WIND TURBINE POWER PLANT INCLUDING AUXILIARY SYSTEMS

20240280082 ยท 2024-08-22

    Inventors

    Cpc classification

    International classification

    Abstract

    A wind turbine plant is provided including: at least one wind turbine, one or more turbine auxiliaries, a transmission apparatus for transmitting electrical power generated by the at least one wind turbine to a power system, the transmission apparatus including an auxiliary circuit for transmitting power one or more turbine auxiliaries, the auxiliary circuit being connected to the at least one wind turbine, the power system and one or more turbine auxiliaries, the turbine auxiliaries being electrically fed by at least one wind turbine or the power system through the auxiliary circuit. The auxiliary circuit includes at least an energy storage, the turbine auxiliaries being electrically connected to the energy storage, and a controller.

    Claims

    1-10. (canceled)

    11. A wind turbine plant including: at least one wind turbine, one or more turbine auxiliaries, a transmission apparatus for transmitting electrical power generated by the at least one wind turbine to a power system, the transmission apparatus comprising an auxiliary circuit for transmitting power to one or more turbine auxiliaries, the auxiliary circuit being connected to the at least one wind turbine, the power system and the one or more turbine auxiliaries, the turbine auxiliaries being electrically fed by the at least one wind turbine or the power system through the auxiliary circuit, wherein the auxiliary circuit includes at least an energy storage, the turbine auxiliaries being electrically connected to the energy storage, and a controller configured for: putting the wind turbine in operation, sending power to the power system and to the energy storage, if the wind turbine stops producing electric power for the power system, using the auxiliary circuit for supplying energy to the turbine auxiliaries, wherein power is sent to the energy storage if the wind turbine is producing the maximum allowable power or if the wind turbine is producing power above a predefined power threshold below the maximum allowable power or if conditions are identified that are typically associated with predefined values of electricity or if the value of electricity is below a predefined threshold, wherein the transmission apparatus comprises at least one auxiliary circuit breaker for disconnecting the auxiliary circuit from the at least one wind turbine and the power system.

    12. The wind turbine plant according to claim 11, wherein the auxiliary circuit comprising an auxiliary line for connecting the turbine auxiliaries to the at least one wind turbine or the power system by-passing the energy storage.

    13. The wind turbine plant according to claim 11, wherein the energy storage comprises a battery electric storage system, a super capacitor, a flywheel, a hydrogen electrolysis or fuel cell system.

    14. The wind turbine plant according to claim 11, wherein the transmission apparatus comprises one transformer, the transformer having a first side connected to the at least one wind turbine and a second side connected to the power system, the auxiliary circuit being connected to the first side of the transformer.

    15. The wind turbine plant according to claim 11, wherein the turbine auxiliaries include any of a cooling pump or a fan or a pitch drive or a yaw drive hydraulic pressure and distribution pump or a dehumidification system or an external lighting system or a control and monitoring system.

    16. The wind turbine plant according to claim 11, wherein the power system is a utility grid.

    17. The wind turbine plant according to claim 11, wherein the wind turbine plant includes a plurality of wind turbines, the controller being configured for: putting the plurality of wind turbines in operation, sending power to the power system and to the energy storages of the wind turbines, if a wind turbine stops producing electric power for the power system and if the power produced by the wind farm is below a predefined threshold, using the auxiliary circuit for supplying energy to the respective turbine auxiliaries.

    18. A method of operating the wind power plant according to the claim 11, wherein the method comprises: putting the at least one wind turbine in operation, sending power to the power system and to the energy storage, if the wind turbine stops producing electric power for the power system, using the auxiliary circuit for supplying energy to the turbine auxiliaries, wherein power is sent to the energy storage if the wind turbine is producing the maximum allowable power or if the wind turbine is producing power above a predefined power threshold below the maximum allowable power or if conditions are identified that are typically associated with predefined values of electricity or if the value of electricity is below a predefined threshold.

    19. The method of operating the wind turbine according to claim 18, wherein the method comprises: putting the wind turbines in operation; sending power to the power system and to the energy storages of the wind turbines; and if a wind turbine stops producing electric power for the power system and if the power produced by the wind farm is below a predefined threshold, using the auxiliary circuit for supplying energy to the respective turbine auxiliaries.

