Hardbanding Method and Apparatus
20190136644 ยท 2019-05-09
Inventors
Cpc classification
B23K9/0026
PERFORMING OPERATIONS; TRANSPORTING
International classification
E21B17/10
FIXED CONSTRUCTIONS
Abstract
Various methods of hardbanding an apparatus are described. In one aspect of the invention an improved method of re-applying a hardbanding alloy to worn tool joints of a previously hardbanded drill pipe results in preservation of the metallurgical properties of the drill pipe and preservation of the internal polymer coating that lines the drill pipe. A method for applying hardbanding includes arc welding a consumable metal welding wire to a tool joint having a surface temperature that ranges from about 50 F. to about 170 F. and the arc welding power supply utilizes DC current. The method herein produces a hardbanded tool joint comprising a heat affected zone (HAZ) of a based metal having a Rockwell hardness of 40 Rc or less.
Claims
1-29. (canceled)
30. A method of hardbanding a pipe in a region of said pipe that has been previously hardbanded, the method comprising: providing said pipe, an outer surface of a portion of said pipe having a prior hardbanding alloy and a base metal heat-affected zone that was formed during application of said prior hardbanding alloy, said base metal heat-affected zone extending about the sides and bottom of said prior hardbanding alloy, said base metal heat-affected zone extending a greater depth into said tool joint than said prior hardbanding alloy; and, applying a secondary hardfacing alloy on at least a portion of a top surface of said prior hardbanding alloy onto at least a portion of said top surface of said prior hardbanding alloy, a top surface of said secondary hardfacing alloy extending above said top surface of said prior hardfacing alloy and also extending above a top surface of said pipe, said step of applying said secondary hardfacing alloy forms a secondary heat-affected zone at least partially in said prior hardbanding alloy, a depth of said secondary heat-affected zone is less than a depth of said base metal heat-affected zone.
31. The method as defined in claim 30, wherein said secondary heat-affected zone that is positioned in said prior hardbanding alloy does not fully extend through said prior hardbanding alloy.
32. The method as defined in claim 30, wherein said prior hardbanding alloy is formed from one or more prior weld beads each having a width, said secondary hardfacing alloy applied as one or more secondary weld beads, a width of each of said secondary weld bead is 20-60% said width of each of said prior weld beads.
33. The method as defined in claim 31, wherein said prior hardbanding alloy is formed from one or more prior weld beads each having a width, said secondary hardfacing alloy applied as one or more secondary weld beads, a width of each of said secondary weld bead is 20-60% said width of each of said prior weld beads.
34. The method as defined in claim 30, wherein said base metal heat-affected zone has a hardness of no greater than 40 Rc prior to said step of applying said secondary hardfacing alloy, and said base metal heat-affected zone that is not affected by said step of applying said secondary hardfacing alloy is no more than 40 Rc.
35. The method as defined in claim 33, wherein said base metal heat-affected zone has a hardness of no greater than 40 Rc prior to said step of applying said secondary hardfacing alloy, and said base metal heat-affected zone that is not affected by said step of applying said secondary hardfacing alloy is no more than 40 Rc.
36. The method as defined in claim 30, wherein a temperature of said pipe does not exceed 150 F. prior to said step of applying said secondary hardfacing alloy.
37. The method as defined in claim 35, wherein a temperature of said pipe does not exceed 150 F. prior to said step of applying said secondary hardfacing alloy.
38. The method as defined in claim 30, wherein said metal welding wire is applied to said pipe while rotating said pipe at a speed of 0.25-3 revolutions per minute, said pipe is cooled at a rate of 100-300 F. per hour after applying said secondary hardfacing alloy to said pipe.
39. The method as defined in claim 37, wherein said metal welding wire is applied to said pipe while rotating said pipe at a speed of 0.25-3 revolutions per minute, said pipe is cooled at a rate of 100-300 F. per hour after applying said secondary hardfacing alloy to said pipe.
40. The method as defined in claim 30, wherein said pipe includes a polymer coating on an inner surface of a cavity of said pipe, said polymer coating not damaged by heat during said step of applying said secondary hardfacing alloy, no fluid cooling liquid medium flows through said cavity of said pipe during said step of applying said secondary hardfacing alloy.
41. The method as defined in claim 39, wherein said pipe includes a polymer coating on an inner surface of a cavity of said pipe, said polymer coating not damaged by heat during said step of applying said secondary hardfacing alloy, no fluid cooling liquid medium flows through said cavity of said pipe during said step of applying said secondary hardfacing alloy.
42. The method as defined in claim 30, wherein said step of applying said secondary hardfacing alloy forms at least three zones of hardness, said secondary hardfacing alloy having a hardness that is greater than a hardness of said secondary heat-affected zone, said secondary heat-affected zone having a hardness that is greater than a hardness of said base metal heat-affected zone.
