Assessment and production of minerals by directed horizontal drilling
10151190 ยท 2018-12-11
Assignee
Inventors
Cpc classification
E21B43/305
FIXED CONSTRUCTIONS
E21B43/30
FIXED CONSTRUCTIONS
E21B43/29
FIXED CONSTRUCTIONS
E21B43/34
FIXED CONSTRUCTIONS
E21B21/06
FIXED CONSTRUCTIONS
E21C41/16
FIXED CONSTRUCTIONS
E21B33/13
FIXED CONSTRUCTIONS
International classification
E21B43/29
FIXED CONSTRUCTIONS
E21B33/13
FIXED CONSTRUCTIONS
E21C41/16
FIXED CONSTRUCTIONS
E21B43/34
FIXED CONSTRUCTIONS
Abstract
Systems and methods for extracting minerals from an underground mineralization zone located below the surface at an oil and gas drilling site. The system includes a vertical drilling means for drilling a vertical bore extending from the surface at the oil and gas drilling site into the mineralization zone, a second horizontal drilling means for drilling at least one horizontal production bore into the mineralization zone. The first horizontal drilling means and the second horizontal drilling means are configured to return material from the mineralization zone to the surface where the mineral content of the material is analyzed and a separator separates minerals, waste and drilling mud from the material. The method includes steps of drilling a horizontal assessment bore, analyzing assessment material for a desired mineral, drilling a horizontal production bore, producing production material containing the desired mineral, and separating the desired material from waste and drilling mud.
Claims
1. A method for extracting minerals from an underground mineralization zone, the method comprising: drilling a horizontal assessment bore in the mineralization zone, said horizontal assessment bore having a location; analyzing assessment material produced from the horizontal assessment bore to determine if a desired mineral is present in the assessment material; drilling a horizontal production bore at the location of the horizontal assessment bore where the desired mineral is present; producing production material from the horizontal production bore, wherein the production material comprises: waste material; and the desired mineral; and separating the desired mineral from the waste material.
2. The method of claim 1 further comprising: analyzing the production material determine whether the desired mineral is present; and stopping the production of the production material when no desired mineral is present.
3. The method of claim 2 further comprising: mixing the waste material with a cement material to create a cement mixture; and inserting the cement mixture into the horizontal production bore to close off the horizontal production bore when there is no desired mineral present.
4. The method of claim 3, wherein the cement mixture provides structural strength to the mineralization zone to allow for a second horizontal production bore to be drilled and prevent loss of drilling mud into the horizontal production bore.
5. The method of claim 1, wherein the horizontal assessment bore has a smaller diameter than the horizontal production bore.
6. A method for extracting minerals from an underground mineralization zone located at an oil and gas well site, the method comprising: drilling a vertical bore through the mineralization zone; drilling a plurality of horizontal assessment bores in the mineralization zone, wherein each of the horizontal assessment bores has a location; analyzing assessment material produced from the plurality of horizontal assessment bores to determine if a desired mineral is present in the assessment material; drilling a horizontal production bore at the location of each horizontal assessment bore where the desired mineral is present; producing production material from the horizontal production bore, wherein the production material comprises: waste material; and the desired mineral; and separating the desired mineral from the waste material.
7. The method of claim 6, wherein each of the plurality of horizontal assessment bores extend horizontally out from the vertical bore in a different direction.
8. The method of claim 6, wherein the location of each of the plurality of horizontal assessment bores is at a different depth.
9. The method of claim 6, wherein each of the plurality of horizontal assessment bores has a smaller diameter than the horizontal production bore.
10. A method for extracting minerals from an underground mineralization zone, the method comprising: drilling a vertical bore through the mineralization zone; drilling a horizontal assessment bore in the mineralization zone, said horizontal assessment bore having a location; inserting production tubing into the horizontal assessment bore, wherein the production tubing comprises a remote sensing equipment; analyzing assessment material in the horizontal assessment bore with the remote sensing equipment to determine if a desired mineral is present in the assessment material; drilling a horizontal production bore at the location of the horizontal assessment bore where the desired mineral is present; producing production material from the horizontal production bore, wherein the production material comprises: waste material; and the desired mineral; and separating the desired mineral from the waste material.
11. The method of claim 10, wherein the horizontal assessment bore has a smaller diameter than the horizontal production bore.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
(3)
(4) In a preferred embodiment, one or more horizontal bores 114 are directed horizontally out into the mineralized zone 108. Since the oil or gas well 102 may be the only contact with the possible mineralized zone 108 for many square miles below the surface 106, the one or more horizontal bores 114 could extend for miles horizontally from the oil and gas well site 102 The horizontal bores 114 may extend in multiple radial directions and in multiple horizontal depths to locate the bounds of the mineralized zone 108. The horizontal bores 114 can be created through the use of directed horizontal oil and gas drilling technology. It will be understood that the horizontal bores 114 can also be of various sizes in diameter. In a preferred embodiment, the horizontal bores 114 are first drilled with a small diameter for sampling the minerals in the mineralized zone 108. These small diameter horizontal bores may be referred to as horizontal assessment bores 114a. Later, the horizontal bores 114 may be drilled to a much larger diameter for obtaining large quantities of the minerals discovered. These larger diameter horizontal bores may be referred to as a horizontal production bores 114b.