    Description

    BRIEF DESCRIPTION

    [0031] Some of the embodiments will be described in detail, with references to the following Figures, wherein like designations denote like members, wherein:

    [0032] FIG. 1 schematically illustrates a wind power plant including a transmission apparatus for transmitting electrical power between the wind power plant and a power system according to a first embodiment of the invention;

    [0033] FIG. 2 schematically illustrates a wind power plant including a transmission apparatus for transmitting electrical power between the wind power plant and a power system according to a second embodiment of the invention;

    [0034] FIG. 3 illustrates steps of a first embodiment of a method for transmitting electrical power between a wind power plant, a power system and one or more auxiliaries according to embodiments of the invention;

    [0035] FIG. 4 illustrates steps of a second embodiment of a method for transmitting electrical power between a wind power plant, a power system and one or more auxiliaries according to embodiments of the invention; and

    [0036] FIG. 5 illustrates further steps of the method according to the second embodiment of FIG. 4.

    DETAILED DESCRIPTION

    [0037] FIG. 1 illustrates a wind power plant 10 including a transmission apparatus 100 interposed between the wind power plant 10 and a power system 200, according to a first embodiment of the present invention. The transmission apparatus 100 is represented according to a single line scheme, but may be a 3-phase system, where the single line of FIG. 1 represents alone the three conductors of a typical 3-phase system. The wind power plant 10 may include one or more wind turbines (one wind turbine 10 is represents in the schematic drawing of the embodiment in FIG. 1). The wind power plant 10 includes one or more controllers 250 (one controller is shown in FIG. 1). If the wind power plant 10 includes a plurality of wind turbines a plurality of controllers 250 may be provided, one for each turbine. The controller 250 may include a centralized part at the power plant level and a plurality of distributed portions at the turbine level. The wind power plant 10 may be an off-shore wind power plant or an off-shore wind power plant. The power system 200 may consist of a utility grid or other electrical consumer. The transmission apparatus 100 is connected to the power plant 10 and to the power system 200 for transmitting the electrical power generated by the wind power plant 10 to the power system 200. Each wind turbines of the wind power plant 10 includes an electrical generator 15 (one electrical generator 15 is represents in the schematic drawing of the embodiment in FIG. 1). Each wind turbines of the power plant 10 further includes a wind turbine frequency converter 20. The wind turbine power converter 20 is connected to the electrical generator 15. Between the frequency converter 20 and the electrical generator 15 a generator circuit breaker 16 is provided.

    [0038] The transmission apparatus 100 comprises a transformer 110 which is connectable between the wind power plant 10 and the power system 200. According to other embodiments of the present invention (not shown) the transmission apparatus 100 may comprise more than one transformer 110. The transformer 110 is configured for changing in operation a first AC voltage level provided by the wind power plant 10 to a second AC voltage level to be provided to the power system 200. Embodiments of the present invention may be applied to any transmission apparatus 100 and any transformer 110, independently from the values of the first AC voltage level and the second AC voltage level. The transmission apparatus 100 includes a reactor 140 connectable in series between the output of the frequency converter 20 and the first side 111 of the transformer 110. The reactor 140 may be used for cooperating in controlling the reactive power transmitted along the transmission apparatus 100. The transmission apparatus 100 further includes a harmonics filter 150, having a terminal connected between the reactor 140 and the first side 111 of the transformer 110. The reactor 140 and the impedance 150 together may form a filter for the voltage output of the frequency converter 20. The transmission apparatus 100 further includes a current transformer 160 connected to the first side 111 of the transformer 110 and a main circuit breaker 170 interposed between the current transformer 160 and reactor 140. The transmission apparatus 100 includes a first voltage portion extending between the transformer 110 and the frequency converter 20 and a second voltage portion extending between the transformer 110 and the power system 200.

    [0039] The transmission apparatus 100 further includes at least one auxiliary circuit 180 having a terminal connected upstream the first side 111 of the transformer 110. The auxiliary circuit 180 transmits power to one or more turbine auxiliaries 300. The auxiliary circuit 180 is connected to the wind power plant 10, the power system 200 and one or more turbine auxiliaries 300. The auxiliary circuit 180 branches off from the first voltage portion of the transmission apparatus 100. The turbine auxiliaries 300 may comprise a cooling pump or a fan or a pitch drive associated to the blades of a wind turbine, or a yaw drive associated to a nacelle of a wind turbine or similar other electrical consumers within the wind power plant 10 like a dehumidification system or an external lighting system or a control and monitoring system. The turbine auxiliaries 300 are electrically fed by the wind power plant 10 or the power system 200 through the auxiliary circuit 180, as better described in the following. The auxiliary circuit 180 may be disconnected from the wind power plant 10 and the power system 200 through an auxiliary circuit breaker 190.

