DEVICE FOR LIFTING POWER EQUIPMENT OF SWITCHBOARD
20240250510 ยท 2024-07-25
Inventors
Cpc classification
B66F7/06
PERFORMING OPERATIONS; TRANSPORTING
International classification
B66C1/66
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The present invention relates to a device for lifting a circuit breaker of a switchgear, the device comprising: a rail part that is located above the switchgear and has a plurality of vertically arranged compartments; an elevating part that can be guided and move above the rail part, and lifts the circuit breaker; and a lifting bracket that is fixed to two facing side surfaces of the circuit breaker, is coupled to a hook block of the elevating part, and moves up and down according to the actions of the elevating part.
Claims
1. A device for lifting power equipment of a switchboard, comprising: a rail part that is located above the switchboard; an elevating part that can be guided and move forward and backward and left and right above the rail part, and lifts the power equipment; and a lifting bracket that is fixed to two facing side surfaces of the power equipment, is coupled to a hook block of the elevating part, and moves up and down according to the actions of the elevating part.
2. The device for lifting power equipment of a switchboard of claim 1, wherein the lifting bracket comprises a frame part providing a circular ring coupled to the hook block; and a hanging part having one side coupled to the frame part and the other side inserted into each groove of two facing side surfaces of the power equipment.
3. The device for lifting power equipment of a switchboard of claim 2, wherein the rail part comprises a first guide installed long in a left and right width direction from an upper portion of the switchboard; and a second guide positioned in an orthogonal direction from the upper side of the first guide, capable of being moved by being guided by the first guide, and guiding the elevating part to move in the front and rear direction of the switchboard, wherein the second guide is configured to protrude toward the front of the switchboard, or has a multi-structure, so that when extended, a part of the second guide protrudes toward the front of the switchboard.
4. The device for lifting power equipment of a switchboard of claim 1, wherein the rail part comprises a first guide installed long in a left and right width direction from an upper portion of the switchboard; and a second guide positioned in an orthogonal direction from the upper side of the first guide, capable of being moved by being guided by the first guide, and guiding the elevating part to move in the front and rear direction of the switchboard, wherein the second guide is configured to protrude toward the front of the switchboard, or has a multi-structure, so that when extended, a part of the second guide protrudes toward the front of the switchboard.
5. The device for lifting power equipment of a switchboard of claim 4, wherein the switchboard is a multisection switchboard in which one section including compartments arranged up and down in one row is arranged in a plurality of left and right, and the first guide is positioned over the entire upper portion of the plurality of sections, so that at least one elevating part can lift the power equipment to the compartments of all sections.
6. The device for lifting power equipment of a switchboard of claim 5, wherein the lifting bracket comprises a frame part providing a circular ring coupled to the hook block; and a hanging part having one side coupled to the frame part and the other side inserted into each groove of two facing side surfaces of the power equipment.
7. The device for lifting power equipment of a switchboard of claim 2, wherein the frame part comprises an upper frame part in the form of a long bar in one direction; and a side frame part extending downward from two facing sides of the upper frame part.
8. The device for lifting power equipment of a switchboard of claim 7, wherein adjusting holes into which opposite ends of the hanging bar coupled to one end of the hanging part are inserted are formed in the side frame part, and insertion grooves for adjusting the spacing into which a part of the hanging bar is inserted are formed in the adjustment hole.
9. The device for lifting power equipment of a switchboard of claim 8, wherein the hanging part is connected to the hanging bar by a link.
10. The device for lifting power equipment of a switchboard of claim 8, further comprising a movement restricting part that rotates around a pivot fixed to the side frame part and has a plurality of grooves for restricting movement of the hanging bar in a closed state.
11. The device for lifting power equipment of a switchboard of claim 10, wherein the movement restricting part further comprises an insertion groove into which a fixing pin fixed to the side frame part opposite to the pivot is inserted with the adjustment hole therebetween.
12. The device for lifting power equipment of a switchboard of claim 2, wherein the hanging part comprises an insertion part having a lower end bent upward and inserted into a groove provided on two facing side surfaces of the power equipment.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053]
[0054]
[0055]
[0056]
DESCRIPTION OF SYMBOLS
[0057] 10: elevating part 20: rail part [0058] 30: lifting bracket 40: power equipment [0059] 50: switchboard
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0060] Hereinafter, in order to fully understand the configuration and effects of the present invention, preferred embodiments of the present invention will be described with reference to the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, and may be embodied in various forms and various modifications may be made. Rather, the description of the present invention is provided so that this disclosure will be thorough and complete and will fully convey the concept of the invention to those of ordinary skill in the art. In the accompanying drawings, the size of the elements is enlarged compared to actual ones for the convenience of description, and the ratio of each element may be exaggerated or reduced.