43. The method as defined in claim 41, wherein said step of applying said secondary hardfacing alloy forms at least three zones of hardness, said secondary hardfacing alloy having a hardness that is greater than a hardness of said secondary heat-affected zone, said secondary heat-affected zone having a hardness than is greater that a hardness of said base metal heat-affected zone.
44. A method of hardbanding a tool joint of a drill pipe in a region of said drill pipe that has been previously hardbanded, the method comprising: providing said drill pipe that includes a tube portion and a tool joint, said tool joint positioned at one end region of said drill pipe, an outer surface of said tool joint having a prior hardbanding alloy and a base metal heat-affected zone that was formed during application of said prior hardbanding alloy, said base metal heat-affected zone extending about the sides and bottom of said prior hardbanding alloy, said base metal heat-affected zone extending a greater depth into said tool joint than said prior hardbanding alloy; and, applying a secondary hardfacing alloy on at least a portion of a top surface of said prior hardbanding alloy by arc welding a consumable metal welding wire onto at least a portion of said top surface of said prior hardbanding alloy, a top surface of said secondary hardfacing alloy extending above said top surface of said prior hardfacing alloy and also above a top surface of said tool joint, said step of applying said secondary hardfacing alloy forms a secondary heat-affected zone at least partially in said prior hardbanding alloy, a depth of said secondary heat-affected zone in said tool joint is less than a depth of said base metal heat-affected zone in said tool joint.
45. The method as defined in claim 44, wherein said secondary heat-affected zone that is positioned in said prior hardbanding alloy does not fully extend through said prior hardbanding alloy.
46. The method as defined in claim 44, wherein said prior hardbanding alloy is formed from one or more prior weld beads each having a width, said secondary hardfacing alloy applied as one or more secondary weld beads, a width of each of said secondary weld bead is 20-60% said width of each of said prior weld beads.
47. The method as defined in claim 44, wherein said base metal heat-affected zone has a hardness of no greater than 40 Rc prior to said step of applying said secondary hardfacing alloy, and said base metal heat-affected zone that is not affected by said step of applying said secondary hardfacing alloy is no more than 40 Rc.
48. The method as defined in claim 44, wherein a temperature of said tool joint does not exceed 150 F. prior to said step of applying said secondary hardfacing alloy.
49. The method as defined in claim 44, wherein said metal welding wire is applied to said tool joint while rotating said tool joint at a speed of 0.25-3 revolutions per minute, said tool joint is cooled at a rate of 100-300 F. per hour after applying said secondary hardfacing alloy to said tool joint.
50. The method as defined in claim 44, wherein said drill pipe includes a polymer coating on an inner surface of a cavity of said drill pipe, said polymer coating not damaged by heat during said step of applying said secondary hardfacing alloy, no fluid cooling liquid medium flows through said cavity of said drill pipe during said step of applying said secondary hardfacing alloy.
51. The method as defined in claim 44, wherein said step of applying said secondary hardfacing alloy forms at least three zones of hardness, said secondary hardfacing alloy having a hardness that is greater than a hardness of said secondary heat-affected zone, said secondary heat-affected zone having a hardness that is greater than a hardness of said base metal heat-affected zone.
52. A method of hardbanding a tool joint of a drill pipe in a region of said drill pipe that has been previously hardbanded, the method comprising: providing said drill pipe that includes a tube portion and a tool joint that is positioned at one end region of said drill pipe, said tool joint having a larger outer diameter than an outer diameter of said tube portion, an outer surface of said tool joint having a prior hardbanding alloy and a base metal heat-affected zone that was formed during application of said prior hardbanding alloy, said base metal heat-affected zone extending about the sides and bottom of said prior hardbanding alloy, said base metal heat-affected zone extending a greater depth into said tool joint than said prior hardbanding alloy; and, arc welding a consumable metal welding wire onto a top surface of said prior hardbanding alloy to form a secondary hardfacing alloy, a top surface of said secondary hardfacing alloy extending above said top surface of said prior hardfacing alloy and also extending above a top surface of said tool joint; and wherein said step of arc welding forms a secondary heat-affected zone at least partially in said prior hardbanding alloy, a depth of said secondary heat-affected zone in said tool joint is less than a depth of said base metal heat-affected zone in said tool joint.
53. The method as defined in claim 52, wherein said hardness of said base metal heat-affected zone after said step of arc welding that is not affected by said arc welding of said secondary hardfacing alloy is less than about 40 Rc.
54. The method as defined in claim 52, wherein said base metal heat-affected zone includes iron alloy, said base metal heat-affected zone prior to said step of arc welding having a Rockwell hardness of less than about 40 Rc.
