Power-system short-circuit capacity monitoring method and system thereof
10175304 ยท 2019-01-08
Assignee
Inventors
- Yoko Kosaka (Nakano, JP)
- Takenori Kobayashi (Meguro, JP)
- Yoshiki Takabayashi (Yokohama, JP)
- Kazuya Omata (Uenohara, JP)
- Verma Suresh Chand (Nagoya, JP)
- Yoshihiko Wazawa (Kasugai, JP)
- Yoshiki Nakachi (Nagoya, JP)
Cpc classification
H02J3/0012
ELECTRICITY
Y04S10/22
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E40/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G01R19/2513
PHYSICS
Y04S10/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G01R27/16
PHYSICS
Y02E60/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
G01R27/16
PHYSICS
Abstract
Synchronous measuring terminals 5 synchronously measure phasor quantity D101 of a voltage/current at respective measurement points 1 and 2. A data-set creating block 91 of a short-circuit capacity monitoring device 7 creates, for each measurement cycle t, a data set D102 containing n pieces of data based on the phasor quantities D101 of voltage and current. A phase correcting block 92 performs a phase correction on the phasor quantity using the data set D102 to create a data set D102, and a backward impedance estimating block 93 estimates a backward impedance D103 using the data set D102.
Claims
1. A method for monitoring a short-circuit capacity of a power system, the method comprising: measuring data synchronously with time, by using a synchronizing signal transmitted from a synchronizing signal satellite, of phasor quantities of a voltage and a current at each of at least two synchronous measuring terminals on a power line of the power system, and a phasor quantity of a voltage at a synchronous measuring terminal for a phase correction connected to the synchronous measuring terminals via the power line of the power system; collecting data of a short-circuit capacity monitoring device collecting measured data measured by the synchronous measuring terminals and by the synchronous measuring terminal for the phase correction in the data measuring; a data-set creating of the short-circuit capacity monitoring device creating, for each predetermined cycle, a data set of the at least two synchronous measuring terminals and a data set of the synchronous measuring terminal for the phase correction, both containing a plural pieces of data based on the measured data collected in the data collecting; a phase correcting of the short-circuit capacity monitoring device correcting a phase of the data set of the at least two synchronous measuring terminals by subtracting a voltage phase of the synchronous measuring terminal for the phase correction from the phase of the data set of the at least two synchronous measuring terminals, defining a voltage phase at a certain time and at any one of the synchronous measuring terminals as a reference phase, and subtracting the reference phase from the phase of the data set of the at least two synchronous measuring terminals which has the voltage phase of the synchronous measuring terminal for the phase correction subtracted therefrom; a backward impedance estimating of the short-circuit capacity monitoring device estimating a backward impedance on a power-source side as viewed from a short-circuit point using the data set of the at least two synchronous measuring terminals having undergone the phase correction in the phase correcting; and a short-circuit capacity calculating of calculating a short-circuit capacity based on the backward impedance estimated in the backward impedance estimating.
2. The power-system short-circuit capacity monitoring method according to claim 1, wherein in the data-set creating, a sample cycle and a number of pieces of data contained in the data set of the at least two synchronous measuring terminals and the data set of the synchronous measuring terminal for the phase correction are set as changeable in accordance with a system fluctuation condition.
3. The power-system short-circuit capacity monitoring method according to claim 1, wherein in the data-set creating, an outlier in the data set of the at least two synchronous measuring terminals and the data set of the synchronous measuring terminal for the phase correction is excluded.
4. The power-system short-circuit capacity monitoring method according to claim 1, wherein in the short-circuit capacity calculating, an outlier in the short-circuit capacity or a short-circuit current which have been calculated is excluded.
5. The power-system short-circuit capacity monitoring method according to claim 1, further comprising: a determination-threshold setting of setting a determination threshold that is a determination criterion for excluding a result of backward impedance estimating; and a fluctuation-width determining of determining whether or not a fluctuation width of the data set of the at least two synchronous measuring terminals caused by the phase correction in the phase correcting is smaller than the determination threshold, wherein in the fluctuation-width determining, when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is smaller than the determination threshold, the power-system short-circuit capacity monitoring method progresses to a next data-set creating without executing the backward impedance estimating and the short-circuit capacity calculating, and when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is larger than the determination threshold, the power-system short-circuit capacity monitoring method progresses to the backward impedance estimating.
6. The power-system short-circuit capacity monitoring method according to claim 1, further comprising a communication of on-line collecting the phasor quantity of a voltage and a current collected in the data collecting, wherein in the short-circuit capacity calculating, the short-circuit capacity or a short-circuit current is calculated sequentially.
