PREFABRICATED STRUCTURAL BAMBOO SYSTEM FOR SLABS AND ROOFS
20190119913 ยท 2019-04-25
Inventors
- Veronica Maria Correa Giraldo (Cuauhtemoc, MX)
- Esteban Flores Mendez (Tlalpan, MX)
- Joao Gabriel Boto de Matos Caeiro (Oaxaca, MX)
- Mathieu Queiros (Cuauhtemoc, MX)
Cpc classification
E04B5/10
FIXED CONSTRUCTIONS
E04B7/00
FIXED CONSTRUCTIONS
E04B2005/235
FIXED CONSTRUCTIONS
E04C3/18
FIXED CONSTRUCTIONS
International classification
Abstract
This invention refers to a structural system for floor and roof construction, based on a parallel arrangement of a set of composite pre-tensioned girders to provide support to a deck formed by layers of any given material. The composite girders are components formed by lengths of bamboo culms, steel components and fillings of mortar or other materials, arranged in such way that a maximum mechanical efficiency is obtained.
Claims
1. A slab system comprising: a deck comprising one or more layers which form a structural diaphragm and/or a top finishing layer and a bottom finishing layer; and a plurality of pre-tensioned composite girders installed in a parallel arrangement to support the deck, the pre-tensioned composite girders made with a length of bamboo culm and a profile of greater length.
2. A slab system according to claim 1, where the profile is fastened to the length of bamboo culm at its ends and in a central zone of a span so that a distance between the length of bamboo culm and the profile is maximum at a center and is linearly variable until making contact with the length of bamboo culm at the ends.
3. A slab system according to claim 1, where the profile is fastened to the length of bamboo culm using a plurality of bolts, nuts, washers or any other fastening method that allows connection through a plurality of bores that simultaneously pass through the profile and the length of bamboo culm in vertically aligned orientation.
4. A slab system according to claim 1, where the pre-tensioned composite girder comprises a tube of greater diameter than a bolt located midway in a span; a tube sheathing the bolt and being introduced to mechanically separate the length of bamboo culm from the profile, thus generating a compression stress between the length of bamboo culm and the profile.
5. A slab system according to claim 4, further characterized by having one or more tubes of greater diameter along a length of the pre-tensioned composite girder.
6. A slab system according to claim 1, wherein each composite pre-tensioned composite girder comprises a steel plate having a curvature of the length of bamboo culm, a tube leaning on a bottom part of the length of bamboo culm over the steel plate which distributes a compression stress over a larger area.
7. A slab system according to claim 1, wherein the deck may be of different materials such as concrete, steel, masonry, adobe, wood, composite materials, polyaluminum, bamboo, polystyrene, mineral wool, mineral insulation in general, matured systems, or a combination thereof.
8. A slab system according to claim 1, wherein the pre-tensioned composite girder results from a separation of the length of bamboo culm from the profile, producing a condition of stress in the profile balanced by a compression produced in the length of bamboo culm.
9. A slab system according to claim 1, wherein the pre-tensioned composite girders comprise a bamboo culm arranged horizontally on a top allowing connection with the deck to which the pre-tensioned composite girders provide support.
10. A slab system according to claim 1, wherein the pre-tensioned composite girder generates a mechanical condition known as flexo-compression, which is produced by a spatial arrangement of a bamboo culm span.
11. A slab system according to claim 1, wherein all components are arranged in such way that the profile is fastened to the ends of the length of bamboo culm producing a condition of stress in the profile and, particularly, more flexo-compression in the length of bamboo culm.
12. A slab system according to claim 1, wherein all components and materials form a spatial arrangement in at least one pre-tensioned composite girder providing it with light weight, rigidity and high mechanical resistance to bear loads and deformations transmitted by the deck.
13. A slab system according to claim 1, wherein at least one internode length of the length of bamboo culm may be filled with a mortar or any other anchoring material at at least one mounting support or connection point to prevent shear stress failures or crushing of one or more culm walls.
14. A slab system according to claim 1, wherein at least one bend of the profile at one or more mounting supports generates a compression condition in the length of bamboo culm when the profile is under stress, thereby reducing a shear stress loads on the length of bamboo culm.
15. A slab system according to claim 3, characterized in that the bolts provide an axis through which a tube of greater diameter slides on to separate the profile from the length of bamboo culm.
16. A slab system according to claim 6, wherein the steel plate with the curvature of the length of bamboo culm and a length no smaller than a third of an internode distance acts as support for a separator tube reducing a shear stress generated by the separator tube on a bottom wall of the length of bamboo culm.
17. A slab system according to claim 1, characterized in that a camber is established by a pre-tensioning process of the pre-tensioned composite girder enabling it to meet one or more service conditions set forth by a plurality of regulations in force.
18. A pre-tensioning process for bamboo characterized in that a bamboo culm is selected based on criteria that takes into consideration ranges of age, cracks, taper and internodal length to produce a composite girder made by selected bamboo with cracks not exceeding from 20% to 30% of a length of the bamboo culm, provided cracks are not located at a neutral axis of a composite girder.
