Field-assembly concrete dowel basket
10280568 ยท 2019-05-07
Assignee
Inventors
Cpc classification
E01C23/04
FIXED CONSTRUCTIONS
E01C23/045
FIXED CONSTRUCTIONS
E01C19/504
FIXED CONSTRUCTIONS
International classification
E01C11/14
FIXED CONSTRUCTIONS
E01C19/50
FIXED CONSTRUCTIONS
E01C23/04
FIXED CONSTRUCTIONS
Abstract
A field-assembly dowel basket for concrete construction configured for in-the-field assembly from standardized components. This allows a number of standard components, including clips, connectors and wire frame components, to be conveniently transported and stored on construction sites to facilitate on-site assembly of dowel baskets on an as-needed, where-needed basis. Since the dowel basket components are much smaller than assembled baskets, they can be shipped and stored much more cost effectively. Standardization of components allows mass production, consolidates inventory management, and avoids the need for ad hoc fabrication for each construction site. On-site fabrication largely eliminates welding from the dowel basket fabrication process (wire frame clips may involve welding), avoids shipping of fabricated dowel baskets, and allows assembly of dowel basket by construction workers as opposed to highly skilled welding shops.
Claims
1. An unassembled field-assembly dowel basket for concrete construction configured for assembly into a dowel basket on an as-needed, where-needed basis, comprising: a plurality of dowels; a plurality of clips, each clip configured to removably support one of the dowels, each clip further configured to removably receive wire segments; the wire segments including a plurality of end wires and a plurality of frame wires; a plurality of T connectors removably attachable to the end wires and a plurality shipping wires; the shipping wires configured to space apart basket sides assembled from the clips and wire segments to position pairs of clips such that each pair of clips supports an associated dowel.
2. The field-assembly dowel basket of claim 1, wherein the dowels are a bar dowels.
3. The field-assembly dowel basket of claim 1, wherein the dowels are a plate dowels.
4. The field-assembly dowel basket of claim 3, wherein each plate dowel is a sub-assembly comprising a pair of slats and a separator configured to removably support the slats.
5. The field-assembly dowel basket of claim 1, further comprising sockets for receiving the wire segments integrally formed as part of the clips.
6. The field-assembly dowel basket of claim 1, further comprising sockets that removably attach to the clips and removably attach to the wire segments.
7. The field-assembly dowel basket of claim 1, wherein the clips are configured to support the dowels from above.
8. The field-assembly dowel basket of claim 1, wherein the clips are configured to support the dowels from below.
9. An assembled field-assembly dowel basket for concrete construction, comprising: a plurality of basket side sections, wherein basket each side section comprises two clips, two end wires, and one frame wire connecting the clips together, wherein the clips are removably attached to the end wires and the frame wire; a plurality of basket web sections, wherein each basket web sections comprises two basket side sections, a T connector removably attached to each basket side section, and a shipping wire removably attached to the T connector spacing; wherein the shipping wire and T connectors space the basket sides apart and position pairs of clips such that each pair of clips supports an associated dowel; wherein the T connectors removably attach the basket web sections to each other to form dowel basket comprising a chain of basket web sections.
10. The field-assembly dowel basket of claim 9, wherein the dowels are a bar dowels.
11. The field-assembly dowel basket of claim 9, wherein the dowels are a plate dowels.
12. The field-assembly dowel basket of claim 11, wherein each plate dowel is a sub-assembly comprising a pair of slats and a separator configured to removably support the slats.
13. The field-assembly dowel basket of claim 9, further comprising sockets for receiving the wire segments integrally formed as part of the clips.
14. The field-assembly dowel basket of claim 9, further comprising sockets that removably attach to the clips and removably attach to the wire segments.
15. The field-assembly dowel basket of claim 9, wherein the clips are configured to support the dowels from above.
16. The field-assembly dowel basket of claim 9, wherein the clips are configured to support the dowels from below.
17. A method for constructing a concrete road at a road construction site, comprising manufacturing or obtaining components of field-assembly dowel baskets; transporting the components in bulk quantities to the construction site; assembling a dowel basket of desired length from the components at the construction site; positioning the dowel basket at the edge of a first concrete slab to be poured; positioning a concrete form around dowels of the dowel basket, wherein the form comprises notches configured to accommodate the dowels; pouring the first concrete slab so that a first portion of each dowel is embedded in the first slab and a second portion of each dowel extends from the first slab; and after the first slab sets, removing the form and pouring a second concrete slab adjacent to the first concrete slab over the second portions of the dowels so that the dowels span a joint between the first and second concrete slabs; and assembling each field-assembly dowel basket from removably attachable components, comprising: a plurality of dowels; a plurality of clips, each clip configured to removably support one of the dowels, each clip further configured to removably receive wire segments; the wire segments including a plurality of end wires and a plurality of frame wires; and a plurality of T connectors removably attachable to the end wires and a plurality shipping wires; wherein the shipping wires are configured to space apart basket sides assembled from the clips and wire segments to position pairs of clips such that each pair of clips supports an associated dowel.
18. The method of claim 17, further comprising forming or cutting an expansion joint above the dowels at the joint between the first and second concrete slabs.
19. The method of claim 17, further comprising assembling each dowel from a pair of slats and a separator.
Description
BRIEF DESCRIPTION OF THE FIGURES
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
DETAILED DESCRIPTION
(23) Embodiments of the invention may be realized in a field-assembly dowel basket, components for a field-assembly dowel basket, a method for constructing a concrete road or other structure using field-assembly dowel baskets, and a road or other structure constructed with field-assembly dowel baskets. Rather than the conventional approach of fabricating dowel baskets at welding shops and transporting the fabricated dowel baskets to the construction site, embodiments of the present invention provide field-assembly dowel baskets assembled at the construction site from a small number of standard components.
(24) The field-assembly dowel basket uses clips to removably hold the dowels in place within a basket frame constructed from the clips, wire segments and connectors. The dowels, clips, wire segments and connectors can therefore be transported to the construction unassembled, where they are stored in bulk and assembled in the field on an as-needed, where needed basis. Once assembled, the dowel basket is positioned at the edge of a first concrete slab prior to pouring the slab. The dowel basket holds the dowels in place about midway up the thickness of the slab. A concrete form is positioned around the dowels near the centerline of the dowel basket. The first slab is poured so that about half of the dowels extend into the slab and half extend beyond the slab. After the first slap sets, the form is removed and a second slab is poured over the portions of the dowels that extending beyond the first slab. An expansion joint is formed or cut over the dowel basket at the intersection of the two slabs.
(25) In an illustrative embodiment, each field-assembly dowel basket is formed from a number of basket web assemblies that each removably hold two dowels in place. Any number of basket web assemblies can be connected together with T clips to form a dowel basket of desired length, which typically extends laterally across the road under construction. Each basket web assembly includes two basket side sub-assemblies spaced apart from each other by the T clips and shipping wires. Each side assembly includes two clips and wire segments that removably attach to the clips. The wire segments in each side assembly include two end wires and a frame wire that connects the clips together. Each clip includes two integral sockets built into the clip. Alternatively, separate sockets may removably attach to the clips the wire segments. For example, integral sockets made from bent sheet metal can be formed into sheet metal clips, while separate plastic sockets may be utilized with wire frame clips.
(26) Different types of clips may be provided to receive different types of dowels, such as bar dowels and plate dowels. In alternative embodiments, the clips may support the dowels from above or below. In a particular embodiment, the plate dowel may itself be a sub-assembly formed from steel slats and one or more plastic separators. This configuration provides the plate dowel with some give allowing the concrete slabs connected by the dowel to laterally shift slightly with respect to each other without cracking. An illustrative dowel includes two slats and a separator.
(27) In an embodiment, the standardized components include dowels, clips with integral sockets, end wires, frame wires, and T connectors. As an option, separate sockets may be provided with wire frame clips or other types of clips that do not include integral sockets. The clips may be manufactured from steel, wire, plastic such as Propylene, PVC or Nylon, or any other suitable material. In a particular embodiment, the clips may be made from sheet metal, such as 24-gauge cold rolled mild or spring steel, with sockets integrally formed by bending the sheet metal to form the sockets. Wire frame clips are also suitable, which may be bent and welded in bulk. The wire segments and wire frame clips (when used) may be manufactured from the type of steel wire typically used in wire mesh for concrete reinforcement. The T connectors, separate sockets (when used), and dowel separators may be made from a suitable inexpensive plastic such as Propylene, PVC or Nylon.
(28) While specific dimensions may vary as a matter of design choice, the following dimensions are typical for an illustrative embodiment. The plate dowels are typically 12 inches long, 2 to 2.5 inches wide, and to inch thick. The bar plate dowels are typically 15 to 18 inches long and to inch in diameter. The dowel-to-dowel spacing is typically 18 to 24 inches. The side-to-side spacing the basket frame is typically 12 inches. The basket frame typically supports the dowels midway in the slab to be poured (e.g., 4 inches for 8 inch thick slab) above the base where the concrete is to be poured. The clips may be to 1.5 inches wide and made from 12 to 18 gauge sheet metal, such as spring steel. The wire components may be made from to inch diameter concrete reinforcement steel wire. The plastic components may be made from any suitable plastic, such as Polypropylene, PVC, Nylon, or many other options.
(29)
(30)
(31)
(32) The clips of the basket frame may be configured to receive bar dowels or plate dowels, which the clips may support from above or below.
(33)
(34)
(35)
(36) FIG.19 is a logic flow diagram 1900 for constructing a concrete road using the field-assembly dowel baskets.
(37) Step 1906 is followed by step 1907, in which a form is positioned around the dowel basket, as illustrated by the dowel basket and form assembly 200 shown in
(38) After the first concrete slab has set sufficiently, step 1907 is followed by step 1908, in which the form is removed and a second concrete slab is poured over the dowel stubs extending from the first slab. Step 1908 is followed by step 1909, in which an expansion joint is formed or cut into the joint between the slabs above the dowel basket.
(39) Although the field-assembly dowel baskets have been illustrated in the context of horizontal road pavement, it will be appreciated that the dowel basket is well adapted for but not limited to the road construction application and can be used for any concrete joint of sufficient size regardless of its intended purpose or orientation. For example, the invention is equally applicable to joints in concrete sidewalks, building floors, walls, ceilings, abutments and other structures. Those skilled in the art will appreciate that the foregoing describes preferred embodiments of the invention and that many adjustments and alterations will be apparent to those skilled in the art within the spirit and scope of the invention as defined by the appended claims.