7. A system that monitors a short-circuit capacity of a power system, the system comprising: a data measurer measuring synchronously with time, by using a synchronizing signal transmitted from a synchronizing signal satellite, a phasor quantity of a voltage and a current at each of at least two synchronous measuring terminals on a power line of the power system, and a phasor quantity of a voltage at a synchronous measuring terminal for a phase correction connected to the synchronous measuring terminals via the power line of the power system; a data collector in a short-circuit capacity monitoring device collecting measured data measured by the data measurer by the synchronous measuring terminals and by the synchronous measuring terminal for the phase correction; a data-set creator in the short-circuit capacity monitoring device creating, for each predetermined cycle, a data set of the at least two synchronous measuring terminals and the data set of the synchronous measuring terminal for the phase correction, both containing a plural pieces of data based on the measured data collected by the data collector; a phase corrector in the short-circuit capacity monitoring device correcting a phase of the data set of the at least two synchronous measuring terminals by subtracting a voltage phase of the synchronous measuring terminal for the phase correction from the phase of the data set of the at least two synchronous measuring terminals, defining a voltage phase at a certain time and at certain synchronous measuring terminals as a reference phase, and subtracting the reference phase from the phase of the data set of the at least two synchronous measuring terminals; a backward impedance estimator in the short-circuit capacity monitoring device estimating a backward impedance on a power-source side as viewed from a short-circuit point using the data set of the at least two synchronous measuring terminals having undergone the phase correction by the phase corrector; and a short-circuit capacity calculator calculating a short-circuit capacity based on the backward impedance estimated by the backward impedance estimator.
8. The power-system short-circuit capacity monitoring method according to claim 2, wherein in the data-set creating, an outlier in the data set of the at least two synchronous measuring terminals and the data set of the synchronous measuring terminal for the phase correction is excluded.
9. The power-system short-circuit capacity monitoring method according to claim 2, wherein in the short-circuit capacity calculating, an outlier in the short-circuit capacity or a short-circuit current which have been calculated is excluded.
10. The power-system short-circuit capacity monitoring method according to claim 3, wherein in the short-circuit capacity calculating, an outlier in the short-circuit capacity or a short-circuit current which have been calculated is excluded.
11. The power-system short-circuit capacity monitoring method according to claim 2, further comprising: a determination-threshold setting of setting a determination threshold that is a determination criterion for excluding a result of backward impedance estimating; and a fluctuation-width determining of determining whether or not a fluctuation width of the data set of the at least two synchronous measuring terminals caused by the phase correction in the phase correcting is smaller than the determination threshold, wherein in the fluctuation-width determining, when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is smaller than the determination threshold, the power-system short-circuit capacity monitoring method progresses to a next data-set creating without executing the backward impedance estimating and the short-circuit capacity calculating, and when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is larger than the determination threshold, the power-system short-circuit capacity monitoring method progresses to the backward impedance estimating.
12. The power-system short-circuit capacity monitoring method according to claim 3, further comprising: a determination-threshold setting of setting a determination threshold that is a determination criterion for excluding a result of backward impedance estimating; and a fluctuation-width determining of determining whether or not a fluctuation width of the data set of the at least two synchronous measuring terminals caused by the phase correction in the phase correcting is smaller than the determination threshold, wherein in the fluctuation-width determining, when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is smaller than the determination threshold, the power-system short-circuit capacity monitoring method progresses to a next data-set creating without executing the backward impedance estimating and the short-circuit capacity calculating, and when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is larger than the determination threshold, the power-system short-circuit capacity monitoring method progresses to the backward impedance estimating.
13. The power-system short-circuit capacity monitoring method according to claim 4, further comprising: a determination-threshold setting of setting a determination threshold that is a determination criterion for excluding a result of backward impedance estimating; and a fluctuation-width determining of determining whether or not a fluctuation width of the data set of the at least two synchronous measuring terminals caused by the phase correction in the phase correcting is smaller than the determination threshold, wherein in the fluctuation-width determining, when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is smaller than the determination threshold, the power-system short-circuit capacity monitoring method progresses to a next data-set creating without executing the backward impedance estimating and the short-circuit capacity calculating, and when it is determined that the fluctuation width of the data set of the at least two synchronous measuring terminals is larger than the determination threshold, the power-system short-circuit capacity monitoring method progresses to the backward impedance estimating.
14. The power-system short-circuit capacity monitoring method according to claim 2, further comprising a communication of on-line collecting the phasor quantity of a voltage and a current collected in the data collecting, wherein in the short-circuit capacity calculating, the short-circuit capacity or a short-circuit current is calculated sequentially.
