System and method of assembling a wind turbine
10119522 ยท 2018-11-06
Assignee
Inventors
Cpc classification
Y02P70/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E10/728
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E04H12/344
FIXED CONSTRUCTIONS
F03D13/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E02B2017/0039
FIXED CONSTRUCTIONS
E04H12/342
FIXED CONSTRUCTIONS
F05B2230/61
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03D13/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F05B2240/9121
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F03D13/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F03D13/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
E02B17/02
FIXED CONSTRUCTIONS
F03D13/25
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
Systems for assembling a wind turbine without the assistance of cranes. According to some implementations a system is provided that includes lifting systems having lifting platforms arranged peripherally around the tower. The lifting platforms cooperate with different connection tools that can be supported on an auxiliary column and thus lift or lower the tower modules.
Claims
1. A system for assembling a wind turbine comprising a nacelle and a tower, the system comprising: a tower foundation configured to support the wind turbine after the assembling, a plurality of spaced-apart lifting systems disposed about the periphery of the tower foundation, each lifting system having a lifting platform that moves vertically upward and downward between upper and lower points, a basic tower module having a top and a bottom, the bottom being configured to rest on the tower foundation, the top being configured to support the nacelle, the basic tower having a first height; and a plurality of upper tower modules that are configured to be sequentially joined together to form the tower, each of the plurality of upper tower modules including a plurality of flanges, at least a majority of the upper tower modules having a second height that is greater than the first height, a plurality of first connectors that is each configured to anchor the plurality of lifting platforms to the nacelle: and a plurality of second connectors different than the plurality of first connectors that is each configured to anchor the plurality of lifting platforms to the flanges of the upper tower modules.
2. The system according to claim 1, wherein the first and second connectors are configured to be removeably attached to the lifting platforms.
3. The system according to claim 1, wherein the second connectors comprise a first part and a second part are configured to be secured to opposite sides of the upper tower module flanges.
4. The system according to claim 1, wherein the upper tower modules each comprise a lattice structure having three or more legs and the number of lifting systems corresponds to the number of legs.
5. The system according to claim 1, wherein the plurality of lifting systems are disposed equidistantly about the tower foundation.
6. The system according to claim 1, wherein the each lifting system is located on a base and is connected to adjacent lifting systems by a joint structure.
7. The system according to claim 1, wherein the upper tower module is a cylindrical structure.
8. A system for assembling a wind turbine comprising a nacelle and a tower, the system comprising: a tower foundation configured to support the wind turbine after the assembling, a plurality of spaced-apart lifting systems disposed around the tower foundation, each lifting system having a lifting platform that moves vertically upward and downward between upper and lower points, adjacent lifting platforms support and have disposed between them an elongate horizontal member that spans the distance between the adjacent lifting platforms and is configured to move horizontally inward and outward with respect to the lifting platforms between at least first and second horizontal positions, the second horizontal position being inward of the first horizontal position, when in the first horizontal position the elongate horizontal members are arranged capable of supporting a bottom of the nacelle; and an upper tower module having one or more protruding members that are capable of being supported on the elongate horizontal members when the elongate horizontal members are in the second horizontal position and not the first horizontal position.
9. The system according to claim 8, wherein the plurality of lifting systems are disposed equidistantly about the tower foundation.
10. The system according to claim 8 comprising a plurality of upper tower modules that are configured to be sequentially joined together to form the tower, each of the plurality of upper tower modules having one or more protruding members that are capable of being supported on the elongate horizontal members.
11. The system according to claim 8, wherein the each lifting system is located on a base and is connected to adjacent lifting systems by a joint structure.
12. The system according to claim 8, wherein the upper tower modules comprise a lattice structure having three or more legs.
13. The system according to claim 12, wherein the number of lifting systems corresponds to the number of legs.
14. The system according to claim 8, wherein the upper tower module is a cylindrical structure.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Below is a brief description of a series of drawings useful for better understanding the various embodiments of the apparatus and methods disclosed herein.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
DETAILED DESCRIPTION
(21)
(22) The assembly of the wind turbine tower can be done without the use of cranes through a series of steps and using a series of devices. According to one embodiment the first step entails preparing the tower foundation 5 as illustrated, for example, in
(23)
(24) The bottom of the lifting system 8 has a lifting mechanism that may comprise electric motors, hydraulic cylinders, rack-pinion units, chains, etc. These elements may be used to lift and lower the lifting platform 11. Loads are absorbed by the lifting platforms 11 and transferred to the lifting systems 8 and their corresponding bases 10. The bases have a diameter or cross-sectional area sufficient to withstand the moments arising from eccentric loads produced between the wind turbine and the lifting systems 8. It should be borne in mind that the distance between the axis of the tower 3 and each axis of the lifting system 8 creates a secondary moment against the structure that should be considered.
