Tank and method for constructing dike
10184240 ยท 2019-01-22
Assignee
Inventors
- Masanori Matsuura (Sagamihara, JP)
- Toshimichi Ichinomiya (Fuchu, JP)
- Shuji Yanai (Tama, JP)
- Yuji Watanabe (Tama, JP)
- Tomoyoshi Yoshiwara (Kawaguchi, JP)
- Shinichi Yoshimura (Fukuoka, JP)
- Ryo Mizutani (Higashimurayama, JP)
- Kazumasa Okubo (Chofu, JP)
- Kosuke Furuichi (Hachioji, JP)
- Shinichi Yamanobe (Inagi, JP)
- TOMOAKI HONDA (TOKYO, JP)
- Yuki Yokota (Chofu, JP)
Cpc classification
F17C3/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04B1/046
FIXED CONSTRUCTIONS
F17C2223/033
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2201/032
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04G23/0218
FIXED CONSTRUCTIONS
F17C2270/0134
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04C5/125
FIXED CONSTRUCTIONS
B65D90/08
PERFORMING OPERATIONS; TRANSPORTING
F17C2201/052
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2203/0678
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04B1/3211
FIXED CONSTRUCTIONS
F17C3/022
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2209/232
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F17C2260/013
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B65D90/024
PERFORMING OPERATIONS; TRANSPORTING
F17C2223/0161
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04H7/02
FIXED CONSTRUCTIONS
E04G2021/127
FIXED CONSTRUCTIONS
F17C2221/033
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E04B1/6187
FIXED CONSTRUCTIONS
F17C2203/0695
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
E04B1/04
FIXED CONSTRUCTIONS
E04B1/61
FIXED CONSTRUCTIONS
E04H7/02
FIXED CONSTRUCTIONS
Abstract
In an LNG tank, a dike is formed by arranging precast blocks in the circumferential direction and layering the precast blocks in the vertical direction. Each of the precast blocks has loop joints on the top, bottom, left, and right side faces, and concrete is deposited between each two precast blocks adjacent in the circumferential direction and the vertical direction, whereby masonry joints are formed in the vertical direction and the circumferential direction. Prestress is imparted to the dike by PC steel members. The PC steel members are provided in the circumferential direction and the vertical direction of the dike, and are arranged so as to avoid the masonry joints in the circumferential direction and the vertical direction. Therefore, it is possible to construct the dike in a short time, and it is possible to provide a tank or the like that can reduce the construction period.
Claims
1. A tank comprising: a dike formed by: a plurality of precast blocks arranged in a circumferential direction of the dike and in a vertical direction of the dike, each of the precast blocks being provided with block joints on a first side and a second side of the precast block and on at least one of an upper portion and a lower portion of the precast block, a filler provided between adjacent precast blocks so as to form masonry joints in the vertical direction and the circumferential direction of the dike, and a circumferential tension member configured to provide a prestress to the dike in the circumferential direction of the dike, and a vertical tension member configured to provide a prestress to the dike in the vertical direction of the dike, the vertical tension member being arranged so as to avoid the masonry joints in the vertical direction, wherein: each of the plurality of precast blocks includes: a main body, a plate protruding from the main body and functioning as a formwork for the filler in forming the masonry joints, the plate being configured to protrude at an upper position on the first side, at an upper position on the second side, at a lower position on the first side, and at a lower position on the second side in a circumference of the main body, and at least two positions of the upper position on the first side, the upper position on the second side, the lower position on the first side, and the lower position on the second side have a shape in which a right-angled corner is cut out of the plate of each precast block, and shapes of the upper and the lower positions of the first side and the upper and lower positions of the second side of the plate of each precast block are defined such that two rectangular areas identical to each other are formed by a complimentary cut out in a corner of the plate located in each of the positions.
2. The tank according to claim 1, wherein the circumferential tension member is configured to avoid the masonry joints in the circumferential direction of the dike.
3. The tank according to claim 1, wherein each of the block joints is one of: (i) a loop joint, (ii) a mechanical joint, and (iii) a joint having a fixing element.
4. The tank according to claim 1, wherein a bottom face of the main body of each of the precast blocks inclines upward toward an exterior of the dike.
5. The tank according to claim 1, wherein the plate protruding from the main body of each of the precast blocks is provided on an inner portion of each of the precast blocks.
6. The tank according to claim 5, wherein: the plates of the precast blocks are continuous in the circumferential direction and in the vertical direction of the dike, and an inner portion of the dike is covered by a combination of the plates of the precast blocks.
7. A method of constructing the dike of the tank according to claim 1, the method comprising: arranging the precast blocks in the circumferential direction of the dike and stacking the precast blocks in the vertical direction of the dike, each of the precast blocks being provided with block joints on the first side and the second side in the circumferential direction, thereof and at least one of the upper portion and the lower portion of each of the preset blocks in the vertical direction; providing the filler between the precast blocks adjacent to each other in the circumferential direction and in the vertical direction of the dike so as to form the masonry joints in the vertical direction and in the circumferential direction of the dike; introducing prestress to the dike by the circumferential tension member and the vertical tension member; and arranging the vertical tension member so as to avoid the masonry joints in the vertical direction.
8. The tank according to claim 1, wherein: a joining structure is formed of joined upper and lower precast blocks of the plurality of precast blocks, each of the upper precast blocks includes a block joint protruding downward from a main body of each of the upper precast blocks, each of the lower precast blocks includes a hole opening in a top face of a main body of each of the lower precast blocks and a block joint embedded in an upper portion of the main body, the filler is provided on the main body of each of the lower precast blocks, and the block joint of each of the upper precast blocks is inserted into the hole of each of the lower precast blocks.
9. The tank according to claim 8, wherein the block joint of each of the upper and lower precast blocks includes a fixing element provided at a free end of a reinforcing steel bar.
10. The tank according to claim 8, wherein a bottom face of the main body of each of the upper precast blocks inclines upward.
11. The tank according to claim 8, wherein the plate protruding upward from the main body is provided on a side face of the main body of each of the lower precast blocks.
12. The tank according to claim 11, further comprising a leakage preventing mechanism configured to prevent the filler from leaking from the plate.
13. A method of constructing a dike of the tank according to claim 8, the method comprising: providing the filler on the main body of each of the lower precast blocks; and inserting the block joint of each of the upper precast blocks into the hole of each of the lower precast blocks.
14. A tank comprising: a dike formed by: a plurality of precast blocks arranged in a circumferential direction of the dike and in a vertical direction of the dike, each of the precast blocks being provided with block joints on a first side and a second side in the circumferential direction and at least one of an upper portion and a lower portion in the vertical direction, a filler provided between the precast blocks adjacent to each other in the vertical direction and the circumferential direction of the dike so as to form masonry joints in the vertical direction and the circumferential direction of the dike, a circumferential tension member configured to provide a prestress in the circumferential direction of the dike, and a vertical tension member configured to provide a prestress in the vertical direction of the dike, the vertical tension member being configured to avoid the masonry joints in the vertical direction, wherein: each of the plurality of precast blocks includes: a main body; a plate protruding from the main body and configured to function as a formwork for the filler when the masonry joints are formed, the plate including a fixing mechanism configured to fix the plate such that the plate overlaps the plate of a different precast block in a front-rear direction, the fixing mechanism including at least one of a convex portion and a receiving portion into which the convex portion is configured to be inserted.
15. The tank according to claim 14, wherein: the plate protrudes upward, downward, from the first side, and from the second side of the main body, the convex portion is disposed at one of the upward and downward protruding portions of the plate and the receiving portion is disposed at the other of the upward and downward protruding portions of the plate, the convex portion is disposed at one of the protruding portion from the first side and the protruding portion from the second side of the plate and the receiving portion is disposed at the other of the protruding portion from the first side and the protruding portion from the second side of the plate, and the receiving portion is positioned in front of the protruding portion and the protruding portion is provided with the convex portion.
16. The tank according to claim 14, wherein the plate is configured to protrude upward, downward, from the first side, and from the second side of the main body, and the convex portions are disposed at the upward protruding portion, downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side of the main body.
17. The tank according to claim 14, wherein the plate is configured to protrude upward, downward, from the first side, and from the second side of the main body, and the receiving portions are disposed at the upward protruding portion, downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side of the main body.
18. The tank according to claim 15, wherein each of the positions including an upper position on the first side, an upper position on the second side, a lower imposition on the first side and a lower position on the second side in the circumference of the main body, has a shape in which a right-angled corner is cut out and chamfered in an oblique direction where the upward protruding portion, the downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side intersect, and shapes of the upper and the lower positions of the first side and the upper and the lower positions of the second side of the plate of each precast block are defined such that two rectangular areas identical to each other are formed by a complimentary cut out in a corner of the plate located in each of the positions.
19. The tank according to claim 15, wherein: out of the positions including an upper position on the first side, an upper position on the second side, a lower position on the first side, and a lower position on the second side in the circumference of the main body, a lower position of two positions on a first diagonal line has a shape in which a right-angled corner is cut out in an internal corner shape where the upward protruding portion, downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side intersect, each of two positions on a second diagonal line has a shape in which a right-angled corner is cut out and chamfered in an oblique direction, and shapes of the positions are defined such that two rectangular areas identical to each other are formed by complimentary features of opposite corners.
20. The tank according to claim 1, wherein the precast blocks are joined together in the vertical and horizontal directions, and the masonry joints are formed by the filler between the main bodies of the adjacent precast blocks.
21. The tank according to claim 14, wherein the plates of the adjacent precast blocks overlap each other in the front-rear direction, the front-rear direction being orthogonal to the vertical direction and circumferential direction with respect to the precast blocks, and no more than two of the plates overlap in the front-rear direction at a contact position of the upper, lower, first side, and second side of precast blocks.
22. The tank according to claim 1, wherein the plates of the adjacent precast blocks are fixed together by a fixing mechanism such that the plates overlap each other in the front-rear direction.
23. The tank according to claim 15, wherein a protruding portion provided with the receiving portion of the plate of one precast block of the adjacent precast blocks overlaps in front of a protruding portion provided with the convex portion of the plate of the other precast block.
24. The tank according to claim 14, wherein: the plate is configured to protrude upward, downward, from the first side, and from the second side of the main body, the precast block provided with the convex portions at the upward protruding portion, the downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side, and the precast block provided with the receiving portions at the upward protruding portion, the downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side, arranged in a zigzag manner, and the precast block provided with the receiving portions at the upward protruding portion, the downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side are arranged in front of the precast block provided with the convex portions at the upward protruding portion, the downward protruding portion, the protruding portion from the first side, and the protruding portion from the second side.
25. A tank comprising: a dike formed by: a plurality of precast blocks arranged in a circumferential direction of the dike and in a vertical direction of the dike, each of the precast blocks being provided with joints on a first side and a second side in the circumferential direction and at least one of an upper portion and a lower portion in the vertical direction, a filler provided between adjacent precast blocks so as to form masonry joints in the vertical direction and the circumferential direction of the dike, a circumferential tension member configured to provide prestress to the dike in the circumferential direction, and a vertical tension member configured to provide prestress to the dike in the vertical direction, the vertical tension member being configured to avoid the masonry joints in the vertical direction, wherein: the tank has a joining structure configured to join a first precast block to a second precast block, the first precast block including: a first end face positioned at one end of the first precast block; a first main reinforcing steel bar embedded in the first precast block; and a first hole extending from the first end face to an inside of the first precast block, and the second precast block including: a second end face positioned at one end of the second precast block; and a second main reinforcing steel bar embedded in the second precast block, protruding from the second end face and configured to be inserted into the first hole, the first hole is filled with a solidifying material, the solidifying material burying the second main reinforcing steel bar inserted into the first hole, a fixing element is disposed at a free end of the second main reinforcing steel bar, and a folded portion is disposed at a free end of the first main reinforcing steel bar, the folded portion being folded in a direction departing from the first end face.
26. The tank according to claim 25, wherein the folded portion is embedded inside the first precast block.
27. The tank according to claim 25, wherein: the folded portions and the first holes are alternately arranged along the first end face, and each of the folded portions is arranged at an approximately middle point position of a line segment connecting two said first holes adjacent to each other.