15. The power-system short-circuit capacity monitoring method according to claim 3, further comprising a communication of on-line collecting the phasor quantity of a voltage and a current collected in the data collecting, wherein in the short-circuit capacity calculating, the short-circuit capacity or a short-circuit current is calculated sequentially.
16. The power-system short-circuit capacity monitoring method according to claim 4, further comprising a communication of on-line collecting the phasor quantity of a voltage and a current collected in the data collecting, wherein in the short-circuit capacity calculating, the short-circuit capacity or a short-circuit current is calculated sequentially.
17. The power-system short-circuit capacity monitoring method according to claim 5, further comprising a communication of on-line collecting the phasor quantity of a voltage and a current collected in the data collecting, wherein in the short-circuit capacity calculating, the short-circuit capacity or a short-circuit current is calculated sequentially.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
DETAILED DESCRIPTION
(29) Example embodiments of the present disclosure will be explained below in detail with reference to the accompanying drawings. The same structure in respective embodiments will be denoted by the same reference numeral, and the duplicated explanation thereof will be omitted.
(30) (1) First Embodiment
(31) [Configuration]
(32) A first embodiment of the present disclosure will be explained with reference to
(33) In
(34) The synchronous measuring terminal 5 is built with a PMU (Phasor Measurement Unit). The PMU receives the GPS signal from the synchronizing signal satellite 6 at a predetermined measurement cycle, realizes highly precise synchronous measurement of the phasor quantity using the received GPS signal as a synchronizing signal, and outputs measured data (as to a phasor communication standard, see IEEE Standard C37. 118-2005). In addition, each synchronous measuring terminal 5 is provided with communication means that transmits the phasor quantities of the voltage and the current as the measured data.
(35) In the short-circuit capacity monitoring system of the first embodiment, the synchronous measuring terminal 5 and the synchronizing signal satellite 6 constitute a data measurer, and a short-circuit capacity monitoring device 7 constitutes the major part of this system. The short-circuit monitoring device 7 is connected with each synchronous measuring terminal 5 via communication means, and is built with block having the following functions. That is, the short-circuit monitoring device 7 is provided with a data collecting memory 8 that collects and stores measured data from each synchronous measuring terminal 5, an arithmetic processor 9 that performs calculation to obtain the short-circuit capacity based on measured data, and a display/input-output device 10 which sets parameters and displays a process result. The arithmetic processor 9 of the short-circuit monitoring device 7 is provided with, as functional blocks for an arithmetic processing, a data-set creating block 91, a phase correcting block 92, a backward impedance estimating block 93, and a short-circuit capacity calculating block 94.
(36) [Whole Process Flow]
(37) Next, a detailed explanation will be given of a power-system short-circuit monitoring method of the first embodiment with reference to the process flow in
(38) In addition, in the arithmetic processor 9 of the short-circuit monitoring device 7, a data-set creating step S103 by the data-set creating block 91, a phasor quantity phase correcting step S104 by the phase correcting block 92, a backward impedance estimating step S014 by the backward impedance estimating block 93, and a short-circuit capacity calculating step S105 by the short-circuit capacity calculating block 94 are sequentially performed.
(39) That is, in the data-set creating block 91, based on the collected and stores phasor quantities D101 of the voltage and the current, a data set D102 having n pieces of data is created (data-set creating step S103) for each measurement cycle t. Using this data set D102, the phase correcting block 92 corrects the phase of the phasor quantity, and creates a correct data set D102 (phase correcting step S104). Next, using the data set D102 having the phase corrected, the backward impedance estimating block 93 estimates a backward impedance D103 (backward impedance estimating step S105). Eventually, based on the estimated backward impedance D103, the short-circuit capacity calculating block 94 calculates the short-circuit capacity D104 (short-circuit capacity calculating step S106).
(40) [Data-set Creating Step]
(41) The steps S103 to S106 by the arithmetic processor 9 will be explained in more detail. First, an explanation will be given the data-set creating step S103 by the data-set creating block 91 with reference to
(42) The voltage/current phasor quantities D101 in
(43) That is, at the measurement-point-1 side, n number of phasor quantities V.sub.11, I.sub.11, . . . V.sub.1n, I.sub.1n of the voltage and the current are collected, and a data set D102A is created based on those pieces of measured data. In addition, at the measurement-point-2 side, n number of phasor quantities V.sub.21, I.sub.21, . . . , V.sub.2n, I.sub.2n of the voltage and the current are collected, and a data set D102B is created based on those pieces of measured data. Still further, at the phase-correction-measurement-point side, n number of voltage phasor quantities V.sub.REF1, . . . , V.sub.REFn are collected, and a data set D102C is created based on those pieces of measured data. An estimation sample cycle T1 of the data set D102 for an estimation is set to be equal to the measurement cycle Lt. In
(44) [Phase Correcting Step]
(45) Next, an explanation will be given of the phase correcting step S104 by the phase correcting block 92 with reference to
(46) A sinusoidal AC voltage v can be expressed as the formula (1) when the magnitude is V [V], the phase is [rad], an angular speed is [rad/s]=2f, and a time is t [s]. Note that f is a system frequency [Hz].
