METHOD OF JOINING BELT MATERIALS
20190099801 ยท 2019-04-04
Inventors
- Masaaki Fujita (Tochigi-ken, JP)
- Ugeun Shin (Tochigi-ken, JP)
- Hiroshi Matsui (Tochigi-ken, JP)
- Kazuma Fujiwara (Tochigi-ken, JP)
- Kuniaki Akutsu (Tochigi-ken, JP)
Cpc classification
B23P11/00
PERFORMING OPERATIONS; TRANSPORTING
B21D43/023
PERFORMING OPERATIONS; TRANSPORTING
B21K25/00
PERFORMING OPERATIONS; TRANSPORTING
F16G5/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
B23P11/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A first recessing-and-projecting line is formed in a trailing end of a preceding first belt material and a second recessing-and-projecting line is formed in a leading end of a newly fed out second belt material, and the first recessing-and-projecting line and the second recessing-and-projecting line are fitted to each other, thereby joining the first belt material and the second belt material. Note that the first recessing-and-projecting line and the second recessing-and-projecting line pass through a holding section that holds an element in the first belt material or the second belt material.
Claims
1. A method of joining belt materials comprising: a joining step in which a trailing end of a first belt material which is fed out ahead and a leading end of a second belt material which is fed out after the first belt material, are opposed, and a first recessing-and-projecting line is formed in the trailing end of the first belt material while a second recessing-and-projecting line is formed in the leading end of the second belt material, and then the first recessing-and-projecting line and the second recessing-and-projecting line are fitted to each other thereby joining the first belt material and the second belt material; and a punching step in which the first belt material and the second belt material are fed out and punched in a shape of an element of a belt for continuously variable transmission, in the joining step, the first recessing-and-projecting line and the second recessing-and-projecting line being formed in a position that passes through a holding section holding the element in the first belt material or the second belt material, thereby joining the first belt material and the second belt material.
2. The method of joining belt materials according to claim 1, wherein the first recessing-and-projecting line and the second recessing-and-projecting line include at least one pair of a recess and a projection within one item of the element.
3. The method of joining belt materials according to claim 1, wherein notches are formed in a vicinity of the trailing end of the first belt material, and the first recessing-and-projecting line is formed in a state where engaging members have been engaged in the notches.
4. The method of joining belt materials according to claim 1, wherein notches are formed in a vicinity of the leading end of the second belt material, and the second recessing-and-projecting line is formed in a state where engaging members have been engaged in the notches.
5. The method of joining belt materials according to claim 1, wherein first notches are formed in a vicinity of the trailing end of the first belt material and second notches are formed in a vicinity of the leading end of the second belt material, and the first recessing-and-projecting line and the second recessing-and-projecting line are fitted to each other in a state where engaging members have been engaged in composite notches formed by parts of the first notches and parts of the second notches.
6. The method of joining belt materials according to claim 1, wherein after the first recessing-and-projecting line and the second recessing-and-projecting line have been fitted to each other, bodies of recesses and projections forming the first recessing-and-projecting line and recesses and projections forming the second recessing-and-projecting line are stretched by crushing.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0037] A preferred embodiment of a method of joining belt materials according to the present invention will be presented and described in detail below with reference to the accompanying drawings, in relation to manufacturing steps of an element for a continuously variable transmission. Note that below, step is sometimes also rephrased as processing.
[0038] First, the element will be described with reference to
[0039] An unillustrated pulley of a driven shaft makes sliding contact with a left side end edge 18 of the body section 12, while an unillustrated pulley of a drive shaft makes sliding contact with a right side end edge 20 of the body section 12. Note that thickness of a lower half section of the body section 12 gradually decreases as a lower edge of said lower half section is approached. That is, the lower half section of the body section 12 is a thin section.
[0040] A circular columnar projection 22 is formed projecting in one end surface of the head section 16, and a recess-for-insertion 24 cut out in a circular columnar body shape is formed in the other end surface of the head section 16 in a position corresponding to a position of the circular columnar projection 22. As will be mentioned later, this recess-for-insertion 24 is engaged by the circular columnar projection 22 of an adjacent element 10.
[0041] The neck section 14 is narrower in width compared to the body section 12 and the head section 16. As a result, a left shoulder groove 26 and a right shoulder groove 28 are formed between an upper edge of the body section 12 and a lower edge of the head section 16.