28. The tank according to claim 25, wherein: the folded portions and the first holes are alternately arranged along the first end face, and each of the folded portions is arranged at a proximity position to each of the first holes.
29. The tank according to claim 25, wherein: the first precast block further includes a second hole extending from the first end face to an inside of the first precast block, the second hole is filled with the solidifying material, and the folded portion is provided inside the second hole.
30. The tank according to claim 25, wherein: the first precast block further includes a tie hoop disposed along a plane intersecting with the first main reinforcing steel bar, and the tie hoop is positioned outside the first hole on the plane and is an anticorrosion reinforcing steel bar.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(53)
(54)
(55)
(56)
(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)
(66)
(67)
(68)
(69)
(70)
(71)
(72)
(73)
(74)
(75)
(76)
(77)
(78)
(79)
(80)
(81)
(82)
(83)
(84)
(85)
(86)
(87)
(88)
(89)
(90)
MODE FOR CARRYING OUT THE INVENTION
(91) Preferred embodiments of the present invention will now be described with reference to the accompanying drawings.
First Embodiment
(92) (1. LNG Tank 1)
(93)
(94) The precast blocks 10 are arranged in the circumferential direction of the dike 2 and stacked in the vertical direction. Concrete (filler) is poured and disposed between each two adjacent blocks 10 in the circumferential direction and the vertical direction of the dike 2 such that the concrete forms masonry joints 17 extending in the vertical direction and the circumferential direction of the dike 2. Non-shrinkage cement is used as the concrete, but the present invention is not limited in this regard.
(95) Prestress is imparted to the dike 2 by PC steel members (tension members) arranged in the circumferential direction and the vertical direction. Pilasters 19 are outwardly protruding portions of the dike 2, and are provided for fixing the PC steel members in the circumferential direction.
(96) (2. Block 10)
(97)
(98) The main body 11 is a concrete member that has a rectangular plate shape, and bends in an arc shape that corresponds to the radius of the tank or the like. A bottom face of the main body 11 inclines upward and outward. In this specification, the outward is a term when viewed from the dike 2. The term inward is used in a similar way.
(99) The loop joints 12 are disposed on the top and bottom faces of the main body 11 as well as on the right and left faces of the main body 11. Each of the loop joints 12 is a protruding portion of the U-shaped reinforcing steel bar from the main body 11, including the bending portion and the straight portions of the U shape. The right-left direction corresponds to the circumferential direction of the dike 2.
(100) The sheath pipes 13 are disposed inside the main body 11 such that they extend in the up-down direction as well as in the right-left direction. Upper and lower ends of those sheath pipes 13 which extend in the up-down direction protrude from the top and bottom faces of the main body 11 respectively, and right and left ends of those sheath pipes 13 which extend in the right-left direction protrude from the right and left faces of the main body 11 respectively. The sheath pipes 13 are used such that the PC steel members pass through the sheath pipes 13.
(101) The plate 14 is a metallic plate member, which is attached to the inner face of the main body 11. The plate 14 is offset from the inner face of the main body 11 such that it protrudes from the main body 11.
(102) In the example shown in
(103) In this embodiment, on the other hand, because the plate 14 is offset upward and leftward from the inner face of the main body 11, the lower end and the right end of the inner face of the main body 11 is not covered with the plate 14.
(104) The foregoing description explains the fundamental structure of the block 10, and it should be noted that the block 10 used for the dike 2 is not limited to the above-described configuration. As will be described below, the block 10 may have a slightly different configuration from the above-described configuration depending upon the location and the like of the block 10.
(105) (3. Method of Constructing the Dike 2)
(106) Now, a method of constructing the dike 2 with the blocks 10 will be described.
(107) In this embodiment, after the bottom slab 5 and other parts are constructed, the blocks 10 of the first row (bottom row, first tier) are arranged in the circumferential direction of the dike 2, as shown in
(108) The main body 11 of each of the blocks 10 of the first row, which are disposed on the bottom slab 5, has a thick(er) wall because the PC steel members are disposed double, i.e., inside and outside, in the vertical direction. The loop joints 12 and the sheath pipes 13 are provided on an inner portion of the main body 11 in a similar manner to the above-described configuration, and the fixing elements 15 for use with the PC steel members are provided on the top face of an outer portion of the main body 11. The fixing elements 15 are connected to the sheath pipes extending in the up-down direction, which are disposed in the outer portion of the main body 11, and the lower ends of the sheath pipes protrude from the bottom face of the outer portion of the main body 11. The loop joints 12 are also provided on the bottom face of the outer portion of the main body (see
(109) As will be described later, the sheath pipes 13 extending in the up-down direction and provided on the inner portion of each main body 11 are connected to the sheath pipes 13 extending in the up-down direction and provided on each block 10 of the second row. Similarly, the sheath pipes 13 extending in the up-down direction and provided in two main bodies 11 of each two stacked blocks are connected to each other. The sheath pipes 13 extending in the up-down direction and provided in the main body 11 of each block 10 of the uppermost row (top row) are connected to the fixing elements 15 provided on the top face of the main body 11, respectively (see
(110) In this embodiment, only the blocks 10 of the first row have the thick wall to place the vertical PC steel members double, i.e., inside and outside, thereon. However, if necessary, the blocks 10 of a plurality of rows may have the thick wall.
(111) When the block 10 has the pilaster 19, the main body 11 of the block 10 protrudes outward, and the fixing elements 15 are provided on the side faces of the protruding main body 11. The fixing elements 15 are connected to the sheath pipes (not shown) extending in the right-left direction and provided in the main body 11.
(112) When the blocks 10 are arranged in the circumferential direction, the block 10-2 is moved from the outside of the dike 2 toward the inside, for example, as indicated by the arrow in
(113) The left end of the plate 14 of the block 10-1 overlaps the inner face of the right end of the main body 11 of the block 10-2. With this positional relationship, the left end of the plate 14 of the block 10-1 is fixed. The plate 14 of the block 10-1 and the plate 14 of the block 10-2 are continuous in the circumferential direction of the dike 2.
(114)
(115) When the block 10-2 is disposed, as shown in
(116) In this embodiment, as shown in
(117) As depicted in
(118) The plates 14a of the bottom slab 5 are fixed to the inner faces of the lower ends of the respective main bodies 11 of the blocks 10 with the fixation tools (not shown) and the like in a similar manner to the above-described configuration such that the plates 14a become continuous to the plates 14 of the blocks 10 in the vertical direction. The blocks 10 are arranged and supported by support members 51 provided on the bottom slab 5. The height of each of the support members 51 is adjustable, and the adjustment may be made depending upon the width of the masonry joint 17 and a purpose of providing the support members, e.g., maintaining the horizontal posture of the blocks 10.
(119) It should be noted that a ring-shaped convex portion may be provided on the bottom slab 5 along the outer circumference of the dike 2, and the loop joints 12, the sheath pipes 13 and the plates 14a may be provided on the convex portion.
(120) After the blocks 10 are disposed in the above-described manner, the sheath pipes 13 of each two adjacent blocks 10 in the circumferential direction are connected to each other, the bottom slab 5 and the sheath pipes 13 of the blocks 10 are connected to each other, and necessary reinforcing bars (not shown) are disposed in the masonry joints 15.
(121)
(122) In this embodiment, as shown in the left illustration, the end of one of the sheath pipes 13 has a connecting tube 132 placed over a main body 131. A spiral convex thread 131a is formed on the outer circumferential face of the main body 131, and the thread engages with a spiral groove (not shown) formed in the inner circumferential face of the connecting tube 132. The connecting tube 132 is pulled out from the main body 131 as the connecting tube 132 is rotated. The end of the connecting tube 132, which is pulled out, is fitted over the main body 131 of the other sheath pipe 13, and the connecting tube 132 is rotated to connect the two sheath pipes 13 to each other, as shown in the right illustration.
(123) After that, outer formworks 52 are disposed, as shown in
(124) Because the bottom face of the main body 11 of each block 10 inclines upward and outward, the air moves along the inclination, as indicated by the arrow a, after the concrete 60 reaches the bottom face of the main body during the pouring and disposing of the concrete 60. Thus, the air is released to the outside from the gap. Accordingly, a trouble such as the trapping of the air below the bottom face of the main body 11 does not occur. The structure obtained after the pouring and disposing of the concrete 60 in the above-mentioned manner is shown in
(125) The outer formworks 53 are disposed as shown in
(126) The concrete 60 is poured and disposed between the blocks 10 and the bottom slab 5 and between each two adjacent blocks 10 in the circumferential direction in the above-described manner, and the masonry joints 17 are formed in the circumferential direction of the dike 2 and in the vertical direction of the dike 2. The resulting structure is shown in
(127) Subsequently, as shown in
(128) On this occasion, the block 10-4 is moved from the outside of the dike 2 toward the inside, as indicated by the arrow in
(129) Similar to the above-described manner, the left end of the plate 14 of the block 10-3 is fixed with a fixation tool (not shown) and the like provided on the inner face of the right end of the block 10-4 such that the plate 14 of the block 10-3 becomes continuous to the plate 14 of the block 10-4 in the circumferential direction of the dike 2.
(130) As the blocks 10 of the second row are disposed in the above-described manner, as shown in
(131) The plates 14 that protrude upward from the respective main bodies 11 of the blocks 10 of the first row are fixed to the inner faces of the lower ends of the corresponding main bodies 11 of the blocks 10 of the second row with fixation tools (not shown) in a similar manner to the above-described manner. Thus, the plates 14 of the blocks 10 of the first row become continuous to the plates 14 of the blocks 10 of the second row in the vertical direction.
(132) After that, the sheath pipes 13 of each two adjacent blocks 10 in the circumferential direction of the second row are connected to each other, and the sheath pipes 13 of the blocks 10 of the first row are connected to the sheath pipes 13 of the blocks 10 of the second row in a similar manner to the above-described manner. Also, necessary reinforcing bars (not shown) are provided in the masonry joints 17.
(133) Subsequently, as shown in
(134) The outer formwork 53 is disposed as shown in
(135) As described above, the concrete 60 is poured and disposed between the blocks 10 of the first row and the blocks 10 of the second row, and between each two adjacent blocks 10 of the second row in the circumferential direction, and the masonry joints 17 are formed extending in the circumferential direction of the dike 2 and in the vertical direction of the dike 2. This condition is illustrated in
(136) In this manner, the blocks 10 are arranged in the circumferential direction of the dike 2 and stacked in the vertical direction, and that the masonry joints 17 are formed. Accordingly, the blocks 10 are disposed up to the top row of the dike 2, as shown in
(137) It should be noted that an upper end of each of the main bodies 11 of the blocks 10 in the top row has an enlarged width. Also, no coupling joints are provided on the upper face of each main body 11, but the fixing elements 15 are provided on the upper face of each main body 11. The fixing elements 15 are connected to the respective sheath pipes (not shown) extending in the up-down direction inside each main body 11.
(138) The plates 14 of the respective blocks 10 are continuous in the circumferential direction of the dike 2 and in the vertical direction of the dike 2, as described above. Thus, the inner side of the dike 2 is covered with the plates 14, and the plates 14 constitute the side wall portion of the outer tank 3b.
(139) It should be noted that the construction work for the inner facility, such as a roof of the outer tank 3b and the inner tank 3a, may start in an early stage, i.e., when the blocks 10 are stacked to a certain extent. Because no work is necessary inside the dike 2 when the dike 2 is constructed, there is no interference between the construction work for the dike and the construction work for the inner facility. This also contributes to the early start of the construction work for the inner facility and the work period reduction. In some occasions, it may be possible to start the construction work for the dike 2 and the construction work for the inner facility at the same time.
(140) Finally, the prestress is imparted to the dike 2 by the PC steel members 54, as shown in
(141) The above-mentioned fixing elements 15 of the blocks 10 of the uppermost row and the fixing elements 15 of the blocks 10 of the first row are used to fix the PC steel members 54 extending in the vertical direction. The fixing elements 15 on the side faces of the pilasters 19 are used to fix the PC steel members 54 in the circumferential direction. These PC steel members 54 are provided such that the PC steel members 54 extend through the sheath pipes 13 disposed in the blocks 10 and on the bottom slab 5.
