Steam turbine preheating system with a steam generator
10337357 ยท 2019-07-02
Assignee
Inventors
- George Vargese Mathai (Atlanta, GA, US)
- Joseph Philip Klosinski (Kennesaw, GA, US)
- Sanji Ekanayake (Mableton, GA)
- Alston Ilford Scipio (Mableton, GA, US)
- William Theadore Fisher (Atlanta, GA, US)
Cpc classification
F01D25/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C6/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K17/025
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05D2220/72
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K13/003
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C6/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E20/14
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E20/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F01K23/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F02C6/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01D25/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F02C6/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K17/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K23/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
The present application provides a power generation system. The power generation system may include a gas turbine engine, a steam turbine, and a steam turbine preheating system. The steam turbine preheating system may include a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.
Claims
1. A power generation system, comprising: a gas turbine engine; a steam turbine; and a steam turbine preheating system; wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.
2. The power generation system of claim 1, wherein the gas turbine engine comprises a turbine casing and wherein the extraction extends from the turbine casing to the steam generator.
3. The power generation system of claim 1, wherein the extraction comprises an extraction of hot combustion gases.
4. The power generation system of claim 1, wherein the steam generator comprises a source of feedwater in communication therewith.
5. The power generation system of claim 1, wherein the steam turbine comprises a steam turbine shell and wherein the flow of steam extends from the steam generator to the steam turbine shell.
6. The power generation system of claim 1, further comprising a controller in communication with a plurality of sensors.
7. The power generation system of claim 1, further comprising a heat recovery steam generator.
8. The power generation system of claim 1, wherein the steam turbine preheating system comprises an attemperation system.
9. The power generation system of claim 8, wherein the attemperation system comprises a spray system for at least one of a water injection and a steam injection.
10. The power generation system of claim 1, wherein the steam turbine preheating system comprises an ejector in communication with the steam generator.
11. The power generation system of claim 10, wherein the ejector is in communication with at least one of an ambient air flow, a filtered air flow, and a compressor air extraction.
12. The power generation system of claim 1, wherein the steam turbine preheating system comprises a cascading ejector system in communication with the steam generator.
13. The power generation system of claim 12, wherein the cascading ejector system comprises a first ejector in communication with a compressor of the gas turbine engine and a second ejector in communication with a turbine of the gas turbine engine.
14. The power generation system of claim 1, wherein the steam turbine preheating system comprises a further extraction from downstream of the gas turbine engine to the steam generator.
15. A method of preheating a steam turbine in a power generation system, comprising: extracting hot combustion gases from a gas turbine to a steam generator; flowing feedwater to the steam generator; exchanging heat between the hot combustion gases and the flow of feedwater to create a flow of steam in the steam generator; and flowing the steam to the steam turbine to warm a shell of the steam turbine.
16. A combined cycle power generation system, comprising: a gas turbine engine; a steam turbine; a heat recovery steam generator; and a steam turbine preheating system; wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine and a flow of feedwater.
17. The combined cycle power generation system of claim 16, wherein the gas turbine engine comprises a turbine casing and wherein the extraction extends from the turbine casing to the steam generator.
18. The combined cycle power generation system of claim 16, wherein the extraction comprises an extraction of hot combustion gases.
19. The combined cycle power generation system of claim 16, wherein the steam turbine comprises a steam turbine shell and wherein the flow of steam extends from the steam generator to the steam turbine shell.
20. The combined cycle power generation system of claim 16, wherein the steam turbine preheating system comprises a spray system for at least one of a water injection and a steam injection.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION
(7) Referring now to the drawings, in which like numerals refer to like elements throughout the several views,
(8) The gas turbine engine 110 may use natural gas, various types of syngas, liquid fuels, and/or other types of fuels and blends thereof. The gas turbine engine 110 may be any one of a number of different gas turbine engines offered by General Electric Company of Schenectady, N.Y., including, but not limited to, a 7 or a 9 series heavy duty gas turbine engine and the like. The gas turbine engines 110 may have many different configurations and may have other types of components. Other types of gas turbine engines also may be used herein. Multiple gas turbine engines, other types of turbines, and other types of power generation equipment also may be used herein together.
(9) The combined cycle power generation system 100 may include a heat recovery steam generator 190. The heat recovery steam generator 190 may recover heat from the hot combustion gases 160 exiting the gas turbine engine 110 so as to create a flow of steam 200. The heat recovery steam generator 190 may be of conventional design and may include one or more pressure sections such as a high pressure section, an intermediate pressure section, and a low pressure section. Each pressure section may include any combination of evaporators, superheaters, economizers, and the like. Other components and other configurations may be used herein.
