Pre-positioned capping device on high pressure wells
10260288 ยท 2019-04-16
Assignee
Inventors
Cpc classification
E21B43/0122
FIXED CONSTRUCTIONS
International classification
E21B43/01
FIXED CONSTRUCTIONS
E21B33/06
FIXED CONSTRUCTIONS
E21B33/038
FIXED CONSTRUCTIONS
E21B33/076
FIXED CONSTRUCTIONS
Abstract
Systems and methods contain fluids discharged from a subsea well or at the surface by capping the well blowout with a pre-positioned capping device. The capping device includes at least one blind shear ram and is separate from a blowout preventer. The blowout preventer may operate to control well events up to a certain pressure, above which the capping device is employed since the capping device has a higher pressure rating than the blowout preventer.
Claims
1. A staged pressure control system attached to a wellhead of a well, comprising: a blowout preventer stack having a first pressure rating below anticipated blowout pressure of the well; and a pre-positioned capping device having a blind shear ram disposed between the wellhead and the blowout preventer stack to close the well and a second pressure rating higher than the first pressure rating, wherein the pre-positioned capping device is configured to actuate upon sensing pressure greater than the first pressure rating.
2. The staged pressure control system according to claim 1, wherein the second pressure rating is at least 25 megapascals greater than the first pressure rating.
3. The staged pressure control system according to claim 1, wherein the second pressure rating is at least 50 megapascals greater than the first pressure rating.
4. The staged pressure control system according to claim 1, wherein the first pressure rating is not more than 104 megapascals and the second pressure rating is at least 137 megapascals.
5. The staged pressure control system according to claim 1, further comprising an independent management system offsite of a rig used to drill the well with an independent control system that sends wellbore data to the management system and sends commands to actuate the ram without use of the rig.
6. The staged pressure control system according to claim 1, wherein the ram is operable independent of a rig used to drill the well.
7. The staged pressure control system according to claim 1, wherein actuation of the ram is controlled concurrent from a rig used to drill the well and from offsite of the rig.
8. The staged pressure control system according to claim 1, wherein the capping device includes a power supply independent of a rig used to drill the well.
9. The staged pressure control system according to claim 1, wherein the ram is operable independent of the blowout preventer stack.
10. The staged pressure control system according to claim 1, wherein the capping device is disposed subsea.
11. A method of controlling a well, comprising: disposing a pre-positioned capping device between a wellhead of the well and a blowout preventer stack having a first pressure rating below anticipated blowout pressure of the well; drilling the well through the capping device and blowout preventer stack; operating the blowout preventer stack to control well events up to a pressure limit; sensing pressure greater than the pressure limit for one of the well events at the well; and controlling a blind shear ram of the pre-positioned capping device having a second pressure rating higher than the first pressure rating in order to close the well upon the sensing of the pressure greater than the pressure limit.
12. The method according to claim 11, wherein the second pressure rating is at least 25 megapascals greater than the first pressure rating.
13. The method according to claim 11, wherein the second pressure rating is at least 50 megapascals greater than the first pressure rating.
14. The method according to claim 11, wherein the pressure limit and the first pressure rating are not more than 104 megapascals and the second pressure rating is at least 137 megapascals.
15. The method according to claim 11, wherein controlling the ram includes automatic closure of the ram upon sensing a pressure at the capping device greater than the first pressure rating of the blowout preventer stack.
16. The method according to claim 11, wherein the operating the pre-positioned capping device uses an independent power source to operate the ram without relying on rig power.
17. The method according to claim 11, wherein the ram is operable independent of a rig used to drill the well.
18. The method according to claim 11, wherein rig personnel and a person offsite of the rig have concurrent control for actuation of the ram.
19. The method according to claim 11, further comprising receiving wellbore data from the pre-positioned capping device with an auxiliary control system disposed offsite of a rig used to drill the well and operated by a person not part of rig personnel, wherein the operating of the blowout preventer stack is with a rig control system disposed on the rig and operated by the rig personnel.
20. The method according to claim 11, wherein the capping device is disposed subsea.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention, together with further advantages thereof, may best be understood by reference to the following description taken in conjunction with the accompanying drawings in which:
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION OF THE INVENTION
(6) Reference will now be made in detail to embodiments of the present invention, one or more examples of which are illustrated in the accompanying drawings. Each example is provided by way of explanation of the invention, not as a limitation of the invention. It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the scope or spirit of the invention. For instance, features illustrated or described as part of one embodiment can be used in another embodiment to yield a still further embodiment. Thus, it is intended that the present invention cover such modifications and variations that come within the scope of the appended claims and their equivalents.
