CRACKING FURNACE SYSTEM AND METHOD FOR CRACKING HYDROCARBON FEEDSTOCK THEREIN
20220372377 · 2022-11-24
Inventors
Cpc classification
International classification
Abstract
Cracking furnace system for converting a hydrocarbon feedstock into cracked gas comprising a convection section, a radiant section and a cooling section, wherein the convection section includes a plurality of convection banks, including a first high temperature coil, configured to receive and preheat hydrocarbon feedstock, wherein the radiant section includes a firebox comprising at least one radiant coil configured to heat up the feedstock to a temperature allowing a pyrolysis reaction, wherein the cooling section includes at least one transfer line exchanger.
Claims
1. Cracking furnace system for converting a hydrocarbon feedstock into cracked gas comprising a convection section, a radiant section and a cooling section, wherein the convection section includes a plurality of convection banks, including a first high temperature coil, configured to receive and preheat a hydrocarbon feedstock-diluent mixture, wherein the radiant section includes a firebox comprising at least one radiant coil configured to heat up the feedstock to a temperature allowing a pyrolysis reaction, wherein the cooling section includes at least one transfer line exchanger, wherein the convection section is configured for mixing said hydrocarbon feedstock with said diluent to provide said hydrocarbon feedstock-diluent mixture, upstream of the first high temperature coil, wherein the system is configured to further preheat the feedstock-diluent mixture after exit of feedstock from the first high temperature coil by the transfer line exchanger before entry into the radiant section, wherein the convection section includes a second high temperature coil configured to further preheat feedstock after exit of the feedstock from the transfer line exchanger and before entry into the radiant section.
2. Cracking furnace system according to claim 1, wherein the second high temperature coil is located in a bottom part of the convection section.
3. Cracking furnace system according to claim 1, wherein the cracking furnace system comprises a provision, configured to mix the feedstock with diluent steam, upstream of said first high temperature coil.
4. Cracking furnace system according to claim 1, further comprising a steam drum configured to generate saturated high pressure steam.
5. Cracking furnace system according to claim 4, further comprising a secondary transfer line exchanger which is located downstream from the primary transfer line exchanger and which is connected to the steam drum, and which is configured to at least partly vaporized boiler water coming from the steam drum.
6. Cracking furnace system according to claim 3, wherein the convection section includes at least one high pressure steam superheater configured to superheat high pressure steam coming from the steam drum.
7. Cracking furnace system according to claim 3, wherein the convection section includes at least one dilution steam super heater configured to superheat dilution steam to add to the feedstock or the feedstock-diluent mixture.
8. Cracking furnace system according to claim 1, wherein the plurality of convection banks further includes a feed preheater configured to preheat the hydrocarbon feedstock prior to a provision, configured to mix the preheated feedstock with part or all of the diluent, which provision is situated between said feed preheater and said first high temperature coil.
9. Cracking furnace system according to claim 1, wherein the plurality of convection banks includes a further provision configured to mix further diluent into the feedstock-diluent mixture which further provision is located downstream of the first high temperature coil and upstream of the transfer line exchanger.
10. Method for cracking hydrocarbon feedstock in a cracking furnace system, the method comprising mixing the hydrocarbon feedstock with a diluent thereby providing a hydrocarbon feedstock-diluent mixture, and subjecting the hydrocarbon feedstock-diluent mixture to a first feedstock preheating step, a second feedstock preheating step, and a third preheating step before entry of the hydrocarbon feedstock-diluent mixture into a radiant section of the cracking furnace system, in which radiant section the hydrocarbon feedstock is cracked, wherein the first feedstock preheating step includes preheating hydrocarbon feedstock-diluent mixture by hot flue gasses of a cracking furnace system using a first high temperature coil, wherein the second feedstock-diluent mixture preheating step includes further preheating of the feedstock-diluent mixture by waste heat of cracked gas of the cracking furnace system using a transfer line exchanger, wherein the third feedstock-diluent mixture preheating step includes further preheating of the feedstock by hot flue gasses of the cracking furnace system using a second high temperature coil.
11. Method according claim 10, wherein the hydrocarbon feedstock is mixed with dilution steam to provide the feedstock-diluent mixture to be preheated in said first preheating step.