(25) The assembly commences at
(26) The lifting of the nacelle is illustrated in
(27)
(28)
(29)
(30)
(31)
(32) The fastening elements shown in
(33)
(34) Each connection part 18 and 18 is subdivided into two parts to mount them from the side around the columns of the modules. This subdivision generates two symmetrical parts: one for the left and the other for the right.
(35) The connection flange 16 may have the same configuration as the connection part 18, differing in the positioning of the easing 21 and the manner of anchoring to the joint ring 12.
(36)
(37)
(38) An additional support 29 is in the process of anchoring the underwater section to the seabed and, with the assistance of the same lifting system 8, submerging the underwater section to the seabed 27.
(39)
(40)
(41)
(42) After securing the underwater tower section, the original process as disclosed above may then be followed to erect the entire wind turbine on the anchored underwater section as if it were a ground foundation.
(43) According to one embodiment a method for lifting the nacelle 4 and tower 3 of a wind turbine is provided. The foundation for the lifting process may be on the ground or on a previously mounted underwater section in offshore applications.
(44) The method may include: (a) preparing a foundation 5 or a retractable platform 26 for supporting a basic tower module 7; (b) installing the basic tower module 7 so that it is supported on the foundation 5 or retractable platform 26; (c), mounting the lifting systems 8 so that they are peripherally disposed about the basic tower module 7; (d) fastening a nacelle 4 (that generally includes a drive train, generator 13, bench and joint ring 12) to a lifting platform 11 of each of the lifting systems 8; (e) vertically lifting the nacelle 4 by use of the lifting systems 8; (f) mounting an upper tower module 14 to the nacelle 4 and the basic tower module 7; (g) disconnecting the lifting platform 11 of each of the lifting systems 8 from the nacelle 4 and lowering the lifting platforms 11; (h) installing an auxiliary column 15 on each of the lifting platforms 11; (i) coupling a top portion of each of the auxiliary columns to the nacelle 4 by the use of a first connector and disconnecting the upper tower module 14 from the basic tower module 7, (j) raising the lifting platforms 11 to lift the nacelle and also the upper tower module 14 that is fastened to the nacelle up and away from the basic tower module 7; (k) mounting another upper tower module 17 to a bottom of the previously installed upper tower module 14 and to the top of the basic tower module 7; (l) disconnecting the auxiliary columns from the nacelle 4; (n) lowering the lifting platforms 11 and removing the first connectors from the auxiliary columns, (o) attaching a second connector different than the first connector to the top portion of each of the auxiliary columns; (p) fastening the second connectors to a location where the upper tower modules 14 and 17 are attached to one another and disconnecting the upper tower module 17 from the basic tower module 7; (q) raising the lifting platforms 11 to lift the nacelle and also the upper tower modules 14 and 17 that are coupled to the nacelle up and away from the basic tower module 7. Steps (r) through (q) may be repeated to add additional upper tower modules as desired until completion of the assembly.
(45) A method, according to one embodiment, for lifting the nacelle 4 and tower 3 of a wind turbine on the ground or offshore with a previously mounted underwater section is detailed below: Prepare the foundation 5 or retractable platform 26 Install the basic tower module 7 Mounting the lifting systems 8 Fastening the nacelle 4 [drive train, generator 13, bench and joint ring 12] Lifting the nacelle 4 Mounting the upper tower module 14 Lowering the lifting platforms 11 Installing the auxiliary column 15 and connection flange 16 Lifting the nacelle 4 with the upper tower module 14 Installation of the module 17 Disconnecting the auxiliary column 15 Lowering the lifting platforms 11 Installing the auxiliary column 15 and connection part 18 Lifting the nacelle 4 with the modules 14 and 17 Repeating with the remaining modules until completion of the assembly.
