GEOTHERMAL SYSTEM COMPRISING MULTITUBE VERTICALLY-SEALED UNDERGROUND HEAT-EXCHANGER AND METHOD FOR INSTALLING SAME
20220397308 · 2022-12-15
Assignee
Inventors
- Heuy Nam CHO (Incheon, KR)
- Hyeon Ho CHANG (Ansan-si, Gyeonggi-do, KR)
- Sung Ouk CHOI (Incheon, KR)
- Young Hwa KIM (Ansan-si, Gyeonggi-do, KR)
- Jo Bum AN (Incheon, KR)
Cpc classification
F24T50/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24T10/15
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24T2010/53
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/10
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
Abstract
A geothermal system including a multitube vertically-sealed underground heat-exchanger includes: a geothermal well formed by vertically excavating a foundation; a heat pump which is arranged in the foundation, and which includes a circulating pump; and a connection tube, an auxiliary facility, and a multitube vertically-sealed underground heat-exchanger which are buried and installed in the geothermal well, and which are connected to the heat pump such that a thermal fluid thermally restored in the geothermal well is supplied to the heat pump through the circulating pump, and the thermal fluid that has undergone heat exchange in the heat pump is recovered back to the geothermal well and thermally restored therein.
Claims
1. A geothermal system including a vertical multitubular hermetic underground heat exchanger, comprising: a geothermal hole vertically drilled in a ground; a heat pump disposed on the ground and including a circulation pump; and the vertical multitubular hermetic underground heat exchanger embedded in the geothermal hole and connected to the heat pump so as to supply thermal fluid, having absorbed heat in the geothermal hole, to the heat pump by the circulation pump and to recover the thermal fluid, having exchanged heat in the heat pump, to the geothermal hole, the vertical multitubular hermetic underground heat exchanger including a connection tube (not shown) and associated components, wherein the vertical multitubular hermetic underground heat exchanger comprises: a recovery header unit disposed underneath the geothermal hole; a recovery unit comprising an outflow tube connected to the heat pump so as to allow the thermal fluid, having exchanged heat in the heat pump, to flow therethrough from the heat pump, a recovery connection tube having openings respectively formed in a lower portion and a side portion thereof and connected at the side portion thereof to the outflow tube, a distribution tube having one opening formed in an upper portion thereof and one or more openings formed in a lower portion thereof and connected at an upper portion thereof to the lower portion of the recovery connection tube, and two or more recovery tubes embedded in the geothermal hole and connected at an upper end thereof to the lower portion of the distribution tube and at a lower end thereof to the recovery header unit such that the thermal fluid outflowing from the outflow tube is recovered to the recovery header unit while absorbing heat; a supply unit comprising an inflow tube connected to the heat pump, a supply connection tube having openings respectively formed in a lower portion and a side portion thereof and connected at the side portion thereof to the inflow tube, an interflow tube having one opening formed in an upper portion thereof and one or more openings formed in a lower portion thereof and connected at the upper portion thereof to the lower portion of the supply connection tube, and two or more supply tubes embedded in the geothermal hole and connected at an upper end thereof to the lower portion of the interflow tube and at a lower end thereof to the recovery header unit such that the thermal fluid recovered to the recovery header unit is supplied to the heat pump through the interflow tube, the supply connection tube, and the inflow tube while absorbing heat; and a load bar coupled both to the recovery tube and to the supply tube, wherein the recovery header unit has an internal space in which the recovery tubes are respectively connected to the supply tubes such that the thermal fluid recovered through the recovery tubes merges and is distributed to the supply tubes by changing a direction, the internal space being curved at a lower portion thereof such that the thermal fluid recovered from the recovery tubes is smoothly transferred to the supply tubes, and wherein the load bar is fixed to the recovery tubes and the supply tubes by means of a fixing member so as to space the recovery tubes and the supply tubes apart from one another, and includes a metal member therein to prevent floatation of the recovery tubes and the supply tubes.
