.
INDUSTRIAL APPLICABILITY
(19) As described above, the present invention is advantageously used for a station auxiliary power source apparatus that converts the regenerative electric power generated by the electric vehicles into the power to be used by the load in the station.
REFERENCE SIGNS LIST
(20) 1 STATION AUXILIARY POWER SOURCE APPARATUS 11 CONTROL DEVICE 12 INVERTER 13 VOLTAGE SENSOR 20 INTERFACE UNIT 30 OPERATION-START VOLTAGE DETERMINATION UNIT 31 FIRST AVERAGE CALCULATION UNIT 32 SECOND AVERAGE CALCULATION UNIT 33 THIRD AVERAGE CALCULATION UNIT 34 COMPARATOR 40 STORAGE UNIT 50 VOLTAGE COMMAND CALCULATION UNIT 60 PWM SIGNAL GENERATION UNIT 100 ELECTRIC POWER SUBSTATION 200 OVERHEAD CABLE 201 ELECTRIC VEHICLE 301 TRANSFORMER 302 LOAD