METHOD FOR MANUFACTURING UNIVERSAL JOINT USING PIPE
20190193138 ยท 2019-06-27
Inventors
Cpc classification
B21D53/88
PERFORMING OPERATIONS; TRANSPORTING
B62D1/20
PERFORMING OPERATIONS; TRANSPORTING
B21K1/765
PERFORMING OPERATIONS; TRANSPORTING
B21J5/02
PERFORMING OPERATIONS; TRANSPORTING
B21K1/76
PERFORMING OPERATIONS; TRANSPORTING
B23P15/00
PERFORMING OPERATIONS; TRANSPORTING
International classification
B21J5/02
PERFORMING OPERATIONS; TRANSPORTING
B21J5/12
PERFORMING OPERATIONS; TRANSPORTING
B21K1/76
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The present invention relates to a method for manufacturing a universal joint using a pipe. The shaft joint of the universal joint is manufactured by: a material preparation step of preparing a material by cutting a pipe to a predetermined length; a shaft formation step of forming a shaft by reducing the outer diameter of a shaft formation portion by forming the outside of the shaft formation portion with a forming machine; a cutting step of bisecting the non-reduced head formation portion by forming a split across the non-reduced head formation portion in an axial direction; a yoke formation step of forming both opposite members of a yoke in a head by pressing the bisected head formation portion; a pinhole formation step of forming a pinhole across the yoke; and a spline shaft formation step of forming a spline shaft on the outer surface of the reduced hollow shaft.
Claims
1. A method for manufacturing a universal joint using a pipe, the universal joint (1) comprising a combination of a shaft joint (2) and a pipe joint (3) integrated with yokes (25 and 35), respectively; the shaft joint (2) being manufactured by: a material preparation step (S11) of preparing a material (B) by cutting a pipe (A) to a predetermined length; a shaft formation step (S12) of forming a shaft (23) by reducing an outer diameter of a shaft formation portion (22), obtained by excluding a head formation portion (21) from the material (B), by forming an outside of the shaft formation portion (22) with a forming machine; a cutting step (S13) of bisecting the non-reduced head formation portion (21) by forming a split (24) across the non-reduced head formation portion (21) in an axial direction; a yoke formation step (S14) of forming both opposite members of a yoke (25) in a head by pressing the bisected head formation portion (21); a pinhole formation step (S15) of forming a pinhole (26) across the yoke (25); and a spline shaft formation step (S16) of forming a spline shaft (27) on an outer surface of the reduced hollow shaft (23).
2. A method for manufacturing a universal joint using a pipe, the universal joint (1) comprising a combination of a shaft joint (2) and a pipe joint (3) integrated with yokes (25 and 35), respectively; the shaft joint (2) being manufactured by: a material preparation step (S111) of preparing a material (B) by cutting a pipe (A) to a predetermined length; a shaft formation step (S112) of forming a shaft (23) by reducing an outer diameter of a shaft formation portion (22), obtained by excluding a head formation portion (21) from the material (B), by forming an outside of the shaft formation portion (22) with a forming machine; a preliminary yoke formation step (S113) of forming a preliminary yoke by means of a pressing method (rolling) of introducing the non-reduced head formation portion (21) into a die and then pressing an upper press die into an inside of the head formation portion (21); a cutting step (S114) for formation of a yoke of cutting away connection portions, other than the yoke, from a rectangular shape with an open top, which is formed by the preliminary yoke formation step; a pinhole formation step (S115) of forming a pinhole (26) across the yoke (25); and a spline shaft formation step (S116) of forming a spline shaft (27) on an outer surface of the reduced hollow shaft (23).
3. A method for manufacturing a universal joint using a pipe, the universal joint (1) comprising a combination of a shaft joint (2) and a pipe joint (3) integrated with yokes (25), respectively; the pipe joint (3) being manufactured by: a material preparation step (S21) of preparing a material (B) by cutting a pipe (A) to a predetermined length; a tube formation step (S22) of reducing an outer diameter of a tube formation portion (32), obtained by excluding a head formation portion (31) from the material (B), by forming an outside of the tube formation portion (32) with a forming machine; a cutting step (S23) of bisecting the non-reduced head formation portion (31) by forming a split (34) across the non-reduced head formation portion (31) in an axial direction; a yoke formation step (S24) of forming both opposite members of a yoke (35) in a head by pressing the bisected head formation portion (31); a pinhole formation step (S26) of forming a pinhole (36) across the yoke (35); and a spline boss formation step (S27) of forming a spline boss (37) on an inner surface of the reduced hollow tube (33).