(142)
(143) As illustrated in the drawing, each of the PC steel members 54 extending in the vertical direction is turned like U, and both ends of each PC steel member 54 are connected to the fixing elements 15 of the associated block 10 in the uppermost row, respectively. The turning back portion of each PC steel member 54 arrives at the bottom slab 5. The PC steel members 54 are disposed while avoiding the masonry joints in the vertical direction. Similarly, the PC steel members 54 are also provided in the outer portions of the blocks 10 of the first row.
(144) On the other hand, the PC steel members 54 extending in the circumferential direction avoid the masonry joints 17 in the circumferential direction. As shown in
(145) As described above, this embodiment can reduce the work period of the dike construction and start the construction work for the inner facility in an early stage, thereby achieving the reduction in the overall construction work period, because the dike 2 is constructed by using the precast blocks 10, and the pouring and disposing of the concrete is only conducted to the masonry joints at the construction site, i.e., the pouring and disposing of the concrete at the construction site is reduced to the minimum. In addition, the concrete structure, in which the coupling joints and the like are embedded, is used as the masonry joints 17 between the blocks 10. Therefore, the concrete structure that possesses the proved reliability as a sufficient structural material to be used at a very low temperature is used, and the precast blocks 10 are united as an RC wall. This realizes with high reliability that the dike 2, including the masonry joints 17, has a load bearing capacity, durability, and liquid-tightness that are necessary to the dike 2.
(146) Those PC steel members 54 which extend in the circumferential direction avoid the masonry joints 17 extending in the circumferential direction of the dike 2, and those PC steel members 54 which extend in the vertical direction avoid the masonry joints 17 extending in the vertical direction of the dike 2. Thus, it is not necessary to dispose the sheath pipes, which are used for the PC steel members 54 to pass therethrough, on the masonry joints 17. Accordingly, the construction work becomes easy, and the masonry joints 17 have an enhanced reliability.
(147) In this embodiment, because the loop joints 12 are used, it is possible to ensure a necessary load bearing capability and other properties to the masonry joints 17 even if the joint length (the protruding length of the joint reinforcing steel bar from the main body 11) is short. Thus, it is possible to reduce the width of each masonry joint 17 to approximately 50 cm-60 cm. This can further reduce an amount of concrete 60 to be poured and disposed, and reduce the construction work period of the dike 2. Although no PC steel members 54 are disposed on the masonry joints 17, the PC steel members 54 are densely disposed in the blocks 10, and therefore it is possible to dispose an almost same amount of tension members, as a whole, when compared to a conventional construction method. In addition, because the loop joints 12 are used, there is another advantage that the blocks 10 can be built up with a low cost.
(148) Because the bottom face of the main body 11 of each block 10 inclines upward and outward of the dike 2, it is possible to prevent the air gap from being created below the main body 11 of the block 10 when the concrete 60 is poured and disposed as the masonry joint 17.
(149) Because the plate 14 protrudes upward or laterally from the associated main body 11, it is possible to utilize the plate 14 as the inner formwork when the concrete 60 is poured and disposed as the masonry joint 17. Thus, a work such as disposing the inner formwork from the inside of the dike 2 becomes unnecessary.
(150) Because the plates 14 of the respective blocks 10 are continuous in the circumferential direction of the dike 2 and in the vertical direction of the dike 2, and the inner face of the dike 2 is covered with the plates 14, the plates 14 can form the side wall portion of the outer tank 3b of the LNG tank 1.
(151) The present invention is, however, not limited to this configuration. For example, the tank structure including the dike 2 of this embodiment may be used for not only the LNG tank but an LPG (liquefied petroleum gas) tank or the like.
(152) Also, the shapes and the like of the dike 2 and the main body 11 of the block 10 may be altered. For example, the shape of the dike 2 is not limited to the circular shape, when looked at in the plan view, as shown in
(153) In this embodiment, each of the blocks 10 of the first row has a thick wall, and the prestress is applied to the outer portion of the block in the vertical direction. However, this configuration is not indispensable. As shown in
(154) Now, examples that have different coupling joints for the precast blocks will be described in a second embodiment and a third embodiment. The second and third embodiments will be described while primarily focusing on the differences between them and the first embodiment, and the description of other configurations will be omitted.
Second Embodiment
(155)
(156) In the block 10a of
(157) When the coupling joints 12a having the fixing elements are disposed in this manner, there are advantages that it is possible to reduce the length of each coupling joint while ensuring necessary load bearing capability and other properties to the masonry joints 17 whereby the width of each masonry joint 17 can be reduced. When the coupling joints 12a having the fixing elements are used, there are advantages that the work of disposing the blocks 10a is easy, and the interference between the reinforcing steel bars in the masonry joints 17 and the coupling joints 12a is unlikely to occur. It should be noted that each of the coupling joints 12a having the fixing elements may have a free end that bends inward. This configuration provides an advantage that a covering depth (thickness) from the outer surface of the concrete 60 of the masonry joint 17 to the fixing element 121 becomes large.
Third Embodiment
(158)
(159) In the block 10b of
(160) When the mechanical joints 12b are disposed in this manner, there are advantages that it is possible to reduce the length of each coupling joint while ensuring necessary load bearing capability and other properties to the masonry joints 17 whereby the width of each masonry joint 17 can be reduced. Also, there are advantages that the coupling joints have reliable strength, and the interference between the reinforcing steel bars in the masonry joints 17 and the coupling joints is unlikely to occur.
(161) It should be noted that the arrangements of the coupling joints are not limited to the above-described example of
(162) Next, examples that use different methods for fixing the plates will be described in a fourth embodiment to a seventh embodiment. Similar to the above-described embodiments, the fourth to seventh embodiments will be described while primarily focusing on the differences between them and the first embodiment, and the description of other configurations will be omitted.
Fourth Embodiment
(163)
(164)
(165) In this example, as shown in the right illustration, the lower end of the plate 14c of the upper block 10c overlaps the upper end of the plate 14c of the lower block 10c, and the positions of the screw holes of the two plates 14c are aligned with each other. Screws 142a are inserted into the screw holes, and nuts 142b are engaged over the screws 142a to position and fix the two plates 14c.
(166) The above-described process applies when the blocks 10c are arranged in the circumferential direction of the dike 2. Specifically, as shown in
(167) As shown in
Fifth Embodiment
(168)
(169)
(170) In this example, as shown in the right illustration, the lower end of the plate 14d of the upper block 10d is received in the receiving portions 143 at the upper end of the plate 14d of the lower block 10d to position and fix the two plates 14d.
(171) The above-described process applies when the blocks 10d are arranged in the circumferential direction of the dike 2. Specifically, as shown in
(172) As shown in
Sixth Embodiment
(173)
(174)
(175) In this example, after the upper block 10e is disposed as shown in the middle illustration of
(176) The above-described process applies when the blocks 10e are arranged in the circumferential direction of the dike 2. Specifically, as shown in
(177) In this case, as shown in
Seventh Embodiment
(178)
(179)
(180) A steel plate 147 is attached to the inner face of the upper end of the plate 14f, and the steel plate 147 extends in the right-left direction of the plate 14f (in the direction perpendicular to the drawing sheet) from the right end to the left end. The upper portion of the steel plate 147 protrudes upward from the plate 14f, and one end of each of the screw steel rods 148 is attached to the protruding portion of the steel plate 147. The screw steel rods 148 are spaced from each other in the right-left direction of the steel plate 147.
(181) In this example, the upper block 10f is disposed such that the lower end of the plate 14f is positioned outside the steel plate 147 as shown in the middle illustration, and then the formwork 52 is disposed as shown in the right illustration. When the formwork 52 is disposed, the other ends of the screw steel rods 148 are inserted in screw holes (not shown) formed in the formwork 52, and the nuts 149 are engaged over the screw steel rods 148. This positions and fixes the plate 14f. After that, the concrete 60 is poured and disposed in a similar manner as described above, thereby forming the masonry joints 17.
(182) The above-described process applies when the blocks 10f are arranged in the circumferential direction of the dike 2. Specifically, as shown in
(183) In this case, the block 10f is disposed on the left of one of the two blocks 10f as shown in
(184) Similar to the first embodiment, it is possible to fix the plates from outside the dike 2 with any of the methods of the fourth to the seventh embodiments. Selection of one method from these methods may be made depending upon easiness of the construction work or the like.
Eighth Embodiment
(185) In this type of tank, generally, the dike is rigidly combined to the bottom slab, and the prestress is applied to the dike by the tension members in the circumferential direction. In a normal situation, which excludes events such as liquid spill from the inner tank, therefore, a large bending moment, which is directed inward to deform the dike inward, is generated in the vertical plane at the lower end of the dike. Usually, in order to prevent the cracking and the like of the dike due to the bending moment, the prestress is introduced by the PC steel members 54 that extend the entire height of the dike 2 in the vertical direction as shown in
(186) However, when the precast blocks are built up to construct the dike 2 as in the present invention, the inventors believe that the prestress may be omitted in the vertical direction. This will be described as an eighth embodiment. The eighth embodiment will be described while primarily focusing on the differences between the eighth embodiment and the first embodiment, and the description of other configurations will be omitted.
(187) In this embodiment, as shown in
(188) A groove 5a is formed in the bottom slab 5 such that the groove 5a extends along the outer periphery of the dike 2. Holes 5b are formed in the groove 5a to receive the coupling joints 12a having the fixing elements of each block 10g. Also, a slide plate 5c is disposed in the groove 5a at a position that corresponds to the pedestal 16 of the block 10g. The slide plate 5c supports the pedestal 16 of the block 10g such that the pedestal 16 can slide. The slide plate 5c is a steel plate, and Teflon (registered trademark) coating is applied onto the surface of the steel plate.
(189) As shown in
(190) In the above-described manner, the blocks 10g are disposed on the bottom slab 5 and arranged in the circumferential direction of the dike 2. Subsequently, the concrete is poured and disposed between the main bodies 11 of each two adjacent blocks 10g in the circumferential direction to form the masonry joints 17 in the vertical direction. This situation is shown in
(191) In this embodiment, subsequently, the PC steel members 54 are disposed in the blocks 10g of the first row in the circumferential direction, as shown in
(192)
(193)
(194) After the prestress is introduced in the above-described manner, a plate 14b is disposed as shown in
(195) The subsequent procedures are generally the same as those in the first embodiment. Specifically, as shown in
(196) After that, as shown in
(197) Then, the blocks 10g are arranged in the circumferential direction of the dike 2 and stacked in the vertical direction, thereby forming the masonry joints 17 in the circumferential direction and the vertical direction of the dike 2. Thus, as shown in
(198) After the blocks 10g are arranged up to the uppermost row of the dike 2 in this manner, the PC steel members 54 are disposed in the blocks 10g of the second and subsequent rows in the circumferential direction of the dike 2 to introduce the prestress, thereby completing the construction of the dike 2, as shown in
(199) In this embodiment, the blocks 10g of the first row are slidable. After the prestress is introduced in the circumferential direction of the dike 2 and the deformation of the blocks 10g is finished, the blocks 10g are fixed to the bottom slab 5. Unlike a conventional cast-in-place concrete pile method, therefore, it is possible to introduce the prestress in a condition that receives no restrictions from the bottom slab 5. Although the prestress is introduced to the upper portion of the dike 2 in the circumferential direction in order to resist the liquid pressure upon liquid spill, the blocks 10g of the first row are fixed to the bottom slab 5 after the blocks 10g have deformed upon the introduction of the prestress, as described above. Thus, as compared to a case where the dike is constructed by a conventional construction method, it is possible to significantly reduce the above-described inward bending moment that would be generated at the lower end of the dike 2. Accordingly, it is possible to omit the prestress in the vertical direction, including the above-described additional prestress, and there is no need for the lower end of the dike 2 to have a thick wall. Consequently, the structure of the dike 2 is simplified, and further merits are obtained in terms of both the necessary materials and the construction work period.
(200) It should be noted that it may be possible to introduce the prestress by the PC steel members 54 that span the entire length of the dike 2 in the vertical direction as shown in
Ninth Embodiment
(201) Now, an example that uses a different structure to slidably dispose the precast blocks will be described as a ninth embodiment. The ninth embodiment will be described while primarily focusing on the differences between the ninth embodiment and the eighth embodiment, and the description of similar configurations will be omitted.
