METHOD AND ASSEMBLY FOR MEASURING SOLID PRECIPITATION IN DRILLING FLUIDS

20240319060 ยท 2024-09-26

Assignee

Inventors

Cpc classification

International classification

Abstract

A measurement method and a measuring assembly are provided, and the measuring assembly enables the measurement of the non-destructive and time-dependent change of solid precipitation in drilling fluid (mud) in static conditions. A measurement method and measuring assembly suitable for use in both in the laboratory and in the field, which is low cost and provides ease of application, has been developed. This method and assembly allow reliable temperature-dependent measurements of the change in the densities of drilling fluids of various densities, containing clays, some chemicals polymers and inert solids like barite (BaSO.sub.4).

Claims

1. A measurement method for non-destructive and time-dependent measurement of solid precipitation of drilling fluid, comprising mud, in static conditions, wherein the measurement method comprises the steps of taking a drilling fluid sample into a fluid chamber, suspending a probe to the drilling fluid by means of a hanger, wherein the probe is completely embedded in the drilling fluid and does not contact a base of the fluid chamber, wherein a weight of the probe is known and a density of the probe is above a maximum density that the drilling fluid is allowed to have, keeping the drilling fluid in the static state, measuring a sum of a weight acting on the probe and a buoyant force caused by the drilling fluid during holding of the drilling fluid, calculating an instantaneous drilling fluid density using the measured force or a change of a drilling fluid density using a change of the measured force.

2. The measurement method according to claim 1, wherein change of the drilling fluid density (??.sub.fl) is calculated according to the equation ? ? fl = ? p .Math. ( 1 - ? W e W ) by using the density of the probe (?.sub.p), the weight of the probe in the air (W) and the change of the measured force (?W.sub.e).

3. The measurement method, according to claim 1, wherein the drilling fluid density (?.sub.flt) at the time (t) is calculated according to the equation ? flt = ? p .Math. ( 1 - W e W ) t by using the density of the probe (?.sub.p), the weight of the probe in the air (W) and the force (W.sub.e) measured at the time (t).

4. The measurement method, according to claim 1, wherein a temperature of the drilling fluid sample is further regulated during measurement.

5. A measuring assembly for measuring solid precipitation of drilling fluid, comprising mud, in static conditions, comprising a fluid chamber holding a drilling fluid sample, a probe, wherein a weight of the probe is known and a density of the probe is above a maximum density that the drilling fluid is allowed to have, a hanger, wherein the hanger has a length to hold the probe in the fluid chamber, wherein the probe is completely embedded in the drilling fluid and does not contact a base of the fluid chamber, a precision balance, wherein the hanger is connected to the precision balance, the precision balance allows measurement of a sum of a weight acting on the probe and a buoyant force caused by the drilling fluid.

6. The measuring assembly according to claim 5, comprising a probe in a form of an ellipsoid, wherein vertical axis of the ellipsoid is longer than horizontal axes of the ellipsoid.

7. The measuring assembly according to claim 6, wherein the probe has a ratio of each horizontal axis length (in a circular shape) to a vertical axis length between 0.3 and 0.4.

8. The measuring assembly according to claim 6, comprising a hanger connected to the probe by a cylindrical channel extending along the vertical axis of the probe.

9. The measuring assembly according to claim 6, wherein the probe has a ratio of horizontal axis length to a diameter of the cylindrical fluid chamber less than 0.3.

10. The measuring assembly according to claim 5, comprising a heat jacket, wherein the heat jacket surrounds the fluid chamber from sides and keeps the fluid chamber at a predetermined temperature.

Description

BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The measuring assembly for achieving the objects of the present invention is shown in the accompanying figures.

[0016] FIG. 1 is a schematic view of a measuring apparatus according to the invention.

[0017] FIG. 2 is a graph showing the change of the effective weight measured according to the invention with respect to time.

[0018] FIG. 3 is a graph showing the time-dependent change of the fluid density calculated according to the invention.

[0019] FIG. 4 is a graph showing the change of the total amount of weighting material (API barite) precipitation calculated according to the invention with respect to time.

