Floating roof reel type ground
10246253 ยท 2019-04-02
Inventors
Cpc classification
B65D88/46
PERFORMING OPERATIONS; TRANSPORTING
International classification
Abstract
In a fluid reservoir tank such as an oil tank, the metal roof floats. The American Petroleum Institute (API) Recommended Practice (RP) number 545 requires a floating roof to tank resistance of less than 30 milli-ohms. The improved cable system uses a preferred aluminum braided cable to provide low resistance combined with resistance to sour fluids. Prior art used copper and tinned copper braided cables. The new reel is factory pre-assembled and tensioned using a new cable guide with a cable stop bar which stops a cable stop attached near the end of the (approximately 80 foot) cable. A new spring assembly increased tension and extends cable life by minimizing slack in the cable.
Claims
1. In a fluid/liquid storage tank with a sidewall and a floating roof floating atop the fluid/liquid, an improved grounding system comprising: a reel connected to the sidewall; said reel having a low impedance conductor for lightning related frequencies connected to the floating roof; said conductor comprising a bare braided aluminum cable; said reel having a take up spool which keeps any slack out of the conductor and maintains a shortest fractional length; said spool having a rewind spring assembly that produces about 80 to about 90 pounds of rewind tension at a maximum payout; said reel having a cable guide with a built in cable stop anchor and a low resistance connection to a spool axle; wherein an excess length of said conductor is wound around said take up spool thereby shorting together adjacent sections of said conductor wound around said take up spool; said conductor having a cable stop; and said reel having a U shaped mounting bracket that bolts to a flat indent on a left end of the spool axle and to a flat indent on a right end of the spool axle.
2. The grounding system of claim 1, wherein the spring assembly further comprises two springs tied in series via a collar.
3. The grounding system of claim 1, wherein the U shaped mounting bracket further comprised a flat flange at each of its ends which fit against the respective flat indent.
4. The grounding system of claim 1, wherein the cable guide has a welded connection to the spool axle.
5. The grounding system of claim 1, wherein the bare braided aluminum cable is about 1 wide by about 0.120 thick.
6. The grounding system of claim 5, wherein the bare braided aluminum cable has a double braided connection assembly for bolting to a vertical roof flange between a first and a second braid of the double braided connection assembly.
7. The grounding system of claim 1, wherein the bare braided aluminum cable with the cable stop is pre-tensioned at final assembly with the cable stop tensioned against the cable stop anchor.
8. The grounding system of claim 1, wherein the maximum payout is about 80 feet.
9. The grounding system of claim 1, wherein the spool axle further comprises a handle at each end.
10. The apparatus of claim 1 further comprising a plurality of said reels and low impedance conductors connected to the sidewall.
11. In a fluid/liquid storage tank with a sidewall and a floating roof floating atop the fluid/liquid, an improved grounding system comprising: a reel connected to the sidewall; said reel having a low impedance conductor for lightning related frequencies connected to the floating roof; said conductor comprising a bare braided aluminum cable; said reel having a take up spool which keeps any slack out of the conductor and maintains a shortest fractional length; said spool having a rewind spring assembly that produces about 80 to about 90 pounds of rewind tension at a maximum payout; said reel having a cable guide with a built in cable stop anchor and a low resistance connection to a stationary spool axle; wherein an excess length of said conductor is wound around said take up spool thereby shorting together adjacent sections of said conductor wound around said take up spool; said conductor having a cable stop; and said reel having a U shaped mounting bracket that connects to the stationary spool axle.
12. The grounding system of claim 11, wherein the spring assembly further comprises two springs tied in series via a collar.
13. The grounding system of claim 11, wherein the U shaped mounting bracket further comprised a flat flange at each of its ends which fit against a respective flat indent on each end of the stationary spool axle.
14. The grounding system of claim 11, wherein the cable guide has a welded connection to the spool axle.
15. The grounding system of claim 11, wherein the bare braided aluminum cable is about 1 wide by about 0.120 thick.
16. The grounding system of claim 15, wherein the bare braided aluminum cable has a double braided connection assembly for bolting to a vertical roof flange between a first and a second braid of the double braided connection assembly.
17. The grounding system of claim 11, wherein the bare braided aluminum cable with the cable stop is pre-tensioned at final assembly with the cable stop tensioned against the cable stop anchor.
18. The grounding system of claim 11, wherein the maximum payout is about 80 feet.
19. The grounding system of claim 11, wherein the spool axle further comprises a handle at each end.
20. The apparatus of claim 11 further comprising a plurality of said reels and low impedance conductors connected to the sidewall.