(202) As shown in
(203) The above-described corner anchor 6 is attached to the lower end of the main body 11 of each block 10g beforehand. The corner anchor 6 has an anchor that is provided on the vertical side face of the L shape, and the anchor is buried in the main body 11. The corner anchor 6 has another anchor that is provided on the horizontal side face of the L shape, and this anchor is buried in the concrete 60, which will be described later.
(204) On the bottom slab 5, support members 5d are provided along sides of the groove 5a, instead of the slide plate 5c. Each support member 5d supports the associated bracket 18 such that the bracket 18 can slide, and can adjust its height, which is similar to the above-described support member 51. The support member 54 may be a jack, a jack base or the like, with Teflon (registered trademark) coating being applied onto the upper face of thereof.
(205) As shown in
(206) After that, the vertical masonry joints 17 are formed between main bodies 11 of each two adjacent blocks 10g in the circumferential direction in a similar manner to the above-described manner, and then the PC steel members 54 are provided in the blocks 10g of the first row in the circumferential direction, thereby introducing the prestress in the circumferential direction by the tension of the PC steel members 54.
(207) Then, as indicated by the arrow in
(208) In this embodiment, as described above, the prestress is introduced to the blocks 10g of the first row in the circumferential direction of the dike 2. This is similar to the previous embodiment. After the deformation is completed, the masonry joints 17 are formed between the blocks 10g of the first row and the bottom slab 5. Thus, this embodiment provides similar advantages to the eighth embodiment. The brackets 18 and the support members 5d are different from the above-described slide plates 5c and the like in that the brackets 18 and the support members 5d do not remain in the concrete 60. Thus, the brackets 18 and the support members 5d may be used again or for other purposes.
Tenth Embodiment
(209) (1. Precast Block 10h)
(210) Now, a tenth embodiment of the present invention will be described. The tenth embodiment is an example of a structure for joining blocks in the LNG tank 1 according to the present invention.
(211) The block 10h includes a main body 11, which is a concrete member having a rectangular plate shape, reinforcing steel rods, which protrude downward from a bottom face of the main body 11, and coupling joints 12a, which have fixing elements and are provided at free ends of the reinforcing steel rods. Similar to the previous embodiments, coupling joints 12a, which have reinforcing steel rods and fixing elements, are embedded in the upper portion of the main body 11.
(212) Holes 114 are also formed in the upper portion of the main body 11 such that the holes 114 are only open in the top face of the main body 11. The holes 114 and the coupling joints having the fixing elements 12a are alternately arranged in the width direction of the main body 11. The coupling joint having the fixing element 12a and the coupling joint having the fixing element 12a are constituted by the two fixing elements provided at opposite ends of the same reinforcing steel rod, respectively. In
(213) It may be possible to dispose coupling joints such as mechanical joints and coupling joints having fixing elements, which may be similar to the coupling joints having the fixing elements 12a, on the right and left faces of the main body 11. However, such coupling joints are not particularly relevant to the joining of the upper and lower blocks 10h, which will be described later, and therefore the description of such coupling joints will be omitted here.
(214) (2. Method of Joining the Precast Blocks 10, and the Joining Structure)
(215) Next, a method of joining the upper and lower blocks 10, and the joining structure made by this joining method will be described.
(216) In this embodiment, the above-described blocks 10h are arranged as shown in
(217) Subsequently, a new block 10h is disposed above the block 10h, as shown in
(218) After that, the upper block 10h is moved down to a predetermined position. Thus, as shown in
(219) As the mortar 80 is cured, the joining structure 90, which is made by the upper and lower blocks 10h, is formed. In this joining structure 90, the coupling joints having the fixing elements 12a of the upper block 10h lap the coupling joints having the fixing elements 12a of the lower block 10h in a similar manner to the manner described with reference to
(220) In this embodiment, as described above, the mortar 80 is firstly provided on the lower block 10h, and then the coupling joints having the fixing elements 12a of the upper block 10h are inserted in the holes 114 of the lower block 10h. Thus, it is possible to easily form the joining structure 90, with the coupling joints of the upper and lower blocks 10h being lapped. The pressure from the upper block 10h can fill the gap between the upper and lower blocks 10h with the mortar 80 in a reliable manner without trapping the air. The relevant work is easy and the formworks to be used are insignificant. It is not necessary to form holes in the side faces of the block 10h, which would otherwise be used for pressurizedly loading the mortar 80.
(221) Because the coupling joints having the fixing elements 12a are used as the coupling joints, the lap length of the coupling joints is small, and the holes 114 formed in the block 10h are short. Also, there is an advantage that the diameter of each of holes 114 is small. It should be noted that the coupling joints are not limited to the coupling joints having the fixing elements 12a. For example, the coupling joints may be mere reinforcing steel rods. Also, the filler is not limited to the mortar 80. Other types of grout materials, such as resin, may be used.
Eleventh Embodiment
(222) (1. LNG Tank 1a)
(223) An example that uses the above-described joining structure in the dike of the LNG tank 1 (1a) according the present invention will be described as an eleventh embodiment. The eleventh embodiment will be described while primarily focusing on the differences between the eleventh embodiment and the tenth embodiment, and the description of similar configurations will be omitted.
(224)
(225) The LNG tank 1a is a tank that is built up on the ground and configured to store an LNG. The LNG tank 1a includes a dike 2a disposed on a bottom slab 5, which is supported by piles 4 in the ground, and also includes an inner tank 3a and an outer tank 3b. The inner tank 3a and outer tank 3b are made from metallic plates and other components and disposed inside the dike 2a. The LNG is stored in the inner tank 3a, and the spacing between the inner tank 3a and the outer tank 3b is used to keep the LNG in a cold condition. A side wall 31b of the outer tank 3b is provided along the dike 2a.
(226) The dike 2a is provided to prevent liquid leakage of the LNG to the outside even if the inner tank 3a and the outer tank 3b are damaged and/or broken. In this embodiment, the precast blocks 10i are arranged in the circumferential direction of the dike 2a and stacked in the vertical direction, and the masonry joints are formed between each two adjacent blocks 10i in the circumferential direction and the vertical direction of the dike 2a to build up the dike 2a. It should be noted that the prestress is applied to the dike 2a by tension members (not shown) disposed in the vertical direction and the circumferential direction of the dike.
(227) (2. Precast Block 1a)
(228)
(229) The main body 11 bends in an arc shape that corresponds to the radius of the tank or the like, and the bottom face of the main body 11 inclines upward and outward.
(230) A plate 14g is attached to the inner face of the main body 11. The plate 14g is a metallic plate member, and protrudes upward, rightward and leftward from the main body 11. The left end 141 of the plate 14g bends such that the left end 141 is shifted outward. A plurality of holes 141a is formed in the left end 141 in the up-down direction. On the other hand, a plurality of holes 141b is formed in the right end of the plate 14g in the up-down direction.
(231) It should be noted that the plate 14g is not present on (plate 14g does not extend over) the lower portion of the inner face of the main body 11 to an extent that the plate 14g protrudes upward from the main body 11. Sheath pipes through which the tension members pass and other parts are also provided on the main body 11, but the illustration thereof is omitted here.
(232) (3. Method of Joining the Blocks 10i, and the Joining Structure)
(233) In this embodiment, the blocks 10i are arranged in the circumferential direction of the dike 2a and stacked in the vertical direction when the dike 2a is built up, in a similar manner as described above. Thus, the joining structure that connects the upper and lower blocks 10i is formed. In the following description, the method of joining the upper and lower blocks 10i, and the joining structure that is made from this joining method will be described.
(234)
(235) The concrete is poured and disposed between the main bodies 11 of each two adjacent blocks 10i up to a position slightly lower than the top faces of the main bodies 11, thereby forming the masonry joints 17. The ends of the mechanical joints 12b (see
(236) As shown in
(237) Then, as shown in
(238) After that, as shown in
(239) As shown in
(240) Because the bottom face of the main body 11 inclines, as described above, the surplus mortar 80 smoothly moves to the above-mentioned gap along the inclination, as indicated by the arrow a, and the air is appropriately discharged. Thus, the air is not trapped under the bottom face of the main body 11.
(241) After that, as shown in
(242) As the mortar 80 is cured upon elapsing of the time, the outer formwork 55, the brackets 31, the supporting posts 33 and the jack bases 34 are removed. Then, as shown in
(243)
(244) The above-described eleventh embodiment can provide similar advantages to the tenth embodiment. Because the block 10i has the plate 14g that protrudes upward from the main body 11, the plate 14g can be used as the inner formwork. Thus, the work for installing the formworks is simplified, and the work for installing the inner formworks from inside the dike 2a and related works become unnecessary. Accordingly, there is no interference with the construction work for the inner facility such as the inner tank 3a and the outer tank 3b, which is conducted inside the dike 2a. This enables the early start of the inner facility construction work and results in the reduction in the work period.
(245) When the block 10i is disposed, the brackets 31 attached to the right and left faces of the block 10i are supported by the jacks 32 while the block 10i is being gradually moved down. Thus, the tilting and/or the falling of the block 10i are prevented, and it is possible to precisely position the block 10i in a reliable manner. In addition, because the bottom face of the main body 11 of the block 10i inclines, it is possible to fill the gap between the upper and lower blocks 10i with the mortar 80 in a reliable manner without trapping the air, as described above.
(246) It should be noted that the shape of the dike 2a is not limited to the circular shape, when viewed in the plan view, as shown in
(247) Likewise, the bottom face of the main body 11 is not limited to the one described with reference to
(248) The plate 14g may also be modified. As seen in the block 10i and the joining structure 90a in
(249) The coupling joints to be provided on the right and left faces of the main body 11 are not limited to the mechanical joints 12b. For example, the coupling joints may be the coupling joints having the fixing elements 12a or the like. In this case, when there is no adjacent block 10i, it is possible to dispose the block 10i as shown in
(250) In such case, a slidable jig may be provided between the bracket 31 and the jack 32 when the new block 10i is disposed, such that the new block 10i can slide in the thickness direction of the main body 11.
(251) Specifically, when a new block 10i is disposed, the new block 10i (right block 10i in
(252) Then, the new block 10i is caused to descent in a similar manner to the previous embodiment. When the lower ends of the coupling joints having the fixing elements 12a, which protrude downward from the main body 11 of the block 10i, are inserted to the middle of the respective holes 114 of the main body 11 of the lower block 10i, the block 10i is caused to slide inward to eliminate the offset. Subsequently, the block 10i is further moved down to the above-described predetermined position, and the block 10i is disposed as shown in
(253) As understood from the foregoing, it is possible to dispose a new block 10i while avoiding the interference between the coupling joints having the fixing elements 12a on the right and left faces. In order to enable the above-described sliding, it may be desired that each of the holes 114 formed in the top face of the main body 11 of the block 10i may be an elongated hole or the like, which is elongated in the thickness direction of the main body 11. Although the new block 10i is firstly offset outward and caused to slide inward later to eliminate the offset in this example, these movements may be conducted in a reverse order. Specifically, the new block 10i may firstly be offset inward and caused to slide outward later to eliminate the offset.
(254) In this embodiment, the outer formwork 55 is separated from the plate 14g, and the outer formwork 55 has the inclined upper portion to form (leave) the gap between the outer formwork 55 and the upper block 10i such that extra mortar 80 can easily be discharged. It should be noted that only a certain part of the outer formwork 55 may have the above-described inclination as the circumstances demand so.
(255) It should be noted that the method of discharging the mortar 80 is not limited to this method. For example, if the area surrounded by the outer formwork 55 is slightly expanded such that the area becomes larger than the bottom face of the main body 11 of the upper block 10i, the gap to be used to discharge the mortar 80 is formed between the outer formwork 55 and the upper block 10i in a similar manner to the above-described configuration.
(256) As shown in
(257) Specifically, as shown in
(258) Although the LNG tank 1a is described as the structure that includes the joining structure 90a in this embodiment, use of the joining structure of this embodiment is not limited to the LNG tank, but the joining structure may be used in various types of structures. For example, the joining structure may be used to join column members to each other with the precast blocks, or to join wall members to beam members.