(5) As the horizontal bores 114 are being created, horizontal tubing 116 is run into the one or more horizontal bores 114. The horizontal tubing 116 contains remote sensing equipment 117. The remote sensing equipment 117 may analyze the mineral content at the site of the horizontal bores 114 underground, or may alternatively return samples to the surface 106 where the samples are analyzed to determine if the desired minerals are present and if the economic value of the mineral deposit is sufficient. The remote sensing equipment 117 used may vary based on the minerals that are expected to be found in the mineralization zone 108. It will be understood that common hard rock minerals being located in the mineralization zone may include precious metals, gold, silver, platinum, rare earths and uranium. These minerals may be economically recovered at relatively low concentrations. Additionally, other minerals containing high concentrations of lesser valuable metals may be economical if the concentration is high enough and refining or processing facilities are near.
(6) If the sampled material shows a positive economic result, then production boring equipment (not depicted) can be installed at the oil and gas well site 102. Production boring equipment is used to drill and enlarge one or more of the horizontal bores 114 along the path indicated by the samples that showed positive economic results. In a preferred embodiment, the horizontal bore 114 is drilled by a drill motor powered by a drilling mud and water. The drilling mud is circulated to the surface returning the drill cuttings which contain the mineral to be recovered. For many applications the drill cuttings will be processed by appropriate equipment on the surface to separate mineral content from drill waste. The drill cuttings are separated at the surface 106 from the drilling mud by various methods depending upon the mineral being recovered. The drilling mud is then returned to the vertical bore 104 and the horizontal bore 114 to assist in additional drilling. The mineral material that has been separated is collected for shipment to a facility that can refine the contained minerals into marketable materials. The waste is collected for redeposit in the horizontal bores 114 or for shipment to a disposal facility. The length of each horizontal bore 114 will depend upon the mineral deposit being drilled. Larger diameter horizontal bores 114 will result in more economical mineral recovery. The production boring equipment should use the largest diameter drilling equipment that is economically available.
(7) When the horizontal bore 114 has been depleted of minerals or if further drilling is not desired, then the production equipment and tubing will be removed from the one or more horizontal bores 114. It can then be used to drill additional horizontal bores 114 from the same vertical access bore offset from any other previous horizontal bores 114 by a distance which will allow for no loss of drilling mud into previous horizontal bores. This distance will be determined by the accuracy of the drilling method and the geology of the mineral deposit. For those mineral deposits that require a large amount of mineral due to the economies for the mineral, each horizontal bore 114 could be filled with a combination of cementing material and waste rock, which would provide structural strength and close off the previous horizontal bore 114 from drilling mud. By using cementing material combined with the waste rock recoveries above 70% could be achieved depending on the accuracy of the horizontal drilling methods.
(8) It will be understood that the method of drilling at least one horizontal bore with production boring equipment may be utilized at any desired location where minerals are known or thought to be present. Although the above system is described at an oil and gas site 102, minerals could be obtained from a mineralization zone located at a traditional mining location where the minerals are already known but previously not obtainable due to the size of the mineral deposits of the depth or structural instability.
(9) Turning now to
(10) If, in step 220, the process determines that there is sufficient desired mineral concentration present in the obtained sample, then in step 230, a horizontal production bore is drilled in the location where the sample was obtained. After the horizontal production bore is drilled, then in step 240, the drill cuttings are extracted to the surface along using known methods and analyzed to determine mineral content. In step 250, the process determines whether sufficient mineral concentration is still present in the drill cuttings. If there is sufficient mineral concentration, then in step 260, the minerals are separated from the waste rock and the drilling mud. It will be understood that the production process is constantly returning samples through the drill cuttings to the surface for analysis, and the process runs until either no minerals are located in the drill cuttings or if the desired length of the horizontal production bore has been reached. Next, in step 270, the waste rock is mixed with cement. After mixing, then in step 280, the cement is returned to the horizontal production bore to allow an additional horizontal production bores to be drilled.
(11) The system and method creates a process to assess and recover minerals at depths and in environments that may not have been accessible before by using horizontal and directional drilling techniques and equipment instead of past non-economical mining methods.
(12) It is to be understood that even though numerous characteristics and advantages of various embodiments of the present invention have been set forth in the foregoing description, together with details of the structure and functions of various embodiments of the invention, this disclosure is illustrative only, and changes may be made in detail, especially in matters of structure and arrangement of parts within the principles of the present invention to the full extent indicated by the broad general meaning of the terms in which the appended claims are expressed. It will be appreciated by those skilled in the art that the teachings of the present invention can be applied to other systems without departing from the scope and spirit of the present invention.