55. A hardbanding on a previously hardbanded tool joint of a pipe comprising a pipe having a tool joint, an outer surface of a portion of said pipe having a prior hardbanding alloy and a base metal heat-affected zone that was formed during application of said prior hardbanding alloy, said base metal heat-affected zone extending about the sides and bottom of said prior hardbanding alloy, said base metal heat-affected zone extending a greater depth into said tool joint than said prior hardbanding alloy; a secondary hardfacing alloy on at least a portion of a top surface of said prior hardbanding alloy, a top surface of said secondary hardfacing alloy extending above said top surface of said prior hardfacing alloy and also extending above a top surface of said pipe, a secondary heat-affected zone at least partially in said prior hardbanding alloy, a depth of said secondary heat-affected zone is less than a depth of said base metal heat-affected zone.
56. The hardbanding as defined in claim 55, wherein said secondary heat-affected zone and said base metal heat-affected zone having a Rockwell hardness of no more than about 40 Rc.
57. The hardbanding as defined in claim 55, wherein said secondary heat-affected zone and said base metal heat-affected zone comprises martensite.
58. The hardbanding as defined in claim 55, wherein said secondary heat-affected zone that is positioned in said prior hardbanding alloy does not fully extend through said prior hardbanding alloy.
59. The hardbanding as defined in claim 55, wherein said prior hardbanding alloy is formed from one or more prior weld beads each having a width, said secondary hardfacing alloy applied as one or more secondary weld beads, a width of each of said secondary weld bead is 20-60% said width of each of said prior weld beads.
60. The hardbanding as defined in claim 55, wherein said pipe includes a polymer coating on an inner surface of a cavity of said pipe, said polymer coating not damaged by heat during application of said secondary hardfacing alloy.
60. The hardbanding as defined in claim 55, wherein said tool joint includes at least three zones of hardness, said secondary hardfacing alloy having a hardness that is greater than a hardness of said secondary heat-affected zone, said secondary heat-affected zone having a hardness that is greater than a hardness of said base metal heat-affected zone.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] The various embodiments of the present invention can be understood with reference to the following drawings of
[0009]
[0010]
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
DETAILED DESCRIPTION
[0018] Various methods of applying hardbanding to a tool joint of drill pipe and embodiments of tool joints are disclosed herein. Particular embodiments of the invention will be described below in relation to its applications in the oil and gas drilling industry; however, it will be appreciated that the present invention could be employed in other industrial applications.
[0019]
[0020]
[0021]
[0022] The cross-section of
[0023] The application of the original hardbanding 20, prior to the application of the internal plastic coating 32 requires preheating of the drill joint made of base metal 32 for adequate arc penetration and also so that the tool joint has proper metallurgical phase profile and physical properties, for example hardness. The preheat temperature also depends at least in part on the diameter of the tool joint can range from temperatures of 150 F. to about 600 F. (66 C.-316 C.) for tool joints having outer diameters that range from 3 to 8, respectively. Higher preheat temperatures are required to maintain adequate surface temperatures due to the larger mass and heat sink of the larger tool joints. Typical preheat temperatures for various size tool joints are listed in Table 1.
TABLE-US-00001 TABLE 1 Weave Bead Weave Bead Tool Joint OD Preheat Temp ( F.) Preheat Temp ( C.) 31/8 to 43/4 150-200 66-93 43/4 to 51/4 200-250 93-121 51/2 to 61/4 400-450 204-232 63/8 to 67/8 450-550 232-288 7 to 73/8 550-600 288-316 8 to 81/2 650-700 343-371 8 to 81/2 550-600 288-316
[0024] The arc penetration is also affected by the level of preheat applied to the tool joint prior to hardbanding. Note that the temperatures for the larger tool joints may be above the critical temperatures for specific internal plastic coating (IPC). The role of DC Power Supply connections has an effect upon the depth of penetration.
[0025] Referring to
[0026]
[0027]
[0028] In accordance with an alternative embodiment of the present invention, the first hardbanded layer on a tool joint of a drill pipe, whether it is the original hardband material or a reapplied hardband, can include one or more stringer weld beads, for example, stringer weld bead 56. A stringer weld bead is smaller in dimensions than a weave weld bead and can be applied as an original hardband, or as a reapplication of a hardband to a worn tool joint as will be further described herein.
[0029] In addition to the bead shape change from weave weld bead to the stringer weld bead, there is a noticeable change in the depth of penetration of the heat affected zone (HAZ) of the tool joint.