12. Method according to claim 11, wherein after said first preheating step, further dilution steam is added to the feedstock-diluent mixture, before subjecting the feedstock-diluent mixture to said further preheating of the feedstock-diluent mixture by waste heat of cracked gas of the cracking furnace system using a transfer line exchanger.
13. Method according to claim 10, wherein high pressure steam is generated by waste heat of cracked gas of the cracking furnace system, using a secondary transfer line exchanger located downstream of the transfer line exchanger.
14. Method according to claim 10, wherein the hydrocarbon feedstock-diluent mixture is superheated in the convection section.
15. Method according to claim 10, wherein the feedstock is subjected to preheating prior to mixing the feedstock with diluent.
16. Method according to claim 15, wherein the feedstock is preheated prior to the mixing with the diluent to temperature whereby upon mixing with diluent a feedstock-diluent mixture, to be fed into the first high temperature coil, is obtained having a temperature exceeding the water dew point.
17. Method according to claim 10, wherein the feedstock-diluent mixture enters the first high temperature coil at a temperature above the dew point of water.
18. Method according to claim 17, wherein the feedstock-diluent mixture enters the first high temperature coil at a temperature of 30-70° C. above the dew point of water.
19. Method according to claim 10, wherein the feedstock-diluent mixture is preheated in the first high temperature coil and the feedstock-diluent mixture already has a temperature exceeding the feedstock's hydrocarbon dew point at the start of the second feedstock-diluent preheating step.
20. Method according to claim 10, wherein the method is carried out in a cracking furnace system, further comprising a steam drum configured to generate saturated high pressure steam.
21. Method according to claim 20, wherein the convection section includes at least one high pressure steam superheater configured to superheat high pressure steam coming from the steam drum.
22. Method according to claim 10, wherein the convection section includes at least one dilution steam super heater configured to superheat dilution steam to add to the feedstock or the feedstock-diluent mixture.
23. Cracking furnace system according to claim 3, wherein the cracking furnace system comprises a further provision configured to add additional diluent steam to the hydrocarbon feedstock-diluent steam mixture, which provision is configured to introduce the additional diluent steam into the hydrocarbon feedstock-diluent steam mixture between the outlet for hydrocarbon feed-diluent steam mixture from said first high temperature coil and the inlet for hydrocarbon feed-diluent steam mixture into said transferline exchanger.
24. Method according to claim 11, wherein the dilution steam is superheated dilution steam.
25. Method according to claim 20, wherein the cracking furnace system further comprises a secondary transfer line exchanger which is located downstream from the primary transfer line exchanger and which is connected to the steam drum, and which is configured to at least partly vaporized boiler water coming from the steam drum.
Description
[0035] The present invention will be further elucidated with reference to figures of exemplary embodiments. Therein,
[0036]
[0037]
[0038]
[0039]
[0040] It is noted that the figures are given by way of schematic representation of embodiments of the invention. Corresponding elements are designated with corresponding reference signs.
[0041]
[0042] The heat of reaction for the highly endothermic pyrolysis reaction can be supplied by the combustion of fuel (gas) 5 in the radiant section 10, also called the furnace firebox, in many different ways, as is known to the person skilled in the art. Combustion air 6 can for example be introduced directly into burners 12 of the furnace firebox, in which burners 12 fuel gas 5 and combustion air 6 is fired to provide heat for the pyrolysis reaction. Alternatively, combustion air 6 may first be preheated in the convection section 20, for example by a convection bank embodied as an air preheater 27 located to a downstream side of the convection section 20, preferably downstream all the other convection section banks in the convection section, as shown. The combustion air 6 may be introduced into the air preheater 27 by for example a forced draft fan 37. Preheating of the combustion air can raise the adiabatic flame temperature and make the firebox more efficient. In the combustion zones 14 in the furnace firebox, fuel 5 and (preheated) combustion air are converted to combustion products such as water and CO2, the so-called flue gas. The waste heat from the flue gas 7 is recovered in the convection section 20 using various types of convection banks 21. Part of the heat is used for the process side, i.e. the preheating and/or evaporation and/or superheating of hydrocarbon feed and/or the feedstock-diluent mixture, and the rest of the heat is used for the non-process side, such as the generation and superheating of high pressure steam, as described above. The combustion in the furnace firebox 10 can be done by means of bottom burners 12 and/or sidewall burners and/or by means of roof burners and/or sidewall burners in a top fired furnace. In the exemplary embodiment of the furnace 10 as shown in
