GENERATOR CIRCUIT BREAKER CONTROL METHOD BASED ON SHORT-CIRCUIT FAULT CURRENT SYMMETRY
20240235180 ยท 2024-07-11
Inventors
- Fei Yang (Xi'an, CN)
- Mingzhe RONG (Xi'an, CN)
- Jinru Sun (Xi'an, CN)
- Yifei Wu (Xi'an, CN)
- Chunping NIU (Xi'an, CN)
- Yi WU (Xi'an, CN)
- Jun Wang (Xi'an, CN)
Cpc classification
International classification
Abstract
The disclosure discloses a generator circuit breaker control method based on short-circuit fault current symmetry. The method includes: collecting, by a control device, current on an outlet side of a generator in real time; calculating a transferring current feeding moment based on a current symmetry method when fault current rises to a peak value after a short-circuit fault occurs; correcting the transferring current feeding moment by a correction coefficient; and then calculating a breaker switching moment, thereby realizing precise control on a generator circuit breaker. The method mainly addresses the situation that the existing control method cannot effectively cope with the complexity of the short-circuit fault current on the outlet side of the generator, and fills the blank of the effective method for short-circuit control of the generator circuit breaker.
Claims
1. A generator circuit breaker control method based on short-circuit fault current symmetry, comprising the following steps: step 1, disposing a main branch and a transfer branch on a generator circuit breaker, setting a correction coefficient ? based on simulation of a short-circuit fault on an outlet side of a generator and measured short-circuit current data, and setting an early switching time threshold ?, a transferring current value I.sub.zy and circuit breaker disconnection waiting time ? according to requirements of the generator circuit breaker; step 2, collecting current on the outlet side of the generator in real time, a short-circuit fault occurring to the outlet side of the generator at a moment T.sub.0; when I.sub.N-1<I.sub.zy<I.sub.N, capturing a moment at which a current value is equal to the transferring current value I.sub.zy at a current rising stage and recording the moment as a moment T.sub.1; when I.sub.N-2<I.sub.N-1>I.sub.N, capturing a moment at which the short-circuit current rises to the peak value and recording the moment as a moment T.sub.2, collecting current on the outlet side of the generator by discrete means, and denoting the moment T.sub.0 at which the short-circuit fault occurs to the outlet side of the generator as a 0 sampling point; I.sub.N-1 representing a current value at a (N?1)th sampling point, I.sub.N representing a current value at a N th sampling point, I.sub.N-2 representing a current value at a (N?2)th sampling point, I.sub.N-1 representing a current value at a (N-1)th sampling point, and I.sub.N representing a current value at a Nth sampling point; transforming discrete time coordinates into continuous time coordinates, to obtain T.sub.1?(N?1)??t+?, T.sub.2?(N?1)??t+?, wherein ?t is a sampling interval; step 3, starting to predict a transferring current feeding moment T.sub.4 and a main branch early switching moment T.sub.3 when a current peak value is collected, correcting the transferring current feeding moment T.sub.4 by the correction coefficient ?, wherein T.sub.4=??(T.sub.2?T.sub.1)+T.sub.2, predicting the main branch early switching moment T.sub.3=T.sub.4?? by the early switching time threshold ?, and calculating generator circuit breaker switching waiting time T.sub.wait, wherein T.sub.wait=T.sub.3?T.sub.2=??(T.sub.2?T.sub.1)??, ? is the correction coefficient; ? is the early switching time threshold; T.sub.1 is the moment at which the short-circuit current rises to the transferring current value; T.sub.2 is a short-circuit current peak value moment; step 4, waiting for generator circuit breaker switching waiting time T.sub.wait after the short-circuit current peak value moment, and performing a circuit breaker switching command; step 5, when the current drops to the transferring current I.sub.zy, feeding the transferring current through the transfer branch such that the short-circuit current on the main branch drops rapidly to 0 to realize rapid disconnection of the main branch; and step 6, waiting for fixed time ? after feeding the transferring current, and implementing disconnection of a fault circuit of the circuit breaker at a moment T.sub.5.
2. The method according to claim 1, wherein preferably, in step 1, the correction coefficient ? is 0.85-1.
3. The method according to claim 1, wherein in step 1, the correction coefficient ? is 1 when the short-circuit fault current of the generator has an axisymmetric waveform.
4. The method according to claim 1, wherein in step 1, the early switching time threshold ? is a minimum time threshold for successful disconnection of contacts of the generator circuit breaker, and the early switching time threshold ? is a constant value.
5. The method according to claim 1, wherein in step 2, the current peak value is a current peak value in a first half wave.
6. The method according to claim 1, in step 2, ? is 2/?t.
7. The method according to claim 1, wherein the transfer branch includes a current transferring and damping module.
8. The method according to claim 1, wherein the correction coefficient ? is 0.9.
9. The method according to claim 1, wherein the transferring current feeding moment T.sub.4 is the moment at which a short-circuit current value is equal to the transferring current value I.sub.zy after the short-circuit current decreases from the peak value.
10. The method according to claim 1, wherein in step 5, the moment at which the transferring current is fed through the transfer branch is determined based on the moment at which the transferring current value is collected by the control device.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Various additional advantages and benefits of the present disclosure will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for the purpose of illustrating preferred embodiments and are not considered to be limitation of the present disclosure. It is obvious that the drawings described below are merely some embodiments of the present disclosure, and those of ordinary skill in the art can also obtain other drawings according to these drawings without creative efforts. Moreover, same reference numerals refer to same parts throughout the drawings
[0027] In the drawings:
[0028]
[0029]
[0030]
[0031] The present disclosure is further explained below with reference to the drawings and embodies.
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0032] The specific embodiments of the present disclosure will be described in more detail below with reference to the
[0033] It should be noted that certain terms are used throughout the description and claims to refer to certain components. Those skilled in the art that should understand that different terms may be used by technicians to refer to the same component. The description and claims do not use differences in nouns as a way to distinguish components, but use differences in function of components as criteria for distinguishing. Comprise or include as referred to throughout the description and claims, is an open-ended language that is to be interpreted as including, but not limited to. The following description describes preferred embodiments for implementing the present disclosure, but the description is for the purpose of general principles of the description and is not intended to limit the scope of the present disclosure. The scope of the present disclosure is defined by the appended claims.
[0034] In order to facilitate the understanding of the embodiments of the present disclosure, several specific embodiments will be further described by way of example with reference to the drawings that are not to be construed as limiting the embodiments of the present disclosure.
[0035] As shown in
[0036] In a current transferring type generator circuit breaker system, the current transferring value I.sub.zy, the early switching time ? and circuit breaker S disconnection waiting time ? are known fixed values determined based on the features of the system short-circuit current. The present disclosure provides a fast generator circuit breaker control method based on short-circuit current symmetry under the above disconnection principles and features, which can accurately predict the start of a switching moment T.sub.3 of the circuit breaker on the main branch, and feeds transferring current when the short-circuit current drops to I.sub.zy. After waiting for the fixed time ?, the circuit breaker S is disconnected at the moment T.sub.5, achieving the purpose of completely disconnecting the fault circuit finally.
[0037] In an embodiment, the present disclosure provides a generator circuit breaker control method based on short-circuit current symmetry, including the following steps. [0038] Step 1: A correction coefficient ? is reasonably set by combining simulation of a short-circuit fault on an outlet side of a generator and measured short-circuit current data. An early switching time threshold ?, a transferring current value I.sub.zy and circuit breaker S disconnection waiting time ? are set according to requirements of the generator circuit breaker. [0039] Step 2: Current on an outlet side of the generator is collected in real time. When a detection system detects a short-circuit fault (at a moment T.sub.0), a control algorithm is started. When I.sub.N-1<I.sub.zy<I.sub.N, a moment at which a current value is equal to the transferring current value I.sub.zy at a current rising stage is captured, and is recorded as T.sub.1. When I.sub.N-2<I.sub.N-1>I.sub.N, a moment at which the short-circuit current rises to a peak value is captured and is recorded as T.sub.2.
[0040] An actual control system collects the current on the outlet side of the generator by discrete means, and the moment T.sub.0 at which the short-circuit fault occurs to the outlet side of the generator is denoted as a 0 sampling point. I.sub.N-1 represents a current value at a (N?1)th sampling point, I.sub.N represents a current value at a Nth sampling point, I.sub.N-2 represents a current value at a (N?2)th sampling point, I.sub.N-1 represents a current value at a (N-1)th sampling point, and I.sub.N represents a current value at a Nth sampling point. Discrete time coordinates are transformed into continuous time coordinates, to obtain T.sub.1?(N?1)??t+?, T.sub.2?(N?1)??t+8, wherein ?t is a sampling interval, and ? is generally ?t/2 by default. [0041] Step 3: A transferring current feeding moment T.sub.4, and a main branch early switching moment T.sub.3 start to be predicted when the current peak value is collected by a control device. Taking into account the influence of the decay of a DC component in the current on the outlet side of the generator, T.sub.4 is corrected by setting the correction coefficient ? in advance to calculate T=??(T.sub.2?T.sub.1)+T.sub.2, and a moment T.sub.3=T.sub.4?? of a switching operation of the circuit breaker is predicted by the early switching time threshold ?. Generator circuit breaker switching waiting time T.sub.wait is calculated by the following formula.
T.sub.wait=T.sub.3?T.sub.2=?(T.sub.2?T.sub.1)??;
[0042] wherein, ? is the correction coefficient;
[0043] ? is the early switching time;
[0044] T.sub.1 is the moment at which the short-circuit current rises to the transferring current value; and
[0045] T.sub.2 is the short-circuit current peak value moment. [0046] Step 4: A circuit breaker switching command is performed waiting for T.sub.wait after the short-circuit current peak value moment. [0047] Step 5: When the current drops to the transferring current I.sub.zy, the transferring current is fed through a transfer branch such that the short-circuit current on the main branch drops rapidly to 0 to realize rapid disconnection of the main branch. [0048] Step 6: The purpose of successful disconnection of a fault circuit of the circuit breaker S is finally implemented at the moment T.sub.5 waiting for fixed time ? after feeding the transferring current.
EMBODIMENT
[0049] The generator circuit breaker control method based on short-circuit current symmetry of this embodiment is applied within one cycle after a short-circuit fault occurs to an outlet side of a generator, and includes the following steps. [0050] Step 1: A correction coefficient ? is reasonably set by combining simulation of a short-circuit fault on an outlet side of a generator and measured short-circuit current data. An early switching time threshold ?, a transferring current value I.sub.zy and circuit breaker S disconnection waiting time ? are set according to requirements of the generator circuit breaker. [0051] Step 2: Current on an outlet side of the generator is collected in real time. When a detection system detects a short-circuit fault (at a moment T.sub.0), a control algorithm is started. When I.sub.N-1<I.sub.zy<I.sub.N, a moment at which a current value is equal to the transferring current value I.sub.zy at a current rising stage is captured, and is recorded as T.sub.1. When I.sub.N-2<I.sub.N-1>I.sub.N, a moment at which the short-circuit current rises to a peak value is captured and is recorded as T.sub.2.
[0052] An actual control system collects the current on the outlet side of the generator by discrete means, and the moment T.sub.0 at which the short-circuit fault occurs to the outlet side of the generator is denoted as a 0 sampling point. I.sub.N-1 represents a current value at a (N?1)th sampling point, IN represents a current value at a N th sampling point, I.sub.N-2 represents a current value at a (N?2)th sampling point, I.sub.N-1 represents a current value at a (N?1)th sampling point, and I.sub.N represents a current value at a N'th sampling point. Discrete time coordinates are transformed into continuous time coordinates, to obtain T?(N?1)??t+?, T.sub.2?(N?1)??t+?, wherein ?t is a sampling interval, and ? is generally ?t/2 by default. [0053] Step 3: A transferring current feeding moment T.sub.4 and a main branch early switching moment T.sub.3 start to be predicted when the current peak value is collected by a control device. Taking into account the influence of the decay of a DC component in the current on the outlet side of the generator, T.sub.4 is corrected by setting the correction coefficient ? in advance to calculate T.sub.4=??(T.sub.2?T.sub.1)+T.sub.2, and a moment T.sub.3=T.sub.4?? of a switching operation of the circuit breaker is predicted by the early switching time threshold ?. Generator circuit breaker switching waiting time T.sub.wait is calculated by the following formula.
T.sub.wait=T.sub.3?T.sub.2=??(T.sub.2?T.sub.1)??;
[0054] wherein, ? is the correction coefficient; [0055] ? is the early switching time; [0056] T.sub.1 is the moment at which the short-circuit current rises to the transferring current value; and [0057] T.sub.2 is the short-circuit current peak value moment. [0058] Step 4: A circuit breaker switching command is performed waiting for T.sub.wait after the short-circuit current peak value moment. [0059] Step 5: When the current drops to the transferring current I.sub.zy, the transferring current is fed through a transfer branch such that the short-circuit current on the main branch drops rapidly to 0 to realize rapid disconnection of the main branch. [0060] Step 6: The purpose of successful disconnection of a fault circuit of the circuit breaker S is finally implemented at the moment T.sub.5 waiting for fixed time ? after feeding the transferring current.
[0061]
[0062] It is particularly noted that the generator circuit breaker control method based on short-circuit current symmetry of the present disclosure is only applied to the current transferring type generator circuit breaker in
[0063]
[0064]
[0065] In combination with
[0066] Although the embodiments of the present disclosure have been described above with reference to the drawings, the present disclosure is not limited to the above specific embodiments and application fields, and the above specific embodiments are only illustrative, instructional, and not restrictive. Those of ordinary skill in the art, in the light of the present disclosure and without departing from the scope of the appended claims, will be able to make numerous forms that all fall within the scope of the present disclosure.