(47) [Formula 1]
v=V cos(t+)(1)
(48) When the formula (1) is expressed by a phasor quantity, it becomes data containing the magnitude V and the phase as expressed by the following formula (2).
(49) [Formula 2]
{dot over (V)}=V(2)
(50) When the formula (1) is expressed by a phasor quantity, based on a presumption that the angular speed is constant, the angular speed in the formula (1) can be eliminated. The phasor quantities synchronously measured at the point A and the point B indicate a magnitude and a phase relationship in a given time cross-section. At this time, at the two measurement points, when a phasor quantity is synchronously measured at a given time cross-section, the phase between the points can maintain the consistency (see a portion surrounded by double dotted lines in
(51) However, in view of the respective measurement points being as multiple time points, in a stationary condition, the system frequency slightly changes. Hence, the angular speed in the formula (1) changes with time, and the phase of the phasor quantity in the formula (2) is affected by a change in the system frequency. Therefore, it is difficult to maintain the consistency in phase throughout multiple time points at the same measurement point, i.e., different time cross-sections.
(52) A change in the voltage phase with time in each measurement point contains, as is indicated in the following formulae (3) and (4) and
(53) [Formula 3]
POINT A:A(t0+t)=A(t0)+A+sys(3)
(54) [Formula 4]
POINT B: B(t0+t)=B(t0)+B+sys(4)
(55) In the backward impedance estimating step S105 to be discussed later, the tiny fluctuation of a load is utilized, and thus the phase change components A, B by a load fluctuation are necessary. Hence, in the phase correcting step S104 of the first embodiment, a process of eliminating a change in the system frequency is performed. In addition, in the phase correcting step S104, a process of maintaining the consistency in the phase at multiple time points are also performed (see a portion surrounded by dotted lines in
(56) First, an explanation will be given of the process of eliminating a change in the system frequency with reference to
(57) Next, with reference to
(58) Formulae (5) to (8) indicate example calculations of maintaining the phase consistency at multiple time points and of eliminating the system frequency change at times t1 and t2. Those examples are cases in which the point A is taken as the reference point. That is, by subtracting the voltage phase of the phase correction measurement point from the phases of the point A and the point B, the system frequency change is eliminated, and the load fluctuation component is left. In addition, by subtracting the selected reference phase from the phases of the point A and the point B, the system frequency change is eliminated, and the load fluctuation component having a time t0 as an origin is left. The calculation is likewise performed for the subsequent time points, and the phase correcting block 92 creates the data set D102 having the phase corrected.
(59) <Time t1>
(60) Phase of Point a:
(61)
Phase of Point B:
(62)
(63) <Time t2>
(64) Phase of Point A:
(65)
Phase of Point B:
(66)
(67) [Backward Impedance Estimating Step]
(68) In the backward impedance estimating step S105, using multiple pieces of data set D102 created by the phase correcting block 92 as explained above, the backward impedance estimating block 93 estimates a backward impedance.
(69)
(70) As to the backward voltage V.sub.G, the backward impedance Z.sub.sys0, and the voltage/current phasor quantities V.sub.k, I.sub.k (where k=1, 2, . . . n) that are measured data at a point, a relationship expressed by the following formula (9) is satisfied.
(71) [Formula 9]
{dot over (V)}.sub.G={dot over (V)}.sub.k+.sub.sys0.sub.k(k=1,2, . . . n)(9)
(72) When the following formula (10) is substituted in the formula (9), the relationship in the formula (9) can be indicated by the following formula (11).
(73)
(74) When it is presumed that in each measurement point, the time period for measuring n number of voltage/current phasor quantities V.sub.k, I.sub.k is only the tiny fluctuation of the system and the backward impedance Z.sub.sys0 is constant, as to the multiple pieces of measured data that are V.sub.rk, V.sub.ik, I.sub.rk, and I.sub.ik, the aforementioned formula (11) is satisfied.