    [0040] In the embodiment of FIG. 1, the auxiliary circuit 180 comprises an AC/DC converter 185, an energy storage 186 and a DC/AC converter 187, arranged in series from the auxiliary circuit breaker 190 to the turbine auxiliaries 300 and therethrough to the wind power plant 10 and the power system 200. The energy storage 186 may comprise a battery electric storage system, a super capacitor, a flywheel, a hydrogen electrolysis or fuel cell system or another energy storage system. A by-pass line 188 is arranged in parallel to the AC/DC converter 185. energy storage 186 and DC/AC converter 187, for directly connecting the turbine auxiliaries 300 to the auxiliary circuit breaker 190 and therethrough to the wind power plant 10 and the power system 200. The by-pass line 188 includes a by-pass breaker 189.

    [0041] FIG. 2 illustrates a transmission apparatus 100 interposed between a wind power plant 10 and a power system 200, according to a second embodiment of the present invention. The second embodiment differentiates itself from the first embodiment for comprising another type of connection between the auxiliary circuit 181, the wind power plant 10, the power system 200 and one or more turbine auxiliaries 300. The transmission apparatus 100 includes an auxiliary line 191 for directly connecting the turbine auxiliaries 300 to the auxiliary circuit breaker 190 and therethrough to the wind power plant 10 and the power system 200. The auxiliary circuit 181 of this second embodiment includes the AC/DC converter 185 and the energy storage 186, wherein the AC/DC converter 185 is connected to the auxiliary line 191, between the auxiliary circuit breaker 190 and the turbine auxiliaries 300.

    [0042] FIG. 3 illustrates a method 500 of operating the wind power plant 10 above described including one wind turbine. In embodiments, the method may be implemented in the controller 250 of the wind turbine. In a first step 501 of the method, the wind turbine is put in operation. While the wind turbine is in operation, energy is sent to the power system 200. In a second step 502 of the method 500, a condition is checked for allowing power to be sent to the energy storage 186. If the condition in the second step 502 is satisfied, then a third step 503 of the method 500 is performed, during which energy is stored into the energy storage 186. In an embodiment, the condition in the second step 502 is met if the wind turbine is producing the maximum allowable power, as permitted by the grid connection. The wind turbine may extract power from the wind in excess of what is permitted for supply to the grid and deliver this excess to the energy storage system. In another embodiment, the condition in the second step 502 is met if the wind turbine is producing power above a predefined power threshold below the maximum allowable power. In a further embodiment, the condition in the second step 502 is met if conditions (time of day, wind speed, temperature, etc.) are present that are typically associated with relatively low value of electricity. The value of electricity may also be directly monitored and used as a condition. If the condition in the second step 502 is not satisfied, then a fourth step 504 of the method 500 is performed, during which it is checked if the wind turbine can operate. For example, when the wind speed becomes low, the wind turbine stops producing electricity power for the power system 200. This may be detected though measurement of the current flowing to the power system 200, or by setting a minimum threshold for the rotational speed of the wind turbine, or by other means. When the wind turbine experiences a fault, it may also stop producing electricity for the power system 200 and go into a standstill or idling mode. If in the fourth step 504 it is detected that the wind turbine has stopped producing electric power for the power system 200, a fifth step 505 of the method 500 is performed, during which the auxiliary circuit 180, 181 supply energy to the turbine auxiliaries 300. In an embodiment, the auxiliary circuit breaker 190 disconnects the auxiliary circuit 180, 181 from the power system 200 and the energy storage 186 supplies the necessary power to the turbine auxiliaries 300. In another embodiment. the auxiliary circuit 180, 181 remains connected to the power system 200 and the energy storage 186 provides power to the turbine auxiliaries 300 and to the grid connection so that the flow of power into the wind turbine is reduced or reversed. By supplying power from the energy storage to the grid connection, power consumption from neighbouring wind turbines may be offset, thereby reducing the overall consumption of power by a wind farm with non-producing wind turbines. The amount of available energy in the energy storage 186 is monitored, so that before the energy storage 186 reaches a predetermined depletion threshold, the supply of power from the energy storage 186 is discontinued. When this occurs, the auxiliary circuit 180, 181 returns to being supplied power from the power system 200. Once conditions are appropriate the wind turbine will return to operation (fault cleared or wind speed or rotor speed sufficient for positive power flow out of the wind turbine). The third step of the method 503 will be executed again when the condition in the second step 502 is again satisfied.

