System and methodology for high pressure alternate path
11525340 · 2022-12-13
Assignee
Inventors
Cpc classification
International classification
E21B17/10
FIXED CONSTRUCTIONS
Abstract
A technique facilitates formation of a gravel pack along relatively lengthy wellbores. According to an embodiment, a completion system comprises a plurality of screen assemblies. The completion system also has an alternate path system disposed along the plurality of screen assemblies. The alternate path system includes shunt tubes, e.g. transport tubes, coupled together by jumper tubes. An anti-buckling structure is coupled to each jumper tube to prevent buckling when high operational pressures, e.g. operating pressures of 9000 psi or higher, are applied to the alternate path system.
Claims
1. A system for use in a well, comprising: a completion system having: a plurality of screen assemblies; an alternate path system disposed along the plurality of screen assemblies, the alternate path system comprising shunt tubes coupled together by jumper tubes; and an anti-buckling structure comprising a first plate affixed to a first jumper tube and coupled to a second plate affixed to a second jumper tube.
2. The system as recited in claim 1, wherein each jumper tube is positioned radially between a base pipe and a shroud.
3. The system as recited in claim 1, wherein the shunt tubes comprise transport tubes.
4. The system as recited in claim 1, wherein the shunt tubes comprise packing tubes.
5. The system as recited in claim 1, wherein the shunt tubes are generally rectangular in cross-section, and wherein the jumper tubes are generally circular in cross-section.
6. A method comprising: carrying a gravel slurry in an alternate path system disposed along a plurality of screen assemblies, the alternate path system comprising shunt tubes coupled together by a first jumper tube and a second jumper tube, each jumper tube being affixed to an anti-buckling structure comprising a first plate affixed to the first jumper tube and coupled to a second plate affixed to the second jumper tube.
7. A method comprising: disposing a plurality of screen assemblies in a completion system, wherein the plurality of screen assemblies comprises a first screen assembly and a second screen assembly sequentially disposed with respect to the first screen assembly; and installing an alternate path system along the plurality of screen assemblies, wherein installing the alternate path system comprises: running a first plurality of shunt tubes externally to a first sand screen of the first screen assembly; running a second plurality of shunt tubes externally to a second sand screen of the second screen assembly; using a first jumper tube and a second jumper tube to join the first plurality of shunt tubes to the second plurality of shunt tubes; and affixing an anti-buckling structure comprising a first plate affixed to a first jumper tube and coupled to a second plate affixed to a second jumper tube.
8. The method of claim 7, wherein the shunt tubes comprise transport tubes.
9. The method of claim 7, wherein the shunt tubes are generally rectangular in cross-section, and wherein the first jumper tube and the second jumper tube are generally circular in cross-section.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Certain embodiments of the disclosure will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It should be understood, however, that the accompanying figures illustrate the various implementations described herein and are not meant to limit the scope of various technologies described herein, and:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
DETAILED DESCRIPTION
(20) In the following description, numerous details are set forth to provide an understanding of some embodiments of the present disclosure. However, it will be understood by those of ordinary skill in the art that the system and/or methodology may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
(21) The disclosure herein generally involves a system and methodology to facilitate formation of gravel packs in wellbores and thus the subsequent production of well fluids. A well completion is provided with an alternate path system, e.g. a shunt tube system, for carrying gravel slurry along an alternate path so as to facilitate improved gravel packing during a gravel packing operation. The system and methodology are very useful for facilitating formation of a gravel pack along relatively lengthy wellbores.
(22) According to an embodiment, a completion system comprises a plurality of screen assemblies. The completion system also has an alternate path system disposed along the plurality of screen assemblies. The alternate path system includes shunt tubes, e.g. transport tubes, coupled together by jumper tubes. For example, an alternate path system may be comprised of shunt tubes running externally to sand screens of the screen assemblies and generally parallel with a base pipe running through the sand screens. The shunt tubes generally terminate within a few feet from each end of the base pipe of the downhole completion. Terminating the shunt tubes a sufficient distance away from the ends of the base pipe provides sufficiently long base pipe ends which are exposed for gripping when sequential alternate path screen assemblies are coupled together on a rig. Once the alternate path screen assemblies are made-up, the sequential alternate path shunt tubes are joined by a corresponding jumper tubes.
