Wellbore completion for methane hydrate production with real time feedback of borehole integrity using fiber optic cable
10233746 ยท 2019-03-19
Assignee
Inventors
- Michael H. Johnson (Katy, TX)
- Bennett M. Richard (Kingwood, TX, US)
- John K. Wakefield (Houston, TX, US)
Cpc classification
E21B47/08
FIXED CONSTRUCTIONS
International classification
E21B43/10
FIXED CONSTRUCTIONS
Abstract
In producing methane a bottom hole assembly the borehole may enlarge due to shifting sands in an unconsolidated formation as the methane is produced. The enlargement of the borehole can be sensed in real time such as by using a fiber optic cable. In response to such information parts of the bottom hole assembly near the washout can be isolated or the bottom hole assembly in the vicinity of the washout can be fortified with inserts from the surface to minimize damage from erosion caused by higher velocities resulting from borehole washouts.
Claims
1. A completion method for methane production from a subterranean location, comprising: running in a bottom hole assembly to an isolated producing zone, said bottom hole assembly conducting produced fluid away from said subterranean location; providing a real time signal away from said subterranean location that a portion of a borehole adjacent said bottom hole assembly has washed out during said conducting of produced fluid; and relocating production flow into said bottom hole assembly or changing the rate of said production flow to limit further washing out of said borehole while allowing at least part of said washed out portion of the borehole to remain washed out when conducting produced fluid.
2. The method of claim 1, comprising: producing methane as said produced fluid.
3. The method of claim 1, comprising: using a fiber optic cable for said real time signal.
4. The method of claim 3, comprising: including a shape memory porous material as part of said bottom hole assembly; and mounting said cable over said shape memory porous material.
5. The method of claim 4, comprising: moving said cable to a borehole wall with said shape memory porous material; and obtaining initial reading of stress in said cable from said moving before said conducting produced fluid.
6. The method of claim 5, comprising: measuring a reduced stress in said cable as a result of said washed out portion of the borehole due to said conducting produced fluid.
7. The method of claim 6, comprising: blocking openings in said bottom hole assembly adjacent where said washed out portion of the borehole is indicated by said reduced stress in said cable.
8. The method of claim 7, comprising: inserting an inner string with at least one seal to block said openings.
9. The method of claim 6, comprising: changing the rate of said conducting said fluid in response to said measuring reduced stress in said cable.
10. The method of claim 6, comprising: producing methane as said produced fluid.
11. The method of claim 5, comprising: causing said shape memory porous material to conform to a borehole shape before conducting said fluid.
12. The method of claim 11, comprising: allowing washouts in the borehole to remain unfilled by said shape memory porous material after said conforming to an initial borehole shape.
13. The method of claim 11, comprising: using borehole fluids to take said shape memory porous material past its critical temperature to change shape.
14. The method of claim 11, comprising: adding fluids or heat through said bottom hole assembly to take said shape memory porous material past its critical temperature to change shape.
15. The method of claim 11, comprising: producing methane as said produced fluid.
16. The method of claim 5, comprising: stressing said cable in compression; and using data from said stressing to determine that said shape memory porous material has filled an annular space in the borehole around said bottom hole assembly before said conducting produced fluid from the subterranean location.
17. The method of claim 3, comprising: extending said cable inside or outside said bottom hole assembly.
18. The method of claim 1, comprising: transmitting pressure data adjacent said bottom hole assembly in real time as part of said providing a real time signal.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
(7) In broad terms the preferred embodiment can be described as a filtration assembly and method of producing methane from methane hydrate in an unconsolidated formation containing sand and other sediments. The filtration assembly comprises a bottom hole assembly comprising a sand control assembly and a base pipe. The sand control assembly comprises a shape memory porous material, which is adapted to surround the base pipe and form a first discrete filtration layer. In one embodiment, a second discrete filtration layer is located under the first discrete filtration layer and comprises one or more filtration assurance devices adapted to support the first discrete filtration layer, assist in filtering sediment from the methane, or aid in depressurization of the formation, or any combination thereof, such as wire mesh, beadpack or both.
(8) In a preferred embodiment, the shape memory porous material is an open-cell shape memory foam, such as the foam described in the list of memory foam patents and patent applications referenced above, and the memory foam marketed by Baker Hughes Incorporated under the trademark GEOFORM. The memory foam is adapted to help manage sand production by inhibiting the formation of a flow path through the filtration layer in which sand may be produced and by providing borehole stability without having to depend on containment by the surrounding borehole.
(9) To dissociate methane from methane hydrate, a depressurization method is employed by applying a differential pressure across the reservoir interface between the bottom hole assembly and the formation, using, for example, an electric submersible pump. As the methane dissociates from methane hydrate it passes through the filtration assembly, which filters sand and other sediments from the methane and allows the methane to enter the base pipe. In one embodiment, the base pipe comprises a depressurization device designed to help equalize flow along at least one interval of the base pipe and protect the filtration layers from high fluid velocities during production. As previously mentioned, however, the second discrete filtration layer when located under the first discrete filtration layer may also serve as a means of assisting in the depressurization of the formation. The borehole may also be reamed to reduce methane production velocities.
(10) Should the borehole subsequently enlarge or the space between the formation and the bottom hole assembly increase due to changing reservoir conditions (e.g., shifting of sands or other sediments in an unconsolidated formation as the methane is produced) the geometric configuration of the bottom hole assembly will not substantially change.
(11) Referring to
(12) In one embodiment, the base pipe comprises a depressurization device for balancing flow along at least one interval of the base pipe, or a selectively or automatically adjustable inflow control member (e.g., an adjustable valve or tubular housing having one or more inflow passages, preferably with a tortuous pathway). See for example, U.S. Pat. Pub. No. 2013/0180724 and flow control products marketed by Baker Hughes Incorporated (United States of America) under the trademark EQUALIZER.
(13) In
(14) Alternatives can be alloy memory foam or screens of various designs that do not change dimension with thermal stimulus. The flow balancing feature can be a porous annular shape or insert plugs in the base pipe or screen materials that vary in mesh size at different opening locations.
(15) In another aspect of the invention as shown in
(16) In yet another embodiment shown in
(17) The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below: