FORMING A PAVED SURFACE WITH AN EMBEDDED TUBULAR BODY
20240229375 ยท 2024-07-11
Inventors
Cpc classification
E01C23/03
FIXED CONSTRUCTIONS
International classification
Abstract
A method for building a surface with an embedded tubular body includes applying a first layer of a first material to a first surface and applying a tubular body. The tubular body can be applied at a top surface of the first layer or the tubular body can be applied at a top surface or within the first surface.
Claims
1. A method of building a surface comprising an embedded tubular body, the method comprising: applying a first layer of a first material to a first surface; and applying a tubular body at one of: a top surface of the first layer, within the first layer, and a top surface of the first surface.
2. The method of claim 1, wherein the first material comprises gravel and the first surface comprises earth.
3. The method of claim 1, wherein the first material comprises asphalt and the first surface comprises a gravel layer or an asphalt layer.
4. The method of claim 1, wherein the first material comprises concrete and the first surface comprises a gravel layer.
5. The method of claim 1, wherein applying a tubular body at a top surface of one of the first layer and the first surface comprises: applying the tubular body onto the top surface of the first surface using an apparatus that moves along the top surface of the first surface while the tubular body is being applied along the top surface of the first surface, the tubular body possessing a. bottom face and a top face, the bottom face contacting the top surface of the first surface and the top face being above the top surface of the first surface.
6. The method of claim 1, wherein applying a tubular body at a top surface of one of the first layer and the first surface comprises: applying the tubular body onto the top surface of the first layer using an apparatus that moves along the top surface of the first layer while the tubular body is being applied along the top surface of the first layer, the tubular body possessing a bottom face and a top face, the bottom face contacting the top surface of the first layer and the top face being above the top surface of the first layer.
7. The method of claim 6, further comprising: in response applying the tubular body onto the top surface of the first layer, compacting the first layer.
8. The method of claim 7, further comprising using the apparatus to compact the first layer.
9. The method of claim 1, wherein applying a tubular body at a top surface of one of the first layer and the first surface comprises unspooling a tubular body spool.
10. The method of claim 1, further comprising: removing a second surface to reveal the first surface underneath.
11. An apparatus for building a surface comprising an embedded tubular body, the apparatus comprising: a main body moveable in an advancing direction, the main body possessing a forward end and a read end, a plurality of rotatable bodies that contact the surface when the main body moves in the advancing direction, the plurality of rotatable bodies supporting the main body, the plurality of rotatable bodies configured to contact the surface at a plurality of respective contact points on the surface; a tubular body holder configured to deploy a tubular body onto the surface, the tubular body holder being mounted on the main body, the tubular body configured to be deployed by the tubular body holder to contact the surface at a line contact point; and a road building element configured to perform a step to build the surface.
12. The apparatus according to claim 11, wherein the tubular body holder and the rotatable bodies are configured such that the line contact point is coplanar with the plurality of respective contact points on the rotatable bodies.
13. The apparatus of claim 11, wherein the rotatable bodies comprise a plurality of wheels, the plurality of wheels rotating when the main body moves in the advancing direction.
14. The apparatus of claim 11, wherein the tubular body holder comprises a rotatable spool that rotates to deploy the tubular body onto the surface.
15. The apparatus of claim 14, further comprising a line guide connected to the forward end of the main body, the line guide defining a hole, wherein the tubular body passes through the hole of the line guide before the tubular body contacts the surface.
16. The apparatus of claim 15, wherein the road building element comprises at least one of a roller configured to compact a first layer to a first surface or a dump truck configured to store and dump one of asphalt and concrete, and wherein the tubular body holder is configured to deploy the tubular body to contact the surface ahead of the road building element as the main body advances.
17. The apparatus of claim 11, wherein the road building element comprises a nozzle configured to distribute tack coat onto a first surface.
18. The apparatus of claim 11, wherein the road building element is a miller configured to destroy a layer of an existing road, and wherein the tubular body holder is configured to deploy the tubular body to contact the surface behind the road building element as the main body advances.
19. The apparatus of claim 11, wherein the road building element is a sweeper configured to remove debris from a first surface, and wherein the tubular body holder is configured to deploy the tubular body to contact the surface behind the road building element as the main body advances.
20. A system for embedding a tubular body during a method of building a man-made surface, the system comprising: a tubular body holder configured to deploy the tubular body onto a layer of the man-made surface, the tubular body holder being configured to be mounted onto a vehicle configured to perform a step to build the man-made surface, the tubular body configured to be deployed by the tubular body holder to contact the man-made surface at a line contact point, the tubular body holder comprising a rotatable spool that rotates to deploy the tubular body onto the man-made surface as the vehicle advances.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0019] The foregoing and other aspects of the present disclosure are best understood from the following detailed description when read in connection with the accompanying drawings. For the purpose of illustrating the disclosed technology, the drawings shows some example embodiments, it being understood, however, that the disclosed technology is not limited to the specific instrumentalities disclosed. Included in the drawings are the following Figures:
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
DETAILED DESCRIPTION
[0027] The present disclosure describes systems, methods, and apparatuses for forming a paved surface with an embedded tubular body. In disclosed embodiments, a tubular body is embedded in a road, which is an example of a paved surface. The paved surface also could be, e.g., a parking lot, a pathway, an airport runway, or any other man-made surface. The tubular body can be embedded at any stage of the roadbuilding (or other paved surface-building) process, whether the road-building process is used to build a new road, repave an existing road, or to add another layer to an existing road. Further, in disclosed embodiments, equipment used during the road-building process can be modified to include an apparatus for deployment of a tubular body.
