Briquetting machine and briquetting method for loose metal scraps
10245801 ยท 2019-04-02
Assignee
Inventors
Cpc classification
B30B11/00
PERFORMING OPERATIONS; TRANSPORTING
B30B7/04
PERFORMING OPERATIONS; TRANSPORTING
International classification
B30B9/30
PERFORMING OPERATIONS; TRANSPORTING
B30B7/04
PERFORMING OPERATIONS; TRANSPORTING
B30B11/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A briquetting machine for loose metal scraps comprises a pre-extrusion part, a re-extrusion part and a final pressing part. On the upper portion of a pre-extrusion cavity (14) of the pre-extrusion part, a pre-extrusion releasing area (15) is formed near to one side of a re-extrusion cavity (24). At the front end of a re-extrusion plunger (23) of the re-extrusion part, a lateral gap (28) is formed near to one side of the pre-extrusion cavity. The cross section of the lateral gap is a right-angled trapezoid and the lateral gap is provided with a lateral slope (29). A briquetting method for loose metal scrapes is disclosed. By way of pre-extrusion and step-by-step feeding and triggering resetting loading, not only is a certain pre-pressing effect guaranteed while the loose metal scraps are processed in each feeding and pre-pressing step, but also the stress can be transferred and released timely under the over-pressure condition, which avoids the formation of dense metal block under the over-pressure condition. Therefore a continuous, automatic and safe pressing operation is assured.
Claims
1. A briquetting apparatus comprising: a pre-extruding punch advancing in a first pathway along a bottom section of a hopper pushing loose metal scraps towards a first entrance leading to an adjacent re-extruding cavity, wherein the hopper further comprises a material staging area, a pre-extruding release area, and an upright arranged baffle plate for dividing the material stage area and the pre-extruding release area to accommodate overflow of the loose metal scraps into the pre-extruding release area as the pre-extruding punch advances towards the first entrance of the re-extruding cavity; a re-extruding punch advancing in a second pathway perpendicular to the pre-extruding punch, compressing and pushing the loose metal scraps from the re-extruding cavity towards a second entrance leading to an adjacent final extruding cavity, wherein a front end of the re-extruding punch comprises at least one indented gap to direct overflow of the loose metal scraps in the re-extruding cavity into the pre-extruding release area and into a re-extruding release area around the second entrance; and a final-extruding punch advancing in a third pathway perpendicular to both the pre- and re-extruding punches, further compressing the loose metal scraps in the final extruding cavity to form a metal cake.
2. The briquetting apparatus of claim 1, wherein the baffle plate situates above the first pathway of the pre-extruding punch at a preset distance away from the first entrance.
3. The briquetting apparatus of claim 1, further comprises a pre-extruding top plate situated immediately above the pre-extruding punch, and advances in synchrony with the pre-extruding punch along the first pathway to prevent loose metal scraps in the material staging area from falling into the first pathway.
4. The briquetting apparatus of claim 1, wherein the first pathway further comprises a travel switch situated at an adjustable distance away from the first entrance, and when the pre-extruding punch comes into contact with the travel switch, the pre-extruding punch stops advancing towards the first entrance and retracts along the first pathway to a starting position.
5. The briquetting apparatus of claim 1, wherein the re-extruding release area is located immediately above the re-extruding cavity to accommodate overflow of loose scrap metal in the re-extruding cavity as the re-extruding punch advances towards the second entrance of the final-extruding cavity.
6. The briquetting apparatus of claim 1, wherein the re-extruding punch is indented to form a top gap on a surface adjacent to the re-extruding release area, which directs overflow of loose scrap metal in the re-extruding cavity into the re-extruding release area.
7. The briquetting apparatus of claim 1, wherein the re-extruding punch is indented to form a side gap on a surface adjacent to the pre-extruding release area, which directs overflow of loose scrap metal in the re-extruding cavity into the pre-extruding release area along the first entrance.
8. The briquetting apparatus of claim 1, wherein the pre-extruding punch, the re-extruding punch and the final-extruding punch are advanced and retracted via hydraulic cylinders respectively housed along the first, the second, and the third pathways.
Description
BRIEF DESCRIPTION OF FIGURES
Description of Figures
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9) In the figures, 11: pre-extruding hydraulic cylinder, 12: pre-extruding top plate, 13: pre-extruding punch, 14: pre-extruding cavity, 15: pre-extruding release area, 16: baffle plate, 17: material staging area, 18: loose metal scrap, 19: travel switch, 21: re-extruding hydraulic cylinder, 22: re-extruding top plate, 23: re-extruding punch, 24: re-extruding cavity, 25: re-extruding release area, 26: top gap, 27: top slope, 28: side gap, 29: side slope, 31: final pressing extruding cylinder, 32: final pressing punch, 33: final pressing cavity, 34: metal cake.