(75) Hence, when, for example, the least squares method is applied, the backward voltage V.sub.G (=V.sub.Gr+jV.sub.Gi) and the backward impedance Z.sub.sys0 (=R.sub.sys0+jX.sub.sys0) can be obtained. How to obtain the backward voltage V.sub.G and the backward impedance Z.sub.sys0 is not limited to the least squares method, and any methods for obtaining a solution that minimizes the error of the formula (11) can be freely selected.
(76) [Short-Circuit Capacity Calculating Step]
(77) In the short-circuit capacity calculating step S106, the short-circuit capacity calculating block 94 calculates a short-circuit impedance Z.sub.sc using the estimated backward impedance Z.sub.sys0 and a load impedance Z.sub.L2, and then a short-circuit current I.sub.sc and a short-circuit capacity P.sub.sc are obtained.
(78) The load impedance Z.sub.L2 is obtained through the following formula (12) using the measured values of the voltage V and the current I.
(79)
(80) Based on the Thevenin's theorem, the internal impedance as viewed from the short-circuit point becomes the short-circuit impedance Z.sub.sc (see
(81)
(82) Based on the short-circuit impedance Z.sub.sc obtained as explained above, a value obtained by subtracting the voltage V at the measurement point before a short-circuit failure occurs is the short-circuit current I.sub.sc (see
(83)
(84) In addition, as is indicated by the following formula (15), by multiplying the short-circuit current I.sub.sc by the voltage V at the measurement point before a short-circuit failure occurs, the short-circuit capacity P.sub.sc can be obtained.
(85) [Formula 15]
{dot over (P)}.sub.sc=.sub.sc*{dot over (V)}(15)
(86) As explained above, the short-circuit capacity calculating block 94 calculates the short-circuit capacity P.sub.sc and the short-circuit current I.sub.sc based on the backward impedance Z.sub.sys0 estimated by the backward impedance estimating block 93 and the formulae (12) to (15). The obtained short-circuit capacity P.sub.sc or short-circuit current I.sub.sc is obtained as the distribution of the n pieces of data in the data set D102. Hence, for the actual short-circuit capacity P.sub.sc or short-circuit current I.sub.sc, the center value, the most frequent value, or the average value is taken as the representative value.
(87) [Backward Impedance Estimating Process When Measurement is Performed at Two Points with Power Line Therebetween]
(88) The system includes a power line and a load. Hence, it is necessary to have redundancy and to enhance the estimation precision of the backward impedance by measuring the phasor quantity at points with a power line therebetween in addition to the measurement at the multiple short-circuit points. In this case, an explanation will be given of a backward impedance estimating step when measurement is performed at two points with a power line therebetween.
(89)
(90)
(91) In this case, the load impedances Z.sub.L1, Z.sub.L2 can be calculated from the following formulae (17), (18) based on the respective measured values.
(92)
(93) As to the power line impedance Z.sub.line, a constant is applied or a calculation through the following formula (19) is performed using the measured value.
(94)
(95) In the case of the measurements at two points, as to the backward voltage V.sub.G, the backward impedance Z.sub.sys, the power line impedance Z.sub.line, and the measured data (multiple voltage and current phasor quantities measured with time) V.sub.1k, I.sub.1k, V.sub.2k, V.sub.2k at the two points, a relationship expressed by the following formula (20) is satisfied.
(96) [Formula 20]
{dot over (V)}.sub.G.sub.sys.sub.k.sub.line.sub.2k={dot over (V)}.sub.2k(k=1,2, . . . n)(20)
(97) When the following formula (21) is substituted in the formula (20), the relationship in the formula (20) can be expressed by the formula (22).
(98)
In this case, {dot over (V)}.sub.G=V.sub.Gr+jV.sub.Gi.sub.sys=R.sub.sys+jX.sub.sys
.sub.line=R.sub.line+jX.sub.line(22)
(99) The backward voltage V.sub.G (=V.sub.Gr+jV.sub.Gi) and the backward impedance Z.sub.sys (=R.sub.sys+X.sub.sys) can be resolved by applying, for example, the least squares method to the formula (22) like the case of the measurement at one point. How to obtain the backward voltage V.sub.G and the backward impedance Z.sub.sys is not limited to the least squares method, and any schemes of obtaining a solution that minimizes the error of the formula (22) can be freely selected like the case of the measurement at one point.
(100) [Short-Circuit Capacity Calculating Process when Measurement is Performed at Two Points with Power Line Therebetween]
(101) Based on the backward impedance Z.sub.sys estimated as explained above, and the aforementioned formulae (16) to (19), the short-circuit impedance Z.sub.sc can be calculated, and based on the calculation result and the aforementioned formulae (14), (15), the short-circuit current I.sub.sc and the short-circuit capacity P.sub.sc can be obtained. When such measurement at two points is performed, the load fluctuation at each measurement point can be grasped through measured data, and thus the estimation error of the backward impedance Z.sub.sys can be reduced.