2. The geothermal system according to claim 1, further comprising: checking units respectively mounted on upper portions of the recovery connection tube and the supply connection tube each having an opening formed in an upper portion thereof; and a cover configured to hermetically close an upper portion of the geothermal hole to thus prevent entry of foreign substances into the geothermal hole.
3. The geothermal system according to claim 1, wherein the side portion of the recovery connection tube is connected to the inflow tube and the side portion of the supply connection tube is connected to the outflow tube such that a function of the recovery tubes is replaced with a function of the supply tubes.
4. The geothermal system according to claim 1, wherein the recovery header unit comprises an upper header and a lower header, the upper header and the lower header being fused to each other by heat in a butt-welding manner.
5. The geothermal system according to claim 2, wherein the recovery header unit comprises a plurality of sockets disposed in an upper portion of an inside thereof.
6. The geothermal system according to claim 5, wherein each of the sockets is internally provided with a heating wire, and the recovery tubes and the supply tubes are respectively inserted into the plurality of sockets and fused thereto by heat.
7. The geothermal system according to claim 5, wherein each of the plurality of sockets comprises a support protective ring including the heating wire therein and fixedly inserted thereinto, and the recovery tubes and the supply tubes are respectively inserted into the support protective rings and fused thereto by heat.
8. The geothermal system according to claim 2, wherein the recovery header unit comprises a plurality of thermal fusion sockets projecting upwards from an upper portion thereof, and the recovery tubes and the supply tubes are melted at outer circumferential surfaces of lower ends thereof and are fused to the plurality of thermal fusion sockets by heat.
9. The geothermal system according to claim 8, wherein each of the plurality of thermal fusion sockets comprises a support ring fitted thereover so as to prevent deformation of the thermal fusion socket.
10. The geothermal system according to claim 2, wherein the recovery tubes comprise a first recovery tube and a second recovery tube, and the supply tubes comprise a first supply tube and a second supply tube.
11. The geothermal system according to claim 10, wherein the recovery tubes further comprise a converging tube, connected to lower ends of the first recovery tube and the second recovery tube, and a third recovery tube, connected to a lower end of the converging tube and connected at a lower end thereof to the recovery header unit, and wherein the supply tubes further comprise a diverging tube, connected to lower ends of the first supply tube and the second supply tube, and a third supply tube, connected to a lower end of the diverging tube and connected at a lower end thereof to the recovery header unit.
12. The geothermal system according to claim 10, wherein the first and second recovery tubes and the first and second supply tubes have a same outside diameter and a same inside diameter.
13. The geothermal system according to claim 10, wherein the first recovery tube has an outside diameter and an inside diameter greater than an outside diameter and an inside diameter of the second recovery tube, the first supply tube has an outside diameter and an inside diameter greater than an outside diameter and an inside diameter of the second supply tube, the first recovery tube and the first supply tube have a same outside diameter and a same inside diameter, and the second recovery tube and the second supply tube have a same outside diameter and a same inside diameter.
14. The geothermal system according to claim 2, further comprising a weight mounted on a lower portion of the recovery header unit so as to prevent floatation of the recovery header unit.
15. The geothermal system according to claim 2, wherein the load bar is disposed between the recovery tubes and the supply tubes so as to space the recovery tubes and the supply tubes apart from one another, and comprises a metal member included therein, and the fixing member fixes the load bar to the recovery tubes and the supply tubes.
16. The geothermal system according to claim 1, wherein the load bar comprises an adhesive band provided on an outer surface thereof so as to attach the load bar to the recovery tubes and the supply tubes.
17. The geothermal system according to claim 2, wherein each of the supply unit and the recovery unit comprises a marker indicating a direction in which the thermal fluid flows.
18. The geothermal system according to claim 2, further comprising an injection pump connected to a water tank so as to supply water to the geothermal hole.