[0020] The parts in the figures are individually numbered, and their corresponding numbers are given below. [0021] 1. Measuring assembly [0022] 2. Probe [0023] 3. Hanger [0024] 4. Precision balance [0025] 5. Fluid chamber [0026] 6. Heat jacket [0027] 7. Heat bath [0028] 8. Pipe [0029] 9. Computer

DETAILED DESCRIPTION OF THE EMBODIMENTS

[0030] The measurement method of the invention, basically, comprises the steps of [0031] taking the drilling fluid sample into a fluid chamber (5), [0032] suspending a probe (2), the weight of which is known and the density of which is above the maximum density that the drilling fluid can have, to the drilling fluid using a hanger (3), [0033] keeping the drilling fluid in the static state, [0034] measuring the time-dependent effective weight of the probe (2) immersed into the drilling fluid, [0035] calculating the instantaneous drilling fluid density employing the buoyancy (Archimedes' principle) using the measured force (effective weight of probe) or the change of the drilling fluid density utilizing the change of the measured force (time-dependent effective weight of probe).

[0036] The probe (2) is suspended so that it is completely submerged in the drilling fluid and does not touch the base of the fluid chamber (5). The density of drilling fluid can be expressed in the form of the core mass (probe) or preferably the corresponding specific gravity.

[0037] Measured force, which can also be called effective weight, can be expressed as follows:

[00001] W e = W - F B o

[0038] Here, W shows the magnitude of the weight of the probe (2) in the air; F.sub.Bo shows the magnitude of the buoyant force. The buoyant force also depends on the density of the drilling fluid (P.sub.?) and the volume of the probe (2) (V). The volume of the probe (2) can also be written in terms of the relevant weight (W) and density of the probe (?.sub.p). Thus, the buoyant force can be expressed as follows:

[00002] F B o = ? fl .Math. V = ? fl .Math. W ? p

[0039] Effective weight, in this case, is expressed as follows:

[00003] W e = W ( 1 - ? fl ? p )

[0040] Similarly, the time-dependent change of effective weight (.fwdarw.?.sub.?) as a result of the precipitation of solid particles can also be expressed as:

[00004] ? W e = W ( 1 - ? ? fl ? p )

[0041] Hence, the density changes of the drilling fluid (??.sub.?) can be found according to the following expression using the measured effective weight variation:

[00005] ? ? fl = ? p .Math. ( 1 - ? W e W )

[0042] The density of the fluid (?.sub.flt) at any time (t) can also be found from the following expression:

[00006] ? flt = ? p .Math. ( 1 - W e W ) t

[0043] In the preferred embodiment of the invention, the temperature of the sample is also regulated during the measurement so that the drilling fluid behavior can be examined under conditions similar to the wellbore or borehole.

[0044] With the measurement method of the invention, measurement at one or more depths can be taken from the drilling fluid sample.

[0045] The measurement setup (1) developed for the application of the measurement method comprises the following: [0046] a fluid chamber (5) holding the drilling fluid sample, [0047] a probe (2), the weight of which is known and the density of which is above the maximum density that the drilling fluid can have, [0048] a hanger (3) having a length that holds the probe (2) in the fluid chamber (5) so that it is completely embedded in the drilling fluid and does not contact the base of the fluid chamber (5), [0049] a precision balance (4), to which the hanger (3) is attached, allows for measurement of the net force caused by the self-weight of the probe (2) and the buoyant force generated by the drilling fluid.

[0050] The hanger (3) may be a wire or line connected to the precision balance (4) at one end or a solid arm. The hanger (3) is preferably selected such that its weight and horizontal cross-sectional area are too small with respect to the probe (2) to minimize the impact on the measurement results.

[0051] The drilling fluid sample taken into the fluid chamber (5) may be a sample prepared for trial purposes before its usage in a borehole or a sample taken from a drilling fluid circulation system.

[0052] The measuring assembly (1) of the invention also includes a heat jacket (6) that surrounds the fluid chamber (5) from the sides and ensures that the sample is kept at a specific temperature so that the drilling fluid behavior can be examined under conditions similar to the wellbore. The heat jacket (6) may be in a structure containing an annular space around the fluid chamber (5) in which a heating fluid circulates, and the desired temperature conditions are ensured therewith. This fluid can be supplied by a heat bath (7) via pipes (8) connected to the heat jacket (6).

[0053] The precision balance (4) is connected to a computer for obtaining, storing, and performing calculations of the measurement results. In addition to the precision balance (4), the heat bath (7) can also be connected to the computer to regulate the temperature. These connections can be established wired or wirelessly via an external or internal card.

[0054] The fluid chamber (5) and the heat jacket (6) may be made of transparent materials for the drilling fluid and the probe (2) to be observed visually. The fluid chamber (5) is preferably in the form of a cylinder.

[0055] The probe (2) is in the form of an ellipsoid whose vertical axis is longer than its horizontal axes. Thus, solid particles such as barite or barite along with bentonite and solid polymers accumulating on the probe (2) during measurement can be prevented, and the known mass value of probe (2) is preserved. In the invention's preferred embodiment, the ratio of each horizontal axis length of the probe (2) to the vertical axis length is between 0.3 to 0.4. The hanger (3) is connected to the probe (2) by a cylindrical channel extending along the vertical axis of the probe (2).

