System And Method For Rapidly Collecting Greenhouse Gas From Farmland In Batches
20240201052 ยท 2024-06-20
Inventors
Cpc classification
Y02A40/25
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
Abstract
Disclosed are a system and method for rapidly collecting greenhouse gas from farmland in batches, relating to the technical field of greenhouse gas collection. The system for rapidly collecting greenhouse gas from farmland in batches includes a static chamber, a static chamber placement device, a gas collection device, and a control device. The static chamber is arranged inside the static chamber placement device, and each static chamber is sleeved outside crops. The gas collection device is arranged in the static chamber placement device. The static chamber, the static chamber placement device and the gas collection device are all in wireless connection with the control device.
Claims
1. A system for rapidly collecting greenhouse gas from farmland in batches, comprising a static chamber, a static chamber placement device, a gas collection device, and a control device; the static chamber is arranged inside the static chamber placement device, and each static chamber is sleeved outside crops; the gas collection device is arranged in the static chamber placement device, the static chamber, the static chamber placement device and the gas collection device are all in wireless connection with the control device.
2. The system for rapidly collecting greenhouse gas from farmland in batches according to claim 1, wherein the static chamber comprises a chamber body, a base, a thermometer, a fan, a liquid sealing device, an upright rubber tube, and a display screen; the chamber body is buckled on the base; the thermometer and the fan are arranged inside the chamber body; the thermometer and the fan are both in wireless connection with the control device; the chamber body is provided with an extraction hole; the upright rubber tube is arranged at a position corresponding to the extraction hole; the liquid sealing device is arranged at an interface of the upright rubber tube; the chamber body is provided with four hooks, so as to be mounted by the static chamber placement device; the display screen is arranged on the chamber body; and the display screen is in wireless connection with the control device.
3. The system for rapidly collecting greenhouse gas from farmland in batches according to claim 1, wherein the static chamber placement device comprises a plurality of fixing posts, a motor assembly, and a traction device; a space frame is formed by the plurality of fixing posts; the traction device is arranged at a top end of the space frame, the motor assembly is arranged on the traction device, the traction device is used for mounting the gas collection device or the static chamber; and the motor assembly is in wireless connection with the control device.
4. The system for rapidly collecting greenhouse gas from farmland in batches according to claim 1, wherein the gas collection device comprises a camera device, a vacuum gas pump, a gas inlet pipe, a gas bag box, an exhaust pipe, and a gas chamber; the camera device is arranged on the gas chamber; the gas inlet pipe passes through the gas chamber and then extends into the gas bag box; the vacuum gas pump is arranged inside the gas chamber; one end of the exhaust pipe is inserted into the gas chamber, and both the exhaust pipe and the gas inlet pipe are connected to the vacuum gas pump.
5. The system for rapidly collecting greenhouse gas from farmland in batches according to claim 1, wherein the control device comprises an Internet of Things processor, and a control apparatus; the Internet of Things processor is used for generating control data of an electrical signal in the static chamber; and the control apparatus is used for generating control data of an electrical signal in the static chamber placement device.
6. A method for rapidly collecting greenhouse gas from farmland in batches, comprising the following steps: obtaining a gas collection task load; determining a task duration based on the gas collection task load; determining operating parameters of components in a system for rapidly collecting greenhouse gas from farmland in batches based on the task duration, wherein the system for rapidly collecting greenhouse gas from farmland in batches is the system according to claim 1, and the operating parameters comprise: placement speed of a static chamber placement device and an injection flow rate of a vacuum gas pump; and respectively determining the total time of a static chamber placement stage and the total time of a gas collection stage based on the operating parameters.
7. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein the static chamber comprises a chamber body, a base, a thermometer, a fan, a liquid sealing device, an upright rubber tube, and a display screen; the chamber body is buckled on the base; the thermometer and the fan are arranged inside the chamber body; the thermometer and the fan are both in wireless connection with the control device; the chamber body is provided with an extraction hole; the upright rubber tube is arranged at a position corresponding to the extraction hole; the liquid sealing device is arranged at an interface of the upright rubber tube; the chamber body is provided with four hooks, so as to be mounted by the static chamber placement device; the display screen is arranged on the chamber body; and the display screen is in wireless connection with the control device.
8. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein the static chamber placement device comprises a plurality of fixing posts, a motor assembly, and a traction device; a space frame is formed by the plurality of fixing posts; the traction device is arranged at a top end of the space frame, the motor assembly is arranged on the traction device, the traction device is used for mounting the gas collection device or the static chamber; and the motor assembly is in wireless connection with the control device.
9. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein the gas collection device comprises a camera device, a vacuum gas pump, a gas inlet pipe, a gas bag box, an exhaust pipe, and a gas chamber; the camera device is arranged on the gas chamber; the gas inlet pipe passes through the gas chamber and then extends into the gas bag box; the vacuum gas pump is arranged inside the gas chamber; one end of the exhaust pipe is inserted into the gas chamber, and both the exhaust pipe and the gas inlet pipe are connected to the vacuum gas pump.
10. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein the control device comprises an Internet of Things processor, and a control apparatus; the Internet of Things processor is used for generating control data of an electrical signal in the static chamber; and the control apparatus is used for generating control data of an electrical signal in the static chamber placement device.
11. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein determining the total time of the static chamber placement stage based on the operating parameters comprises the following steps: determining a placement path of a static chamber according to a placement position of the static chamber and a lifting distance of the placed static chamber; setting placement time based on the placement path and placement speed of the static chamber; and determining the total time of the static chamber placement stage based on the placement time.
12. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 7, wherein determining the total time of the static chamber placement stage based on the operating parameters comprises the following steps: determining a placement path of a static chamber according to a placement position of the static chamber and a lifting distance of the placed static chamber; setting placement time based on the placement path and placement speed of the static chamber; and determining the total time of the static chamber placement stage based on the placement time.
13. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 8, wherein determining the total time of the static chamber placement stage based on the operating parameters comprises the following steps: determining a placement path of a static chamber according to a placement position of the static chamber and a lifting distance of the placed static chamber; setting placement time based on the placement path and placement speed of the static chamber; and determining the total time of the static chamber placement stage based on the placement time.
14. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 9, wherein determining the total time of the static chamber placement stage based on the operating parameters comprises the following steps: determining a placement path of a static chamber according to a placement position of the static chamber and a lifting distance of the placed static chamber; setting placement time based on the placement path and placement speed of the static chamber; and determining the total time of the static chamber placement stage based on the placement time.
15. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 10, wherein determining the total time of the static chamber placement stage based on the operating parameters comprises the following steps: determining a placement path of a static chamber according to a placement position of the static chamber and a lifting distance of the placed static chamber; setting placement time based on the placement path and placement speed of the static chamber; and determining the total time of the static chamber placement stage based on the placement time.
16. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 6, wherein determining the total time of the gas collection stage based on the operating parameters comprises the following steps: determining an air tightness leakage rate of a gas chamber; determining evacuation time of the gas chamber based on the air tightness leakage rate; determining extraction time of the gas chamber of a single static chamber and gas injection time of a single gas bag; and determining the total time of the gas collection stage according to the evacuation time, the extraction time and the gas injection time.
17. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 7, wherein determining the total time of the gas collection stage based on the operating parameters comprises the following steps: determining an air tightness leakage rate of a gas chamber; determining evacuation time of the gas chamber based on the air tightness leakage rate; determining extraction time of the gas chamber of a single static chamber and gas injection time of a single gas bag; and determining the total time of the gas collection stage according to the evacuation time, the extraction time and the gas injection time.
18. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 8, wherein determining the total time of the gas collection stage based on the operating parameters comprises the following steps: determining an air tightness leakage rate of a gas chamber; determining evacuation time of the gas chamber based on the air tightness leakage rate; determining extraction time of the gas chamber of a single static chamber and gas injection time of a single gas bag; and determining the total time of the gas collection stage according to the evacuation time, the extraction time and the gas injection time.
19. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 9, wherein determining the total time of the gas collection stage based on the operating parameters comprises the following steps: determining an air tightness leakage rate of a gas chamber; determining evacuation time of the gas chamber based on the air tightness leakage rate; determining extraction time of the gas chamber of a single static chamber and gas injection time of a single gas bag; and determining the total time of the gas collection stage according to the evacuation time, the extraction time and the gas injection time.
