Method for regulating a gas turbine power supply
10344680 · 2019-07-09
Assignee
Inventors
- Yuriy Valeryevich BABKOV (Kolomna, RU)
- Yuriy Ivanovich KLIMENKO (Kolomna, RU)
- Pavel Leonidovich CHUDAKOV (Lukhovitsy, RU)
- Vladimir Aleksandrovich LINKOV (Kolomna, RU)
- Nikolai Valeryevich GRACHEV (Kolomna, RU)
- Oksana Aleksandrovna ISTOMINA (Kolomna, RU)
Cpc classification
F05D2270/304
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H02P9/04
ELECTRICITY
F05B2270/337
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/26
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02T10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F05D2270/053
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02T10/64
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B61C7/04
PERFORMING OPERATIONS; TRANSPORTING
B60L50/15
PERFORMING OPERATIONS; TRANSPORTING
B60L15/20
PERFORMING OPERATIONS; TRANSPORTING
F02C6/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/263
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2270/1014
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2270/327
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F02C9/26
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B60L50/15
PERFORMING OPERATIONS; TRANSPORTING
F02C6/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C9/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H02P9/04
ELECTRICITY
B61C7/04
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The method effects control upon engines, in particular to regulating power of a gas-turbine-generator system used in gas-turbine locomotives, hybrid locomotives, etc. A control signal for the fuel metering unit actuator is formed by an electronic engine control system on the basis of processing of a signal from a turbine rpm sensor and a design value of the generator active electric output power. The system power can be preset. A preset power value is compared to a real power calculated value which is obtained according to measured values of current and voltage. An obtained difference is taken as the basis for forming a control signal for the fuel metering unit actuator in order to provide a certain turbine rpm and a control signal for a current regulator supplying energy to the generator excitation winding in accordance with the load curve of the gas turbine-generator system.
Claims
1. A method for regulating power, the method comprising the steps of: assembling a gas turbine power supply in a locomotive, wherein said gas turbine power supply comprises: a generator being comprised of an excitation winding and temperature sensors; a gas turbine connected via a shaft to said generator; a traction rectifier connected to said generator; a starter connected to said generator and said traction rectifier; a fuel metering unit connected to said gas turbine; an electronic engine control system connected to said fuel metering unit and having a preset critical value of temperature and a preset critical value of rpm; a power controller connected to said electronic engine control system; a turbine rpm sensor connected to said electronic engine control system; a current sensor connected to said electronic engine control system and said traction rectifier; a voltage sensor connected to said electronic engine control system and said traction rectifier; and a current regulator connected to said generator, said engine control system, and said traction rectifier, wherein said generator, said traction rectifier, said starter, and said current regulator form a locomotive power circuit; starting said gas turbine with said starter and power from said locomotive power circuit; setting an output power and an output rpm based on a locomotive operating mode with said power controller; sending a control signal from said power controller to said electronic engine control system, said control signal corresponding to said output rpm and said output power; detecting an actual rpm with said turbine rpm sensor for said electronic engine control system; comparing said actual rpm and said output rpm with said electronic engine control system so as to form an adjustment rpm control instruction corresponding to adjustments to said actual rpm to match said output rpm; sending said adjustment rpm control instruction to said fuel metering unit so as to match said actual rpm to said output rpm detecting an actual output power with said current sensor and said voltage sensor through said traction rectifier for said electronic engine control system; comparing said actual output power and said output power with said electronic engine control system so as to form an adjustment power control instruction corresponding to adjustments to said actual output power to match said output power; sending said adjustment power control instruction to said generator with said electronic engine control system through said current regulator; adjusting current in said excitation winding of said generator so as to match said actual output power to said output power; changing said locomotive operating mode with said power controller to a subsequent locomotive operating mode with a subsequent output power and a subsequent output rpm; repeating the steps of setting said output power and said output rpm, sending said control signal, detecting said actual rpm, comparing said actual rpm and said output rpm, sending said adjustment rpm control instruction, detecting said actual output power, comparing said actual output power and said output power, and sending said adjustment power control instruction for said subsequent control signal as said control signal; monitoring temperatures of said generator with said temperature sensors; monitoring rpms of said gas turbine with said turbine rpm sensor; sending said temperatures and said rpms to said electronic engine control system; comparing said temperatures to said preset critical value of temperature with said electronic engine control system; comparing said rpms to said preset critical value of rpm with said electronic engine control system; sending a temperature emergency correction control signal to said gas turbine when a temperature exceeds said preset critical value of temperature; and sending an rpm emergency correction control signal to said gas turbine when an rpm exceeds said preset critical value of rpms, wherein at least one temperature emergency correction control signal corresponds to stopping said gas turbine, and wherein at least one rpm emergency correction control signal corresponds to stopping said gas turbine.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
(1) The FIGURE is an accompanying drawing showing a structural block diagram of the proposed method for regulating power of the gas turbine power supply in a locomotive.
DETAILED DESCRIPTION OF THE INVENTION
(2) The gas turbine 1 is connected, via the shaft, to the generator 2 which power outputs are connected to the input lines of the traction rectifier in the locomotive power circuit 3 supplying energy from the battery to the starter 4. The fuel metering unit 5, which is controlled by an electric signal sent by the electronic engine control system 6 (EECS) which inputs receive signals from the power controller 7, the turbine rpm sensor 8, the current sensor 9, and the voltage sensor 10, ensures a required rpm of the gas turbine 1. The current regulator 11 receives energy from the traction rectifier of the power circuit 3 and regulates current in the excitation winding of the generator 2.
(3) The method for regulating power of the gas turbine power supply can be implemented as follows.
(4) In order to start the turbine 1 connected to the generator 2 via the shaft 1A, the starter 4 is used that receives starting electric energy from a battery included into the locomotive power circuit 3A (as such, an asynchronous electric motor receiving energy from a frequency converter may be used). After the turbine 1 is started, the EECS 6 forms an instruction concerning rpm of the gas turbine 1 according to a value of a control signal sent by the power controller 7, which value is compared with a real value received by the EECS 6 from the turbine rpm sensor 8 measuring rpm of the turbine 1. A control instruction for the actuator of the fuel metering unit 5 is formed on the basis of a result of this comparison. At the same time, an initial signal is formed for the current regulator 11 regulating current in the excitation winding 2A of the generator 2. Real values of rectified current and voltage are measured by the current sensor 9 and the voltage sensor 10 which are arranged on the output lines of the traction rectifier 3 included into the locomotive power circuit 3A. By using a result of measuring these parameters a real value of electric power is calculated that is compared with a preset value corresponding to a signal received from the power controller 7. According to a comparison result, a control signal is formed for the current regulator 11 providing energy to the excitation winding of the generator 2. In this way output power of the gas turbine power supply is maintained at a level corresponding to its load curve in the conditions of using in a given locomotive.
(5) While effecting control upon the gas turbine power supply, instrumentation means (not shown in the drawing) monitor rpm of the turbine 1, temperatures of the windings of the generator 2 (including temperature sensors 2B), its bearing assemblies, gases downstream the turbine 1. If critical values of the checked parameters are exceeded, the EECS 6 performs protection algorithms correcting control signals for the actuators in the power circuit 3, and, when necessary, an emergency algorithm is performed for stopping the turbine 1, including a signal for closing a shutoff valve (not shown in the drawing).
(6) The proposed method for regulating power has been tested on a GT1h-002 gas-turbine locomotive and showed good results.