DEVICE AND METHOD FOR MITIGATING ANNULAR PRESSURE BUILDUP IN A WELLBORE CASING ANNULUS

20190063191 ยท 2019-02-28

Assignee

Inventors

Cpc classification

International classification

Abstract

A device and method are provided for mitigating annular pressure buildup in a wellbore casing annulus of an oil or gas well. The device includes a tubular member including an outer side, a chamber secured around the outer side, the chamber having at least one flexible portion for varying the internal volume of the chamber, at least one reservoir capable of supplying a gas, and a pressure compensator connecting the reservoir and the chamber. The reservoir is able to feed the chamber volume with the gas via the pressure compensator.

Claims

1. A device for mitigating annular pressure buildup in a wellbore casing annulus of an oil or gas well, comprising: a tubular member comprising an outer side, a chamber secured around said outer side, said chamber having at least one flexible portion for varying the internal volume of the chamber, at least one reservoir capable of supplying a gas, a pressure compensator connecting said at least one reservoir and said chamber, and wherein said at least one reservoir is able to feed said chamber with said gas via the pressure compensator.

2. A device for mitigating annular pressure buildup according to claim 1, wherein said chamber comprises an envelope disposed around said outer side, said outer side and said envelope forming said chamber, and wherein said envelope comprises said at least one flexible portion.

3. A device for mitigating annular pressure buildup according to claim 2, wherein said envelope includes a first flange and a second flange, said flanges being arranged at a distance from one another along said tubular member, and wherein said flexible portion is an elastic membrane that is disposed radially around said outer side, that extends axially along the tubular member and that is fastened at its axial extremities to said two flanges.

4. A device for mitigating annular pressure buildup according to claim 3, wherein said elastic membrane is configured to produce a uniform rise or decrease of said chamber volume.

5. A device for mitigating annular pressure buildup according to claim 3, wherein said elastic membrane is transversally or longitudinally lobe-shaped.

6. A device for mitigating annular pressure buildup according to claim 3, wherein said flanges and said elastic membrane are made of steel.

7. A device for mitigating annular pressure buildup according to claim 3, wherein said tubular member comprises reinforcement and holding means fastening said elastic membrane.

8. A device for mitigating annular pressure buildup according to claim 1, wherein said chamber includes at least one tube, wherein said tube comprises said at least one flexible portion.

9. A device for mitigating annular pressure buildup according to claim 8, wherein said one or more tubes are straight tubes arranged parallel to said tubular member or tubes wound around said tubular member.

10. A device for mitigating annular pressure buildup according to claim 1, wherein said pressure compensator allows gas to flow from said at least one reservoir to said chamber when said external pressure increases.

11. A device for mitigating annular pressure buildup according to claim 1, wherein said pressure compensator is an air pressure regulator adapted to high pressure.

12. A device for mitigating annular pressure buildup according to claim 1, wherein said reservoir is selected from bottles, cylinders or any other recipients suitable for containing gas under pressure.

13. A device for mitigating annular pressure buildup according to claim 1, wherein said at least one reservoir is a cryogenic storage dewar.

14. A device for mitigating annular pressure buildup according to claim 1, wherein said chamber comprises a burst disk to vent supply gas when the pressure prevailing in the chamber exceeds a predetermined limit.

15. A device for mitigating annular pressure buildup according to claim 1, wherein the said tubular member is a casing tube.

16. A method of mitigating pressure buildup within a wellbore casing annulus of an oil or gas well, wherein said method comprises: providing at the ground level a device for mitigating annular pressure buildup according to claim 1, lowering said device in the wellbore, letting said pressure compensator allow flow of said gas from the at least one reservoir into the chamber, so as to at least partially compensate an increase of external pressure due to the lowering of said device.

17. A method according to claim 16, comprising filling said reservoir with said gas in pressurized form or in liquid form, before lowering said device in the wellbore.

18. A method according to claim 17, wherein said gas is inert gas, such as nitrogen.

19. A method according to claim 16, further comprising filling said reservoir with a gas generator capable of producing said gas, before lowering said device in the wellbore.

20. A method according to claim 19, wherein said gas generator is a propellant and wherein said gas is produced by said propellant.

21. A method according to claim 16, further comprising adjusting the pressure prevailing in said chamber to a value substantially equal to ground level pressure before lowering said device in the wellbore.

22. A method according to claim 16, wherein said pressure compensator lets said gas flow from the at least one reservoir to the chamber when the external pressure is above a specified pressure.

23. A method according to claim 16, wherein said flexible portion deforms when the pressure difference between the external pressure and the pressure inside said chamber exceeds a specified value.