(102) [Advantageous Effects]
(103) As explained above, according to the first embodiment, the backward impedance is estimated based on multiple pieces of synchronous measured data, and the short-circuit capacity is calculated based on the estimated backward impedance. Hence, even if the short-circuit capacity changes, a short-circuit capacity in accordance with an actual condition for a necessary cross-section can be precisely obtained.
(104) In addition, a phase correction of eliminating the system frequency change while maintaining the consistency of the phase at multiple time points is performed. Hence, even if the measurement time is different and the system frequency changes, the measured phasor quantity is not affected by a change in the system frequency. Therefore, it becomes possible to highly precisely estimate the backward impedance, and the short-circuit capacity in accordance with an actual condition can be precisely obtained.
(105) Thus, the precise short-circuit capacity can be monitored periodically. When the system divisional operation is performed for suppressing a short-circuit capacity, such an operation can be retained as minimum as necessary. Hence, the flexibility of the system operation can be ensured, and the advantages of the system interconnection can be effectively utilized. Moreover, the set value of a protection relay can be selected in accordance with the actual condition, and thus it contributes an improvement of electrical power quality.
(106) (2) Second Embodiment
(107) [Configuration]
(108) Next, a second embodiment of the present disclosure will be explained with reference to
(109) According to a power-system short-circuit capacity monitoring system of the second embodiment, as the measured data synchronously measured with time by the synchronous measuring terminal 5, three-phase voltage and current phasor quantities D101 at each measurement point are utilized, and the arithmetic processor 9 of the short-circuit capacity monitoring device 7 performs a positive phase component calculating step S107 for calculating a positive phase component between the data collecting and storing step S102 and the data-set creating step S103.
(110) In the positive phase component calculating step S107, the three-phase voltage and current phasor quantities data D101 measured by the synchronous measuring terminal 5 is input, and is subjected to a symmetrical coordinate conversion to calculate a positive phase component D105 of the voltage and the current phasor quantities, and the obtained positive phase component D105 is transmitted to the data-set creating block 91.
(111) The positive phase component calculating step S107 may be performed at the synchronous-measuring-terminal-5 side instead of the arithmetic processor 9 of the short-circuit capacity monitoring device 7. In this case, the synchronous measuring terminal 5 synchronously measures with time the positive phase component D105 of the voltage/current phasor quantity, and transmits the measured positive phase component D105 to the short-circuit capacity monitoring device 7.
(112) [Advantageous Effects]
(113) According to the second embodiment, in addition to the above-explained advantageous effects of the first embodiment, the adverse effect of unbalancing in the system can be expelled by utilizing the three-phase voltage and current phasor quantities D101 as the measured data. Hence, the short-circuit capacity can be further precisely obtained.
(114) (3) Third Embodiment
(115) [Configuration]
(116) Next, a third embodiment of the present disclosure will be explained with reference to
(117) The estimation data set contains the voltage phasor quantities and the current phasor quantities measured multiple times, thus having a certain distribution. In the third embodiment, in the data-set creating step S103 by the data-set creating block 91, a sample cycle T1 and the number n of the data in the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) are set as changeable, and with reference to a distribution of the magnitude of the current I.sub.2 at any one of the measurement points, a measuring cycle of the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) is selected. For example, 10 measured values of the distribution having a standard deviation becoming equal to or greater than a certain level within 30 minutes are selected as the estimation data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n). Since the magnitude of the standard deviation depends on the magnitude of the load at the measurement point, for example, a distribution that is equal to or greater than 5% of the load average value is selected.
(118) In this case, an explanation will be given of how to set the estimation data set for a case in which the tiny fluctuation of the power system 1 is large and a case in which the tiny fluctuation of the power system 1 is small with reference to the graphs of
(119) In
(120) When the tiny fluctuation of the power system 1 is large, it means that the distribution of the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) has a large variation (
(121) Hence, according to the third embodiment, in consideration of the measuring time period of the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) in accordance with the fluctuation condition of the system, the estimation data-set creating block 91 selects the sample cycle T1of the estimation data set and the number n of data so as to have a widespread distribution width of the voltage/current phasor quantity in the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n). In the above explanation, the measuring time period of the estimation data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) is selected with reference to the distribution of the current, but the measuring time period of the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) may be selected with reference to the distribution of the voltage and the distribution of the phase other than the distribution of the current.