[0043] With the new inventive arrangement, an optimized radiant coil inlet temperature can be maintained while the logarithmic mean temperature difference in the primary transfer line exchanger can be enlarged, which can accelerate the freezing of the reaction equilibrium and limit the conversion of products to by-products, leading to an improvement of the yield of the system. As an example, the feedstock may enter the transfer line exchanger 35 at a cold side inlet temperature of around 350° C. and be preheated to a cold side outlet temperature of around 555° C. instead of approximately 610° C. previously, whereas at the same time, the effluent may enter the transfer line exchanger 35 with a hot side inlet temperature of approximately 810° C. and be cooled to a hot side outlet temperature of around 630° C. instead of approximately 575° C. in a prior art design. This results in an increase of the logarithmic mean temperature difference from 213° C. to 267° C., which corresponds to an increase of 25% in the logarithmic mean temperature difference in the primary transfer line exchanger, improving the yield of the system with a factor of approximately 0.1% to more or less 2.0%, which may be significant for large production capacities of products such as ethylene, propylene, or butadiene. As mentioned before, maintaining an optimized radiant coil inlet temperature is important as a lower inlet temperature of the feedstock would raise the radiant duty and lower the firebox efficiency and raise the fuel consumption, while a higher inlet temperature could result in conversion of feedstock inside the convection section and associated deposition of cokes on the internal surface convection section tubes.
[0044] The invention of a three-step preheating of hydrocarbon feedstock by a first high temperature coil in the convection section, a transfer line exchanger in the cooling section and by a second high temperature coil in the convection section can also be advantageously applied to alternative cracking furnace systems and methods for cracking hydrocarbon feedstock therein.
[0045]
[0046]
[0047] The work leading to this invention has received funding from the European Union Horizon H2020 Programme (H2020-SPIRE-04-2016) under grant agreement no. 723706.
[0048] For the purpose of clarity and a concise description, features are described herein as part of the same or separate embodiments, however, it will be appreciated that the scope of the invention may include embodiments having combinations of all or some of the features described. It may be understood that the embodiments shown have the same or similar components, apart from where they are described as being different.
[0049] In the claims, any reference signs placed between parentheses shall not be construed as limiting the claim. The word ‘comprising’ does not exclude the presence of other features or steps than those listed in a claim. Furthermore, the words ‘a’ and ‘an’ shall not be construed as limited to ‘only one’, but instead are used to mean ‘at least one’, and do not exclude a plurality. The mere fact that certain measures are recited in mutually different claims does not indicate that a combination of these measures cannot be used to an advantage. Many variants will be apparent to the person skilled in the art. All variants are understood to be comprised within the scope of the invention defined in the following claims.
REFERENCES
[0050] 1. Hydrocarbon feedstock [0051] 2. Dilution steam [0052] 3. Boiler feed water [0053] 4. High pressure steam [0054] 5. Fuel gas [0055] 6. Combustion air [0056] 7. Flue gas [0057] 8. Cracked gas [0058] 9a. Boiler water [0059] 9b. Partly vaporized boiler water [0060] 10. Radiant section/furnace firebox [0061] 11. Radiant coil [0062] 12. Bottom burner [0063] 13. Feedstock/dilution steam mixture [0064] 14. Combustion zone [0065] 20. Convection section [0066] 21. Convection bank [0067] 22. Feed preheater [0068] 23. First high temperature coil [0069] 24. Dilution steam super heater [0070] 25. High pressure steam super heater [0071] 26. Second high temperature coil [0072] 27. Air preheater [0073] 30. Induced draft fan [0074] 31. Stack [0075] 33. Steam drum [0076] 34. De-super heater [0077] 35. Primary transfer line exchanger [0078] 36. Secondary transfer line exchanger [0079] 37. Forced draft fan [0080] 40. Cracking furnace system [0081] 50. Preheated combustion air [0082] 51. Oxygen [0083] 52. Externally recycled flue gas [0084] 54. Flue gas splitter [0085] 55. Flue gas ejector