Description
BRIEF DESCRIPTION
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16) Other aspects of this invention will appear from the following description and appended claims, reference being made to the accompanying drawings forming a part of this specification wherein like reference characters designate corresponding parts in the several views.
BRIEF DESCRIPTION OF THE DRAWINGS
(17) Referring first to
(18) The reel 106 has cable guide 104 which has an integral cable stop anchor 105. The reel 106 is shown bolted to a known right angle bracket 107 which is fastened to an upper ledge 108 of the cylindrical wall 21. Alternately the direct wall bracket 110 can be wall mounted. The reel's U shaped mounting bracket 110 is bolted to bracket 107.
(19) A spring assembly 109 keeps any slack out of cable 101 and forms adjacent cable windings 300.
(20) The cable 101 is preferably aluminum to meet the low resistance specification from API (under 30 milli-ohms) from the floating roof 23 to the tank wall 21. It was found that using a tin coated copper cable in a sour gas environment, the cable corroded and failed prematurely. Silver or gold cables could be used, but the cost makes it not feasible. Also the risk of theft would be enormous.
(21) Referring next to
(22) The reel housing 810 spins with the rotation of the reel 106. The spool assembly 817 supports the cable 101. The cable 101 has a distal connector 877 which sandwiches the cable 101 in an aluminum sheath, and then holes 878 are drilled. The cable guide 104 has a guide mount 879 that is welded WELD to the axle 202. The axle 202 does not rotate. The handle 88 is threaded into the end of the axle 202 so as to provide an aid for lifting the heavy reel 106 during installation. The cable is preferably 1 wide by 0.120 thick. The reel 106 is sized to lift 70 to 80 feet of cable 101. The reel weight is about 78 pounds. The cable tension at 70 foot payout is about 66 pounds. Height h1 is about 16.21 inches.
(23) Referring next to
(24) Referring next to
(25) Referring next to
(26) Referring next To
(27) Referring next to
(28) Referring next to
(29) A bushing 81 is held on the axle 202 by mount 110 in
(30) Nominal dimensions follow below:
(31) d1=1.94
(32) d2=0.12
(33) d3=3.50
(34) d4=1.62
(35) d5=806
(36) d6=1.50
(37) d7=0.75
(38) d8=1.00
(39) d9=0.50
(40) d10=0.25
(41) d11=20.23
(42) d12=3.00
(43) d13=1.25
(44) d14=20.44
(45) d15=0.93
(46) d16=1.86
(47) d17=0.63
(48) d18=0.38
(49) d19=0.35
(50) d20=0.12
(51) Cable 101 weave=1056/30
(52) Ground Strap 102A and B weave=768/30
(53) Before explaining the disclosed embodiment of the present invention in detail, it is to be understood that the invention is not limited in its application to the details of the particular arrangement shown, since the invention is capable of other embodiments. Also, the terminology used herein is for the purpose of description and not of limitation.
(54) Installation Guidelines
(55) The present invention is known commercially as the RGA 750. It is designed to create the lowest impedance connection between the roof and shell of a floating roof tank by creating the shortest possible path between the two. This connection is obtained by keeping constant tension on the wide aluminum braided cable.
(56) The following manual outlines the procedures required for proper installation of an RGA.
(57) In many cases, the RGA is sold in conjunction with LEC's Dissipation Array System (DAS). A LEC site supervisor may be helpful for the DAS installation. The Supervisor could assist the on-site contactor that will be responsible for installing the DAS. This assistance includes training the contractor in the nuances of the installation and thereby ensuring proper installation.
(58) Note: Review all documents and drawings prior to commencing work. The RGA can be installed on a tank during maintenance shut downs or while the tank is in service. Follow all plant safety procedures and acquire necessary permits.
(59) Equipment and Tools Required
(60) Pneumatic Punch, Hand Punch or Drill to create 7/16 [11 mm] diameter holes 9/16 or Adjustable Wrench2 Wire Wheel or Brush Lectra Shield Note: Tap set or welder may be required if tank had bolted foam dam Supplied Parts
(61) TABLE-US-00002 Part Name Quantity Reel, 316L Stainless Steel 1 RGA Mount, 316L Stainless 1 Steel 316 Stainless Steel 2 Bolt 316 Stainless Steel 2 Flat Washer 1,056/30 Braided Aluminum 80 ft [24.4 m] Cable Cable Stop 1 Handle 2 Horizontal Bracket, 1 Galvanized Steel 12 Flexible Aluminum Ground 2 Strap 316 Stainless Steel Bolt 10 316 Stainless Steel Nut 10 316 Stainless Steel Flat 20 Washer Stainless Steel Lock 10 Washer Installation Manual 1
Preparing Materials
(62) Inspect reel, cable, hardware, grounding straps, mount and wire guide. Do not remove the shrink-wrap from cable on the reel at this time. Contact your LEC representative or LEC Sales Manager and DO NOT INSTALL the RGA if any of the parts are missing or damaged.