[0061] Terms such as first and second may be used to describe various elements, but, the above elements should not be limited by the terms above. The above terms may be used only for the purpose of distinguishing one element from another. For example, without departing from the scope of the present invention, a first element may be named a second element and similarly, a second element may also be named a first element. In addition, expressions in the singular include plural expressions unless explicitly expressed otherwise in the context. Unless otherwise defined, terms used in the embodiments of the present invention may be interpreted as meanings commonly known to those of ordinary skill in the art.
[0062] Hereinafter, a device for lifting power equipment of a switchboard according to an embodiment of the present invention will be described in detail with reference to the drawings.
[0063]
[0064] Referring to
[0065] Hereinafter, the device for lifting power equipment of a switchboard according to one embodiment of the present invention constructed as above will be described in detail.
[0066] First, the device for lifting power equipment of the present invention is to be installed on the upper surface of the switchboard 50 in order to secure safety such as fall prevention and to minimize costs.
[0067]
[0068] The power equipment 40 may be a circuit breaker.
[0069] If the rail part 20 installed on the upper surface of the switchboard 50 has a structure that can move the elevating part 10 in the x-axis and y-axis directions, it can be applied to the present invention regardless of the structure.
[0070] The x-axis movement of the elevating part 10 allows the power equipment 40 to be moved closer to the compartment after lifting it, and is to ensure stability by positioning the elevating part 10 on the upper side of the switchboard 50 when the elevating part 10 is not used.
[0071] In addition, when the switchboard 50 of
[0072]
[0073] Referring to
[0074] In the above embodiment, a driving means such as a motor and a power transmission means such as a belt or a gear for transmitting the driving force of the driving means to the first roller 22 are omitted, and the omitted configurations may be by those of ordinary skill in the art to which the present invention pertains.
[0075] In the above embodiment, the first roller 22 is shown, and the configuration in which the second guide 23 moves along the y-axis direction by the rotation of the first roller 22 has been described, but the first roller 22 may be formed on the second guide 23 instead of on the first guide 21.
[0076] This means that the rail part 20 can be configured in various shapes, and as long as the rail part 20 of the present invention has a structure that guides the elevating part 10 to move freely in the x-axis and y-axis directions with respect to the ground, precisely in the front-rear direction and left and right side directions of the switchboard 50, it can be applied to the present invention.
[0077] The elevating part 10 may move up and down the hook block 11 described above, including a hoist 12, and a second roller 13 may be provided on the side surface so as to be in contact with the second guide 23 and be moved in the front-rear direction of the switchboard 50 in the x-axis direction along the second guide 23.
[0078] In the above example, although the second guide 23 is shown as having a single configuration, the guide itself may be designed in a dual structure that can be extended and shortened and may be configured that the elevating part 10 may be positioned on the upper portion of the switchboard 50 when the guide is shortened, and the elevating part 10 may protrude toward the front side of the switchboard 50 when the guide is extended.
[0079] In this case, a housing for accommodating the shortened second guide 23 may be further included, and the housing may be configured to have a door that can be opened and closed to open the door and protrude the elevating part 10 when the second guide 23 is extended.
[0080] By using the rail part 20 that can be subjected to various modifications as described above, it is possible to lift and load the power equipment 40 in all the compartments of one section (including compartments arranged up to 4 above and below) by making it possible to move the elevating part 10 to the front and rear sides of the switchboard 50.
[0081] In addition, by applying to the switchboard 50 having a plurality of sections, and by allowing at least one elevating part 10 to move left and right of a switchgear 50, it is possible to lift and load the power equipment 40 in the compartments of all sections.
[0082] In this configuration, compared to using a conventional trolley lifter, the input of manpower of the operator is significantly reduced, and safety can be secured by preventing the risk of overturning.
[0083] In addition, there is a feature that can significantly reduce the installation cost compared to the conventional method using a bridge crane.
[0084] Compared to the above method using the conventional bridge crane, it is also possible to prevent the shaking of the power equipment 40 to be lifted, and the feature capable of preventing such shaking is due to the characteristic structure of the lifting bracket 30.
[0085]
[0086] Referring to
[0087] More specifically, the upper frame part 31 of the lifting bracket 30 has a long bar shape on one side, and on the two long sides thereof facing each other, the side frame part 32 is positioned bent downward.