[0056] A coating paint was also applied to the surface of the probe (2) in order to prevent the accumulation of solid particles on the probe (2). The ratio of the horizontal axis length of the probe (2) to the diameter of the cylindrical fluid chamber (5) is less than 0.3 so that solid particles accumulation on the probe (2) is prevented and the probe (2) does not influence the precipitation tendency of the drilling fluid.

[0057] In an exemplary embodiment of the invention, a cylindrical fluid chamber (5) with a diameter of 67 mm and an ellipsoid-shaped probe (2) with a vertical axis of 41.82 mm and horizontal axes of 13.72 mm (in a circular shape) is used. The probe (2) is positioned by means of the hanger (3) so that it is two-thirds above the depth of the drilling fluid sample from the base of the fluid chamber (5).

[0058] An experiment was also carried out with an exemplary KCl-polymer drilling fluid to demonstrate the efficacy of the invention. 350 ml of distilled water was placed in a mixer chamber in accordance with API (American Petroleum Institute) standards for the preparation of drilling fluid. 25 g potassium chloride (KCl), 1 g polyacrylamide (PHPA), 4 g polyanionic cellulose (PAC-LV), 0.25 g xanthan gum, 0.1 g sodium hydroxide (NaOH), 100 g sodium chloride (NaCl) and 524 g barite (BaSO.sub.4) were added respectively. At the same time, the purified water was mixed in the chamber. The drilling fluid was stirred for 5 minutes after adding each substance.

[0059] According to the invention, the solid precipitation test in the drilling fluid was carried out with the measuring assembly (1). The initial weight of the probe in the air was measured as 37.80 g (W) and its initial effective weight as 31.09 g (W.sub.ei). The measured initial fluid density (?.sub.fli) was determined as 15.97 lbm/gal (1917 kg/m3), the initial theoretical fluid density (?.sub.fli.teo) was determined as 15.96 lbm/gal (1916 kg/m3), and the initial barite ratio (W.sub.bi%) in suspension was determined as 52.17% by weight. The results obtained are given in the following equation.

[00007] ? fli = ? p .Math. ( 1 - W e i W ) = 1 0 . 8 0 g cm 3 .Math. ( 1 - 31.09 g 37.8 g ) = 1 . 9 1 7 g cm 3 = 1 5 . 9 7 lbm gal ? fli . teo = .Math. m .Math. V = m b a r i t e + m KCI + m NaCI + m w a t e r + m o t h e r V b a r i t e + V s u + N a C I + KCI + V o t h e r ? fli . teo = ( 5 2 4 + 2 5 + 1 0 0 + 3 5 0 + 5 . 3 5 ) g ( 1 2 4 . 7 6 + 3 9 6 . 8 2 + 2 . 6 6 ) cm 3 = 1 . 9 1 6 g cm 3 = 15.96 lbm gal w b i % = .Math. m b .Math. m = 524 g ( 5 2 4 + 2 5 + 1 0 0 + 3 5 0 + 5 . 3 5 ) g = 52.17 %

[0060] Initially, the effective weight (W.sub.ei) measured as 31.09 g was measured as 32.53 g (FIG. 2) after 405 minutes. After 405 minutes, the drilling fluid density was determined as 12.54 lbm/gal (1505 kg/m3) (FIG. 3).

[00008] ? fl @ 405 = ? p .Math. ( 1 - W e W ) = 1 0 . 8 0 g cm 3 .Math. ( 1 - 32.53 g 37.8 g ) = 1.505 g cm 3 = 12.54 lbm gal

[0061] While the barite content in the suspension was 52.17% by weight at the beginning, the total amount of barite deposited after 405 minutes was calculated as 223 g. The amount of barite in the suspension with a density of 12.54 lbm/gal (1505 kg/m3) was calculated as 38.52% by weight (FIG. 4). At the end of 405 minutes, the barite ratio by weight is given in the following equation.

[00009] w b @ 405 % = m b .Math. m = ( 5 2 4 - 2 23 ) g [ ( 5 2 4 - 2 2 3 ) + 2 5 + 1 0 0 + 3 5 0 + 5 . 3 5 ] g = 38.52 %

[0062] The measurement method and the measuring assembly (1), which are the subject of the invention, pave the way for performing non-destructive measurements and ensure that the density change in the drilling fluid and the solid precipitation can be determined reliably and precisely, as shown in the experimental results.