(63) Layout and Tank Preparation
(64) If an installation drawing with the RGA quantity and location is provided by LEC, mark the location(s) of where the RGA should be placed in accordance with the print. If a drawing is not provided, the RGAs should be equally spaced from each other according to API Recommended Practice 545, Recommended Practice of Lightning Protection of Aboveground Storage Tanks for Flammable or Combustible liquids, latest edition, which requires that bypass conductors be evenly spaced not more than every 100 ft. [30 m] around the circumference of the tank with a minimum of two. For example, 4 RGAs (bypass conductors) would be required for on 100 ft. [30 m] diameter tank. Each RGA would be placed 90 apart or roughly 78 ft-6 in. [23.94 m] on the circumference of the rim of the tank. Mark these locations. Ideally, the RGA will be placed on the highest possible location of the tank: the fire suppression/swash plate, because explosive gases must not be present immediately around the reel during regular use. If the RGA cannot be mounted on the fire suppression plate or directly to the tank wall, use the Horizontal Bracket.
(65) Note: Ensure that the RGA will not interfere with the tank roof when fully filled. Finally, if any obstacles or interference are encountered, contact the LEC Sales Manager for assistance.
(66) Attaching the RGA to the Tank
(67) The RGA can be mounted directly to the fire suppression plate/tank wall or the tank lip using the supplied Horizontal Bracket.
(68) Mounting the RGA directly to the Tank WallCreated four (4) 7/19 in. [11 mm] diameter holes in the tank wall. Scrape paint and rust from around the drilled holes and under the RGA Mount to bare metal. Apply Lectra Shield to both sides of the holes and all bare metal surfaces to prevent rusting. Using the supplied hardware, secure the RGA Mount and Reel assembly to the tank wall and apply Lectra Shield to the hardware after assembly. Alternately, the RGA Reel may first be separated from the Mount by removing the bolts on either side of the Reel and the Mount may be attached to the tank wall separately from the Reel.
(69) Mounting the RGA using the Horizontal BracketTwo (2) 7/16 [11 mm] diameter holes need to be made in the field on the tank lip using the Horizontal Bracket as a template. Scrape paint and rust from around the drilled holes and under the Horizontal Bracket to bare metal. Apply Lectra Shield to both sides of the hole and all bare metal to prevent rusting. Using the supplied hardware, secure the Horizontal Bracket to the tank rim angle and apply Lectra Shield to the hardware after assembly. Attach the RGA Mount and Reel assembly to the Horizontal Bracket.
(70) Grounding and Bending
(71) Foam Dam TypesTwo methods are commonly used to attach foam dams to floating roofs. It generally consists of an approximately in. [6.4 mm] thick piece of steel, approximately 18-24 in. [457-610 mm] tall, that is rolled to the approximate diameter of the tank and welded directly to the floating roof. A typical bolted foam dam connection generally consists of a series of 18-24 in. [457-610 mm] wide plates which are bolted to a welded portion of the floating roof. These foam dam plates are typically mounted over the primary and secondary seal fabric, as well as any gasket material, thereby resulting in unacceptably high impedance between the foam dam and floating roof.
(72) RGA straps MAY NOT be attached to a bolted foam dam as seal fabric and gasket material prevent the establishment of an acceptable electrical connection between the straps and tank roof. If the tank has a bolted foam dam, additional mounting hardware will be required and the bolted foam dam strap installation procedure below must be followed.
(73) Regardless of foam dam type, the attachment point on the floating roof must align vertically with the center of the braided cable wire. To facilitate vertical alignment, the RGA should be installed when the tank is at its fullest capacity. A plumb bob or laser level can be used for best possible results (cautiona plumb bob should only be utilized when the wind is calm). Maintaining vertical cable alignment within +/12 in. [305 mm] will minimize cable wear and maximize cable life.
(74) Locate a level portion of roof that is vertically aligned with the RGA and sufficiently inboard from the tank wall so that the RGA cable and straps will not rub against any portion of the bolted foam dam as the tank roof rises and falls. The RGA cable and straps will be nearest to the lip of the foam dam when the tank is at its fullest and the roof is near the top of the tank.