19. The geothermal system according to claim 1, further comprising: a cement tremie tube inserted into the geothermal hole and connected at an upper portion thereof to a cement injection pump so as to supply a grout material containing cement to a lower portion of an inside of the geothermal hole; and a bentonite tremie tube inserted into the geothermal hole and connected at an upper portion thereof to a bentonite injection pump so as to supply a grout material containing bentonite to an upper portion of the inside of the geothermal hole, wherein the grout material containing cement comprises a waterproofing agent in order to prevent the thermal fluid from leaking outside the recovery tubes and the supply tubes when the thermal fluid leaks from the recovery header unit.
20. A method of installing the geothermal system including a vertical multitubular hermetic underground heat exchanger according to claim 19, comprising: a first operation of vertically drilling a ground to form a geothermal hole; a second operation of disposing two or more recovery tube injectors and two or more supply tube injectors on the ground; a third operation of coupling the recovery header unit to lower ends of the recovery tubes running from the recovery tube injectors and to lower ends of the supply tubes running from the supply tube injectors; a fourth operation of fixing the load bar to the recovery tubes and the supply tubes, injecting the recovery tubes into the geothermal hole from the recovery tube injectors while injecting the supply tubes into the geothermal hole from the supply tube injectors in order to dispose the recovery header unit at a lower portion of the geothermal hole, and disposing the cement tremie tube and/or the bentonite tremie tube in the geothermal hole; a fifth operation of mounting valves on upper ends of the recovery tubes and the supply tubes, and charging clean water into the recovery tubes and the supply tubes through the valves in order to prevent constriction of the recovery tubes and the supply tubes; a sixth operation of supplying the grout material containing cement to the lower portion of the inside of the geothermal hole through the cement tremie tube and supplying the grout material containing bentonite to the upper portion of the inside of the geothermal hole through the bentonite tremie tube; and a seventh operation of removing the valves from the upper ends of the recovery tubes and the supply tubes, connecting the distribution tube to the upper ends of the recovery tubes, connecting the recovery connection tube to the distribution tube, connecting the outflow tube to the recovery connection tube, connecting the interflow tube to the upper ends of the supply tubes, connecting the supply connection tube to the interflow tube, connecting the inflow tube to the supply connection tube, and connecting the outflow tube and the inflow tube to the heat pump.
21. The method according to claim 20, wherein the seventh operation comprises mounting checking units on upper portions of the recovery connection tube and the supply connection tube.
22. The method according to claim 20, wherein the third operation comprises mounting a weight to a lower portion of the recovery header unit in order to prevent floatation of the recovery header unit.
23. The method according to claim 20, wherein the cement tremie tube and the bentonite tremie tube are constructed so as to have a same configuration, and wherein the sixth operation comprises supplying the grout material containing cement to the lower portion of the inside of the geothermal hole through the cement tremie tube and supplying the grout material containing bentonite to the upper portion of the inside of the geothermal hole through the cement tremie tube.
Description
DESCRIPTION OF DRAWINGS
[0040]
[0041]
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053]
[0054]
[0055]
[0056]
[0057]
[0058]
[0059]
[0060]
[0061]
DESCRIPTION OF REFERENCE NUMERALS
[0062] 10: vertical multitubular hermetic underground heat exchanger [0063] 100: recovery header unit 200: recovery unit 210: outflow tube 220: recovery connection tube 230: distribution tube [0064] 240: recovery tube 240a: first recovery tube 240b: second recovery tube [0065] 300: supply unit 310: inflow tube 320: supply connection tube 330: interflow tube 340: supply tube [0066] 340a: first supply tube 340b: second supply tube [0067] 400: checking unit 500: cement tremie tube 600: bentonite tremie tube [0068] 700: weight 800: cover 900: load bar 1000: fixing member [0069] 20: ground 21: geothermal hole HP: heat pump CP: circulation pump WP: injection pump
BEST MODE
[0070] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. Herein, descriptions of known technologies are given briefly or omitted for brevity of explanation.