(7) By way of explanation and not by way of limitation, the following description focuses on subsea pre-positioned capping device (PCD) used with a jack-up drilling unit. However, it is to be clearly understood that the principles of the present invention are not limited to environments as described herein. Thus, the use of the PCD on a jack-up drilling unit is described herein as merely an example of the wide variety of uses for the principles of the present invention. The PCD can be used with a subsea BOP or any surface BOP with location being subsea, on a lower level below the BOP, or positioned immediately below the BOP.
(8)
(9) The legs 140 of such units may be designed to penetrate the sea-bed 20, may be fitted with enlarged sections or footings, or may be attached to a bottom mat. Footings or spudcans 180 spread the load so the rig 100 does not sink into the sea-bed 20. The base of each leg 140 is fitted with a spudcan 180, which may include a plate or dish designed to spread the load and prevent over penetration of the leg 140 into the sea-bed 20. The spudcans 180 may be circular, square or polygonal.
(10) A high pressure riser 220 leads to the wellhead 200 in the sea-bed 20. The high pressure riser 220 may be a thick walled, high strength riser and can contain full well pressure. A surface blowout preventer (BOP) stack 240 is located on the jack-up rig 100. The PCD 300 is pre-installed on the wellhead 200.
(11) The PCD 300 functions as an independent safety and containment device for well leakage and/or blowout. The PCD 300 is installed on the well when the BOP stack 240 is installed and is a safety device to be used if the drilling unit's BOP stack 240 fails to control a well blowout. When necessary, the PCD 300 is activated immediately to regain control of the well leak or blowout providing a secondary level of environmental and personnel protection. The PCD 300 can additionally function to secure the well by closure of the PCD 300 if the rig must be moved.
(12)
(13) The blind shear rams 301, 302 (also known as shear seal rams, or sealing shear rams) seal the wellbore, even when the bore is occupied by a drill string, by cutting through the drill string as the rams 301, 302 close off the well. The upper portion of the severed drill string is freed from the ram 301, 302, while the lower portion may be crimped and the fish tail captured to hang the drill string. For some embodiments, the independent control system 303 for the PCD 300 may not actuate the rams 301, 302 during normal drilling or kick occurrences handled by the BOP stack 240 but rather only upon the independent control system 303 being operated for loss of control for which the BOP stack 240 does not or cannot regain control.
(14) The PCD 300 may further include at least one pressure and/or temperature transducer below each ram 301, 302 capable of analogue local display. The PCD 300 may have a number of outlets 304. Each outlet may be provided with two hydraulically controlled gate valves. Two of the outlets may be equipped with manually controlled chokes to perform soft shut-in of the second blind shear ram 302. The capping stack may also include an inlet 305 to inject glycol or methanol to mitigate hydrate formation.
(15) As described in further detail with respect to
(16)
(17) The PCD 300 having this independent management system ensures that decisions are made in a timely manner to prevent a major blowout and harm to personnel. Personnel directly involved in the well blowout on the installation, and which perhaps caused it, may not manage the PCD 300. Independent systems from the drilling rig unit 10 mean that in the event of a large fire/explosion on the drilling rig unit 10 the PCD 300 can still be activated to protect personnel and the environment. As previously mentioned, the PCD 300 may be implemented in numerous cases, including: (1) failure of the well control system on the drilling rig unit 10; (2) management system failure on the drilling rig unit 10; or (3) fire or explosion on the drilling rig unit 10 that prevents operation or continued operation, i.e., loss of hydraulic pressure on some function, of other well control systems, such as the BOP stack 240.
(18) In operation, signals from the rig transducer 315 or the auxiliary transducer 340 to a PCD transducer 310 or a remote transducer 335 provide command signals to the control system 303 for functioning of the PCD 300. Both the PCD transducer 310 and the remote transducer 335 connect to the control system 303. The remote transducer 335 may connect to the PCD 300 by a cable 325 of sufficient length (e.g., 150 meters) to enable placement of the remote transducer 335 away from the PCD transducer 310 proximate the PCD 300. The remote transducer 335 thus may facilitate communicating with PCD 300 should access to the drilling rig unit 10 be restricted. Acoustic data transmission may also be sent from the PCD 300 to the surface via the transducers 310, 315, 335, 340 to monitor the system status and wellbore conditions (e.g., pressure and/or temperature measured by the transducers of the PCD 300).