20. The method for rapidly collecting greenhouse gas from farmland in batches according to claim 10, wherein determining the total time of the gas collection stage based on the operating parameters comprises the following steps: determining an air tightness leakage rate of a gas chamber; determining evacuation time of the gas chamber based on the air tightness leakage rate; determining extraction time of the gas chamber of a single static chamber and gas injection time of a single gas bag; and determining the total time of the gas collection stage according to the evacuation time, the extraction time and the gas injection time.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0023] To describe the technical solutions in the embodiments of the present disclosure or in the prior art more clearly, the following briefly introduces the accompanying drawings required for describing the embodiments. Apparently, the accompanying drawings in the following description show merely some embodiments of the present disclosure, and those of ordinary skill in the art may still derive other drawings from these accompanying drawings without creative efforts.
[0024]
[0025]
[0026]
[0027]
[0028]
[0029] In the drawings: [0030] 1motor assembly, 2fixing post, 3display screen, 4thermometer, 5gas collection device, 6liquid sealing device, 7fan, 8chamber body, 9base, 10upright rubber tube, 11liquid, 12control apparatus, 13gas bag box, 14vacuum gas pump, 15camera device, 16exhaust pipe, 17gas chamber, 18gas inlet pipe.
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0031] The following clearly and completely describes the technical solutions in the embodiments of the present disclosure with reference to the accompanying drawings in the embodiments of the present disclosure. Apparently, the described embodiments are merely a part rather than all of the embodiments of the present disclosure. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present disclosure without creative efforts shall fall within the protection scope of the present disclosure.
[0032] An objective of the present disclosure is to provide a system and a method for rapidly collecting greenhouse gas from farmland in batches, thus satisfying the requirements of collecting greenhouse gases from the farmland rapidly and conveniently under different farmland environments.
[0033] To make the above objectives, features and advantages of the present disclosure more apparently and understandably, the present disclosure is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0034] A system for rapidly collecting greenhouse gas from farmland in batches includes a static chamber, a static chamber placement device, a gas collection device and a control device.
[0035] The static chamber is arranged inside the static chamber placement device, and each static chamber is sleeved outside crops. The gas collection device is arranged in the static chamber placement device. The static chamber, the static chamber placement device and the gas collection device are all in wireless connection with the control device.
[0036] As shown in
[0037] The chamber body 8 is of a cylindrical structure with a sealed top, and the base 9 is also of a cylindrical structure. The chamber body 8 is provided with four hooks, so as to be mounted by the static chamber placement device.
[0038] The thermometer 4, the fan 7, the liquid sealing device 6 and the display screen 3 are all fixed to the chamber body 8, and then the chamber body cooperates with the base 9 to form a gas collection airtight space. A reading of the thermometer 4 and a status of the fan 7 are displayed on the display screen 3. Specifically, the status of the fan 7 and the reading of the thermometer 4 are transmitted to an Internet of Things processor to be processed and then displayed on the display screen 3 above the chamber body 8.
[0039] The liquid sealing device 6 is composed of liquid 11, an upright rubber tube 10, and a gas inlet pipe 18. An upper part of the chamber body 8 is provided with an extraction hole, the upright rubber tube 10 is arranged at the extraction hole, and the liquid sealing device 6 is arranged at an interface of the upright rubber tube 10 to guarantee that no air enters.
[0040] The static chamber placement device is mainly composed of a control apparatus 12. After the control apparatus 12 is connected to the hooks on the chamber body 8, the static chamber can be placed at a corresponding position. For example, as shown in
[0041] The gas collection device 5 includes a gas bag box 13, a vacuum gas pump 14, a camera device 15 (i.e., a camera and a host), an exhaust pipe 16, a gas chamber 17, and a gas inlet pipe 18. The gas bag box 13 can hold a certain number of gas bags and replacement gas bags. The vacuum gas pump 14 can extract the gas in the chamber body 8 out through the gas inlet pipe 18, can exhaust the gas from the gas chamber 17 through the exhaust hole 16, and can vacuumize the gas bag in the gas bag box 13 and inject the gas from the gas chamber 17 into the gas bag. The camera device 15 is provided with a camera and a host, the host includes image data processing, storage and transmission elements. The vacuum gas pump 14 can achieve a gas pumping or vacuumizing function, so as to achieve gas transfer. The gas chamber 17 has a gas inlet, an exhaust port, and a gas bag opening. The vacuum gas pump 14 is used to transfer gas or exhaust air through different openings.