    [0043] FIGS. 4 and 5 illustrate a method 600, 700 of operating the wind power plant 10 above described including a plurality of wind turbines arranged in a wind farm. In embodiments. the method may be implemented in the controller 250 of the wind power plant 10. In this implementation, the objective of the wind farm operator may be to reduce the overall flow of power into the wind farm (rather than just individual wind turbines). In this embodiment a measure of the net power flow for the entire wind farm is made using either a single power flow measurement or multiple distributed measurements combined. In embodiments, the method of operating the wind power plant 10 comprises a first set 600 of steps, which are executed at each wind turbine of the power plant 10. In a first step 601 of the first set 600 of steps, the wind turbine is put in operation. While the wind turbine is in operation, energy is sent to the power system 200. In a second step 602, a condition is checked for allowing power to be sent to the energy storage 186. If the condition in the second step 602 is satisfied. then a third step 603 is performed, during which energy is stored into the energy storage 186. In an embodiment, the condition in the second step 602 is met if the wind turbine is producing the maximum allowable power, as permitted by the grid connection. The wind turbine may extract power from the wind in excess of what is permitted for supply to the grid and deliver this excess to the energy storage system. In another embodiment, the condition in the second step 602 is met if the wind turbine is producing power above a predefined power threshold below the maximum allowable power. In a further embodiment, the condition in the second step 602 is met if conditions (time of day. wind speed, temperature, etc.) are present that are typically associated with relatively low value of electricity. The value of electricity may also be directly monitored and used as a condition. If the condition in the second step 602 is not satisfied, then a fourth step 604 of the method 500 is performed, during which it is checked if the wind turbine can operate. For example, when the wind speed becomes low, the wind turbine stops producing electricity power for the power system 200. This may be detected though measurement of the current flowing to the power system 200, or by setting a minimum threshold for the rotational speed of the wind turbine, or by other means. When the wind turbine experiences a fault, it may also stop producing electricity for the power system 200 and go into a standstill or idling mode. If in the fourth step 604 it is detected that the wind turbine has stopped producing electric power for the power system 200, a fifth step 605 of the method 500 is performed, during which it is checked if the controller 250 of the power plant 10 has sent a command to reduce power consumption. This is performed through a second set 700 of steps of the method (shown in FIG. 5). The controller 250 of the power plant 10 put the wind farm into operation (first step 701) and perform a control to check if the power produced by the wind farm is below a predefined threshold (second step 702). If such condition is satisfied, the command to reduce power consumption is sent to the wind turbines (third step 703). After that, in the fifth step 605, each turbine detects the presence of such command, then a sixth step 606 of the method 600 is performed, during which the auxiliary circuit 180, 181 supply energy to the turbine auxiliaries 300 of the respective wind turbine. Each individual wind turbine is not using its energy storage 186 to supply its turbine auxiliaries 300 until the command from then centralized control system is sent. Once a sufficient number of wind turbines within the wind farm stop operating, such that power begins to flow into the wind farm, a communication system is used to communicate to wind turbines which are out of operation to begin using their energy storage systems to supply their auxiliary systems. The centralized control system may be designed so that it tries to use only the minimum amount of power from the energy storage systems to keep the flow of power into the wind farm at zero. This may be done by sending the command to utilize the energy storage system to only a portion of the wind turbines which are out of operation or (for auxiliary systems which remain grid connected while being powered by the energy storage system) by sending a reference power to the energy storage systems so that they only reduce auxiliary consumption by a sufficient amount.

    [0044] Although the present invention has been disclosed in the form of embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.

    [0045] For the sake of clarity, it is to be understood that the use of a or an throughout this application does not exclude a plurality, and comprising does not exclude other steps or elements.