[0071] A geothermal system 1 including a vertical multitubular hermetic underground heat exchanger 10 may include a geothermal hole 21 vertically formed in the ground 20, a heat pump HP disposed on the ground 20 and including a circulation pump CP, and the vertical multitubular hermetic underground heat exchanger 10, which is embedded in the geothermal hole 21 and is connected to the heat pump HP so as to supply thermal fluid, which has absorbed heat in the geothermal hole 21, to the heat pump HP and to recover the thermal fluid, which has exchanged heat in the heat pump HP, to the geothermal hole 21, the vertical multitubular hermetic underground heat exchanger 10 including a connection tube (not shown) and associated components.
[0072] Here, the circulation pump CP may be mounted inside or outside the heat pump HP so as to circulate the thermal fluid, which has exchanged heat in the heat pump HP.
[0073] Referring to
[0074] Referring to
[0075] The recovery header unit 100 may be constructed to serve as a functional boundary at which supply tubes 340 of the supply unit 300 are connected to recovery tubes 240 of the recovery unit 200.
[0076] The recovery header unit 100 may have an internal space 100s defined therein.
[0077] Referring to
[0078] The internal space 100s in the recovery header unit 100 may be filled with the thermal fluid, which is recovered from the recovery tubes 240 connected to the upper portion of the recovery header unit 100, and the thermal fluid charged in the internal space 100s may be supplied to the supply tubes 340 connected to the upper portion of the recovery header unit 100.
[0079] Referring to
[0080] As additionally illustrated in
[0081] Further referring to
[0082] Here, the converging tube 240d may be composed of a “Y”-shaped tube, and may be connected at the upper end thereof both to the lower end of the first recovery tube 240a and to the lower end of the second recovery tube 240b and at the lower end thereof to the upper end of the third recovery tube 240c, which is connected to the recover header 100. Consequently, because the number of connection tubes is lower than in the case in which the first recovery tube 240a and the second recovery tube 240b are connected to the recover header 100, it is possible to easily perform a connection operation.
[0083] Here, the diverging tube 340d may be composed of a “Y”-shaped tube, and may be connected at the upper end thereof both to the lower end of the first supply tube 340a and to the lower end of the second supply tube 340b and at the lower end thereof to the upper end of the third supply tube 340c, which is connected to the recover header 100. Consequently, because the number of connection tubes is lower than in the case in which the first supply tube 340a and the second supply tube 340b are connected to the recover header 100, it is possible to easily perform a connection operation.
[0084] Furthermore, the converging tube 240d and the diverging tube 340d may be disposed at different levels so as to allow the tubes to be easily inserted into the geothermal hole 21 even when the geothermal hole 21 has a small diameter.
[0085] Alternatively, each of the converging tube 240d and the diverging tube 340d may be composed at one end thereof of an elbow tube and at the other end thereof of a “T”-shaped tube so as to convey the same effect.
[0086] Referring to
[0087] Alternatively, the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b may have the same diameter, and the first “U”-shaped band U1 and the second “U”-shaped band U2 may have the same diameter. Furthermore, the first and second recovery tubes 240a and 240b, the first and second supply tubes 340a and 340b, and the first and second “U”-shaped bands U1 and U2 may be fixedly inserted into a tube body constituting the recovery header unit 100 so as to realize a more simplified recovery header unit 100.
[0088] Referring to
[0089] Referring to
[0090] Here, the recovery connection tube 220 may have an opening formed in the upper portion thereof, and the checking unit 400 may be mounted in the upper portion of the recovery connection tube 220.
[0091] The opening formed in the upper portion of the distribution tube 230 may have an area greater than the total area of the two openings formed in the lower portion of the distribution tube 230 such that the rate of flow of the fluid that is introduced into the opening formed in the upper portion of the distribution tube 230 is equal to the rate of flow of the fluid that is discharged from the two opening formed in the lower portion of the distribution tube 230.