[0042] A method for rapidly collecting greenhouse gas from farmland in batches includes the following steps. [0043] (1) A base 9 is installed in advance, and a specific position of the base 9 can be set according to actual demands in a control host of a static chamber placement device. [0044] (2) A required static chamber is prepared before collecting, and the fan 7 and the thermometer 4 in the chamber body 8 are turned on. [0045] (3) All static chambers are mounted using the static chamber placement device and placed to corresponding bases 9. In this step, it is also necessary to determine the total time for placing the static chamber. The specific determination method is as follows: [0046] (1) A task load is input into the system, and the system gives a task time range [T.sub.f, T.sub.e] according to apparatus performance and the task load. A task duration T (T.sub.f<T<T.sub.c) can be modified by adjusting task parameters of the control apparatus 12, mainly including the total time T.sub.s of a static chamber placement stage and the total time T.sub.c of a gas collection stage,
[0048] In the implementation process, the range given by the system after calculation can be set after the static chamber placement task and the gas collection task. After specific time is set by a user, the system continuously calculates the duration of each link in reverse and automatically adjusts operating parameters in the process, thus making the total time equal to the time set by the user. [0049] (2) All static chambers are efficiently mounted to the corresponding bases 9 in batches. Assuming that the average mounting time is t.sub.m, Ci is the i-th static chamber, and the number of all static chambers is N.sub.s, then i ?{1, 2, . . . , N.sub.s}. As only one static chamber can be placed every time, the placement speed v follows the variable speed motion. The length, width and height of the system are set to be x, y and z, respectively, the static chamber is lift by h (h<z) meters during the placement process, and a placement position of the i-th static chamber is {(a, b), where a<x, b<y}. As the static chamber moves towards the placement position when lifting, the total distance (the distance of placement and the distance of returning to a starting point after placement) can be recorded as d.sub.i:
[0050] Then the time required is as follows:
[0051] The total time of the static chamber placement stage is as follows:
[0053] In the gas collection stage, the gas collection device 5 is used to collect gas and record the contents of the display screen 3. Assuming that a space of the gas chamber 17 is S, the total number of gas bags is Na, the volume of the gas bag is V, an internal pressure is p and a single-side area is Sc in the gas collection device 5. The gas in the gas chamber 17 is exhausted by a vacuum pump 14, and the gas chamber is pumped into vacuum. In this process, the air tightness of the gas chamber 17 is self-inspected, assuming that pumping speed of a previous pump k, an initial air pressure of the gas chamber 17 is p.sub.0, and the final air pressure of the gas chamber 17 is p.sub.1, and the an air tightness leakage rate ? is calculated.
[0054] t.sub.f is an absolute temperature (K) of the gas in the gas chamber 17 at the start of the self-inspection, and t.sub.e is an absolute temperature (K) of the gas in the gas chamber 17 at the end of the self-inspection. If ?<0.2%, the air tightness of the gas chamber 17 is qualified, and evacuation time t.sub.f can be calculated:
[0055] An injection flow rate of the vacuum gas pump 14 is q.sub.v, the cross-sectional area of a gas pipe for injecting gas into the gas bag is A, an average flow rate in the pipe is u, the intensity of pressure detected by the pressure outside the gas bag is p.sub.o, and a threshold value is Fc.
[0056] The extraction time of a corresponding gas chamber 17 of single static chamber is as follows:
[0057] Gas injection time of a single gas bag is as follows:
[0058] The total time of the static chamber placement stage is as follows:
[0060] Based on the above description, the upright rubber tube of the chamber body of the static chamber is positioned through a computer vision technology, so as to achieve the butt joint of the gas inlet pipe and the upright rubber tube in the liquid sealing device. Real-time images obtained by the camera and the host are processed by the host, so as to identify the upright rubber tube of the chamber body of the static chamber, and then the gas inlet pipe connected to the vacuum gas pump is connected to the rubber tube in the liquid sealing device for gas collection. After the operation of the static chamber is completed, the camera is used to capture the display screen above the static chamber to record a real-time temperature and a fan status. The method not only can work directly in the field, but also simplifies the complex instrument operation. Due to the adoption of mechanical devices, Internet of Things and computer vision technology, the gas collection time is rapid, and the collection efficiency can be effectively improved.
[0061] Embodiments in this specification are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts between the embodiments can be referred to each other.
[0062] Several examples are used for illustration of the principles and implementation methods of the present disclosure. The description of the embodiments is merely used to help illustrate the method and its core principles of the present disclosure. In addition, those of ordinary skill in the art can make various modifications in terms of specific embodiments and scope of application in accordance with the teachings of the present disclosure. In conclusion, the content of this specification shall not be construed as a limitation to the present disclosure.