PROCESS FOR PACKAGING STICKY SUBSTANCES IN THE FLUID PHASE WITH A THIN FILM

20180354663 ยท 2018-12-13

    Inventors

    Cpc classification

    International classification

    Abstract

    Process for packaging sticky substances in the molten state, in which the sticky substance is cast in a tray-mould lined be-forehand with a film of non-sticky plastic material and compatible in the fluid state with the sticky substance, including, among other, the phase of lining the internal walls of the tray-moulds with a first thin and easily formable film of the non-sticky plastic material, causing it to perfectly adhere to the walls of the mould by connecting the lower external part of the moulds connection to a vacuum source, in which the degree of vacuum during the opening transient of the connection is modulated.

    Claims

    1. Process for packaging substances in the molten state, which substances are sticky at room temperature or treatment temperature, of the type in which the sticky substance is cast into a tray-mould lined beforehand with a film of plastic material which is non-sticky at room temperature or treatment temperature and compatible in the fluid state with said sticky substance, comprising the following stages: a) providing a plurality of tray-moulds apt to receive the cast of a sticky substance at the molten state, said tray-moulds having a plurality of through-holes passing through at least part of their walls and being arranged in adjacent subsequent rows to form a continuous tray conveyor belt; b) rapidly lining the internal walls of the tray-moulds of one or more trays with a first thin and easily formable film of said non-sticky plastic material, causing it to perfectly adhere to the walls of the mould by connecting the lower external part of the moulds to a vacuum source; c) casting into the thus-lined tray-moulds, under pressure and with a non-turbulent flow, a predetermined amount of sticky substance at the molten state; d) allowing the cooling of the free surface of the sticky substance, during the step-like progress of the conveyor belt, until obtaining the stabilisation of said surface; e) covering said free surface of the sticky substance with a non-sticky material compatible in the fluid state with said substance; and f) welding said non-sticky material to said first film; characterised in that it furthermore comprises, in the above-said stage b), to modulate the degree of vacuum during the opening transient of the connection of the lower external part of the mould to a source of vacuum by the additional steps of: g) detecting (V1) the time necessary to reach a first set degree of vacuum, starting from the beginning of the above-said opening transient of the connection to the source of vacuum; h) detecting (V2) the value of the degree of vacuum in the lower part of the mould, after a set period of time from the closing of the connection to the source of vacuum; i) giving consent (A) to the start of the above-said stage c) only if the time measured in step g) falls within a set range of acceptability and the degree of vacuum measured in stage h) is below a set maximum value.

    2. Packaging process as in claim 1, wherein there are further provided the additional stages of: k) conditioning at a controlled temperature the air volume wherein the tray-mould lining stage and the casting into tray-moulds stage are performed; l) detecting the average temperature in the area immediately preceding the one in which the tray-mould are lined and the molten sticky substance is cast into the same; m) comparing (T1) such an average temperature with an acceptable temperature range set around said controlled temperature; n) deactivating (A) on all the tray-moulds the casting operation (C) as well as the cooling ventilation on the entire plant should such average temperature be below the minimum value of said range of acceptable temperatures; o) activating an additional cooling conditioning when such average temperature draws near to the maximum value of said range of acceptable temperatures.

    3. Packaging process as in claim 2, wherein there are further provided the additional stages of: p) controlling (T2) the inner temperature of the tray-moulds, and q) giving consent (A) to the start of the above-said stage c) only when said temperature falls within a set range of temperatures.

    4. Packaging process as in claim 1, wherein the acceptability range of the time for reaching the desired vacuum value in the above-said stage g) is from 1 to 3 sec.

    5. Packaging process as in claim 1, wherein the degree of vacuum in the lower part of the mould in the above-said stage h) ranges between ?0.15 and ?0.20 bar, such value being measured after a period of up to 1 second from the closing of the connection to the vacuum source.