[0030]
[0031] The rotational speed of the drill pipe while applying stringer beads is greater than the rotational speed while applying a weave weld bead. The rotational speeds to produce a stringer bead weld zone can vary up to as much as three (3) times faster than the rotational speed used to form weave beads, although the rotational speed will vary depending upon the width of the stringer beads and the welding parameters. For example, the rotational speed of the drill pipe during application of the welding wire for a hardband of stringer weld beads ranges from about 0.25 revolutions per minute to about 3 revolutions per minute, alternatively from about 0.5 revolutions per minute to about 2 revolutions per minute, and yet alternatively from about 0.7 to about 1.5 revolutions per minute. In applying welding wire to form stringer beads, the rotational speed of the tool joint must be increased to accommodate the molten metal deposited, given the same welding amperage and voltage.
[0032]
[0033] The expanded view of
[0034] Accordingly, in one embodiment of the present invention a hardbanded tool joint comprises an internal polymer coating 30 (
[0035] As described above with reference to
[0036] In one embodiment a method of hardbanding a drill pipe includes arc welding a consumable metal welding wire onto a previously hardbanded tool joint having a surface temperature that ranges from about 50 F. to about 170 F., in another embodiment from about 60 F. to about 160 F., and in another embodiment from about 70 F. to about 150 F. and wherein the arc welding power supply utilizes direct current (DC). In another embodiment the method includes cooling at a rate that ranges from about 100 F. to about 300 F. per hour after arc welding to ensure that the metal in the tool joint achieves the proper metallurgical phase profile and that the hardness of the base metal HAZ does not become too hard. Cooling fluid such as water and pressurized air can be optionally used to control the temperature of the cooling phase, although the use of a cooling medium is not required.
[0037] A summary of re-application procedures according to an embodiment of the present invention is shown with reference to flow diagram 80 in
[0038] The outer surface area of the equipment or component, whether new or previously used, can be inspected prior to welding and may be cleaned of debris, rust, paint, lubricants, and other foreign matter, and the surface may be preheated prior to the application of the weld wire. The wire may be welded (box 92) to the surface of the tool using arc welding. Examples of possible welding processes include, but are not limited to, flux core arc welding (FCAW), gas metal arc welding (GMAW), and plasma arc welding (PAW). After welding, the weld deposit and tool joint are cooled (box 94) at a gradual rate depending upon the application and environment for welding. Typically, the weld beads of the hardband alloy are up to about 25 mm wide and up to about 3 mm thick and can be deposited in single or double layers without spalling. In order to more fully and clearly describe the present invention so that those skilled in the art may better understand how to practice the present invention, the following examples are given. The examples are intended to illustrate the invention and should not be construed as limiting the invention disclosed and claimed herein in any manner.
EXAMPLES
Examples 1-4
[0039] Experiments were run to show results of a method of hardbanding to form a stringer bead weld zone using various welding wires having a tubular wire fill. Specifically, tool joints with an internal plastic coating and that had been previously hardbanded and worn in drilling operations were inspected and the surfaces ground so that the previously applied weave bead so that the surfaces were flush with the OD of the tool joint. The welding wires were applied to the tool joints having a surface temperature of 70 F. to form stringer bead weld zone on each tool joint.
[0040]
[0041] The microhardness values revealed that the base metal HAZ 104 has been preserved the specified requirement of 40 Rc or less.
[0042] The attributes of the hardbanding method described above of applying a stringer bead weld zone to used tool joints having a temperature of 70 F. were observed in the various Examples 1 and 2 and Control 1 and Control 2 are listed in Table 2 below. Examples 2 and Control 2 hardbanding methods used direct current electrode positive (DCEP). Examples 1 and Control 1 methods used direct current electrode negative (DCEN) settings. Example 1 observations pertained to hardbanding method which used Duraband NC hardbanding wire for the stringer bead weld zone to produce the tool joint illustrated and described with reference to
[0043] The results show that all welding wires were successful in utilizing the described method of reapplication of the hardbanding at 70 F. using both the DCEP and DCEN settings.
TABLE-US-00002 TABLE 2 Example 1 Example 2 DCEN DCEP Duraband Duraband Attribute NC Control 1 NC Control 2 Arc Stability Excellent Poor Excellent Good Spatter Very Low Very High Very Low Medium Penetration Low Low High High Dilution Shallow Shallow Deep Deep
[0044] While the present invention has been illustrated by the description of embodiments thereof, and while the embodiments have been described in considerable detail, it is not the intention of the applicants to restrict or in any way limit the scope of the appended claims to such detail. Additional advantages and modifications will readily appear to those skilled in the art. Therefore, the invention, in its broader aspects, is not limited to the specific details, the representative apparatus, and illustrative examples shown and described. Accordingly, departures may be made from such details without departing from the spirit or scope of the applicant's general inventive concept.