(122) [Advantageous Effects]
(123) According to the above-explained third embodiment, the following unique advantages can be accomplished. That is, since the sample cycle T1 and the number n of data are set as changeable in the creation of the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k in the data-set creating step S103 by the data-set creating block 91, it becomes possible to estimate the backward impedance Z.sub.sys highly precisely. Hence, the calculation error can be reduced, and thus the short-circuit capacity can be obtained highly precisely.
(124) (4) Fourth Embodiment
(125) [Configuration]
(126) Next, an explanation will be given of a fourth embodiment of the present disclosure with reference to
(127) The fourth embodiment has an improvement in the data-set creating step S103 by the data-set creating block 91 like the third embodiment. That is, in the data-set creating step S103 of the fourth embodiment, an outlier is detected from the collected data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n), and a data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) is created by eliminating the outlier from the collected data set.
(128) The data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, . . . , n) contains the voltage phasor quantities and the current phasor quantities measured multiple times, thus having a certain distribution. The same is true of the distribution of the current or that of the phase.
(129) In those figures,
(130) [Advantageous Effects]
(131) According to the above-explained fourth embodiment, in the data-set creating step S103 by the data-set creating block 91, the outlier in the data set V.sub.1k, I.sub.1k, V.sub.2k, I.sub.2k (where k=1, 2, n) is eliminated in advance, and thus the adverse effect due to an accidental system fluctuation can be eliminated. Hence, the estimation precision of the backward impedance Z.sub.sys can be enhanced, and the calculation error can be reduced. Therefore, the short-circuit capacity can be always precisely obtained.
(132) (5) Fifth Embodiment
(133) [Configuration]
(134) Next, a fifth embodiment of the present disclosure will be explained with reference to
(135) The fifth embodiment eliminates the outlier during the arithmetic processing like the fourth embodiment, but eliminates an outlier in a short-circuit capacity P.sub.sc or the short-circuit current I.sub.sc in the short-circuit capacity calculating step S106, not eliminating the outlier in the data-set creating step S103.
(136) The conceptual diagrams of
(137) Ina short-circuit capacity calculation through the execution of the short-circuit capacity calculating step S106, a distribution of the short-circuit capacity P.sub.sc can be obtained. Hence, a representative value (e.g., a center value of the distribution, the most frequent value, or an average value) is calculated and plotted. Next, the representative value of the short-circuit capacity P.sub.sc for a certain time period has a distribution. At this time, as illustrated in
(138) [Advantageous Effects]
(139) According to the above-explained fifth embodiment, the outlier short-circuit capacity P.sub.sc is eliminated in the short-circuit capacity calculating step by the short-circuit capacity calculating block 94, and thus adverse effects due to an accidental system fluctuation and a sudden change can be surely eliminated.
(140) (6) Sixth Embodiment
(141) [Configuration]
(142) Next, a sixth embodiment of the present disclosure will be explained with reference to
(143) As illustrated in
(144) The fluctuation-width determining block 96 determines whether or not the fluctuation width of the data set D102 having undergone the phase correction is smaller than the determination threshold D105 based on the determination threshold D105 set by the determination-threshold setting block 95 (fluctuation-width determining step S109). The fluctuation width of the data set D102 having undergone the phase correction is a width of the data set D102 fluctuated through the phase correcting step S104 in which the data set D102 is created through the data-set creating step S103. The fluctuation-width determining step S109 is executed between the phase correcting step S104 and the backward impedance estimating step S105.
(145) In the fluctuation-width determining step S109, when it is determined that the fluctuation width of the data set D102 having undergone the phase correction is smaller than the determination threshold D105 (S109: YES), the process progresses to next data-set creating step S110 without executing the backward impedance estimating step S105 and the short-circuit capacity calculating step S106. Conversely, when it is determined that the fluctuation width of the data set D102 having undergone the phase correction is equal to or larger than the determination threshold D105 (S109: NO), the process progresses to the backward impedance estimating step S105.
(146) An explanation will be given of an example method of setting the determination threshold D105 with reference to
(147) The short-circuit current estimation value becomes a large outlier when the voltage standard deviation is small. Hence, when the voltage standard deviation is smaller than the determination threshold D105, the process does not progress to the backward impedance estimating step S105, but progresses to the next data-set creating step S110. In this case, as the determination threshold D105, a half of the average of the voltage standard deviation of a day is applied.
(148) In
(149) [Advantageous Effects]
(150) According to the above-explained sixth embodiment, as to the fluctuation width of the data set D102 having undergone the phase correction, if it is smaller than the determination threshold D105, no estimation of the backward impedance is performed. Hence, the variation of the estimation result itself can be reduced. Therefore, the estimation precision of the backward impedance Z.sub.sys can be further improved, and the calculation error can be further reduced.