    6. Packaging process as in claim 1, wherein said controlled temperature of stage k) is equal to 40? C.

    7. Packaging process as in claim 6, wherein said range of acceptable temperatures of stage m) is of ?5? C. and preferably ?2? C. around said controlled temperature.

    8. Packaging process as in claim 1, wherein said set range of temperatures in stage q) ranges between 5 and 50? C. and preferably between 15 and 40? C.

    9. Packaging process as in claim 1, wherein the casting operation (C) of a sticky substance of stage c), is obtained through a cylinder-piston assembly operated by a step motor.

    10. Packaging process as in claim 1, wherein said first film of non-sticky material is caused to progress in sync with said tray conveyor belt for the length thereof comprised between the tray-mould lining station with the first film of stage b), and the covering station of the free cast surface with the non-sticky material of stage f), the deviation tolerance of said synchronism for the entire above-said length being below +/?1 mm.

    11. Packaging process as in claim 10, wherein the drive of said conveyor belt and the drive of the first film of non-sticky material are both controlled by step motors.

    12. Packaging process as in claim 9, wherein said step motors are controlled by a motor control (I) so as to cause regular acceleration and braking ramps.

    13. Packaging process as in claim 12, wherein said step motors are controlled by a motor control (I) so as to furthermore cause synchronous acceleration and braking ramps between the drive of said conveyor belt and the drive of the first film of non-sticky material.

    Description

    BRIEF DESCRIPTION OF THE DRAWING

    [0023] Further features and advantages of the packaging process according to the present invention will be more evident from the following detailed description of a preferred embodiment of such a process, provided purely by way of non limiting example, with reference to the accompanying drawing in which one preferred flow diagram of this process is shown.

    DETAILED DESCRIPTION OF THE KNOWN PRIOR ART

    [0024] The present invention has been completed on the basis of extensive studies conducted by the Applicant on the dry packaging process described in the introductory part of the present description, in particular on the conditions that cause the most detrimental error condition of said process, namely the uncontrolled melting of the non-sticky plastic film having a low Vicat softening temperaturewhich film is preferably used as a lining material for the melted sticky substanceresulting in a direct contact between the walls of the tray-mould and the melted sticky substance.

    [0025] As it is clearly disclosed in the above cited prior patent EP-718 199, the whole content of which is incorporated herein by reference, the packaging process of the present inventionwhich is preferably carried out on a continuous tray conveyor belt, each element of which consists of 3 or 4 flanked tray-moulds, which moves in successive steps between the different work stationsis divided substantially into four stages arranged on the length of the conveyor belt.

    [0026] In a first stage (I), the tray-moulds, consisting of rigid metal elements which are finely perforated in their bottom surface and at least partly in their side surfaces, are lined with a non-sticky plastic film. Such a lining (R) is preferably carried out by forming the film under vacuum, after the latter has been suitably heated and thus seal blocked on the tray-mould, by connecting a vacuum source to a chamber formed at the external lower part of the tray-mould, said chamber being then in communication with the fine holes formed in the tray-mould. In the tray-moulds so prepared, the melted sticky substance is then cast (C) in a carefully set quantity and with a non-turbulent flow through wide mouth shutters having an anti-drip device, feed by a load cylinder-piston assembly.

    [0027] In a second stage (II), the mould thus filled, and in particular the free surface of the sticky substance cast therein, is cooled with a suitable ventilation with air as it moves along the conveyor belt, to obtain a sufficient degree of stabilization of the free surface.

    [0028] In a third stage (III) said free surface is covered with a second film of non-sticky material, and the two films are then heat-welded one another at the edges of the mould.

    [0029] In the fourth and last stage (IV), the two films of non-sticky material are cut immediately outside the welding zone, the material of said films surrounding the tray-moulds is removed, and finally the packaged cakes are released from the tray-moulds and sent to the packaging through a series of successive conveyor belts in which the further cooling of the cakes is performed up to an acceptable temperature for said packaging operations.

    DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT OF THE INVENTION

    [0030] Following these studies, the Applicant has been able to verify that the critical stage of the process, within which the most detrimental error conditions for the safety of the process can occur, is the first stage (I) described above, wherein the contact between the sticky substance melted to its higher temperature and the first film of non-sticky material takes pace. In fact, in this stage there is a plurality of parameters to keep under control at the same time so that the lining operation (R) of the mould takes place with a perfect adhesion between film and tray-mould but without forming holes located at the holes of the tray-mould in connection with the vacuum source. In fact, if this delicate operation is not optimally performed, the subsequent casting (C) of molten sticky substance on the tray-mould thus lined can easily cause localized melting and tearing of the film in areas where such contact shows any discontinuity and then where the film is not constantly cooled and mechanically supported by the underlying tray-mould.

    [0031] It must be emphasized, in fact, that using lining films having a very low softening temperature, this temperature is in most cases lower than the temperature of the molten sticky substance. When the molten sticky substance is put in contact with the film, as a result there is always a partial melting of the latter. However, since the casting (C) of the melted sticky substance is performed with a non-turbulent flow, when the film has been successfully thermoformed to be intimately adhered to the tray-mould, no mixing between the two molten materials takes place, and then, once solidified, on the outside of the cake a layer of non-sticky material always remains.

    [0032] According to the present invention, in order to achieve the above mentioned purpose and thus to allow the use of lining non-sticky films characterized by a low Vicat softening temperature, the dry process of the prior art has been further implemented. This implementation involves, on the one hand, the insertion of a stage for the modulation of the vacuum formation rate in the chamber below the tray-moulds, in order to make more gradual the thermoforming operation of the first non-sticky film, and, on the other hand, a plurality of repetitive controls of the physical parameters characterizing the lining operation of the tray-moulds with the film of non-sticky plastic material, both while this operation is carried out and after its completion, to verify that such parameters fall within set acceptability ranges and that therefore the lining operation has been carried out correctly.

    [0033] In sporadic cases of non-compliance of the verified parameters in comparison with acceptable set ranges, the resulting action is the deactivation of the casting stage (C) of sticky substance in the tray-moulds on which a significant non-compliance of the checked parameters has been revealed. Preferably, the control action is performed independently on each mould, instead than globally on all the moulds of a single tray of the conveyor belt undergone to the lining operation at the same time, so that this preventive control action will lead to the possible deactivation of the casting stage on a limited number of tray-moulds. The productivity is therefore affected only minimally by this preventive control action, but, on the other hand, film tearing conditions are completely prevented, along with the consequent contact of the sticky substance with the tray-mould, which conditions should require instead the immediate shutdown of the entire plant in order to perform complicated cleaning operations causing a substantial production loss.

    [0034] Instead, in the ordinary case in which the result of all the controls is consistent with the acceptable values, the required operations of filling (C) of the tray-moulds are carried out, along with the conveying operations of the filled tray-moulds, up to the third stage (III) of the process, namely the lining of the upper surface of the mould with the second non-sticky film. However, both of these operations, according to a further feature of the invention, are carried out by modifying the graduality by which the filling and movement transients of the tray-moulds are performed, so as to ensure that the relative stresses between the film and the mould are always sufficiently low as not to create micro-detachments between these two elements, namely to maintain a continuous and intimate contact between each other. In fact, any alteration of this continued and intimate contact condition between the film and the mould, until the melted adhesive substance is not at least partially cooled, result in an immediate melting of the film and consequently the direct contact between the mould and the molten adhesive substance, causing the above described drawbacks.