4. A method for manufacturing a universal joint using a pipe, the universal joint (1) comprising a combination of a shaft joint (2) and a pipe joint (3) integrated with yokes (25), respectively; the pipe joint (3) being manufactured by: a material preparation step (S211) of preparing a material (B) by cutting a pipe (A) to a predetermined length; a tube formation step (S212) of reducing an outer diameter of a tube formation portion (32), obtained by excluding a head formation portion (31) from the material (B), by forming an outside of the tube formation portion (32) with a forming machine; a preliminary yoke formation step (S213) of forming a preliminary yoke by means of a pressing method (rolling) of introducing the non-reduced head formation portion (31) into a die and then pressing an upper press die into an inside of the head formation portion (31); a cutting step (S214) for formation of a yoke of cutting away connection portions, other than the yoke, from a rectangular shape with an open top, which is formed by the preliminary yoke formation step; a pinhole formation step (S215) of forming a pinhole (36) across the yoke (35); and a spline boss formation step (S216) of forming a spline boss (37) on an inner surface of the reduced hollow tube (33).
5. The method of claim 1, wherein the pipe (A) prepared at each of the material preparation steps (S11, S111, S21, and S211) is a seamless pipe without a seam.
6. The method of claim 2, wherein the pipe (A) prepared at each of the material preparation steps (S11, S111, S21, and S211) is a seamless pipe without a seam.
7. The method of claim 3, wherein the pipe (A) prepared at each of the material preparation steps (S11, S111, S21, and S211) is a seamless pipe without a seam.
8. The method of claim 4, wherein the pipe (A) prepared at each of the material preparation steps (S11, S111, S21, and S211) is a seamless pipe without a seam.
Description
DESCRIPTION OF DRAWINGS
[0019]
[0020]
[0021]
[0022]
[0023]
BEST MODE
[0024] A method for manufacturing a universal joint using a pipe, which is provided by the present invention, will be described based on the accompanying drawings below.
[0025]
[0026] A steering apparatus that is provided to enable a driver to change the traveling direction of a vehicle as desired is applied to the vehicle.
[0027] The steering apparatus includes: a steering wheel disposed in front of a driver's seat and configured to change the traveling direction of a vehicle through the manipulation of the driver; a steering column disposed beneath the steering wheel; a steering gearbox configured to switch the rotation of the steering wheel from rotation movement to rectilinear movement and to also change the directions of tires by increasing steering force; and a universal joint 1 configured to transfer rotating force, transferred to the steering column, to the steering gearbox.
[0028] As shown in
[0029] The universal joint 1 using the pipe A, which is provided by the present invention, is characterized in that the shaft joint 2 and the pipe joint 3, which are configured as described above, are each manufactured using the pipe A, rather than using the conventional round rod material, thereby reducing manufacturing cost, improving production efficiency, and fulfilling durability while providing the effect of reducing the weight of a product.
[0030] A method for manufacturing the shaft joint 2 using a pipe A and a method for manufacturing the pipe joint 3 using a pipe A will be described in greater detail below.
[0031] Manufacture of the Shaft Joint
[0032]
[0033] The process of manufacturing the shaft joint 2 of a universal joint 1 using a pipe A according to the present invention, in which a yoke 25 is integrated with the shaft joint 2, is performed in the sequence of: 1) a material preparation step S11; 2) a shaft formation step S12; 3) a cutting step S13 for forming a head that corresponds to the yoke 25; 4) a yoke formation step S14; 5) a pinhole formation step S15; and 6) a spline shaft formation step S16, and these individual steps will be described in greater detail below.
[0034] 1) Material Preparation Step S11
[0035] A material B is prepared by cutting a pipe A having a predetermined diameter to a predetermined length by means of a cutting machine. In this case, a diameter that is suitable for a head formation portion 21 to be described later is used as the preferable diameter of the pipe A. Furthermore, when a cracking phenomenon in a manufacturing process, etc. are taken into account, it is preferable to use a seamless pipe A without a seam as the pipe A.
[0036] 2) Shaft Formation Step S12
[0037] The material B provided by cutting the pipe A to the predetermined length may be divided into the head formation portion 21 and a shaft formation portion 22. The shaft (23) formation step is the step of forming the shaft formation portion 22 into a shaft 23 by reducing the diameter of the shaft formation portion 22.
[0038] Preferably, the shaft 23 is formed by reducing the outer diameter of the shaft formation portion 22 by means of a method for introducing the shaft formation portion 22, obtained by excluding the head formation portion 21 from the material B, into a forming machine and then forming the shaft 23.