(259) In the eleventh embodiment, the screws and the nuts are used to fix the plate 14g to the outer formwork 55. In this case, when the upper block 10i is disposed as shown in
(260) The following passages will describe examples of this leakage preventing mechanism with reference to
Twelfth Embodiment
(261) In the twelfth embodiment, as shown in
(262) Inside the check valve portion 150, packings 151 (water stops) are provided such that the packings 151 protrude from the opposite faces of the main body 11 in the width direction, respectively, and the packings 151 span the entire width of the main body.
(263) On the other hand, the upper end of each plate 14g bends such that the upper end of the plate 14g shifts outward, and a packing 140a is provided on the free end of the plate 14g such that the packing 140a protrudes inward and outward and spans the entire width of the plate.
(264) When the upper block 10j is disposed, as shown in
(265) The packings 140a and 151 form a check valve structure (leakage preventing mechanism) to prevent the leakage of the mortar 80. In this manner, the joining structure 90b including the upper and lower block 10j is formed.
Thirteenth Embodiment
(266) In the thirteenth embodiment, as shown in
(267) A plate member 143a having elasticity is attached to the plate 14g such that the plate member 143a extends in the width direction and spans the entire width of the plate 14g. The plate member 143a is provided inside the recess 116. A water stop plate 160, which also possesses elasticity, is attached to the lower end of the inner face of the main body 11 such that the water stop plate 160 extends in the width direction and spans the entire width of the main body 11. The free end of the plate member 143a turns back (folds) downward, and the free end of the water stop plate 160 turns back upward.
(268) When the upper block 10k is disposed, as shown in
(269) As shown in the left illustration of
Fourteenth Embodiment
(270) In the fourteenth embodiment, as shown in
(271) A water stop plate 170 having elasticity is provided at the bottom of the inner face of the main body 11 such that the water stop plate 170 extends in the width direction and spans the entire width of the main body 11. A packing 171, which projects outward, is provided at the free end of the water stop plate 170 such that the packing 171 extends in the width direction and spans the entire width of the water stop plate 170.
(272) When the upper block 10m is disposed, as shown in
(273) The packings 116a and 171 form a check valve structure (leakage preventing mechanism) to prevent the leakage of the mortar 80. In this manner, the joining structure 90d that includes the upper and lower blocks 10m is formed.
Fifteenth Embodiment
(274) In the fifteenth embodiment, as shown in
(275) When the upper block 10n is disposed, as shown in
(276) The groove 115a and the water stop rubber 144a (leakage preventing mechanism) prevent the leakage of the mortar 80. In this manner, the joining structure 90e that includes the upper and lower blocks 10n is formed.
(277) It should be noted that as seen in the block 10n of
Sixteenth Embodiment
(278) In the sixteenth embodiment, as shown in
(279) When the upper block 10p is disposed, as shown in
(280) It should be noted that as seen in a block 10p and a joining structure 90f of
Seventeenth Embodiment
(281) In the seventeenth embodiment, as shown in
(282) The protection film 181 is removed immediately before the adhesive portion 180 contacts the plate 14g of the lower block 10q. The upper block 10q is disposed at the above-described predetermined position. Then, as shown in
Eighteenth Embodiment
(283) In the eighteenth embodiment, the precast blocks 10i which are similar to those used in the eleventh embodiment are used. However, as shown in
(284) With this situation, as the upper block 10i is disposed at the above-mentioned predetermined position, the sheet 190 closely contacts and is clamped between the lower portion of the inner face of the main body 11 of the upper block 10i and the plate 14g of the lower block 10i as shown in
(285) By using the leakage preventing mechanisms of the above-described twelfth to eighteenth embodiments, it is possible to prevent the extra mortar 80 from leaking to the inside of the dike 2a from the plate 14g when the upper precast block is disposed. This eliminates the work for removing the mortar 80 that leaks to the inside of the dike 2a and relevant works. Which one of the mechanisms should be used will be decided depending upon the easiness of the work and the cost.
Nineteenth Embodiment
(286) (1. Precast Block 10r)
(287) The nineteenth to the twenty-second embodiments are directed to examples of precast blocks used in the LNG tank 1 according to the present invention.
(288) The block 10r includes the main body 11, the coupling joints having the fixing elements 12a, the mechanical joints 12b, the plate 14h and other parts.
(289) The main body 11 is a concrete member that has a rectangular plate shape. The above-mentioned coupling joints having the fixing elements 12a, the mechanical joints 12b and the plate 14h are mounted on the main body 11.
(290) Each of the coupling joints 12a has a fixing element at a free end of each of the reinforcing steel bars that protrude from the top and bottom faces of the main body 11.
(291) The mechanical joints 12b are disposed on the right and left faces of the main body 11. Those mechanical joints 12b which are provided on one of the right and left faces are male joints, and those mechanical joints 12b which are provided on the other of the right and left faces are female joints. As the free ends of the male joints are inserted and fixed in the couplers of the female joints, the male joints and the female joints of two adjacent blocks 10r are connected to each other.
(292) The plate 14h is a metallic plate member, which is attached to the back face of the main body 11. The plate 14h has a frame shape with an opening 140c or a plate shape with no opening. Edges (protruding portions) of the plate 14h protrude upward, downward, rightward and leftward from the main body 11.
(293) Bolts 26 (convex portions) are provided along the right edge and the upper edge of the plate 14h. Holes 25 are formed along the left edge and the lower edge of the plate 14h. The holes 25 are receiving portions into which the bolts 26 can be inserted. The holes 25 and the bolts 26 are provided along the respective edges in the up-down direction and the right-left direction, and constitute, in combination, a fixing mechanism for fixing the plate 14h.
(294) As indicated by the bent portions 27 in
(295) If the lower left corner of the plate 14h, at which the left edge having the holes 25 formed therein and the lower edge meet, and the upper right corner of the plate 14h, at which the right edge having the bolts 26 provided thereon and the upper edge meet, are looked at, the lower left corner has a shape that is prepared by cutting out the right-angle corner in an L shape to form an internal corner. On the other hand, the upper right corner is a right-angle corner.
(296) The upper left corner of the plate 14h, at which the left edge having the holes 25 formed therein and the upper edge having the bolts 26 provided thereon meet, has a shape that is prepared by slantwise cutting out the right-angle corner, i.e., chamfering. Similarly, the lower right corner of the plate 14h, at which the lower edge having the holes 25 formed therein and the right edge having the bolts 26 provided thereon meet, has a shape that is prepared by slantwise cutting out the right-angle corner, i.e., chamfering. In this embodiment, these corners are cut out in a direction of 45-degree inclination relative to the respective edges.
(297) As shown in
(298) (2. Structure 30 Made from the Blocks 10r)
(299)
(300) At this point in time, the coupling joints having the fixing elements 12a (see
(301) In this manner, the blocks 10r are connected to each other in the up-down direction and the right-left direction to construct the wall-like structure 30. The edges of the plates 14h serve as the inner formworks when the concrete is poured and disposed.
(302)
(303) The plates 14h of the upper and lower blocks 10r are fixed to each other by causing the lower edge (see
(304) The plates 14h of the right and left blocks 10r are fixed to each other by causing the left edge (see
(305) (3. Method of Constructing the Structure 30 with the Blocks 10r)
(306) Now, a method of constructing the structure 30 with the blocks 10r will be described. Here, the constructing method will be described while focusing on those blocks 10r which are present in the vicinity of the contact position E shown in
(307) In this embodiment, on the right of the lower left block 10r from the contact position E shown in
(308)
(309) Subsequently, as shown in
(310) The block 10r on the upper left of the contact position E is disposed in a similar manner to the above-described manner. Specifically, the new block 10r is moved from the forward position to the rearward position as indicated by the arrow in
(311) A block 10r on the upper right of the contact position E is disposed in a similar manner. Specifically, the new block 10r is moved from the forward position to the rearward position as indicated by the arrow in
(312) It should be noted that in an actual construction work, as shown in
(313) In the above-described manner, the blocks 10r are connected to each other in the up-down direction and the right-left direction. Also, the masonry joints 17 are formed between the main bodies 11 of the blocks 10r while using the plates 14h as the inner formworks for the filler. Accordingly, the above-mentioned structure 30 is formed.
(314) (4. Overlapping Portion of the Plates 14h)
(315)
(316) In this embodiment, the oblique side of the lower right portion (at the lower right corner) of the plate 14h of the upper left block 10r meets (overlaps) the oblique side of the upper left portion (at the upper left corner) of the plate 14h of the lower right block 10r in the overlapping portion F indicated in the drawing.
(317) In the overlapping portion F, the right-angle corner of the upper right corner of the plate 14h of the lower left block 10r is located at a position that corresponds to the location of the L-shaped internal corner at the lower left corner of the plate 14h of the upper right block 10r, when viewed in the plan view. As a result, the number of the plates 14h that overlap in the front-rear direction in the overlapping portion F does not exceed two.
(318) As described above, this embodiment can form the masonry joints 17 with the filler while the plates 14h protruding from the main bodies of the blocks 10r are used as the inner formworks. Thus, a work for disposing the formworks from one side of the structure 30 and associated works are unnecessary. Consequently, the embodiment can avoid the interference with those works that should be conducted at one side, and it is possible to reduce the work period to be spent to construct the entire structure. Because each plate 14h has the above-described features at the four corners (at the four positions on the contour) of the main body 11, it can be considered that less than three plates 14h overlap at the contact position of the upper and lower blocks and the right and left blocks 10r. Thus, the disposing of the blocks 10r is easy.
(319) In this embodiment, because the fixing mechanism that has the holes 25 and the bolts 26 is used to fix the plates 14h of the adjacent blocks 10r, with the plates 14h being lapped, it is possible to fix the positions of the plates 14h and construct the structure 30 appropriately. Because the holes 25 and the bolts 26 are used as the fixing mechanism, it is possible to easily fix the positions of the plates 14h.
(320) Furthermore, in this embodiment, the shape of the plate 14h is decided in the above-described manner, and the holes 25 and the bolts 26 are provided along the upper, lower, right and left edges of the plate 14h. Thus, the use of the plates 14h enables the construction of the structure 30 with one kind of blocks 10r, and the efficiency of the work is high.
(321) It should be noted, however, that the present invention is not limited to the above-described configurations. For example, the shape of the main body 11 is not limited to a particular shape, and the types of the upper, lower, right and left coupling joints are not limited to particular types. For example, the coupling joints may be loop joints.
(322) Also, the locations of the holes 25 and the bolts 26 of the plate 14h are not limited to the above-described locations. For example, the locations may be reversed upside down or horizontally. Specifically, the bolts 26 may be provided along the left edge of the plate 14h, and the holes 25 may be formed along the right edge.
(323) The features of the plate 14h at the four positions, i.e., the upper left corner, the upper right corner, the lower left corner and the lower right corner, are not limited to the above-described features as long as the cutout portions 140 can create two substantially identical rectangular areas when the cutout portions 140 are combined. For example, one of the upper left corner and the lower right corner of the plate 14h may be cut out in an L shape to form an internal corner and the other may be a right-angle corner, instead of obliquely cutting out the upper left corner and the lower right corner of the plate 14h.
(324) Although the plate 14h is bent such that those edges having the holes 25 therein are positioned forward in this embodiment, the plate 14h may be bent such that those edges having the bolts 26 thereon may be positioned rearward. Alternatively, instead of bending the plate 14h, the two plates 14h and 14h may overlap in the front-rear direction as shown in the left illustration of
(325) The fixing mechanism may not necessarily include the holes 25 and the bolts 26. For example, in the configuration of
(326) In the following description, examples of other precast blocks will be described as twentieth to twenty-third embodiments. These embodiments will be described while primarily focusing on the differences between them and the nineteenth embodiment, and the description of similar configurations will be omitted by using, for example, the same reference numerals in the drawings and the description.
Twentieth Embodiment
(327) (1. Precast Block 10s)
(328)
(329) The block 10s differs from the nineteenth embodiment in a shape thereof at the four positions of the upper right, upper left, lower right, and lower left of the plate 14i.