[0092] To summarize, the recovery unit 200 may be connected both to the heat pump HP and to the recovery header unit 100 so as to recover the thermal fluid, which has exchanged heat in the heat pump HP, to the recovery header unit 100. The thermal fluid absorbs heat in the geothermal hole 21 while flowing to the recovery header unit 100 from the heat pump HP.
[0093] Referring to
[0094] Here, the supply connection tube 320 may have an opening formed in the upper portion thereof, and the checking unit 400 may be mounted in the upper portion of the supply connection tube 320.
[0095] The opening formed in the upper portion of the interflow tube 330 may have an area greater than the total area of the two openings formed in the lower portion of the interflow tube 330 such that the rate of flow of the fluid that is introduced into the opening formed in the upper portion of the interflow tube 330 is equal to the rate of flow of the fluid that is discharged from the two openings formed in the lower portion of the interflow tube 330.
[0096] To summarize, the supply unit 300 may be connected both to the recovery header unit 100 and to the heat pump HP so as to supply the thermal fluid to the heat pump HP from the recovery header unit 100, and the thermal fluid may absorb heat while flowing to the heat pump HP from the recovery header unit 100.
[0097] The inflow tube 310, the supply connection tube 320, the interflow tube 330, and the supply tube 340 of the supply unit 300 may be configured so as to respectively correspond to the outflow tube 210, the recovery connection tube 220, the distribution tube 230, and the recovery tube 240 of the recovery unit 200.
[0098] Referring to
[0099] Alternatively, the cut surfaces of the lower ends of the recovery tubes 240 and the supply tubes 340 may be thermally fused to the thermal fusion sockets 110 provided at the upper portion of the recovery header unit 100 in a butt-welding manner. Furthermore, the cut surfaces of the lower ends of the recovery tubes 240 and the supply tubes 340 may be thermally fused to the first and second “U”-shaped bands U1 and U2.
[0100] In this case, the thermal fusion sockets 110 may be considered to be formed at the recovery header unit 100 and to include the first and second “U”-shaped bands U1 and U2, which are respectively coupled to the recovery tubes 240 and the supply tubes 340.
[0101] Alternatively, the supply tubes 340 of the supply unit 300 may be embodied as a single supply tube 340, and the recovery tubes 240 of the recovery unit 200 may be composed of the first and second recovery tubes 240a and 240b, as illustrated in
[0102] Alternatively, the supply tubes 340 may be composed of two or more supply tubes, which are coupled to the recovery header unit 100.
[0103] Alternatively, the configuration of the supply tubes 340 may be replaced with the configuration of the first and second recovery tubes 240a and 240 such that the supply unit 300 performs the function of the recovery unit 200 while the recovery unit 200 performs the function of the supply unit 300.
[0104] In other words, the side portion of the recovery connection tube 220 may be connected to the inflow tube 310 and the side portion of the supply connection tube 320 may be connected to the outflow tube 210 such that the function of the recovery tube 240 is exchanged with the function of the supply tube 340.
[0105] Consequently, the recovery header unit 100 may be constructed so as to serve as the functional boundary at which the supply tubes 340 are connected to the recovery tube 240.
[0106] Referring to
[0107] The reason why the socket portions 110′ are internally provided at the upper portion of the recovery header unit 100 is because the case in which the socket portion 110′ are internally provided occupies a small space compared to the case in which the socket portions 110′ project outwards from the recovery header unit 100 when the recovery header unit 100 is inserted into the geothermal hole 21, which has a small diameter, thereby allowing the recovery header unit 100 to be easily inserted into the geothermal hole 21.
[0108] The socket portions 110′ may be internally provided with heating wires T, and the recovery tubes 240 and the supply tubes 340 may be respectively inserted into the socket portions 110′ so as to be fused to the socket portions 110′ using heat.
[0109] Alternatively, the socket portions 110′ may be internally provided therein with support protective rings 120′ each including a heating wire T embedded therein, and the recovery tubes 240 and the supply tubes 340 may be respectively inserted into the support protective rings 120′ so as to be fused thereto using heat.