(10) The combined cycle power generation system 100 also may include a steam turbine 210. The steam turbine 210 may be of conventional design and may include one or more pressure sections such as a high pressure section, an intermediate pressure section, and a low pressure section. The flows of steam 200 from the heat recovery generator 190 may be expanded in the steam turbine 210 so as to drive an additional load such as an electrical generator and the like. The steam turbine 210 may include a condenser 220 for the recovery of the spent fluid flow therein. Other components and other configurations may be used herein.
(11) The combined cycle power generation system 100 also may include a steam turbine preheating system 230. The steam turbine preheating system 230 may include one or more extractions 240 of the hot combustion gases 160 from a casing 250 of the turbine 170 or elsewhere. The casing 250 may be modified to include flanges at various stages to allow for the extractions 240. The extractions 240 may be in communication with a steam generator 260. The steam generator 260 may be of conventional design. Specifically, the steam generator 260 may be a heat exchanger that exchanges heat between the hot combustion gases 160 from the turbine 170 and a flow of feedwater 270 from any source so as to create a flow of steam 280. The flow of steam 280 may be sent to a shell 290 of the steam turbine 210 so as to preheat the steam turbine 210 before and/or during start-up. The steam/condensate exiting the steam turbine shell 290 may pass into the condenser 220 or otherwise. The extracted combustion gases 160 passing through the steam turbine 210 may flow either upstream of the heat recovery steam generator 190 so as to exchange heat therein or downstream of the heat recovery steam generator 190 towards the main stack or otherwise. Other components and other configurations may be used herein.
(12) Overall control of the steam turbine preheating system 230 may be governed via a controller 300. The controller 300 may be any type of programmable logic device. The controller 300 may be local or remote. The controller 300 may receive data from a number of sensors in communication with the steam turbine preheating system 230. These sensors may include a flow rate sensor 310, one or more temperature sensors 320, a pressure sensor 330, and the like. Other types of sensors may be used herein. Based upon the data from the sensors and the overall steam turbine controls 340, the controller 300 may open and close the steam turbine preheating system 230 via an inlet valve 350 and one or more outlet valves. In this embodiment, a first outlet valve 360 and a second outlet valve 370 are shown. Other types of flow control devices and the like also may be used herein. Other components and other configurations may be used herein.
(13) In use, the controller 300 may receive information on overall operational parameters of the steam turbine 210 via the steam turbine controls 340 including, for example, the temperature of the rotor and/or the blades. In order to preheat the steam turbine 210, the controller 300 may open the inlet valve 350 of the steam turbine preheating system 230 so as to allow the extraction 240 of the hot combustion gases 160 from the turbine casing 250 to flow to the steam generator 260. The hot combustion gases 160 exchange heat with the flow of feedwater 270 in the steam generator 260 so as to create the flow of steam 280. The flow of steam 280 thus may be used to warm the steam turbine shell 290.
(14) The controller 300 may monitor the flow rate and the temperature of the extraction 240 upstream of the steam generator 290 via the flow rate sensor 310 and one of the temperature sensors 320. The controller 300 also may monitor the temperature and pressure of the steam 280 downstream of the steam generator 260 via one of the temperature sensors 320 and the pressure sensor 330. Once the steam turbine 210 reaches a predetermined temperature, the controller 300 may turn off the steam turbine preheating system 230 by closing the inlet valve 350 or otherwise. Closing the inlet valve 350 directs all of the combustion gases 160 towards the turbine 170 and the heat recovery steam generator 190. Other components and other configurations may be used herein.
(15)
(16)
(17)
(18)
(19)
(20) The embodiments of the steam turbine preheating system 230 thus may use the extractions 240 of the hot combustion gases 160 from the casing 250 of the turbine 170 so as to create a flow of steam 280 in the steam generator 260. The flow of steam 280 may be used in turn to preheat the steam turbine 210. Preheating the steam turbine 210 during start-up should reduce the overall start-up time of the plant as a whole. Specifically, the plant may not have to wait for traditional steam conditions to be met before introducing steam to the steam turbine to begin the warming process. Reducing start-up time generally lowers emissions and improves fuel consumption. Moreover, improved-start up times also provides operational flexibility, increased performance, and increased competitiveness.
(21) It should be apparent that the foregoing relates only to certain embodiments of the present application and the resultant patent. Numerous changes and modifications may be made herein by one of skill in the art without departing from the general spirit and scope of the invention as defined by the following claims and the equivalents thereof.