Description

[0060] Other advantages and features of the invention will emerge upon examining the detailed description of embodiments, which are in no way limiting, and in view of the appended drawings wherein:

[0061] FIG. 1 is a sectional side view of a wellbore including crushable foams according to prior art to mitigate annular pressure buildup,

[0062] FIG. 2 is a side view of a tubular member provided with a device for mitigating annular pressure buildup according to the invention,

[0063] FIGS. 3A and 3B are side view and sectional front view, respectively, of a tubular member and a part of a device according to one embodiment of the invention, and

[0064] FIG. 4A is a graph of external pressure Pe and external temperature Te in a wellbore annulus, and chamber pressure P1 and reservoir inner pressure P2 in a device for mitigating annular pressure buildup according to the invention, during deployment and production.

[0065] FIG. 4B is a graph of external pressure Pe in a wellbore annulus, and chamber volume V1, chamber pressure P1 and reservoir inner pressure P2 in a device for mitigating annular pressure buildup according to the invention, during deployment and production.

[0066] FIG. 1 shows a sectional side view of a wellbore according to the state of the art having several coaxial annuli. As shown in FIG. 1, wellbore 1 penetrates subterranean formation 2. Within wellbore 1, concentrically placed casing strings 30 define annuli 3A, 3B and 3C. The casing strings are made of one or more casing tubes and are usually much longer than their diameter. Concrete 31 is inserted in the outer annuli 3B and 3C and close them at their bottom end. A production tubing 4 is inserted in the arrangement of casing strings. While shown with two concentric annuli, depending on the length of wellbore 1, any number of concentric annuli may be present. Annulus 3A, which is defined between the innermost casing surface and production tubing 4, extends through most of the length of wellbore 1 and maintains fluid communication with the head of wellbore 1. Although FIG. 1 shows wellbore 1 as having a vertical section, it is to be recognized that any wellbore orientation may be possible.

[0067] In the process of drilling and servicing wellbore 1, fluids, such as drilling fluid or any fluid from the formation, such as brine, may accumulate within annuli 3B and 3C.

[0068] Annuli are often sealed at their upper ends as well, thereby trapping the annular fluid within a confined space. As explained above, when annuli 3B and 3C are sealed at both their upper and lower ends, a pressure increase can occur upon the trapped annular fluid undergoing thermal expansion due to exposure to high-temperature production fluids. Through this phenomenon, the accumulated annular fluid can possibly lead to annular pressure buildup.

[0069] Known pressure-collapsible materials such as hollow spheres and syntactic foam, shown by the numerical reference 5 in FIG. 1, can mitigate annular pressure buildup by providing available space for the annular fluid upon their collapse. Such materials are limited, however, in that they are only effective for one pressurization cycle. That is, once they have collapsed in response to a pressure increase, they are no longer effective to further mitigate the pressure increase. Additionally, the pressure for initiating their collapse may be above a threshold pressure at which casing damage begins to occur. Additionally, when temperature decreases, trapped fluid volume decreases accordingly. Pressure will decrease to the point that a vacuum cap may form in place of the collapsed volume of material. This vacuum may be detrimental to the well integrity.

[0070] Referring to FIG. 2, a device for mitigating annular pressure buildup according to a preferred embodiment of the invention is represented. The device is secured to a tubular member 6, such as a wellbore casing section made of pipe body. In use, the device is mainly immersed in wellbore fluids, such as brine, having an external pressure Pe.

[0071] In this embodiment, an elastic membrane 7 is mounted around the tubular member 6 and at a specified distance from the surface of the tubular member 6. This elastic membrane 7 is preferably disposed radially around the outer side of the tubular member 6, and extends axially along the tubular member 6. The device further includes a first flange 8A and a second flange 8B at a distance from one another and secured to the tubular member 6 in a leak-tight manner. Said flanges are preferably made of steel and welded to the tubular member 6. The elastic membrane 7 is attached in a leak-tight manner to the two flanges 8A and 8B at its axial extremities. The space located between the elastic membrane 7, the tubular member 6, and the two flanges 8A and 8B forms a sealed chamber 8, having a chamber volume V1. Said chamber 8 has an internal pressure P1 in use.

[0072] At least one reservoir 9, having a volume V2, capable of containing a specified quantity of gas, such as inert gas such as nitrogen (N.sub.2), or of a gas generator, is rigidly connected to a pressure compensator 10. In one embodiment of the invention, the pressure compensator 10 may be an air pressure regulator adapted to handle the external pressure, which typically varies between 3 ksi (20.7 MPa) and 20 ksi (137.9 MPa), and more typically between 5 ksi (34.5 MPa) and 15 ksi (103.4 MPa). This reservoir 9 is able to let gas flow into the chamber 8 through the pressure compensator 10.