    [0035] Based on this coordinated action of: [0036] modulation of the vacuum formation rate in the chamber below the tray-moulds; [0037] identification of parameters representative of the correct execution of the tray-mould lining operation with the film of non-sticky material; [0038] experimental verification of acceptable ranges of values of these parameters; [0039] control of these parameters on each individual tray-mould; [0040] consequent corrective action, in case of non-compliance of parameters, consisting in the deactivation of the casting of molten sticky material on the single-mould tray on which the non-compliance of the parameters in comparison with the range of acceptable values has been revealed; and [0041] maintainment of a continuous and intimate contact between the first lining film of the tray-moulds and the internal surface of said tray-moulds, during the filling of the tray-moulds with the melted adhesive substance and the movement of said tray-moulds up to the conclusion of the third stage of covering the tray-moulds with the second non-sticky film;
    the present invention has been therefore accomplished. These individual innovative aspects of the dry packaging process according to the present invention will be separately described in greater detail below.

    Modulation of the Vacuum

    [0042] In the prior art process, the connection between the vacuum source and the vacuum chamber formed below the lower area of the moulds, is carried out by the direct activation of a traditional ON/OFF electric valve. This causes the curve of the vacuum formation in said chamber to be very abrupt and uncontrolled. On the contrary, according to the present invention, a satisfactory modulation in the formation of the degree of vacuum in the chamber below the lower external portion of the tray-moulds is obtained by using, in order to adjust the opening of the connection of said chamber with the vacuum source, a regulating valve driven by an electric valve with an opening ramp which can be programmed by a centralized control (V). The control (V) for opening said electric valve, which preferably is part of a central unit (U) for controlling the entire process, can be suitably calibrated by electronic mode, thus allowing to modulate at will the ramp of the degree of vacuum formation during the opening transient of said connection to obtain the desired action graduality. This allows to modify and make more gradual the thermoforming operation of the non-sticky film material on the mould, without any increase in the overall duration of this operation, avoiding the drawbacks that frequently occur in the prior art process, namely the formation of film areas having lower mechanical resistance, due to the mechanical stress and consequent embrittlement caused by a too abrupt stretching action on said film.

    Identification of Representative Parameters and Related Controls

    [0043] The process parameters which have been identified by the Applicant as the most representative of a correct execution of the lining operation of the tray-moulds, and which therefore, according to a main feature of the present invention, are subjected to the aforementioned action of continuous control on each individual mould, are the following: [0044] temperature of the first film of non-sticky material at the entrance in the thermoforming zone; [0045] temperature of the tray-moulds in the thermoforming zone; [0046] the time required for the vacuum formation, i.e. the time required to obtain the desired degree of vacuum in the vacuum chamber below the external lower zone of the tray-moulds, after the opening of the connection of such chamber with the vacuum source; [0047] maintainment of the vacuum over the time, i.e. the value of the degree of vacuum in the vacuum chamber below the external lower zone of the tray-moulds, after a set period of time from the closing of the connection with the vacuum source.

    [0048] The relevant control modes and the preferred acceptable ranges of values, for each of said parameters, which have been identified during the experimental trials of preferred embodiments of the process of the present invention will be described in the following. It is clear, however, that these ranges of acceptable values should be understood as exemplary and not limitative values of the present invention, being well clear to a person skilled in the art that these values may vary, even significantly, for example depending on the size of the tray-moulds, the type of material treated, the type of lining film, the weather conditions of the plant locations, etc.

    Checking the Film Temperature Before the ThermoformingT1

    [0049] A first control is carried out on the average temperature in the area immediately before the lining area of the moulds and the cast area of the molten sticky substance; with a good approximation, such a temperature corresponds to the temperature at which the first film of non-sticky plastic material entering the lining area is conditioned.