[0088] The upper frame part 31 and the lower frame part 32 may be integrally formed, or may be combined after separate formation.
[0089] A circular ring 31a capable of hanging and fixing the hook block 11 is provided at the position of the center of gravity of the upper surface of the upper frame part 31.
[0090] The side frame parts 32 have an adjustment hole 33 in the form of a long hole for fixing a pair of hanging parts 36 and adjusting the distance between the pair of hanging parts 36 as needed.
[0091] The shape of the adjustment hole 33 is closely related to the structure of the hanging part 36, and the shape of the hanging part 36 will be first described before the description of the shape of the adjustment hole 33.
[0092] The hanging part 36 has a plate-shaped structure, and a hanging bar 38 is coupled to one end thereof, and the other end thereof is bent upward in a direction in contact with the side surface of the power equipment 40 to form an insertion part 37.
[0093] The power equipment 40 in the form of a metal box has grooves formed on two facing side surfaces according to the standard, and the insertion part 37 is inserted into the grooves.
[0094] The length of the hanging bar 38 is longer than the distance between the two side frame parts 32, and thus opposite ends of the hanging bar 38 are respectively inserted into the adjustment holes 33 formed to face the two side frame parts 32 to fix the hanging part 36 having the insertion part 37 at the ends.
[0095] The adjustment hole 33 has semicircular insertion grooves 33a, 33b, and 33c into which a part of the hanging bar 38 is inserted, each formed at different positions.
[0096] Therefore, by inserting each of opposite ends of the hanging bar 38 into the insertion groove selected among the insertion grooves 33a, 33b, 33c, the distance between the two hanging bars 38 can be adjusted, and finally, the distance between the insertion part 37 which is the end of the hanging part 36 can be adjusted.
[0097] In this way, by adjusting the spacing of the insertion parts 37, the power equipments 40 having different sizes determined by the standard can be lifted using a single lifting bracket 30.
[0098] The lifting bracket 30 has a movement preventing part 35 that blocks the movement of the hanging bar 38 inserted into a specific insertion groove in order to secure safety during the lifting of the power equipment 40.
[0099] Two movement preventing parts 35 are provided for each side frame part 32, and have a bar shape with one end rotatably fixed to the side frame part 32 by a pivot 34b.
[0100] The pivot 34b is positioned between opposite ends of the side frame part 32 and the adjustment hole 33.
[0101] One end of the movement preventing part 35 includes insertion grooves 35a, 35b, 35c corresponding to the positions of the insertion grooves 33a, 33b, 33c provided in the adjustment hole 33, and in a state in which the movement preventing part 35 is rotated so as to be in contact with the side of the side frame part 32, the upper sides of opposite ends of the hanging bar 38 are inserted into one of the insertion grooves 35a, 35b, and 35c, so that the movement of the hanging bar 38 is restricted.
[0102] In this case, a fixing pin 34a protrudes between the two adjustment holes 33 formed in each side frame part 32, and an insertion groove 35d into which the fixing pin 34a is inserted is provided in the movement preventing part 35.
[0103] In this way, the position of the hanging part 36 of which the distance adjustment is completed is fixed by using the movement preventing part 35, and a stable lifting can be made possible.
[0104]
[0105] (a) of
[0106] It can be seen that the upper side of the hanging bar 38 is inserted into the second insertion groove 35b of the movement preventing part 35 in the closed state.
[0107] In the description with reference to
[0108] In such a state, when it is necessary to further widen the distance between the hanging bars 38 to lift a larger power equipment 40, the operator rotates the movement preventing part 35 around the pivot 34b as shown in (b) of
[0109] At this time, the rotation direction is upward, and the state at this time is defined as an open state.
[0110] Then, the operator moves the hanging bar 38 to the last insertion groove 35c of the adjustment hole 33 and inserts it, and moves the hanging part 36 to a position where the largest power equipment 40 can be lifted.
[0111] In this way, when the movement preventing part 35 is opened, the position of the hanging bar 38 can be adjusted, and the position of the hanging part 36 can be adjusted according to the size of the power equipment 40 to be lifted.
[0112] Next, as shown in (d) of
[0113]
[0114] While the present invention has been described in connection with what are presently considered to be practical exemplary embodiments, those skilled in the art may understand that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. Accordingly, the true technical protection scope of the present invention shall be determined according to the attached claims.
INDUSTRIAL APPLICABILITY
[0115] The present invention relates to a device for lifting capable of stably lifting power equipment by changing a mechanical shape, and has industrial applicability.