19. A pre-tensioning process for bamboo according to claim 18, characterized in that a taper of the bamboo culm, as defined by a difference in diameters between both ends, may not exceed 0.3 to 0.7 cm.
20. A pre-tensioning process for bamboo according to claim 18, characterized in that a longest length between any two nodes does not exceed 30 cm.
21. A pre-tensioning process for bamboo according to claim 18, characterized in that cutting the bamboo culm is performed at an end of the bamboo culm closest to any two nodes at a distance smaller than three to five times a thickness of the bamboo culm.
22. A pre-tensioning process for bamboo according to claim 18, characterized in that selection and bending of a profile corresponding to a selected bamboo culm is adjusted depending on a diameter of the bamboo culm.
23. A pre-tensioning process for bamboo according to claim 18, characterized by assembling the bamboo culm and a profile.
24. A pre-tensioning process for bamboo according to claim 18, characterized in that the bamboo culm is assembled together with a profile on a workbench by securing it with one or more clamps.
25. A pre-tensioning process for bamboo according to claim 18, characterized in that the bamboo culm and a profile are perforated together at the same time.
26. A pre-tensioning process for bamboo according to claim 18, characterized in that the bamboo culm and a profile are perforated with a drilling bit while both are secured to a workbench.
27. A pre-tensioning process for bamboo according to claim 18, characterized in that the bamboo culm and a profile are connected to at least one mounting support of the composite girder by fastening a bolt in an aligned bore using a nut and washer.
28. A pre-tensioning process for bamboo according to claim 18, characterized by further stretching a profile at its center by a mechanical or hydraulic jack, until reaching a previously specified distance; screwing a bolt in a bore aligned with a tube amid the bamboo culm and the profile; and generating a separation gap by screwing with the nuts and the washer between a separator tube and inserting a curved steel plate.
29. A slab system according to claim 1, where the top finishing layer and the bottom finishing layer are used for aesthetic, acoustic and thermal functions, among others.
30. A method of preparing a slab system according to claim 1, comprising performing a special preparation at a shear stress transmission zone to prevent an occurrence of local failures, such as tearing in planes parallel to a plurality of fibers, warping or crushing, among others.
31. A method of preparing a slab system according to claim 1, comprising using a special preparation in a shear stress transmission zone to prevent an occurrence of local faults such as tearing in planes parallel to a plurality of fibers, buckling or crushing, among others.
Description
BRIEF DESCRIPTION OF THE FIGURES
[0015]
[0016]
[0017]
DETAILED DESCRIPTION OF THE INVENTION
[0018] The present invention as shown in
[0019]
[0020]
[0021] The bamboo longitudinal compression condition is produced due to a stress balancing action exercised by the profile due to the transfer of load to the ends of the culm. The proposed system achieves a mechanical condition allowing to obtain a reduced bottom deflection lower than the maximum permitted by the Official Mexican Standards for building methods and the Building Regulations of the Federal District (Mexico City). The fastened composite girders (1) subject to the presence of service load adopt a slightly curved condition. The bends of the profile together with the mortar filling, if any, at the ends of the bamboo culm have the function of freeing the bamboo from the shear stress load produced by the bolts, causing that the transmission of the profile load to the bamboo is achieved through the compression of the culm in the direction of its longitudinal fibers.
[0022] Any system used to keep the gap between the profile and the culm is considered a possible variation of the system, such as the introduction of nuts to prevent the culm and the profile from returning to their initial balance position. Another possible variation of the system is the introduction of additional bolts (with or without a tube) along the span length to cover greater distances. Another possible variation of the system is the introduction of any steel component that works under tension as a replacement of the profile, such as a rigid or flexible cable. Still another possible variation of the system is the absence of camber for roofs subject to a wind driven suction action. Other possible variations include any form of filling in any of the internode span to prevent local failures, or in points where there are bolts connecting to the deck, or elements for bracing the composite girder.
[0023] The differences with the existing patented systems lay on the fact that in the present invention the compression is being absorbed by the bamboo culm section and not by a system with a girder manufactured with laminated bamboo. The stress is absorbed by a steel component placed outside the culm, thus achieving an optimum performance of the materials. The pre-tensioned condition makes the bamboo and the steel work together from the beginning and not when the stress forces from the service load start to appear. The condition of the girder ends at the mounting support free the bamboo culm from the possibility of crushing and/or tearing due to shear stress.
[0024] The pre-tensioned composite girder has the fundamental property of dissipating energy due to its non-linear behavior to the failure.
[0025] The present invention is a system of geometrical and mechanical configuration that meets all the requirements of the current domestic and foreign building regulations. The system is light in weight and, for example, during an earthquake it allows floor slab displacements of small magnitude, and its deformation condition due to dead and live loads is low due to the resistance of steel and bamboo, and the pre-tensioned condition of the composite girders.