[0028] Although certain examples of the disclosed technology are explained in detail, it is to be understood that other examples, embodiments, and implementations of the disclosed technology are contemplated. Accordingly, it is not intended that the disclosed technology is limited in its scope to the details of construction and arrangement of components set forth in the following description or illustrated in the drawings. The disclosed technology can be implemented in a variety of examples and can be practiced or carried out in various ways. In particular, the presently disclosed subject matter is described in the context of forming a road with an embedded tubular body. The present disclosure, however, is not so limited, and can be applicable to other applications. The present disclosure, for example and not limitation, can include forming any paved surface with an embedded tubular body, including a parking lot, a pathway, an airport runway, or any other man-made surface. Such implementations and applications are contemplated within the scope of the present disclosure. Accordingly, when the present disclosure is described in the context of forming a road with an embedded tubular body, it will be understood that other implementations can take the place of those referred to.
[0029]
[0030]
[0031]
[0032] As illustrated in
[0033] For another example, as illustrated in
[0034] For another example, as illustrated in
[0035] In another example, the tubular body 150 can be applied after any of the base layer 101, sub-base layer 102, or sub-grade layer 103 are applied but before the respective layer sets (e.g., fully hardens or fixes) and pushed into the respective layer so that the tubular body 150 becomes embedded in such layer after the respective layer sets. In some cases, as shown, e.g., in
[0036]
[0037] In some embodiments, the tubular body deployment apparatus 500 can include a smoothing apparatus 524 as shown in
[0038] In some embodiments, a tubular body deployment apparatus 500 can be used to deploy a tubular body 150 onto the top surface of a layer of road before a subsequent layer is applied on top. For example, the tubular body 150 can be deployed onto the top surface of the sub-base layer 102 by the tubular body deployment apparatus 500 before the base layer 101 is laid.
[0039] In other embodiments, a tubular body 150 (e.g., a communication line, a fiber optic cable, an electrical conductor)) can be deployed onto the top surface of a layer of road by the tubular body deployment apparatus 500 and then pushed into (smushed into) that layer using, for example, a roller machine. For example, the tubular body 150 can be deployed onto the top surface of the base layer 101 and smushed into the base layer 101 when the roller machine compacts the base layer 101. As one of ordinary skill in the art will appreciate, in order to push the tubular body 150 into a layer, the layer may be capable of receiving the tubular body 150. For example, if the layer comprises asphalt or concrete, the asphalt or concrete may not have cured yet. For another example, if the layer includes gravel, the gravel may not be compacted so densely that it cannot receive the tubular body 150. Optionally, a subsequent layer can be laid on top of the layer that the tubular body has been pushed in to, for example, when the tubular body 150 is pushed into the sub-base layer 102 a base layer 101 can be laid on top.
[0040] In addition to the embodiments discussed above, when repaving an existing road, the tubular body 150 can be deployed after the old road is milled and before the new base layer is laid. Further, when adding a subsequent base layer to an existing road, the tubular body 150 can be laid on top of the old base layer before the new base layer is laid or it can be laid on top of and pushed into the new base layer.
[0041] In some embodiments, a tubular body 150 can be deployed while performing a step of the road forming process. For example, the tubular body 150 can be deployed while laying or compacting the sub-grade layer 103, sub-base layer 102, or base layers 101. For example, road-building equipment can include a tubular body deployment apparatus 400 to deploy the tubular body 150 while performing other roadbuilding steps. For example, as shown in
[0042] For another example, as shown in
[0043] Although the foregoing embodiments describe a tubular body deployment apparatus 500 attached to a roller machine 600 and an asphalt paver machine 700, the disclosed subject matter is not so limited. Instead, as one of ordinary skill in the art will appreciate, the deployment system can be attached to any piece of equipment used for road building, including, for example, a dump truck configured to store and dump one of asphalt and concrete, a miller configured to destroy a layer of an existing road, a sweeper configured to remove debris from a first surface, or a piece of equipment including a nozzle configured to distribute tack coat onto a surface.
[0044] While various exemplary embodiments of the disclosed systems, methods, and apparatuses for forming a road with an embedded tubular body have been described above, it should be understood that these exemplary embodiments have been presented for purposes of example only, and are not limitations. The exemplary embodiments are not exhaustive and do not limit the disclosure to the precise form disclosed. Modifications and variations are possible in light of the above teachings or may be acquired from practicing of the disclosure, without departing from the breadth or scope.