    [0050] In order to minimize the local temperature fluctuations in this areaas it was found that said temperature fluctuations may easily cause localized anomalies in the thermoforming conditions of the first filmaccording to the present invention it is provided that the air volume of this zone of the plant is conditioned to a controlled temperature, or to a narrow range thereof, by means of a suitable containment of such an air volume by using bulkheads and a controlled heating, with the aim of maintaining the air temperature to a constant and homogeneous value throughout the abovementioned volume, and therefore to ensure that the film arrives to the preheating station always at the same temperature and then exits from the subsequent heating station always at a same (although of course higher) temperature. Preferably, this constant temperature value is maintained unchanged during the whole year, irrespective of seasonal variations of the external temperature, because this allows to maintain a constant setting of all the variable parameters of the machine, in particular the preheating and heating temperature of the film and the modulation of the vacuum, regardless of the varying conditions of external moisture and temperature. This temperature will be selected in order to have the minimum total energy consumption on an annual basis, according to the seasonal average conditions in the area of the plant. An exemplary value of this temperature is 40? C., where the maximum permissible oscillation thereof is ?5? C. and, preferably, ?2? C.

    [0051] Where the average temperature detected is lower than the minimum value defined as acceptable, a first control (T1) sends a signal to the casting activation block (A) that disables the casting of melted sticky substance (C) on all moulds; simultaneously, the activation block (A) turns off the cooling ventilation on the entire plant. This situation is typical of the start of production or after extended periods of work suspension.

    [0052] When, on the contrary, the average temperature detected by the control (T1) is close to the maximum value of the acceptability range, the activation block (A) activates an additional cooling ventilation of the plant.

    Controlling the Temperature of Tray-MouldsT2

    [0053] The detection of the internal temperature of the tray-moulds is performed by means of pyrometers at the station for the thermoforming and filling of the moulds. The temperature thus detected should preferably be above a minimum temperature value, below which the film is not properly thermoformed due to the immediate shrinkage of the film, having a a thickness also lower than 10 ?m), due to the thermal shock caused by the abrupt contact with the cold surface, when it is put in contact with the tray-mould walls. This minimum value of temperature varies depending on the type of material and the thickness of the film of non-sticky material; indicatively, this minimum temperature of the moulds is in the range of 5-15? C.

    [0054] However, the temperature measured on the tray-moulds must not even be higher than a maximum value, beyond which the film of non-sticky material may suffer from excessive thinning, lacerations or instability during the thermoforming operation, considered that, because of the high temperature of the tray-mould, eventually the film will be maintained above its softening temperature for an excessively long period of time. Again, this maximum value varies according to the type of material and the thickness of the film of non-sticky material; indicatively, this maximum temperature of the moulds is in the range of 40-50? C.

    [0055] As already said in the introductory part, when the control unit (T2) detects that the internal temperature of the tray-moulds is out of a set temperature range for the specific material being processed, the film thermoforming operation is regularly performed but the next filling process of the moulds is deactivated by the activation block (A) only at the moulds on which the anomalous temperature was detected.

    Controlling the Vacuum Forming TimeV1

    [0056] The vacuum forming time is calculated by a first control (V1) from the opening of the connection with the vacuum source of the chamber below the tray-moulds, until the desired degree of vacuum is reached. This time value must be comprised within a set range. In fact, if the vacuum forming time is too short, this means that a portion of the holes of the tray-moulds is clogged and thus the formation of the vacuum takes place on a part of the mould only. If, on the contrary, the vacuum forming time is too long, this means that the film is perforated at one or more holes of the tray-mould.

    [0057] In both cases, at all the tray-moulds on which anomalous vacuum forming time values were found, the activation block (A) deactivates the mould-filling stage (C).

    [0058] A preferred acceptable time range, for a correct formation of the vacuum in the vacuum chamber below the tray-moulds, is 1-3 sec.

    [0059] According to an additional control mode, the individual tray-moulds are individually numbered in an electronically traceable manner, and the activation block (A) stores the number of the tray-mould on which incorrect vacuum forming time values were found, and then controls over time if the error on that particular mould is either random or repetitive in nature. In this second case, a mould fault signal is sent to activate a replacement/maintenance stage thereof.