[0110] The checking unit 400 may include a pair of checking units, which are respectively mounted on the upper portions of the recovery connection tube 220 and the supply connection tube 320.
[0111] Referring to
[0112] Consequently, because it is possible to perform checking after the vertical multitubular hermetic underground heat exchanger 10 is mounted in the geothermal hole 21 and it is possible to separately check the geothermal holes 21 for accidental spillage to thus respond to the accidental spillage, it is possible to prevent shutdown of the entire facility due to accidental spillage.
[0113] Referring to
[0114] The cement tremie tube 500 may be inserted in the geothermal hole 21, and may be connected at the upper portion thereof to a cement injection pump CP so as to supply a grout material C containing cement into the geothermal hole 21. The lower portion of the geothermal hole 21 may be filled with the grout material C containing cement.
[0115] Particularly, the grout material C containing cement may include a waterproofing agent in order to prevent the heat in the geothermal hole 21 from leaking to the outside of the recovery tubes 240 or the supply tubes 340 when the heat leaks from the upper thermal fusion socket 110 of the recovery header unit 100, which has a large number of connected portions, while the grout material C cures in the geothermal hole 21.
[0116] The bentonite tremie tube 600 may be inserted into the geothermal hole 21, and may be connected at the upper portion thereof to a bentonite injection pump BP so as to supply a grout material B containing bentonite into the geothermal hole 21. The upper portion of the geothermal hole 21 may be filled with the grout material B containing bentonite.
[0117] In some field circumstances, the cement tremie tube 500 and the bentonite tremie tube 600 may be integrated into a single tube, and one of the grout material B containing bentonite and the grout material C containing cement may be applied for construction of the underground heat exchanger.
[0118] Particularly, in the case of the cement material or so-called “high efficient bentonite material” in which bentonite is mixed with an excessive amount of sand in order to increase the thermal conductivity thereof, there is the possibility of unintentional constriction in which the recovery tubes 240 and the supply tubes 340 are deformed inwards in a deep zone due to the high specific gravity of the grout material B or C when the grout material B or C is injected into the geothermal hole 21.
[0119] In order to prevent this problem, the hydraulic pressure of the water, which is injected into the geothermal hole 21 through one of the valves Va, mounted on the recovery tubes 240 and the supply tubes 340, prior to injection of the grout material B or C into the geothermal hole 21, is increased to 7-10 kg/cm2 while checking the pressure of the water through a manometer PG, and the increased pressure is maintained until curation of the cement or gelation of the bentonite is completed, thereby preventing unintentional constriction of the recovery tubes 240 and the supply tubes 340.
[0120] Although there is a characteristic in that the increased moisture content of the cement or bentonite charged in the geothermal hole 21 causes an increase in thermal conductivity, the interior of the underground heat exchanger 10 becomes dried, thus causing a decrease in thermal conductivity when the interior temperature of the geothermal hole 21 increases due to the cooling operation.
[0121] In order to solve this problem, when the cement tremie tube 500 and the bentonite tremie tube 600 are inserted into the geothermal hole 21, an injection water tube wpt connected to an injection pump WP may also be inserted together with the cement tremie tube 500 and the bentonite tremie tube 600.
[0122] In some instances, the injection water tube wpt may be inserted before holes in the injection water tube wpt are plugged with mud or water-soluble grease.
[0123] The injection pump WP configured to supply injection water may be connected to a water tank (not shown). The injection pump WP may forcibly and continuously inject the water in the water tank (not shown) into the geothermal hole 21 through the injection water tube wpt, and thus the holes wpts in the injection water tube wpt, which are plugged with mud or water-soluble grease, may be gradually opened so as to allow the injection water to be introduced into the geothermal hole 21. Consequently, the high moisture content in the geothermal hole 21 may be persistently maintained, thereby increasing the thermal conductivity of the underground heat exchanger 10.