(330) In other words, the plate 14i has a shape in which right-angled corners are cut out and chamfered in an oblique direction (a direction inclined at 45 degrees relative to the edge in this embodiment) at four positions of the upper right, upper left, lower right, and lower left in the circumference of the main body 11. As shown in
(331) (2. Structure 30a Made from the Blocks 10s)
(332)
(333) A method of fixing the plate 14i is also generally similar to the method in the nineteenth embodiment. In other words, the plates 14i of the blocks 10s adjacent to each other in the vertical and horizontal directions are fixed by lapping the edge portion of the plate 14i of one block 10s, which is provided with a hole 25 (as shown in
(334) (3. Method of Constructing the Structure 30a with the Blocks 10s)
(335) A method of constructing the structure 30a with the blocks 10s is generally similar to the method of the nineteenth embodiment. In other words, at the right side of the block 10s positioned at the lower left of the contact position G as shown in
(336) Then, as shown in
(337) Subsequently, as shown in
(338) The block 10s at the upper left of the contact position G is also arranged in the similar manner. As indicated by the arrow in
(339) As indicated by the arrow in the
(340) As described above, the blocks 10s are arranged in the vertical and horizontal direction. The masonry joint can be formed by using the plate 14i protruding from the main body 11 as the inner formwork and depositing the concrete or the like between the inner formwork and the outer formwork (not shown).
(341) (4. Overlapped Portion of the Plates 14i)
(342)
(343) According to this embodiment, in the overlapped portion H shown in
(344) A lower left position of the plate 14i of the upper right block 10s and an upper right position of the plate 14i of the lower left block 10s are arranged such that oblique sides thereof correspond to each other on a plane. As a result, the number of the plates 14i overlapped in the front-rear direction at the overlapped portion H does not exceed two.
(345) According to the twentieth embodiment, similar effects to those in the nineteenth embodiment can be obtained. As the shapes of the cutout portions 140 of the plates 14i are all identical to one another, it is possible to achieve an advantage that the machining and processing are easy.
(346) It should be noted that, as shown in the block 10s in
(347) In this example, the bolts 26 having the nuts 28 are provided at the upper edge of the plate 14i. By lowering the upper block 10s, as indicated by the arrow in the left illustration of
(348) At this situation, preferably, the length of each bolt 26 at the upper edge of the plate 14i of the block 10s (i.e., the length from the plate 14i to the nut 28) is made longer than the length of the bolt 26 at the right edge by at least the thickness of the plate. By employing this configuration, it is possible to lower the upper block 10s without an interference with the bolts 26 of the left block 10s such that the upper block 10s is present in front of the lower block 10s. Thus, the bolts 26 of the lower block 10s can be inserted into the slits 25a of the upper block 10s.
(349) Subsequently, by shifting the upper block 10s backward, the bolts 26 at the right edge of the block 10s at the left side thereof can be inserted into the holes 25 at the left edge of the plate 14i of the upper side block 10s. It should be noted that after the bolts 26 are inserted into the slits 25a and the holes 25, as shown in the right illustration in
(350) When the slits 25a are employed for the fixing mechanism between the upper and lower plates, the plate holding portions 182, which are the hook-shaped members as shown in
Twenty-First Embodiment
(351) (1. Precast Blocks 10t and 10u)
(352)
(353) The plates 14j of the block 10t and 10u have respective edge portions that are on the same plane without the upper, the lower, the right and the left edge portions thereof being bent. Holes 25 are formed at the right and left edges of the plate 14j of the block 10t, and slits 25a are formed at the upper and lower edge of the plate 14j of the block 10t. On the other hand, bolts 26 are provided at the respective edges of the plate 14j of the block 10u.
(354) It should be noted that the shapes of the four positions of the upper right, the upper left, the lower right and the lower left of the plate 14j, at which the upper, the lower, the right and the left edges of the plates 14j intersect, are similar to those in the plate 14i.
(355) (2. Structure 30b Made from the Blocks 10t and 10u)
(356)
(357) According to the twenty-first embodiment, blocks 10t and 10u are allocated in a zigzag manner and arranged in the vertical and horizontal directions, the concrete is deposited between the main bodies 11 of the blocks 10t and 10u adjacent to each other, and the masonry joints 17 are formed (as shown in
(358) The block 10t is arranged in front of the block 10u. The plates 14j of the upper and lower blocks 10t and 10u are fixed by lapping the edge provided with the slits 25a of the plate 14j of the block 10t in front of the edge provided with the bolts 26 of the plate 14j of the block 10u, inserting the bolts 26 into the slits 25a, and tightening the nuts 28 over the bolts 26.
(359) Similar to the above-described configuration, the plates 14j of the right and left blocks 10t and 10u are also fixed by lapping the edge provided with the holes 25 of the plate 14j of the block 10t in front of the edge provided with the bolts 26 of the plate 14j of the block 10u, inserting the bolts 26 into the holes 25, and tightening the nuts 28 over the bolts 26.
(360) (3. Method of Constructing the Structure 30b with the Blocks 10t and 10u)
(361) Hereinafter, a method of constructing the structure 30b with the blocks 10t and 10u will be described. Here, the description will be made with focusing on the blocks 10t and 10u in the circumference of the contact position J as shown in
(362) According to this embodiment, as shown in
(363) It should be noted that, alternatively, it is possible that, after inserting the bolts 26 at the lower edge of the plate 14j of the block 10u that is currently concerned into the slits 25a at the upper edge of the plate 14j of the lower block 10t and moving it from the backward position to the forward position, the bolts 26 at the left edge of the plate 14j of the block 10u are inserted into the holes 25 at the right edge of the plate 14j of the left block 10t. In this case, similar to the block 10s, preferably, the length of each bolt 26 at the upper and lower edges is made longer than the length of the bolts 26 at the right and left edges by at least the thickness of the plate, respectively.
(364) The block 10t at the lower right of the contact position J is, as indicated by the arrow in
(365) In this way, after alternately arranging the blocks 10t and 10u from the left to the right to lay out the blocks 10t and 10u in the lower row, the blocks 10t and 10u in the upper row are similarly arranged.
(366) The block 10t at the upper left of the contact position J is arranged in a similar manner to the above-described block 10t. In other words, as indicated by the arrow in
(367) The block 10u at the upper right of the contact position J is also arranged in a similar manner to the above-mentioned block 10u. In other words, as indicated by the arrow in
(368) As described above, the blocks 10t and 10u are allocated in a zigzag manner and arranged in the vertical and horizontal directions. The masonry joint can be, similar to the above-described configuration, formed by using the plate 14j protruding from the main body 11 as the inner formwork and depositing the concrete or the like between the inner formwork and the outer formwork (not shown).
(369) (4. Overlapped Portion of the Plates 14j)
(370)
(371) According to this embodiment, in the overlapped portion K shown in the drawings, a lower right position of the plate 14j of the upper left block 10t is overlapped with an upper left position of the plate 14j of the lower right block 10t at oblique sides thereof.
(372) An upper right position of the plate 14j of the lower left block 10u is overlapped with a lower left position of the plate 14j of the upper right block 10u at oblique sides thereof. As a result, the number of the plates 14j overlapped in the front-rear direction at the overlapped portion K does not exceed two.
(373) According to the twenty-first embodiment, similar effects to those in the nineteenth embodiment can be obtained. Also, the plate 14j is provided with the bolts 26 only, or alternatively provided with the holes 25 and the slits 25a only. This brings about advantages in which the workload for machining and processing the plate 14j is reduced and the associated cost is also reduced. Meanwhile, according to the third embodiment, it is required to prepare the same number of two types of blocks 10t and 10u. From this viewpoint, the nineteenth and twentieth embodiments are more advantageous in which a required number (only one type) of blocks may be prepared.
(374) It should be noted that, according to this embodiment, the plate 14j is not provided with the folded portion 27. Instead, the respective edges provided with the holes 25 or the slits 25a of the plate 14j of the block 10t may be bent and positioned forward, or the respective edges provided with the bolts 26 of the plate 14j of the block 10u may be bent and positioned backward.
(375) As shown in the block 10t in
(376) As shown in a block 10t in
(377) In this case, as indicated by the arrow in the left illustration of
Twenty-Second Embodiment
(378) (1. Precast Block 10v)
(379)
(380) The plate 14k of the block 10v has a gate-like shape, and the upper edge, the right edge and the left edge thereof protrude from the main body 11, respectively. The bolts 26 are provided at the upper edge and the right edge of the plate 14k.
(381) On the other hand, hook-shaped portions 29 are provided at the left edge of the plate 14k. Each of the hook-shaped portions 29 is a receiving portion into which the bolt 26 can be inserted and then hooked. Slits 25a are formed at the lower ends of the right and left edges of the plate 14k. The bolts 26 at the upper edge of the plate 14k are arranged at positions that correspond to the slits 25a in the vertical direction, respectively.
(382) The shapes of the upper right, the upper left, the lower right and the lower left positions of the plate 14k are similar to those in the plate 14i, and, as shown in
(383) As seen in the folded portion 27 in
(384) At the upper portion of the main body 11, a plurality of joints 12a, each having a fixing element made by a reinforcing bar and a fixing element, are buried and a plurality of holes 114 opening only in the top face of the main body 11 are provided. It should be noted that the joints 12a having the fixing elements, which protrude downward from the main body 11, and the joints 12a having the fixing elements are joints in which the respective fixing elements are provided at both ends of the same reinforcing bar. The holes 114 and the joints 12a (12a) having the fixing elements are alternately arranged in the horizontal direction of the main body 11.
(385) (2. Structure 30c Made from the Blocks 10v)
(386)
(387)
(388) The plates 14k of the upper and lower blocks 10v are fixed by lapping the lower end portions of the left and right edges provided with the slits 25a of the plate 14k of the upper block 10v in front of the upper edge provided with the bolts 26 of the plate 14k of the lower block 10v, inserting the bolts 26 into the slits 25a, and tightening the nuts 28 over the bolts 26.
(389) According to this embodiment, at this moment, the joints 12a having the fixing elements, which protrude downward from the main body 11 of the upper block 10v are inserted into the holes 114 of the main body 11 of the lower block 10v, and then overlapped with the joints 12a having the fixing elements buried in the main body 11 (as shown in
(390) For this reason, for one of the upper and lower blocks 10v, a block in which the positions of the holes 114 and the joints 12a (12a) having the fixing elements are reversed in the block 10v (as shown in
(391) (3. Method of Constructing the Structure 30c with the Blocks 10v)
(392) Hereinafter, a method of constructing a structure 30c with the blocks 10v will be described.
(393) According to this embodiment, as shown in
(394) Subsequently, as indicated by the arrow in
(395) As described above, by lowering the block 10v, the joints 12a having the fixing elements, which protrude downward from the main body 11 of the block 10v, are inserted into the holes 114 of the main body 11 of the lower block 10v.
(396) In order to enable a series of the above-mentioned operations to the block 10v, it is preferable to set a pitch f in the vertical direction of the bolts 26 at the right edge of the plate 14k as shown in
(397) It should be noted that, when performing an actual construction, as shown in
(398) As shown in
(399) In this way, the blocks 10v in the respective rows are installed from the left to the right, the blocks 10v are joined in the vertical and horizontal directions, and the masonry joints 17 are formed, thereby constructing the structure 30c as shown in
(400) According to the twenty-second embodiment, it is possible to obtain the similar effects and advantages to those in the nineteenth embodiment. As the bolts 26 can be inserted into the hook-like portions 29 or the slits 25a by moving the block(s) 10v downward, the installation of the block(s) 10v becomes easy.
Twenty-Third Embodiment
(401) (1. Precast Blocks 10w and 10x)
(402)
(403) Each of plates 14m of the blocks 10w and 10x has a gate-like shape, and the right and left edge portions thereof protrude from the main body 11. The block 10w is provided with the hook-like portions 29 at the right and left edge portions of the plate 14m, and the block 10x is provided with the bolts 26 at the right and left edge portions of the plate 14m. It should be noted that the plate 14m is not provided with the folded portion 27 or the like and thus the right and left edge portions thereof are on the same plane.
(404) A portion on the top face of the main body 11 at the plate 14m side is lifted upward, and a water stop (cut off) portion 211 such as a rubber or the like is provided thereon. According to this embodiment, this lifted portion functions as an inner formwork for loading the filler. It should be noted that the main body 11 is provided with the joints 12a and 12a having the fixing elements or the holes 114, which are similar to those in the twenty-second embodiment, in addition to the mechanical joints 12b on the right and left faces.