(19) While the digital acoustic control system functions as the primary PCD control system, a secondary interface may also be utilized. In an embodiment, a remotely operated vehicle (ROV) may be utilized as a secondary PCD control system with the ROV providing physical input direct to the PCD 300 through an ROV control panel 306. The ROV control panel 306 may send a signal to the control system 303 of the PCD 300 that operates valves sending hydraulic pressure from the power source 307 to operate the blind shear rams 301, 302.
(20) PCD systems on the surface have independent controls also. Examples of such independent controls include wireless controls or shielded fiber optics, cable, or piping. Regardless of signal interface techniques employed, the independent controls enable operation of the PCD systems independent from BOP control systems.
(21) In some embodiments, the PCD facilitates capping a well almost immediately. This quick response time reduces the chance of fire or explosion endangering personnel or even sinking the drilling unit or complete loss of a fixed platform. The blowout oil spill volume is greatly reduced as the flow duration is minutes instead of weeks reducing the potential for environmental damage.
(22) There are no issues with installing the system since the PCD is preinstalled. A conventional capping stack, which is installed after a blowout, could encounter a situation where debris prevents installation. The PCD also prevents the situation where the drilling unit or platform collapses on a well due to fire and/or explosion. In this case, the blowout could not be capped with a capping stack due to debris or damage to the BOP and/or wellhead.
(23) The PCD with independent power can be operated even with significant damage to the drilling unit. The drilling unit's BOP might have failed due to loss of power but this would not impact the PCD. The PCD may include redundant blind shear rams in case one ram fails to shear the drill string and seal the well, but one ram may be sufficient if designed to shear and seal on tubulars used in the well.
(24)
(25) For example, the BOP stack 440 may be pressure rated for no more than 104 megapascals (MPa), which is sufficient for normal drilling operations where wellbore pressures are controlled with weight of mud used but may not be adequate to contain possible pressures anticipated at some wells should a blowout occur. The PCD 430 may enable safe operation even during a blowout situation by being pressure rated at the maximum anticipated pressure, such as at least 137 MPa. In some embodiments, the PCD 430 provides an at least 25 MPa or at least 50 MPa greater pressure rating than the BOP stack 440. For some embodiments, actuation of the PCD 430 occurs upon sensing a pressure at the PCD 430 greater than a threshold pressure limit, such as the pressure rating of the BOP stack 440.
(26) The PCD 430 thereby enables cost efficient use of commercial ready to use versions of the BOP stack 440 with wells that may experience pressures above existing pressure ratings of the BOP stack 440. In particular, increasing pressure ratings of the BOP stack 440 increases weight of the BOP stack 440 and requires all associated equipment to handle this extra weight and also be pressure rated the same as the BOP stack 440. The PCD 430 ensures that equipment above the PCD 430 would only be exposed to normal operating pressures and would be isolated from maximum well pressures since the PCD 430 would be operated and capable of closing the well.
(27) The pressure rating of the PCD 430 and the BOP stack 440 may utilize industry practices for qualification. For example, the PCD 430 and the BOP stack 440 may withstand one and one-half times (1.5) the pressure for which rated without having a mechanical failure or leaking. In some embodiments, the BOP stack 440 may fail or leak at pressures below those at which the PCD 430 may fail or leak or even below the pressure rating of the PCD 430.
(28) In closing, it should be noted that the discussion of any reference is not an admission that it is prior art to the present invention, especially any reference that may have a publication date after the priority date of this application. At the same time, each and every claim below is hereby incorporated into this detailed description or specification as an additional embodiment of the present invention.
(29) Although the systems and processes described herein have been described in detail, it should be understood that various changes, substitutions, and alterations can be made without departing from the spirit and scope of the invention as defined by the following claims. Those skilled in the art may be able to study the preferred embodiments and identify other ways to practice the invention that are not exactly as described herein. It is the intent of the inventors that variations and equivalents of the invention are within the scope of the claims while the description, abstract and drawings are not to be used to limit the scope of the invention. The invention is specifically intended to be as broad as the claims below and their equivalents.