(23) The shunt tubes may have various sizes and configurations. In some applications, however, the shunt tubes are generally rectangular in cross-section and the jumper tubes are generally circular in cross-section. The jumper tubes are each coupled with an anti-buckling structure to prevent buckling when high operational pressures are applied to the alternate path system. Examples of high operational pressures are pressures above 5000 psi and sometimes 9000 psi or higher.
(24) Referring generally to
(25) With reference to
(26) With additional reference to
(27) It should be noted the use of shunt tubes having a rectangular shape facilitates minimization of the overall outside diameter of the completion while helping maximize the size/diameter of the base pipe—which can be important in many types of oilfield applications. Thus, although the rectangular shape may not be desirable for pressure containment, the rectangular shape helps maximize base pipe diameter for a given wellbore size. However, in the longitudinal space between sand screens 40 at the joint-to-joint connection between sequential sand screen assemblies 32, there is no underlying sand screen. This provides substantially more physical space to accommodate jumper tubes 50 having generally round cross-sections while providing the same internal flow area as the rectangular shunt tubes 44, e.g. transport tubes 46, disposed along the screen assemblies 32. Consequently, the jumper tubes 50 may have a desirable rounded cross-section for pressure containment while providing similar flow area as the rectangular shunt tubes 44. The consistent flow area results in no or limited slurry acceleration (and thus no increased erosion risk) through the jumper tubes 50.
(28) As illustrated in
(29) The shroud 58, e.g. a split shroud, works in a similar manner to provide support against radially outward buckling and radially inward buckling of the corresponding jumper tubes 50. However, when the jumper tube 50 is a round tube having a generally round cross-sectional configuration, the direction of buckling is potentially in infinite directions. Accordingly, an anti-buckling structure 60 is coupled with each jumper tube 50 to provide lateral restraint in addition to the radial restraint provided by the base pipe 38 and the shroud 58.
(30) An embodiment of the anti-buckling structure 60 is illustrated in
(31) According to one embodiment, each plate portion 64 may be welded to the corresponding jumper tube 50. The plate portions 64 of the adjacent jumper tubes 50 are then joined together to provide the connecting plate 62. The plate portions 64 may be mechanically coupled via appropriate fasteners 66, e.g. screws, positioned along their length, as illustrated in
(32) In some embodiments, one or both of the plate portions 64 may be slotted so the connecting plate 62 is adjustable. For example, the plate portions 64 and thus the corresponding jumper tubes 50 may be moved closer or farther apart from each other as desired to match the tube spacing with the spacing of corresponding shunt tubes 44. The adjustability enables tubes on sequential sand screen assemblies 32 to be readily assembled even if imprecise spacing exists between shunt tubes 44. That is, the slotted plate portions 62 accommodate variable spacing between jumper tubes 50 due to manufacturing tolerances. The adjustment of plate portion 64 may be performed on, for example, the rig during assembly of the sequential screen assemblies 32 to form completion 30.
(33) The resulting structure, once the two jumpers 50 are coupled, resembles a structural construction shape called a wide flange beam where the connecting plate 62 performs as a web and the jumper tubes 50 perform as flanges (see
(34) If the shunt tubes 44 of the corresponding, sequential screen assemblies 32 are precisely spaced, the anti-buckling structure 60 may be made with a single plate welded to the two adjacent jumper tubes 50. In other embodiments with precise spacing available, the fasteners/screws 66 may be torqued to lock the jumper tubes 50 in their appropriate position prior to coupling the jumper tubes 50 with the corresponding shunt tube 44.
(35) According to another embodiment, the anti-buckling structure 60 may be in the form of a single plate 68 or a plurality of plates 68 rigidly secured, e.g. welded, to the side wall forming each jumper tube 50, as illustrated by the examples provided in
(36) Although a few embodiments of the disclosure have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this disclosure. Accordingly, such modifications are intended to be included within the scope of this disclosure as defined in the claims.