(405) (2. Structure 30d Made from the Blocks 10w and 10x)
(406)
(407) According to the twenty-third embodiment, the blocks 10w and 10x are alternately disposed in the horizontal direction and arranged in the vertical and horizontal directions, the filler such as the concrete, the mortar or the like is loaded between the main bodies 11 of the blocks 10w and 10x adjacent to one another to form the masonry joints 17 (as shown in
(408) The block 10w is arranged in front of the block 10x. The plates 14m of the right and left blocks 10w and 10x are fixed by lapping the edge provided with the hook-like portions 29 of the plate 14m of one block 10w in front of the edge provided with the bolts 26 of the plate 14m of the other block 10x, inserting the bolts 26 into the hook-like portions 29 to be hooked, and tightening the nuts 28 over the bolts 26.
(409) It should be noted that, according to the twenty-third embodiment, similar to the twenty-second embodiment, the joints 12a having the fixing elements, which protrude downward from the main body 11 of the upper block 10w or 10x is inserted into the holes 114 of the main body 11 of the lower block 10w or 10x, and then overlapped with the joints 12a having the fixing elements buried in the main body 11 that is currently concerned (as shown in
(410) (3. Method of Constructing the Structure 30d with the Blocks 10w and 10x)
(411) Hereinafter, a method of constructing a structure 30d with the blocks 10w and 10x will be described.
(412) According to this embodiment, as shown in
(413) Next, as shown in
(414) Subsequently, as indicated by the arrow in
(415) Also, similar to installing the block 10x, the joints 12a having the fixing elements (as shown in
(416) It should be noted that, similar to the twenty-second embodiment, the block 10w (10x) is arranged by lowering the block 10w (10x) after providing the mortar serving as the filler on the top face of the lower block 10w (10x) at an appropriate time. Similar to the above-described configuration, the masonry joint in the vertical direction is formed between the main bodies 11 of the blocks 10w and 10x adjacent to each other in the horizontal direction.
(417) In this way, the blocks 10w and 10x in the respective rows are arranged, the blocks 10w and 10x are joined together in the vertical and horizontal directions to form the masonry joints 17. Thus, it is possible to construct the structure 30d.
(418) According to the twenty-third embodiment, similar effects and advantages to those in the twenty-second embodiment can be obtained. It should be noted that one type of blocks 10x out of the two types of blocks 10w and 10x are firstly arranged and aligned in the comb-like state in this embodiment, which is similarly applicable to the installation of the blocks 10t and 10u in the twenty-first embodiment.
Twenty-Fourth Embodiment
(419) Hereinafter, as a twenty-fourth embodiment, an example in which the precast blocks, which have been described above, are applied to a dike of an LNG tank 1 (1b) according to the present invention.
(420)
(421) When viewed in the plan view, the dike 2b has a round shape corresponding to the diameter of the tank, and it is possible to construct the dike 2b with precast blocks 10s as shown in
(422) According to a similar procedure to those described in
(423) By employing this configuration, similar effects and advantages to those in the nineteenth embodiment can be obtained. As the work for installing the formworks from the inside can be eliminated when forming the masonry joints 17, it leads to the reduction in the construction period for constructing the tank without the interference with a construction work for the inner facility such as the inner tank and the outer tank 3b. It should be noted that an applicable target of the precast blocks according to the nineteenth to twenty-third embodiments is not limited to the above-mentioned dike 2b but the precast blocks are also applicable to various structures in which the interference with a work to be performed at one side of the structural body is required to be prevented, such as a wall-like structure, a container-like structure and the like.
Twenty-Fifth Embodiment
(424) A twenty-fifth embodiment to a thirtieth embodiment are examples of a joining structure of the blocks in the LNG tank 1 according to the present invention.
(425) The above-mentioned inner tank and the outer tank 3b are constituted by metal plates or the like, respectively, and the gap between the inner tank and the outer tank 3b maintains the LNG in a cold condition. A side wall of the outer tank 3b, which is formed in an annular shape, is provided so as to be arranged along the dike 2c inside the dike 2c. The dike 2c is provided in order to prevent the LNG from leaking to the outside. The bottom slab 5 is supported by piles buried in the ground.
(426) The dike 2c is constituted by a plurality of precast members (precast blocks) 10y, each of which has a block shape, and the precast members 10y are arranged along the circumferential direction and the vertical direction of the LNG tank 1c. In other words, in the LNG tank 1c, the precast members 10y are arranged in the circumferential direction of the LNG tank 1c and stacked in the vertical direction thereof, and the masonry joints are formed between the precast members 10y adjacent to one another in the circumferential direction and the vertical direction so as to construct the dike 2c. Also, the prestress is introduced to the dike 2c by prestressed concrete (PC) steel wires, which extend in the vertical direction in the precast members 10y, and PC steel wires, which extend in the circumferential direction in the precast members 10y.
(427)
(428) A plurality of holes (first holes) 11b are formed in one of end faces (a first end face) 11a of the main body 11. These holes 11b are formed by, for example, burying sheath pipes in the main body 11. The holes 11b are formed so as to extend from the end face 11a toward the inside (downward) of the main body 11. The holes 11b are provided in order to allow the main reinforcing steel bars 120 and the fixing elements 121 of the different precast member 10y to be inserted from above and load the mortar (solidifying material or filler) M to bury the main reinforcing steel bars 120 and the fixing elements 121.
(429) On the horizontal plane, the holes 11b and the main reinforcing steel bars 120 are arranged in a grid shape. The holes 11b and the main reinforcing steel bars 120 are alternately arranged in the length direction of the main body 11. Also, the holes 11b and the main reinforcing steel bars 120 are arranged to be adjacent to each other in the thickness direction of the main body 11. It should be noted that the sheath pipes through which the above-mentioned PC steel wires pass are also buried in the main body 11. It should be noted, however, that the PC wires and sheath pipes may be omitted.
(430) The main reinforcing steel bars 120 are buried in the main body 11 and extend in the up-down direction in the main body 11, and a lower end of each of the main reinforcing steel bars 120 protrudes downward from another end face (a second end face) 11c of the main body 11. The end face 11c is an end face positioned at a lower end of the precast member 10y. On the other hand, an upper end of the main reinforcing steel bar 120 is in a state being buried in the main body 11 and is not exposed outside the main body 11. It should be noted that although the joints such as the mechanical joints or the joints having the fixing elements, which are similar to those described in the previous embodiments, may be also provided on right and left faces of the main body 11, an explanation will be hereinafter omitted as is irrelevant to joining the upper and lower precast members 10y, which will be described later.
(431) A U-shaped hook (folded portion) 123, which is folded in a direction departing from the end face 11a, is provided at an upper end of each of the main reinforcing steel bars 120. The U-shaped hook 123 is arranged at an approximately middle point position of a linear segment S connecting two holes 11b adjacent to each other. In other words, the U-shaped hook 123 may be arranged at a middle point position of the line segment S, or alternatively arranged at a position slightly deviated from the middle point of the linear segment S.
(432) The U-shaped hook 123 is formed by folding the upper end of the main reinforcing bar 120 inward in the thickness direction of the main body 11. In this way, it is possible to shorten the distance between the main reinforcing steel bar 120 and the hole 11b by folding the upper end of the main reinforcing bar 120 inward in the thickness direction. As a result, it is possible to smoothly transmit a force to the main reinforcing steel bar 120 inserted into the hole 11b. It should be noted that the direction to which the U-shaped hook 123 is folded is not necessarily inward in the thickness direction of the main body 11, but for example the U-shaped hook 123 may be folded in the direction inclined with respect to the thickness direction. Also, the fixing body 121 is fixed to the lower end of the main reinforcing bar 120 by, for example, the pressure bonding.
(433) Hereinafter, a method of joining the precast member 10y constituted as described above will be described. This joining method is a joining method in which the precast members 10y are opposed to each other in the vertical direction and the upper precast member 10y is stacked on the lower precast member 10y. As shown in
(434) Firstly, a jig 125 for adjusting the verticality of the second precast member 10yB is arranged on the end face 11a of the first precast member 10yA. The jig 125 is provided in order to form (leave) a gap between the end face 11a of the first precast member 10yA and the end face 11c of the second precast member 10yB and also to adjust the height of the second precast member 10yB with respect to the first precast member 10yA. Next, an upper face of the jig 125 is scraped by a file or the like to uniform the height of the upper face of the jig 125. Subsequently, the second precast member 10yB is temporarily placed on the upper face of the jig 125 to adjust the height (verticality) of the second precast member 10yB with respect to the first precast member 10yA. After the adjustment is completed, the second precast member 10yB is once removed.
(435) Next, a formwork 57 is arranged so as to surround the end face 11a (upper end face) of the first precast member 10yA (a step of arranging a formwork). The formwork 57 is arranged by, for example, attaching the formwork 57 to the upper ends of the respective side faces of the first precast member 10yA by screws. After the formwork 57 is arranged, the end face 11a is filled with the mortar M (a step of loading the solidifying material). At this moment, the mortar M is also disposed (loaded) around the jig 125. It should be noted that, except for
(436) Then, before the loaded mortar M is cured, the end face 11c of the second precast member 10yB is placed on the upper face of the jig 125, and the main reinforcing steel bars 120 of the second precast member 10yB are inserted into the holes 11b of the first precast member 10yA (a step of inserting the second reinforcing bar). At this moment, the fixing elements 121 attached to the lower ends of the respective main reinforcing steel bars 120 are also inserted into the holes 11b along with the main reinforcing bars 120.
(437) As shown in
(438) As described above, according to the joining structure S1 of this embodiment, the U-shaped hooks 123 are provided which are folded in the direction departing from the end face 11a, and the free ends thereof at the end face 11a side of the main reinforcing bar 120 are folded. As a result, it is possible to ensure the transmission of the force between the U-shaped hooks 123 of the first precast member 10yA and the main reinforcing steel bars 123 inserted into the holes 11b of the first precast member 10yA. As the U-shaped hooks 123 are provided at the free ends of the main reinforcing steel bars 120, it is possible to shorten the fixing length without the fixing elements being attached to the free ends of the respective main reinforcing steel bars 120. In this way, in the joining structure S1, the fixing elements may be eliminated and the work for attaching the fixing elements in the factory or the like can be simplified to reduce the cost or the labor associated with the machining and processing. Accordingly, it is possible to improve the workability.
(439) In the factory, the labor for burying the main reinforcing steel bars 120 with the U-shaped hooks 123 does not differ from the labor for burying the main reinforcing steel bars without the U-shaped hooks 123. Also, the construction can be performed only by filling the holes 11b with the mortar M and inserting the main reinforcing steel bars 120 into the holes 11b. Accordingly, also from this viewpoint, higher workability is attainable.
(440) The U-shaped hooks 123 are buried inside the first precast member 10yA. Thus, as depositing the concrete for burying the U-shaped hooks 123 is eliminated, it is possible to further simplify the construction work. Because the holes 11b, into which the main reinforcing steel bars 120 are inserted, are only required to be prepared as the holes, it is possible to reduce the size of each of the holes to be formed in advance.
(441) As described above, a plurality of U-shaped hooks 123 and a plurality of holes 11b are alternately arranged, and each of the U-shaped hooks 123 is arranged at the middle point position of the line segment S connecting two holes 11b adjacent to each other.
(442) According to the joining method of forming the joining structure S1 of this embodiment, the formwork 57 is arranged so as to surround the end face 11a and the end face 11a is filled with the mortar M, and subsequently the main reinforcing bars 120 are inserted into the respective holes 11b and the mortar M is hardened. In this way, the main reinforcing steel bars 120 may be inserted after arranging the formwork 57 and filling the mortar M in advance. Thus, it is possible to improve the efficiency of the work for joining the first precast member 10yA and the second precast member 10yB to each other.
Twenty-Sixth Embodiment
(443) Next, a joining structure and a method of joining the precast members 10z according to a twenty-sixth embodiment will be described. Hereinafter, an explanation duplicated with the twenty fifth embodiment will be omitted.