[0039] When the shaft 23 is formed using the forming machine, as described above, a hollow shape is provided in such a manner that the outer diameter of the shaft formation portion 22 is reduced, the length of the shaft formation portion 22 is increased, and the thickness of the shaft formation portion 22 is also increased. The effect of reducing weight while maintaining durability may be provided.
[0040] It is preferred that the outer diameter of the shaft formation portion 22 is gradually reduced by repeating the above-described formation process using the forming machine one or more times depending on the extent to which the outer diameter of the shaft 23 is reduced.
[0041] 3) Cutting Step S13
[0042] This step is the step that is performed before the formation of the yoke 25, and is the step of forming a split 24 across the head formation portion 21 by means of a method for bisecting the non-reduced head formation portion 21 in an axial direction by means of a cutting machine, a metal laser cutting machine, or the like.
[0043] 4) Yoke Formation Step S14
[0044] The yoke formation step S14 is the step of forming the yoke 25. Both the opposite members of the yoke are formed by means of a pressing method (rolling) of introducing the bisected head formation portion 21 into a die and then pressing an upper press die into the inside of the head formation portion 21.
[0045] 5) Pinhole Formation Step S15
[0046] The yoke 25 formed in the head formation portion 21 requires a pinhole 26 into which a needle roller bearing coupled to a neighboring counterpart yoke 25 via a cross axis is fitted. Accordingly, the pinhole 26 is formed across both the opposite members of the yoke 25.
[0047] The pinhole 26 is formed to have a desired diameter through drilling in the state in which a sufficient thickness has been provided through drawing using a press so that a needle roller bearing can be stably fitted into the pinhole 26.
[0048] 6) Spline Shaft Formation Step S16
[0049] The spline shaft 27 is formed on the outer surface of the hollow shaft 23 that has been reduced through forming using the forming machine, as described above.
[0050]
[0051] The process of manufacturing the shaft joint 2 of a universal joint 1 using a pipe A according to the present invention, in which a yoke 25 is integrated with the shaft joint 2, is performed in the sequence of: 1) a material preparation step S111; 2) a shaft formation step S112; 3) a preliminary yoke formation step S113; 4) a cutting-away step S114 for the formation of a yoke; 5) a pinhole formation step S115; and 6) a spline shaft formation step S116, and these individual steps will be described in greater detail below.
[0052] 1) Material Preparation Step S111
[0053] A material B is prepared by cutting a pipe A having a predetermined diameter to a predetermined length by means of a cutting machine. In this case, a diameter that is suitable for a head formation portion 21 to be described later is used as the preferable diameter of the pipe A. Furthermore, when a cracking phenomenon in a manufacturing process, etc. are taken into account, it is preferable to use a seamless pipe A without a seam as the pipe A.
[0054] 2) Shaft Formation Step S112
[0055] The material B provided by cutting the pipe A to the predetermined length may be divided into the head formation portion 21 and a shaft formation portion 22. The shaft (23) formation step is the step of forming the shaft formation portion 22 into a shaft 23 by reducing the diameter of the shaft formation portion 22.
[0056] Preferably, the shaft 23 is formed by reducing the outer diameter of the shaft formation portion 22 by means of a method for introducing the shaft formation portion 22, obtained by excluding the head formation portion 21 from the material B, into a forming machine and then forming the shaft 23.
[0057] When the shaft 23 is formed using the forming machine, as described above, a hollow shape is provided in such a manner that the outer diameter of the shaft formation portion 22 is reduced, the length of the shaft formation portion 22 is increased, and the thickness of the shaft formation portion 22 is also increased. The effect of reducing weight while maintaining durability may be provided.
[0058] It is preferred that the outer diameter of the shaft formation portion 22 is gradually reduced by repeating the above-described formation process using the forming machine one or more times depending on the extent to which the outer diameter of the shaft 23 is reduced.
[0059] 3) Preliminary Yoke Formation Step S113
[0060] The pipe A is configured to have a diameter that is suitable for a head formation portion. A preliminary yoke is formed by means of a pressing method (rolling) of introducing the head formation portion into a die and then pressing an upper press die into the inside of the head formation portion 21.
[0061] In this case, the opposite members of the yoke are in the state of being connected to each other, and the preliminary yoke is formed in the shape of a rectangular container with an open top.
[0062] 4) Cutting-Away Step S114 for the Formation of a Yoke
[0063] The cutting step is the step of providing a yoke. The yoke that is formed at the preliminary yoke formation step is configured to have the connected members. At this cutting step, the portions other than the yoke are cut away. The cutting-away step may be performed by means of a machine tool, such as a milling machine, or a metal laser cutting machine.