[0124] Alternatively, in place of the injection water tube wpt having formed therein the holes wpts, a tube, which is finely slit in the outer circumferential surface thereof or is wound in a roll fashion, may be applied so as to realize the same function of allowing the grout materials B and C to be supplied into the geothermal hole 21 but not to be introduced into the injection water tube wpt when the interior of the geothermal hole 21 is grouted.
[0125] The weight 700 may be composed of a case and a material having a specific gravity higher than metal or cement concrete and charged in the case. The weight 700 is provided at the lower portion of the recovery header unit 100 so as to prevent floatation of the recovery header unit 100.
[0126] Accordingly, the weight 700 is capable of preventing floatation of the recovery tubes 240 and the supply tubes 340, which are connected to the recovery header unit 100.
[0127] Referring to
[0128] Referring to
[0129] Furthermore, the weight 700 may be integrally formed with the lower portion of the recovery header unit 100.
[0130] Referring to
[0131] More specifically, the bracket 1100 may be additionally provided at the upper portion of the recovery header unit 100, and the outer surfaces of the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b may be fastened and coupled to the bracket 1100 by means of the “U”-shaped bolts 1110 and mating nuts.
[0132] The cover 800 may hermetically close the upper portion of the geothermal hole 21 to prevent the entry of foreign substances. The cover 800 may be provided at a side portion thereof with a checking window 810 so as to enable a worker to open the checking window 810 and to check the vertical multitubular hermetic underground heat exchanger 10 through the checking window 400.
[0133] Referring to
[0134] Alternatively, referring to
[0135] Accordingly, because the number of supply tubes 340 and the number of recovery tubes 240 are increased and thus the heat exchange area is increase compared to a conventional underground heat exchanger composed of a single supply tube and a single recovery tube, it is possible to increase the efficiency of heat exchange of the underground heat exchanger 10.
[0136] Referring to
[0137] Referring to
[0138] The load bar 900 may further include adhesive bands 903 configured to attach the load bar 900 to the recovery tubes 240 and the supply tubes 340. The adhesive bands 930 may serve to prevent the recovery tubes 240 and the supply tubes 340 from being separated from the load bar 900 by virtue of the adhesive action therebetween when the recovery tubes 240 and the supply tubes 340 are fixed to the load bar 900 by means of the fixing member 1000.
[0139] Furthermore, the load bar 900 may be fixed to the recovery tubes 240 and the supply tubes 340 by means of an additional fixing band (not shown) in a bolt-fastening manner.
[0140] Referring to
[0141] The fixing member 1000 may be a band made of rubber, urethane, or the like.
[0142] Referring to
[0143] Referring to
[0144] Accordingly, because the load bar 900 is fixed to the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b by means of the fixing member 1000, it is possible to prevent floatation of the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b using not only the weight 700 but also the load bar 900.
[0145] When the supply tubes 340 of the supply unit 300 are composed of a single supply tube 340 and the recovery tubes 240 of the recovery unit 200 are composed of the first and second recovery tubes 240a and 240b, as illustrated in
[0146] An operation of installing the geothermal system including the vertical multitubular hermetic underground heat exchanger according to the present invention will be described with reference to
[0147] As illustrated in
[0148] As illustrated in
[0149] Here, each of the recovery tube injectors 2000 may be composed of a recovery roller 2100 around which the recovery tubes 240 are wound and a recovery roller motor 2200 configured to rotate the recovery roller 2100 to thus supply the recovery tubes 240, and the supply tube injector 3000 may be composed of a supply roller 3100 around which the supply tubes 340 are wound and a supply roller motor 3200 configured to rotate the supply roller 3100 to thus supply the supply tubes 340.
[0150] The recovery roller motor 2200 and the supply roller motor 3200 may be omitted when an additional hydraulic injection apparatus (not shown) is provided.