(75) Scrape paint and rust on the roof to bare metal where the custom roof mount bracket will be placed. Weld the bracket all the way around to the tank roof. If welding is not possible, the bracket may be temporarily attached to the roof by drilling and tapping two (2) in. holes, using the bracket as template. If the bracket is bolted to the roof, it should be welded in place during the next maintenance shutdown or when feasible to do so.
(76) Apply Lectra Shield to the welded or bolted connection to prevent rusting.
(77) Placing the RGA into Service
(78) When the tank is ready to be placed into service, follow the steps below to finalize the installation: 1. Turn the RGA reel back and forth to verify that the reel rotates freely and does not bind. 2. Un-reel the RGA cable to the roof of the tank. 3. Pull the cable out the intended travel distance and carefully allow it to rewind. This procedure should be repeated five (5) to ten (10) times in order to prepare the springs for use. 4. Secure the supplied Ground Straps to the tank and RGA Cable, with the supplied stainless steel hardware. 5. Confirm cable retraction by pulling the cable out and letting it retract back. 6. Verify that all nuts and bolts are mechanically tight with clean electrical contact.
(79) Note: Do not remove or adjust the position of the cable stop which is factory set 12 [305 mm] from the end of the cable to prevent loss of pre-tension turns.
(80) Finally, coat all mechanical ground connections with Lectra Shield.
(81) To maximize cable and strap service life, LEC recommends disconnecting the ground straps from the foam dam or custom bracket and allowing the cable to retract if the tank will be out of service for an extended period of time. The RGA Ground Straps should be reconnected before the rank is placed back into service. When reconnecting the Ground Straps remove any rust at the connection point to bare metal and apply Lectra Shield before and after securing the straps.
(82) Welding the Horizontal Bracket
(83) The Horizontal Bracket should be welded onto the tank lip during a maintenance shut down or when feasible to do so.
(84) Corrosion Protection
(85) For the RGA to function properly LEC requires a coating of Lectra Shield, a corrosion inhibitor, to be applied to all mechanical grounding connections as described above. Lectra Shield can be purchased directly from LEC. LEC Shield LEC Part #0000120 LEC Approved Alternatives (if Lectra shield is unavailable): Emerson & Cummings: ECCOCOAT CC 40 A Sanchem Inc.: NO-OC-IC Special
Uninstall
(86) In the event that the RGA must be removed from the tank, the following steps should be followed. The tank should be at its fullest capacity to minimize stored energy in the springs. Unbolt the ground strap from the foam dam or custom bracket without allowing the spring motor to recoil. Next, carefully retract the strap to the reel. Secure the strap to the reel with shrink-wrap or heavy-duty tape. While supporting the Reel, either unbolt and separate the Reel from the Mount, or unbolt and separate the Reel and Mount assembly from the tank. The RGA horizontal bracket, if the present, may then be unbolted from the tank.
(87) Maintenance
(88) RGAs are often installed in corrosive environments. The more corrosive the environment, the more frequently inspection and maintenance must be performed. At minimum, the following should be performed on an annual basis. LEC recommends an increase in the frequency of inspection/maintenance as conditions require. Remove build-up from RGA cable and reel. Keep the bearing well lubricated using Thomas & Betts Aluma-Shield PN M-53 or AP8, Sanchem Inc. NO-OX-ID A-Special or other electrically conductive lubricant. Visually inspect the RGA cable for dirt, corrosion or tearing; if there is a tear in the cable, call your LEC Sales Manager immediately. Ensure that all Ground Strap, Mount and Horizontal Bracket nuts and bolts are mechanically tight. Tighten any loose hardware immediately.
Replacement Parts 12 Flexible Aluminum Ground Strap LEC Part #0010874 12 Flexible Aluminum Ground Straps (2) and SS Hardware LEC Part #0010861 80 ft 1,056/30 Braided Aluminum Cable LEC Part #0010863
ATEX Certification
(89) The CE/Ex markings on the RGA signify the RGA's compliance with the requirements of Directive 94/9EC involving potentially explosive atmospheres. The various markings are described below. CE CE Mark Ex Specific mark for explosion protection II Equipment Group II: intended for use above Ground, not for use in mines 2 Equipment Category 2: the equipment is protected against ignition hazards in normal operation where a gas is likely to occur under normal conditions G Equipment is intended for exposure to Explosive gasses and mists only (not Protected against explosive dusts) T4 In normal operation, the maximum surface Temperature of the equipment will not exceed 275 deg. F. (135 deg. C.).