(46)
(47) Each of the lifting systems 8 includes a lifting platform 11 that is capable of being moved vertically between a low point as shown in
(48) As noted above, a problem with many wind turbine assembly methods is that they require the use of structures other than the lifting systems themselves during the assembly process. For example, the method disclosed in U.S. Publication No. 2009/0087311 requires the use of stabilizing supports 61 that are anchored to the base 60 to maintain the tower modules in their vertical orientation during assembly. The method disclosed in Spanish Publication No. 2389345 also requires more than just the vertical cylinders 6 to maintain the tower modules in a vertical position during assembly. As seen in FIGS. 1-5 of Spanish Publication No. 2389345, the assembling method requires the use of a horizontally oriented clamps 4 that are located within an annular body 2 supported by a plurality of legs 3. According to at least some of the embodiments disclosed herein the lifting systems are spaced sufficiently away from the tower to counter bending moments that may occur during the assembly process. These distances may vary depending on the type and height of the towers being constructed. According to some embodiments the lifting systems 8 are spaced outwardly away from the tower under construction by a distance of between 1 to 2 meters. This facilitates the construction of tall towers in excess, of for example, 90 meters. This can include towers having a height of 160 meters or more that are capable of being constructed without stabilizers other than the lifting systems themselves.
(49) The method of
(50) After the nacelle 4 has been lifted to an elevated position as shown in
(51) With the nacelle 4 securely attached to the top of the first upper tower module 14, the remainder of the tower may be constructed by the lifting and insertion of additional upper tower modules as shown in
(52) As shown in
(53) Upon the lifting platforms 11 being attached to the tower module 14, the tower module 14 and the nacelle 4 attached to it are elevated by moving the lifting platforms upward as shown in
(54) The process of inserting and attaching additional tower modules is repeated until the tower is completed. It is important to note that each time a tower module is placed onto the tower foundation, the bottom of the tower module may be securely attached to the foundation. If this is done, each time a tower module is lifted it must first be decoupled from the tower foundation.
(55) It is important to note that although the figures illustrate lattice-type tower modules, the present disclosure is in no way limited to such structures. For example, the tower modules may comprise non-lattice type modules such as cylindrical modules, conical modules, etc. With respect to these other types of modules, their outer surfaces may be equipped with any of a variety of protuberances that are adapted to be coupled to or supported on the lifting platforms 11. These protuberances may be in the form of flanges, L-shaped members, inverted L-shaped members, etc.
(56)
(57) The method of
(58) The nacelle 4 may be coupled to or supported on the members 11 in a manner similar to how the nacelle is coupled to or supported on the lifting platforms 11 described in the embodiments previously disclosed herein.
(59) After the nacelle 4 has been lifted to an elevated position, as shown in
(60) With the nacelle 4 securely attached to the top of the first upper tower module 14, the remainder of the tower may be constructed by the lifting and insertion of additional tower modules as shown in
(61) As shown in
(62) Upon the first upper tower module 14 being supported on the members 11, the first upper tower module 14 and the nacelle 4 attached to it are elevated by moving the lifting platforms upward as shown in
(63) The process of inserting and attaching additional tower modules is repeated until the tower is completed. It is important to note that each time a tower module is placed onto the tower foundation, the bottom of the tower module may be securely attached to the foundation. If this is done, each time a tower module is to be lifted it must first be decoupled from the tower foundation.
(64) It is important to note that although
(65) The systems of
(66) According to some implementations systems for assembling a wind turbine are provided according to Clauses 1 through 12 below.
(67) Clause 1. A system for assembling a wind turbine comprising a nacelle and a tower, the system comprising:
(68) a tower foundation configured to support the wind turbine after the assembling,
(69) a plurality of spaced-apart lifting systems disposed peripherally about the tower foundation, each lifting system having a lifting platform that moves vertically upward and downward by a first distance between upper and lower points, each lifting platform is capable of being coupled to the nacelle,
(70) a basic tower module secured to the tower foundation, the basic tower module having a top and a bottom, the top being configured to support the nacelle, the basic tower having a first height,
(71) a plurality of upper tower modules that are configured to be sequentially joined together to form the tower, the plurality of upper tower modules having a second height that is greater than the first height,
(72) a plurality of auxiliary columns each having a top and a bottom, each of the plurality of auxiliary columns configured to be attached to a respective lifting platform so that when attached the auxiliary column extends vertically upward from the lifting platform to which it is attached, the height of each of the auxiliary columns being sufficient to permit a first of the plurality of upper tower modules to be inserted between the nacelle and the basic tower module or between a second of the plurality of upper tower modules and the basic tower module when the lifting platform is located at the upper point.
(73) a plurality of first connectors that is each configured to anchor the top of at least some of the plurality of auxiliary columns to the nacelle: and
(74) a plurality of second connectors different than the plurality of first connectors that is each configured to anchor the top of at least some of the plurality of auxiliary columns to respective joints that join two adjoining upper tower modules.