    Controlling the Vacuum MaintenanceV2

    [0060] A second control (V2) of the degree of vacuum is provided immediately after the closing of the connection of the chamber below the external lower part of the moulds with the vacuum source, to control whether the drop of such degree of vacuum is too rapid, thus revealing the presence of holes or tearings on the lining film.

    [0061] Such control is carried out simply by measuring the value of the vacuum degree after a set time from the actual closing of the connection with the vacuum source and by verifying that this value is not less than a set threshold value. Exemplary acceptable values may for example be a waiting time up to 1 second and a value of the degree of vacuum drop, measured at the end of the waiting time, between ?0.15 and ?0.20 bar, compared to a maximum value of vacuum degree, at the time of closing of the connection, between ?0.20 and ?0.30 bar.

    [0062] When the degree of vacuum drop is greater than the threshold value, determined for each individual application, the activation block (A) deactivates the filling stage of the tray-moulds with the molten sticky substance at the tray-moulds on which the anomaly was found.

    Maintaining a Continuous and Intimate Contact Between First Film and Tray-Moulds

    [0063] Finally, a last feature of the packaging process of the present invention has the aim to ensure the abovementioned continued and intimate contact between the first film of non-sticky material and the inner walls of the tray-moulds, starting from the end of the lining stage and until the conclusion of the third stage (III) of the process, i.e., the covering of the free surface of the molten sticky substance contained in the tray-moulds with a second film of non-sticky material. This object is achieved by means of two changes to the known process. A first change was implemented in the control of the cylinder-piston assembly which powers the casting shutters of sticky substance in the tray-moulds. Such an assembly is in fact controlled by a step motor that allows to adjust smoothly the startup and stop ramps of the flow, so as to minimize the effect of the first impact of the flow on the first film applied on the tray-mould, and to maintain then non-turbulent flow conditions throughout the casting period. The purpose of this, as already anticipated above, is to avoid any possible relative displacement between the lining film and the surface of the tray-mould during the casting operation (C); in fact, a displacement, however small it is, would cause the immediate melting of the film during the casting of the molten adhesive.

    [0064] Instead, a second modification, having the same purpose of maintaining a continued and intimate contact between the film and tray-moulds, concerns the control of the chains that drive the conveyor belt of the tray-moulds and, respectively, those that drive the first film of non-sticky material. According to the present invention, both of these drive chains are in fact operated by step motors, adjusted so as to have startup and stop transients, between every single working step, which are particularly smooth and synchronized. In fact, it is necessary to avoid with the utmost care every possible position deviation between the above two drive chains, since this would lead to a possible detachment of the first film from the inner surface of the tray-moulds, and this both during the startup and stop transients and throughout the entire length in which the two systems cooperate, i.e., from the lining station of the moulds with the first film up to the cutting station of the two welded films. An acceptable synchronization between the two chains provides a maximum deviation of +/?1 mm between the beginning and the end of the coupling length of the two chains.

    [0065] A motor control (I), also preferably arranged inside the central unit (U), both adjusts, according to the needed gradually, the startup and stop transients of the casting operation (C) of the melted adhesive substance, as well as the step coordinated displacements of the first film and the tray-moulds, and maintains the aforesaid fine synchronization between the driving systems of said first film and the tray-moulds.

    CONCLUSION

    [0066] Thanks to this new and unique combination of features, the dry packaging process of the present invention has fully reached the intended object. In fact, by optimizing the process conditions and monitoring the critical parameters for detecting possible non-compliance situations, it is possible to use lining films having a very low softening temperature, quite comparable to the films used in in-water packaging processes, while maintaining constant and close to zero the level of error conditions which are not detected by the above described controls.

    [0067] It is understood, however, that the invention is not to be considered as limited by the particular arrangements illustrated above, which represent only exemplary embodiments of the same, but different variants are possible, all within the reach of a person skilled in the art, without departing from the scope of the invention itself, which is exclusively defined by the following claims.