[0064] 5) Pinhole Formation Step S115
[0065] The yoke 25 formed in the head formation portion 21 requires a pinhole 26 into which a needle roller bearing coupled to a neighboring counterpart yoke 25 via a cross axis is fitted. Accordingly, the pinhole 26 is formed across both the opposite members of the yoke 25.
[0066] The pinhole 26 is formed to have a desired diameter through drilling in the state in which a sufficient thickness has been provided through drawing using a press so that a needle roller bearing can be stably fitted into the pinhole 26.
[0067] 6) Spline Shaft Formation Step S116
[0068] The spline shaft 27 is formed on the outer surface of the hollow shaft 23 that has been reduced through forming using the forming machine, as described above.
[0069] The formation of the spline shaft may be performed by any one of a press method, a forming method using a forming machine, and a rolling method. These forming methods are commonly used methods, and thus detailed descriptions thereof will be omitted.
[0070] Manufacture of the Pipe Joint
[0071]
[0072] The process of manufacturing the pipe joint 3 of a universal joint 1 using a pipe A according to the present invention, in which a yoke 35 is integrated with the pipe joint 3, is performed in the sequence of: 1) a material preparation step S21; 2) a tube formation step S22; 3) a cutting step S23 for the formation of a head corresponding to a yoke 35; 4) a yoke formation step S24; 5) a pinhole formation step S25; and 6) a spline boss formation step S26.
[0073] 1) Material Preparation Step S11
[0074] A material B is prepared by cutting a pipe A having a predetermined diameter to a predetermined length by means of a cutting machine. In this case, a diameter that is suitable for a head formation portion 31 to be described later is used as the preferable diameter of the pipe A. Furthermore, when a cracking phenomenon in a manufacturing process, etc. are taken into account, it is preferable to use a seamless pipe A without a seam as the pipe A.
[0075] 2) Tube Formation Step S22
[0076] The material B provided by cutting the pipe A to the predetermined length may be divided into the head formation portion 31 and a shaft formation portion 32. The tube formation step is the step of forming the tube formation portion 32 into a tube 33 by reducing the diameter of the tube formation portion 32.
[0077] Preferably, the tube 33 is formed by reducing the outer diameter of the tube formation portion 32 by means of a method for introducing the tube formation portion 32, obtained by excluding the head formation portion 31 from the material B, into a forming machine and then forming the tube 33 so that the spline shaft 27 of the above-described shaft joint 2 can be inserted into the tube 33.
[0078] When the tube 33 is formed using the forming machine, as described above, a hollow shape is provided in such a manner that the outer diameter of the tube formation portion 32 is reduced, the length of the tube formation portion 32 is increased, and the thickness of the tube formation portion 32 is also increased. The effect of reducing weight while maintaining durability may be provided.
[0079] It is preferred that the outer diameter of the tube formation portion 32 is gradually reduced by repeating the above-described formation process using the forming machine one or more times depending on the extent to which the outer diameter of the tube 33 is reduced.
[0080] 3) Cutting Step S13
[0081] This step is the step that is performed before the formation of the yoke 35, and is the step of forming a split 34 across the head formation portion 31 by means of a method for bisecting the non-reduced head formation portion 31 in an axial direction by means of a cutting machine, a metal laser cutting machine, or the like.
[0082] 4) Yoke Formation Step S14
[0083] The yoke formation step S14 is the step of forming the yoke 25. Both the opposite members of the yoke are formed by means of a pressing method (rolling) of introducing the bisected head formation portion 31 into a die and then pressing an upper press die into the inside of the head formation portion 31.
[0084] 5) Pinhole Formation Step S15
[0085] The yoke 35 formed in the head formation portion 31 requires a pinhole 36 into which a needle roller bearing coupled to a neighboring counterpart yoke 35 via a cross axis is fitted. Accordingly, the pinhole 36 is formed across both the opposite members of the yoke 35.
[0086] The pinhole 36 is formed to have a desired diameter through drilling in the state in which a sufficient thickness has been provided through drawing using a press so that a needle roller bearing can be stably fitted into the pinhole 36.
[0087] 6) Spline Boss Formation Step S16
[0088] A spline boss 37 is formed on the inner surface of the hollow tube 33 that has been reduced through forming using the pipe (A) forming machine, as described above.