(75) Clause 2. The system according to clause 1, wherein the each lifting system is located on a base and is connected to adjacent lifting systems by a joint structure.
(76) Clause 3. The system according to clause 1, wherein each lifting platform is configured to be directly anchored to the nacelle.
(77) Clause 4. The system according to clause 1, wherein the top of each of the auxiliary columns comprises a flange, the first connector configured to connect the flange to the nacelle.
(78) Clause 5. The system according to clause 1, wherein the top of each of the auxiliary columns comprises a flange, the second connector configured to connect the flange to the joint that joins two upper lattice tower modules.
(79) Clause 6. The system according to clause 1, wherein the auxiliary columns are each configured to be removably attached to its respective lifting platform.
(80) Clause 7. The system according to clause 4, wherein the first connector is configured to be removably attached to the flange.
(81) Clause 8. The system according to clause 5, wherein the second connector is configured to be removably attached to the flange.
(82) Clause 9. The system according to clause 7, wherein the flange is sandwiched by the first connector.
(83) Clause 10. The system according to clause 8, wherein the flange is sandwiched by the second connector.
(84) Clause 11. The system according to clause 1 wherein the basic tower module and the upper tower modules each comprise a lattice structure having three or more legs.
(85) Clause 12. The system according to clause 11, wherein the number of lifting systems corresponds to the number of legs.
(86) According to some implementations methods for assembling a wind turbine are provided according to Clauses 13 through 19 below.
(87) Clause 13. A method for assembling a wind turbine comprising a nacelle and a tower, the method comprising:
(88) preparing a foundation or a retractable platform for supporting a basic tower module,
(89) installing the basic tower module so that it is supported on the foundation or the retractable platform,
(90) mounting a plurality of lifting systems so that they are peripherally disposed about the basic tower module, each lifting system comprising a lifting platform, each lifting platform being vertically movable between a lower point and an upper point, each of the lifting systems being spaced-apart from one another,
(91) coupling the nacelle to each of the lifting platforms,
(92) vertically lifting the nacelle by use of the lifting systems,
(93) inserting a first upper tower module between the nacelle and the basic tower module,
(94) fastening the first upper tower module to the nacelle and to the basic tower module,
(95) disconnecting the lifting platform of each of the lifting systems from the nacelle and lowering each of the lifting platforms,
(96) installing an auxiliary column on each of the lifting platforms,
(97) coupling a top portion of each of the auxiliary columns to the nacelle by use of a first connector,
(98) disconnecting the first upper tower module from the basic tower module,
(99) raising the lifting platforms to lift the nacelle and also the first upper tower module that is fastened to the nacelle up and away from the basic tower module,
(100) inserting a second upper tower module between a bottom of the first upper tower module and to the top of the basic tower module,
(101) fastening the second upper tower module to the bottom of the first upper tower module and to the top of the basic tower module,
(102) disconnecting the nacelle from the auxiliary columns.
(103) Clause 14. The method according to clause 13, further comprising:
(104) lowering each of the lifting platforms,
(105) removing the first connectors from the auxiliary columns,
(106) attaching a second connector different from the first connector to each of the auxiliary columns,
(107) fastening each of the auxiliary columns by the use of the second connectors to a joint that joins the first and second upper tower modules,
(108) disconnecting the second upper tower module from the basic tower module; and
(109) raising the lifting platforms to lift the nacelle and also the first and second upper tower modules that are coupled to the nacelle up and away from the basic tower module.
(110) Clause 15. The method according to clause 14 further comprising
(111) inserting a third upper tower module between a bottom of the second upper tower module and to the top of the basic tower module,
(112) fastening the third upper tower module to the bottom of the second upper tower module and to the top of the basic tower module.
(113) Clause 16. The method according to clause 13, wherein the nacelle is coupled to the basic tower module before the mounting of the plurality of lifting systems peripherally about the basic tower module.
(114) Clause 17. The method according to clause 13, wherein the nacelle is coupled to the basic tower module after the mounting of the plurality of lifting systems peripherally about the basic tower module.
(115) Clause 18. The method according to clause 13, wherein the basic tower module has a first height and the first and second upper tower modules have a second height, the second height being greater than the first height.
(116) Clause 19. The method according to clause 13, wherein the foundation is a retractable platform of an off-shore floating platform located at sea, the method further comprising retracting the platform and lowering at least a portion of the tower into the sea.