[0042] As shown in
[0043] Note that in
[0044] The element 10 is manufactured by an element manufacturing facility 40 an outline of which is shown in
[0045] The strip joining apparatus 48 includes: a notch forming die 54 and notch forming punch 56; a recessing-and-projecting line forming die 58 and recessing-and-projecting line forming punch 60; and a caulking die 62 and caulking punch 64. The dies 54, 58, 62 are each fixed types having their positions fixed, while the punches 56, 60, 64 are each movable types that respectively approach (descend onto) or separate from (rise up from) the dies 54, 58, 62. Moreover, the recessing-and-projecting line forming die 58 is additionally provided with an upper strip-supporting panel 66, and the recessing-and-projecting line forming punch 60 is additionally provided with a lower strip-supporting panel 68. The upper strip-supporting panel 66 is a fixed type, and the lower strip-supporting panel 68 is a movable type that undergoes displacement integrally with the recessing-and-projecting line forming punch 60.
[0046]
[0047] When the roll material 42 is consumed to its trailing end by being sequentially fed out as the first strip 80, a new roll material 42 is mounted in the uncoiler, and a leading end of the new roll material 42 is fed out as the second strip 82. The trailing end of the first strip 80 and the leading end of the second strip 82 (refer to
[0048]
[0049] When the vicinity of the trailing end of the first strip 80 has been positioned between the notch forming die 54 and the notch forming punch 56, the feeder 50 once stops feeding-out of the first strip 80. Then, the notch forming punch 56 descends, and first notches 84a, 84b of substantially semicircular shape are respectively formed in both end sections in the width direction of the first strip 80.
[0050] After the notch forming punch 56 has risen, the feeder 50 feeds out a predetermined section (pitch) amount of the first strip 80. As shown in
[0051] In this state, the recessing-and-projecting line forming punch 60 descends toward the recessing-and-projecting line forming die 58. As a result, a first recessing-and-projecting line 90 having a plurality of recesses 86 and projections 88 alternately aligned therein is formed in the vicinity of the trailing end of the first strip 80. As the lower strip-supporting panel 68 and the recessing-and-projecting line forming punch 60 further descend, the vicinity of the trailing end of the first strip 80 is divided into a processing target section to be fed out to the press molding apparatus 52 and a section-for-discarding 92a, with the first recessing-and-projecting line 90 as a boundary line.
[0052] The first recessing-and-projecting line 90 extends so as to reach from the first notches 84a to the first notches 84b. Therefore, while approximately half of the first notches 84a, 84b are left in the processing target section, the remaining approximately half of the first notches 84a, 84b are removed along with the section-for-discarding 92a.
[0053] After the recessing-and-projecting line forming punch 60 has risen, the feeder 50 feeds out a predetermined pitch amount of the first strip 80. Due to this feeding-out, as shown in
[0054] After the section-for-discarding 92a has been removed from between the recessing-and-projecting line forming die 58 and the upper strip-supporting panel 66, a vicinity of the leading end of the second strip 82 is positioned between the notch forming die 54 and the notch forming punch 56, under operation of the feeder 50. Then, the notch forming punch 56 descends, and second notches 94a, 94b of substantially semicircular shape are respectively formed in both end sections in the width direction of the second strip 82. The first notches 84a, 84b and the second notches 94a, 94b are formed by the same notch forming punch 56, so have substantially the same shape.
[0055] After the notch forming punch 56 has risen, the feeder 50 feeds out the second strip 82 with a predetermined pitch. As a result, as shown in
[0056] In this state, the recessing-and-projecting line forming punch 60 descends toward the recessing-and-projecting line forming die 58. As a result, a second recessing-and-projecting line 96 having a plurality of recesses 86 and projections 88 alternately aligned therein is formed in the vicinity of the leading end of the second strip 82. As the lower strip-supporting panel 68 and the recessing-and-projecting line forming punch 60 further descend, the vicinity of the leading end of the second strip 82 is divided into a section-for-discarding 92b which is more to a downstream side than the second recessing-and-projecting line 96 is, and a processing target section which is more to an upstream side than the second recessing-and-projecting line 96 is and which is to be fed out to the press molding apparatus 52.
[0057] Thus, in the present embodiment, a configuration is adopted whereby the first notches 84a, 84b and the second notches 94a, 94b are utilized to fix the position of the first strip 80 or the second strip 82, and in this state, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 are formed. Therefore, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 are formed precisely in predetermined positions of the first strip 80 and the second strip 82.
[0058] The second recessing-and-projecting line 96 extends so as to reach from the second notches 94a to the second notches 94b. Therefore, while approximately half on the downstream side of the second notches 94a, 94b is removed along with the section-for-discarding 92b, approximately half of the second notches 94a, 94b are left in the processing target section on the upstream side.