(444) As shown in
(445) A joining method of joining the precast members 10z according to the twenty-sixth embodiment is similar to the method in the twenty-fifth embodiment. In other words, as shown in
(446) According to the joining structure S2 of the twenty-sixth embodiment, a plurality of U-shaped hooks 123 and a plurality of holes 21b are alternately arranged, and each of the U-shaped hooks 123 is arranged at the proximity position to the each of the holes 21b. Thus, as the distance becomes closer between the main reinforcing steel bars 220 of the first precast member 10zA and the main reinforcing steel bars 220 of the second precast member 10zB inserted into the holes 21b, it is possible to further smoothly transmit the force in the main reinforcing steel bars 220. By arranging the U-shaped hooks 123 in the proximity position to the holes 21b, it is possible to directly transmit the force between the main reinforcing steel bars 220 inserted into the holes 21b and the U-shaped hooks 123 and to clearly define the transmission path of the power. Even if steel wires (PC steel wires) or the like different from the main reinforcing steel bars 220 are buried in the vicinity of the end face 11a, the U-shaped hooks 123 are arranged at the proximity positions to the holes 21b, and therefore it is possible to transmit the force directly and smoothly in these main reinforcing steel bars 220 without being affected from the steel wires or the like.
Twenty-Seventh Embodiment
(447) Hereinafter, a joining structure and a joining method of precast members 10 according to a twenty-seventh embodiment will be described. The precast member 10 according to the twenty-seventh embodiment differs from the twenty-sixth embodiment in a structure of a main body 36, and other structures are similar to those in the precast member 10z according to the twenty-sixth embodiment.
(448) As shown in
(449) A joining method of joining the precast members 10 is similar to the methods in the twenty-fifth and twenty-sixth embodiments. In other words, as shown in
(450) As described above, according to the joining structure S3 of the twenty-seventh embodiment, the first precast member 10A is provided with the holes 36b extending from the end face 11a to the inside of the first precast member 10A, and the holes 36b are filled with the mortar M. Then, the U-shaped hooks 123 are provided inside the holes 36b, respectively. In this way, according to the joining structure S3, each of the U-shaped hooks 123 of the first precast member 10A and the associated main reinforcing steel bar 220 of the second precast member 10B are arranged in the same area (i.e., an area formed by the holes 21b and the holes 36b). As a result, it is possible to shorten the distance between the main reinforcing bar 220 of the first precast member 10A and the main reinforcing steel bar 220 inserted from above so as to obtain the similar effect to the twenty-sixth embodiment.
(451) Furthermore, according to the joining structure S3 of the twenty-seventh embodiment, the holes 21b and the holes 36b are entirely filled with the mortar M. Thus, the force is transmitted between the main reinforcing bars 220 via the hardened mortar M. Accordingly, it is possible to effectively increase the strength of the joints between the main reinforcing steel bars 220 by increasing the strength of the mortar M.
Twenty-Eighth Embodiment
(452) Hereinafter, a joining structure of the precast members 10 according to the twenty-eighth embodiment will be described. It should be noted that a joining method of the precast members 10 according to the twenty-eighth embodiment is similar to the joining method in the twenty fifth embodiment. Thus, detailed explanation thereof will be omitted. As shown in
(453) The tie hoops 41 and 42 are buried in the main body 11 such that the tie hoops are arranged along a plurality of planes (horizontal planes) orthogonal to the main reinforcing steel bars 120, and arranged so as to surround the main reinforcing steel bars 120 inside the main body 11. The tie hoops 41 are positioned outside the holes 11b, and the tie hoops 42 are positioned at positions other than the outside of the holes 11b. The holes 11b and the U-shaped hook 123 are provided inside the tie hoops 41, and the main reinforcing steel bars 120 extending in the up-down direction are provided inside the tie hoops 42. Here, the tie hoops 41 positioned outside the holes 11b have the thinner concrete (i.e., covering) positioned outside the tie hoops 41 as compared to the tie hoops 42 positioned at the positions other than the outside of the holes 11b. As a result, the tie hoops 41 positioned outside the holes 11b are more likely to be corroded than the tie hoops 42 positioned at the positions other than the outside of the holes 11b.
(454) For this reason, in the precast member 10, the tie hoops 41 positioned outside the holes 11b are made of a corrosion resistant reinforcing steel bar. More particularly, the tie hoops 41 have a higher anticorrosion property by applying an epoxy coating to the tie hoops 41. It should be noted that, as materials for increasing the corrosion resistance of the tie hoops 41, for example, galvanizing may be enumerated in addition to the above-mentioned epoxy resin.
(455) As described above, according to the twenty-eighth embodiment, it is possible to further suppress the corrosion of the tie hoops 41 in a reliable manner even when the thickness of the concrete positioned outside the tie hoops 41 is thinner, by employing the corrosion resistant reinforcing steel bars for the tie hoops 41 positioned outside the holes 11b.
Twenty-Ninth Embodiment
(456) Hereinafter, a joining method according to a twenty-ninth embodiment will be described. A joining structure according to the twenty-ninth embodiment is similar to the joining structure according to the twenty-fifth embodiment, and the twenty-ninth embodiment differs from the twenty-fifth embodiment only in the joining method. Hereinafter, a duplicated description with the twenty-fifth embodiment will be omitted, and a description will be made by focusing on those configurations which are different from the twenty-fifth embodiment.
(457) As shown in
(458) The formwork 58 is arranged by, for example, attaching the formwork 58 to the respective side faces of the main body 11 by screws or the like. As shown in
(459) As described above, according to the joining method of the twenty-ninth embodiment, the main reinforcing steel bars 120 of the second precast member 10yB are inserted into the respective holes 11b while forming the gap between the end face 11a and the end face 11c while the hole 11b is filled with the mortar M in advance. Then, the formwork 58 is arranged so as to surround the gap, and then the gap is filled with the mortar M from the hole 58a formed in the formwork 58 so as to harden the mortar M. Thus, the mortar M, which fills the gap, may be loaded and hardened after the hole 11b is filled with the mortar M and the main reinforcing steel bars 120 are inserted into the holes 11b. Accordingly, it is possible to improve the efficiency of the work for joining the first precast member 10yA to the second precast member 10yB.
Thirtieth Embodiment
(460) Now, a joining structure and a joining method according to a thirtieth embodiment will be described. As shown in
(461) The concave portion 61, which is positioned on the end face 11c of the second precast member 10yB, and the concave portion 62, which is positioned on the end face 11a of the first precast member 10yA, oppose to each other in the vertical direction when the second precast member 10yB is arranged immediately above the first precast member 10yB. The concave portion 61 and the concave portion 62 are formed in annular shapes in the vicinity of outer edges of the end face 11c and the end face 11a, respectively. Similar to the concave portion 61 and the concave portion 62, the butyl rubber 63 has an annular shape and is attached on the concave portion 62. The butyl rubber 63 is provided in order to infill the gap between the end face 11a of the first precast member 10yA and the end face 11c of the second precast member 10yB. The butyl rubber 63 may be expandable when sucking water, and in this case, it is possible to further improve the water stop property in the above-mentioned gap.
(462) Next, a joining method according to the thirtieth embodiment will be described. Firstly, as shown in
(463) Next, the main reinforcing steel bars 120 of the second precast member 10yB are inserted into the holes 11b of the first precast member 10yA from above. Then, the butyl rubber 63 is compressed against the end face 11c (concave portion 61) of the second precast member 10yB from above to press the butyl rubber 63 (a step of pressing the water stop rubber). At this moment, as shown in
(464) As described above, after the main reinforcing steel bars 120 are inserted into the holes 11b and the butyl rubber 63 is compressed, the mortar M is hardened over a certain length of time (a step of hardening the solidifying material) so as to complete the joining structure according to the thirtieth embodiment.
(465) As described above, according to the joining method of the thirtieth embodiment, after the butyl rubber 63 is arranged on the end face 11a (concave portion 62) of the first precast member 10yA and the holes 11b are filled with the mortar M, the main reinforcing bars 120 are inserted into the holes 11b and also butyl rubber 63 is pressed (squeezed) by the end face 11c. As a result, the pressed butyl rubber 63 expands in the lateral direction between the end face 11a and the end face 11c. Thus, it is possible to improve the water stop property at the joining portion between the first precast member 10yA and the second precast member 10yB. Also, according to the thirtieth embodiment, the formwork is not necessary and therefore the labor for arranging the formwork can be eliminated. Thus, it is possible to further improve the workability.
(466) It should be noted that, according to the thirtieth embodiment, although the butyl rubber 63 is used as the water stop rubber, alternatively other water stop rubbers may be used other than the butyl rubber. In other words, for example, other water expansive rubber may be used instead of the butyl rubber 63. Also, the water stop rubber may be arranged at the concave portion 61 positioned on the end face 11c of the second precast member 10yB.
(467) As described above, although preferred embodiments of the joining structure or the like of the LNG tank 1 according to the present invention are described, the joining structures are not limited to those described in the above-described embodiments. For example, in the above-described embodiments, as shown in
(468) Although, in the above-described embodiments, certain examples in which the mortar M is used as the solidifying material are described, other solidifying materials may be used instead of the mortar M. For example, a grout material, resin or the like may be used instead of the mortar M.
(469) Although, in the above-described embodiments, certain examples are described in which the upper second precast member 10yB is stacked on the lower first precast member 10yA, a joining arrangement is not limited to those described. For example, the first precast member and the second precast member may be joined in the lateral direction. In this case, for example, the first precast member or the second precast member slides (moves) in the lateral direction by a rail, the reinforcing bars are inserted into the holes, and then the holes are filled with the solidifying material so as to form the joining structure.
(470) Although, in the above-described embodiment, certain examples in which the joining structure is applied to the LNG tank 1c are described, respective joining structures and joining methods may be applied to structures other than the LNG tank 1c. For example, the present invention may be applied to a wall material or a pillar material constituting a structure other than the LNG tank, or a box culvert or the like partitioned into upper and lower parts.
(471) As described above, while certain embodiments of the present invention have been described referring to the accompanying drawings, the technical scope of the present invention is not intended to be limited to those described in the above-described embodiments. It is apparent that a person skilled in the art would conceive various changes and modifications without departing from the spirit and technical idea recited in the appended claims, and it should be appreciated that such changes and modifications naturally belong to the technical scope of the present invention.
REFERENCE NUMERALS AND SYMBOLS
(472) 1, 1a, 1b, 1c, 100: LNG tank 2, 2a, 2b, 2c, 20: Dike 3a: Inner tank 3b: Outer tank 5b, 114: Hole 5d, 51: Supporting member 10, 10a, 10b, 10c, 10d, 10e, 10f, 10g, 10g, 10h, 10i, 10i, 10i, 10j, 10k, 10m, 10n, 10n, 10p, 10p, 10q, 10r, 10s, 10s, 10s, 10t, 10t, 10t, 10u, 10v, 10w, 10x, 200: Precast block 10y, 10z, 10, 10: Precast member 11, 11f, 21, 36: Block main body 11b, 21b, 36b, 58a: Hole 12: Loop joint 12a, 12a, 201: Coupling joint having a fixing element 12b: Mechanical joint 13: Sheath pipe 14, 14a, 14b, 14c, 14d, 14e, 14f, 14g, 14g, 14h, 14h, 14i, 14j, 14k, 14m: Plate 17: Masonry joint 18, 31: Bracket 19: Pilaster 25, 140, 141a, 141b, 551: Hole 25a: Cutout 25b: Elongated hole 23c: Oblique cutout 26: Bolt 27: Bending portion 28, 142b, 146, 149: Nut 29: Hook-like portion 30, 30a, 30b, 30c, 30d: Structure 31b: Side wall portion 32: Jack 41, 42: Tie hoop 52, 53, 55, 56, 57, 58, 300: Formwork 54: PC steel member 60, 400: Concrete 63: Butyl rubber (water stop rubber) 80, M: Mortar 90, 90a, 90a, 90b, 90c, 90d, 90e, 90f, 90f, 90g, 90h, S1, S2, S3: Joining structure 116a, 140a, 151, 161, 171: Packing 117, 144a: Sponge 120, 220: Main reinforcing steel rod 121: Fixing element 123: U-shaped hook (turning back portion) 142a: Screw 143: Receiving portion 144a: Water stop rubber 150: Check valve portion 160, 170: Water stop plate 180: Bonding portion 181: Protection film 190: Sheet 211: Water stop portion