[0073] In another embodiment, liquid state of nitrogen is used in the reservoir, which therefore may be a dewar flask. Volume needed is advantageously less than one liter and generates much more volume compensation capacity. After installation, gas would slowly vaporize and flow in the chamber 8. This embodiment advantageously includes a heat exchanger sized to absorb heat at a relevant pace from the environment. Moreover, this embodiment advantageously allows to reduce the size of the reservoir.

[0074] In an alternative embodiment, the reservoir may contain a gas generator cartridge using solid propellant such as sodium azide (NaN.sub.3) with potassium nitrate (KNO.sub.3) or ammonium perchlorate composite propellant. An alternative to solid propellant could be liquid propellant selected among hydrogen peroxide, hydrazine, or nitrous oxide, or any combination thereof, that may mechanically be activated to release gas during the lowering operation.

[0075] FIG. 3A illustrates a side view of a section of a tubular member 6 partially covered by parts of a device according to the invention. The parts of device shown include an elastic membrane 7, the first flange 8A and the second flange 8B. FIG. 3B shows a view through section III of the elastic membrane 7. In the embodiment of the invention illustrated in FIGS. 3A and 3B, the elastic membrane 7 includes four lobes. The transversally lobe-shaped membrane is advantageously adapted for reinforcement and holding means (not represented) used in the fastening of the elastic membrane 7 to the tubular member 6. The shape of the elastic membrane 7 is designed according to the compliance needs in volume, and allows a uniform radial deformation when submitted to a differential pressure between chamber internal pressure P1 and external pressure Pe. The compliance needs in volume may be between 0.5 gal/foot (6.2 liter/m) and 4 gal/foot (49.7 liter/m). It also allows having a higher chamber pressure P1 than external pressure Pe when installed. The elastic membrane has a stiffness that allows having a lower chamber internal pressure P1 than external pressure Pe at the nominal external temperature when maximal compensation is needed. In this manner, the pressure exerted on the tubular member is lower than the external pressure and thereby reduces the risk of deformation or collapse of the tubular member.

[0076] The flanges and the elastic membrane are preferably made of steel so as to achieve high values of resistance to pressure. In that case, the thickness of the elastic membrane may be between 1/16 inch and 3/16 inch to provide resistance to pressure and flexibility.

[0077] FIGS. 4A and 4B provide example values for external pressure Pe, external temperature Te, chamber pressure P1 and volume V1, and reservoir pressure P2. The evolutions of these parameters have been represented during two stages, using an arbitrary time scale numbered from 1 to 20. The first stage starts at the ground level. Time 1 to time 9 illustrate the progressive lowering of the device in the wellbore, i.e., its installation. The second stage starts when the device is in its final position. Time 10 to time 20 represent a period of production in the wellbore.

[0078] During the installation (times 1 to 9), external pressure Pe significantly rises due to hydrostatic pressure. At the same time, the reservoir fills the chamber volume V1, thus simultaneously raising internal chamber pressure P1 and lowering reservoir pressure P2, until around 4.5 ksi (31 MPa) each at the end of the stage.

[0079] As illustrated in FIG. 4B, the internal chamber volume V1 increases significantly, i.e., from 5 L up to 8.4 L in this example, and as a consequence, provides more expansion compensation ability once the annulus is closed. However, depending on the pressure difference, the internal chamber volume V1 does not necessarily increase during the installation.

[0080] While producing (times 10 to 20), external temperature dramatically increase from 20 C. to 80 C., classically expanding the volume of trapped fluids, typically including brine, within the external annulus, following the annular pressure buildup phenomenon above described. The elastic membrane, which closes the chamber 8 having the internal pressure P1, compresses under the effect of external pressure Pe, thus, resulting in the slight increase of internal pressure P1, combined with a steep fall of the internal chamber volume V1. Space has advantageously rose in the external annulus, which also advantageously reduces the external pressure Pe elevation, and finally mitigates the annular pressure buildup.

[0081] In the example of FIGS. 4A and 4B, the internal chamber volume V1 increases during the installation stage and decreases during the operation stage.

[0082] The proposed device and method are reversible since chamber volume V1 springs back to its installation bottom hole capacity when external temperature drops. In case the device needs to be recovered back to the surface and gas vented out during the process, the device may be reconditioned and the reservoir may be refilled in order to re-use the device just as if it was for the first time.

[0083] Safety may advantageously be improved by using a robust gas container for the transportation and manipulation of pressurized gas in steel bottles.

[0084] In an alternative embodiment, several devices of the invention may be used along the casing string, typically 50 to 200, to accommodate the whole annulus volume.

[0085] In such an embodiment, reservoirs could be connected together in series and fed from ground level. Thus, they would advantageously provide more gas supply for deepest chambers.