[0059] While the second notches 94a, 94b and the second recessing-and-projecting line 96 are being formed in this way, the trailing end of the first strip 80 where the first recessing-and-projecting line 90 has been formed is waiting at the caulking die 62. When the section-for-discarding 92b is removed from between the lower strip-supporting panel 68 and the recessing-and-projecting line forming punch 60, the feeder 50 feeds out to a caulking die 62 side the leading end of the second strip 82 where the second recessing-and-projecting line 96 has been formed, as shown in
[0060] At this time, residual sections of the first notches 84a, 84b on a first strip 80 side and residual sections of the second notches 94a, 94b on a second strip 82 side are combined to form composite notches 98a, 98b, and said composite notches 98a, 98b engage with the second engaging members 72a, 72b. That is, the first strip 80 and the second strip 82 have their positions fixed.
[0061] In the first strip 80, a downstream side in the vicinity of the trailing end provided with the first recessing-and-projecting line 90 is left as the processing target section, while in the second strip 82, an upstream side in the vicinity of the leading end provided with the second recessing-and-projecting line 96 is left as the processing target section. Therefore, in the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96, phases of the recesses 86 and projections 88 are reversed. Moreover, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 are formed precisely, and the first strip 80 and the second strip 82 have their positions fixed. Therefore, it is difficult for a relative position slippage of the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 to occur. For the above kinds of reasons, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 engage with each other in the caulking die 62.
[0062] Next, the caulking punch 64 descends toward the caulking die 62, in other words, toward the engaged first recessing-and-projecting line 90 and second recessing-and-projecting line 96. That is, bodies of the recesses 86 and projections 88 forming the first recessing-and-projecting line 90 and second recessing-and-projecting line 96 are stretched by crushing, and, as a result, the recesses 86 and projections 88 attain a mutually caulked state. Due to this caulking, the first strip 80 and the second strip 82 are joined.
[0063] The joined first strip 80 and second strip 82 are integrally fed out to the press molding apparatus 52, and, in said press molding apparatus 52, undergo window forming processing and crushing processing as required. In the crushing processing, crushing for making the lower half section of the body section 12 a thin section, is performed.
[0064] Then, as shown in
[0065] If, in contrast, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 are positioned so as to detour the holding section 102, then in the rough punching processing, part of the element 10 is also punched thereby falling into a punching die. That is, by configuring the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 to be in a position passing through the holding section 102, the element 10 can be kept held in the first strip 80 or the second strip 82 as a predetermined shape. Therefore, a manufacturing yield of the element 10 improves, and work for stopping the press molding apparatus 52 to remove a fallen piece becomes unnecessary.
[0066] Specifically, in the present embodiment, the first recessing-and-projecting line 90 and the second recessing-and-projecting line 96 are shaped such that there exists at least one pair of the recess 86 and the projection 88 for one item of the element 10. Since a sufficient caulking force is realized in a joining section for this purpose, then separation of the first strip 80 and the second strip 82 is avoided. That is, it is easy for the second strip 82 to be fed out integrally with the first strip 80.
[0067] Then, the first strip 80 and the second strip 82 are further fed out under operation of the feeder 50, and a completion punching processing (a separating processing) to sever the holding section 102 is performed. As a result, the element 10 is separated from the first strip 80 or the second strip 82.
[0068] Thus, according to the present embodiment, a configuration is adopted such that when the roll material 42 has reached its trailing end after being fed out as a strip, the leading end of a new roll material 42 is joined to said trailing end, thereby continuing the feeding-out. Therefore, the sections-for-discarding 92a, 92b are merely a vicinity of a trailing end of the preceding roll material 42 (the first strip 80) and a vicinity of a leading end of the new roll material 42 (the second strip 82). That is, a discarded amount of the roll material 42 is greatly reduced, so a lowering of material costs of the element 10 can be achieved.
[0069] Moreover, since it is only required that the new roll material 42 is fed out to the strip joining apparatus 48 and since this work takes only a comparatively short time, arrangements for setting the new roll material 42 in the feeder 50, and so on, are unnecessary. That is, the case of joining as described above excels in work efficiency. Therefore, it is possible to achieve even greater lowering of manufacturing costs of the element 10.
[0070] The present invention is not particularly limited to the above-described embodiment, and may undergo a variety of modifications in a range not departing from the spirit of the present invention.
[0071] For example, when a sufficient caulking force is obtained, a configuration may be adopted whereby as shown in
[0072] Moreover, a configuration may be adopted whereby as shown in