(151) (7) Seventh Embodiment
(152) [Configuration]
(153) A seventh embodiment of the present disclosure will be explained with reference to
(154) As illustrated in
(155) For example, five short-circuit capacity calculating methods are prepared, and it is presumed that a first calculating method is the most general calculating method. The second calculating method has a characteristic flexible with the tiny fluctuation of the system, and the third calculating method is effective when there is a load between measurement points. In addition, the fourth calculating method is compatible with a time change in the short-circuit capacity P.sub.sc, and the fifth calculating method is effective when the short-circuit capacity P.sub.sc is small.
(156) According to those first to fifth calculating methods, the first calculating method is set as a default, and the determination criteria of selecting the second to fifth calculating methods are as follow. That is, for the second calculating method, a threshold of the tiny fluctuation, for the third calculating method, presence of a load, for a fourth calculating method, presence or absence of a time change in the short-circuit capacity P.sub.sc, and for the fifth calculating method, a threshold P.sub.scX of the short-circuit capacity P.sub.sc.
(157) That is, when the system tiny fluctuation is smaller than the threshold , or when there is no load between the measurement points, or when the short-circuit capacity P.sub.sc is constant, or when the short-circuit capacity P.sub.sc is larger than the threshold P.sub.scX, the first short-circuit capacity calculating method is applied to the short-circuit capacity calculating step S105 by the short-circuit capacity calculating block 94.
(158) In contrast, when the system tiny fluctuation is larger than the threshold 6, the second calculating method is applied. In addition, when there is a load between the measurement points, the third calculating method is applied, and when the short-circuit capacity P.sub.sc has a time change, the fourth calculating method is applied. Still further, when the short-circuit capacity P.sub.sc is smaller than the threshold P.sub.scX, the fifth calculating method is applied.
(159) When the criteria for applying the second to fifth calculating methods are simultaneously satisfied, the preference is given to each calculating method in the order of second, third, fourth, and fifth calculating methods, and only one calculating method is applied. When, for example, the system tiny fluctuation is larger than the threshold and there is a load between the measurement points, the criteria for applying the second and third calculating methods are satisfied. In this case, only the second calculating method is applied.
(160) Moreover, when the short-circuit capacity P.sub.sc has a time change, and the short-circuit capacity P.sub.sc is smaller than the threshold P.sub.scX, the criteria for applying the fourth and fifth calculating methods are satisfied. In this case, only the fourth calculating method is applied. Multiple calculating methods among the first to fifth calculating methods may be applied to obtain multiple short-circuit capacities P.sub.sc instead of applying only one calculating method, and one of the short-circuit capacities P.sub.sc can be eventually selected.
(161) [Advantageous Effects]
(162) According to the above-explained seventh embodiment, in addition to the advantageous effects of the aforementioned embodiments, a unique advantageous effect that enables a highly precise calculation of the short-circuit capacity can be accomplished by applying the optimized calculating method in accordance with the system condition.
(163) (8) Eighth Embodiment
(164) [Configuration]
(165) An eighth embodiment of the present disclosure will be explained with reference to
(166) [Advantageous Effects]
(167) According to the eighth embodiment employing the above-explained configuration, using the voltage and the current phasor quantities obtained by online measuring, the estimation of the short-circuit capacity can be performed sequentially. Hence, the short-circuit capacity can be always and continuously monitored, contributing an improvement of the reliability of the power system.
(168) (9) Other Embodiments
(169) The present disclosure is not limited to the aforementioned embodiments, and the number of installed synchronous measuring terminals and the configuration of the short-circuit capacity monitoring device can be changed as needed. For example, in the first embodiment, the estimation sample cycle T1 of the estimation data set D102 is set to be equal to the measurement cycle t, but it is fine if the estimation sample cycle T1 is not equal to the measurement cycle t, and as illustrated in
REFERENCE SIGNS LIST
(170) 1 Power system
(171) 2 Power generator
(172) 3 Power line
(173) 4 Load
(174) 5 Synchronous measuring terminal
(175) 6 Synchronizing signal satellite
(176) 7 Short-circuit capacity monitoring device
(177) 8 Data collecting memory
(178) 9 Arithmetic processor
(179) 91 Data-set creating block
(180) 92 Phase correcting block
(181) 93 Backward impedance estimating block
(182) 94 Short-circuit capacity calculating block
(183) 95 Determination-threshold setting block
(184) 96 Fluctuation-width determining block
(185) 10 Display/input-output device
(186) 11 Communication controller
(187) 12 Transmission channel