[0151] Subsequently, as illustrated in
[0152] Subsequently, a fourth operation (S400) of fixing the load bar 900 to the recovery tubes 240 and the supply tubes 340 by means of the fixing member 1000, injecting the recovery tubes 240 into the geothermal hole 21 through the recovery tube injector 2000, injecting the supply tubes 340 into the geothermal hole 21 through the supply tube injector 3000 to position the recovery header unit 100 at the lower portion of the geothermal hole 21, and mounting the cement tremie tube 500 and/or the bentonite tremie tube 600 in the geothermal hole 21 is performed.
[0153] In this operation, the cement tremie tube 500 may be omitted.
[0154] Subsequently, as illustrated in
[0155] Subsequently, a sixth operation (S600) of supplying the grout material C containing cement to the lower portion of the inside of the geothermal hole 21 through the cement tremie tube 500 and supplying the grout material B containing bentonite to the upper portion of the inside of the geothermal hole 21 through the bentonite tremie tube 600 is performed.
[0156] The sixth operation may be an operation of supplying the grout material B containing bentonite to the upper portion of the inside of the geothermal hole 21 through the bentonite tremie tube 600 without supplying the grout material C containing cement to the lower portion of the inside of the geothermal hole 21 through the cement tremie tube 500.
[0157] Finally, a seventh operation (S700) of removing the valves Va from the recovery tubes 240 and the supply tubes 340 after the grout material C containing cement or the grout material B containing bentonite is cured, connecting the distribution tube 230 to the upper end of the recovery tubes 240 and then connecting the recovery connection tube 220 to the distribution tube 230, as illustrated in
[0158] In the seventh operation (S700), the checking units 400 may be respectively mounted in upper portions of the recovery connection tube 220 and the supply connection tube 320.
[0159] In the third operation (S300), the weight 700 may be mounted on the lower portion of the recovery header unit 100 so as to prevent floatation of the recovery header unit 100.
[0160] The cement tremie tube 500 may be constructed so as to have the same configuration as the bentonite tremie tube 600.
[0161] More specifically, in the fourth operation (S400), both the cement tremie tube 500 and the bentonite tremie tube 600 may not be mounted in the geothermal hole 21, only the cement tremie tube 500 may be mounted in the geothermal hole 21, the grout material C containing cement may be supplied to the lower portion of the inside of the geothermal hole 21 through the cement tremie tube 500, and the grout material B containing bentonite may be supplied to the upper portion of the inside of the geothermal hole 21 through the cement tremie tube 500.
[0162] Consequently, because the geothermal system 1 including the vertical multitubular hermetic underground heat exchanger according to the present invention has an increased number of supply tubes 340 and the recovery tubes 240 and thus has increased heat exchange area, it is possible to improve the efficiency of heat exchange of the underground heat exchanger.
[0163] Furthermore, because the weight 700 is mounted on the lower portion of the recovery header unit 100, it is possible to prevent floatation of the recovery header unit 100, the first and second recovery tubes 240a and 40b and the first and second supply tubes 340a and 340b, which are connected to the recovery header unit 100. In addition, because the load bar 900 is disposed between the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b and is fixed to the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b by means of the fixing member 1000, it is also possible to prevent floatation of the first and second recovery tubes 240a and 240b and the first and second supply tubes 340a and 340b by means of the load bar 900 and the fixing member 1000.
[0164] In addition, because the checking units 400 are respectively mounted on the recovery connection tube 220 and the supply connection tube 320 so as to enable the vertical multitubular hermetic underground heat exchanger 10 to be checked after the vertical multitubular hermetic underground heat exchanger 10 is installed in the geothermal hole 21, it is possible to separately check for accidental spillage at all geothermal holes 21 and to preemptively prevent complete shutdown of a facility due to the accidental spillage.
[0165] Although the present invention has been described in detail based on the embodiments, the embodiments are only some of preferred embodiments of the present invention. Accordingly, it should be understood that the present invention is not limited by the embodiments disclosed herein and that the present invention must be construed by the attached claims and equivalents thereof.