BEST MODE OF THE INVENTION
(10) In combination of the descriptions in the figures, the best mode of carrying out the present invention is described as follows.
(11) Through a large number of researches and practices, the applicant finds that the high-density and soft loose metal scraps similar to copper rice cannot be extruded densely during briquetting and a larger release space needs to be provided to hold the expansion after stress. According to the above principles, the invention is improved in the aspects of structure, control, etc. of the original briquetting machine.
(12) As shown in
(13) During actual operation, the loose metal scrap 18 is input from the opening of the material staging area 17 and enters the pre-extruding cavity 14. When the equipment carries out the pre-extrusion, the pre-extruding hydraulic cylinder 11 drives the pre-extruding punch 13 to move forwards so as to push the materials in the pre-extruding cavity 14 into the re-extruding cavity 24, and the pre-extruding top plate 12 gradually closes the bottom of the material staging area 17 so as to prevent the materials in the material staging area 17 from falling into the rear space of the pre-extruding punch 13 to damage the equipment. A shown in
(14) For the existing briquetting machine equipment, basically the pre-extruding punch 13 immediately returns to the original position after the one-time thorough pre-extrusion so as to carry out the next-time feeding, namely that each time of pre-extrusion coordinates with the one-time re-extrusion and final pressure. In practice, it is found that if this pre-extrusion mode is also used for loose metal scraps, the materials in the material staging area 17 at the upper part are supplemented rapidly after the pre-extruding punch 13 returns to the original position, which results in that the materials in the pre-extruding cavity 14 are more and more and gradually pressurized so as to form the dense metal cakes. Therefore, in the invention, the front part of the pre-extruding cavity 14 is provided with the travel switch 19 which can be adjusted back and forth. In practice, the commissioning is first carried out according to the materials to be extruded so as to determine the cylinder stretching time of the pre-extruding hydraulic cylinder 11 and the front and back positions of the travel switch 19. Before the pre-extruding punch 13 comes into contact with the travel switch 19, it is stipulated that the hydraulic cylinder can only be gradually pushed into the pre-extruding punch 13 according to the predetermined cylinder stretching time and kept at the current position, and then the briquetting machine carries out the re-extruding and final pressing actions. The pre-extruding hydraulic cylinder 11 can be shrunk only after the pre-extruding punch 13 triggers the travel switch 19, which can make the pre-extruding punch 13 fully return to the original position so as to realize the next-time loading of the pre-extruding cavity 14; that is to say, according to the difference of the materials to be extruded, the one-time loading of the pre-extruding cavity 14 can meet the filling requirements of multi-time re-extruding and final pressing actions step by step. Certainly, the above method can carry out the cylinder stretching control through the time, travel distance or pressure feedback, but the method of time control is relatively simple and effective. The method of feeding step by step and triggering reset can ensure that there are a moderate number of proper-density materials in the re-extruding cavity 24 during each time of re-extruding operation. When the re-extruding punch 23 returns to the original position after the re-extruding and final pressing actions are completed, the materials overflowing in the pre-extruding release area 15 at the previous step also fall into the re-extruding cavity 24 so as to coordinate with the feeding action of the pre-extruding punch 13 at the next step to fill the re-extruding cavity 24. In this way, the materials overflowing in the pre-extruding release area 15 can also be consumed timely.
(15) In Sum, through arranging the pre-extruding release area 15 at the upper part of the junction between the pre-extruding cavity and the re-extruding cavity and adopting the method of carrying out the feeding step by step and triggering the reset loading by the pre-extruding punch 13, the stress of loose metal scraps can be released timely under the complex stress condition, and simultaneously it is ensured that loose metal scraps are fed into the re-extruding cavity at a proper density and quantity so as to avoid forming the metal cakes in the case of overpressure.
(16) As shown in
(17) In actual operation, the pre-extruding punch 13 feed the materials into the re-extruding cavity 24. As shown in
(18) As shown in
(19) It needs to be explained that the upper part of the re-extruding cavity 24 is provided with the re-extruding release area 25 and simultaneously the top surface of the re-extruding punch 23 is provided with the top gap 26 which can be the optimized structure aimed at some special soft metal scraps. The briquetting machine for processing the conventional loose metal scraps is provided with the pre-extruding release area 15 and the side gap 28 is arranged at one side close to the pre-extruding cavity 14 of the re-extruding punch so as to successfully implement the pressure relief of scraps and ensure the continuously normal operation of the equipment.
(20) The above description is an exemplary implementation of the present invention, and is not in anyway limiting. The scope of the present invention is defined in its claims. The invention can be modified in any form without violating its principle of operation.