[0089]
[0090] The process of manufacturing the pipe joint 3 of a universal joint 1 using a pipe A according to the present invention, in which a yoke 35 is integrated with the pipe joint 3, is performed in the sequence of: 1) a material preparation step S211; 2) a tube formation step S212; 3) a preliminary yoke formation step S213; 4) a cutting step S214 for the formation of a yoke; 5) a pinhole formation step S215; and 6) a spline boss formation step S216.
[0091] 1) Material Preparation Step S111
[0092] A material B is prepared by cutting a pipe A having a predetermined diameter to a predetermined length by means of a cutting machine. In this case, a diameter that is suitable for a head formation portion 31 to be described later is used as the preferable diameter of the pipe A. Furthermore, when a cracking phenomenon in a manufacturing process, etc. are taken into account, it is preferable to use a seamless pipe without a seam as the pipe A.
[0093] 2) Tube Formation Step S212
[0094] The material B provided by cutting the pipe A to the predetermined length may be divided into the head formation portion 31 and a shaft formation portion 32. The tube formation step is the step of forming the tube formation portion 32 into a tube 33 by reducing the diameter of the tube formation portion 32.
[0095] Preferably, the tube 33 is formed by reducing the outer diameter of the tube formation portion 32 by means of a method for introducing the tube formation portion 32, obtained by excluding the head formation portion 31 from the material B, into a forming machine and then forming the tube 33 so that the spline shaft 27 of the above-described shaft joint 2 can be inserted into the tube 33.
[0096] When the tube 33 is formed using the forming machine, as described above, a hollow shape is provided in such a manner that the outer diameter of the tube formation portion 32 is reduced, the length of the tube formation portion 32 is increased, and the thickness of the tube formation portion 32 is also increased. The effect of reducing weight while maintaining durability may be provided.
[0097] It is preferred that the outer diameter of the tube formation portion 32 is gradually reduced by repeating the above-described formation process using the forming machine one or more times depending on the extent to which the outer diameter of the tube 33 is reduced.
[0098] 3) Preliminary Yoke Formation Step S213
[0099] The pipe A is configured to have a diameter that is suitable for a head formation portion. A preliminary yoke is formed by means of a pressing method (rolling) of introducing the head formation portion into a die and then pressing an upper press die into the inside of the head formation portion.
[0100] In this case, the opposite members of the yoke are in the state of being connected to each other, and the preliminary yoke is formed in the shape of a rectangular container with an open top.
[0101] 4) Cutting-Away Step S214 for the Formation of a Yoke
[0102] The cutting step is the step of providing a yoke. The yoke that is formed at the preliminary yoke formation step is configured to have the connected members. At this cutting step, the portions other than the yoke are cut away.
[0103] The cutting-away step may be performed by means of a machine tool, such as a milling machine, or a metal laser cutting machine.
[0104] 5) Pinhole Formation Step S215
[0105] The yoke 35 formed in the head formation portion 31 requires a pinhole 36 into which a needle roller bearing coupled to a neighboring counterpart yoke 35 via a cross axis is fitted. Accordingly, the pinhole 36 is formed across both the opposite members of the yoke 35.
[0106] The pinhole 36 is formed to have a desired diameter through drilling in the state in which a sufficient thickness has been provided through drawing using a press so that a needle roller bearing can be stably fitted into the pinhole 36.
[0107] 6) Spline Boss Formation Step S216
[0108] A spline boss 37 is formed on the inner surface of the hollow tube 33 that has been reduced through forming using the pipe (A) forming machine, as described above.
[0109] The formation of the spline boss 37 may be performed by any one of a press method, a forming method using a forming machine, and a rolling method. These forming methods are commonly used methods, and thus detailed descriptions thereof will be omitted.
[0110] Meanwhile, although not mentioned in connection with the present invention, it is apparent that a heat treatment step may be additionally applied to the spline shaft 27 and the spline boss 37 formed on the shaft joint 2 and the pipe joint 3, respectively, and the yokes 25 and 35 for the purpose of increasing abrasion resistance.
[0111] When the shaft joint 2 and the pipe joint 3 are manufactured using the method for manufacturing the universal joint 1 using the pipe A, as described above, the method may considerably reduce the cost of the materials B than the conventional methods for rolling a round rod. In particular, the shaft joint 2 may be provided in a hollow form, and thus the weight of a product may be considerably reduced, which will also contribute to the effort to reduce part weight in order to improve fuel efficiency in the automotive industry.
[0112] Although the specific embodiments have been described in the detailed description of the present invention, it will be apparent that various modifications may be made within a range that does not depart from the scope of the present invention. Therefore, the range of protection of the present invention should not be defined based on only the described embodiments, and should be defined based on not only the attached claims but also equivalents thereto.