The Concrete Wall Form Removable Bolt Tie Sleeve is a process developed that utilizes a flexible polyolefin plastic sleeve to improve the efficiency of the current concrete wall forming process. The bolt tie is placed inside the flexible polyolefin plastic sleeve before inserted into the wall form. The sleeve saves the installer time by no prior greasing of the bolt tie, no returning on site to “turn” the bolt tie, and no cleaning of the bolt tie after it has been removed. The flexible polyolefin plastic allows the sleeve to not adhere to the concrete, allowing the bolt tie and the flexible polyolefin plastic sleeve to be easily removed after the concrete has dried.
Claims
1. The Concrete Wall Form Removable Bolt Tie Sleeve is a component of a system process to construct a concrete wall, the system process comprising of: a bolt tie to be inserted into the Concrete Wall Form Removable Bolt Tie Sleeve. This now sleeved bolt tie is to be inserted into wall forms giving the walls adequate strength to hold the wall forms together from the immense weight of the concrete in its liquid state. As the concrete dries the Concrete Wall Form Removable Bolt Tie Sleeve does not adhere to the concrete as it dries because this component is made of a Flexible Polyolefin Plastic. After the concrete has dried the bolt tie can be easily removed due to the Concrete Wall Form Removable Bolt Tie Sleeve. The wall forms can now be removed, and finally the Concrete Wall Form Removable Bolt Tie Sleeve can be removed from the concrete wall easily by hand due to the Flexible Polyolefin Plastic that does not adhere to concrete.
Description
A BRIEF DESCRIPTION OF DRAWINGS
[0013] Concrete Wall Form Removable Bolt Tie Sleeve
[0014] 1.
[0015] 2.
[0016] 3.
[0017] 4.
DETAILED DESCRIPTION OF THE INVENTION
Concrete Wall Form Removable Bolt Tie Sleeve
[0018]
[0019] This complete overview of all the assembled components in the concrete wall form process starts with 100 the erected walls. These walls are what make the concrete form, giving the wet liquid concrete a container to be poured into. In order for these walls 100 to not be pushed apart from the immense weight of the liquid concrete a bolt tie 102 usually referred to as a She Bolt, Treaded Rod, or Tapper Tie is inserted through both walls and then fastened with a wing nut on each side of the exterior wall giving the walls the strength to hold the form together. Prior to the bolt tie 102 to be inserted through the walls it is first inserted through the removable bolt tie sleeve 101. The sleeve is cut to length long enough to be visible through each exterior side of the wall 103 extending out to cover the bolt tie 102. Once the assembly is fully constructed as shown in Figure one the concrete can now be poured into the center or interior of the wall forms 100. As the liquid concrete is poured into the interior of the walls 100 the bolt tie 102 is fully protected by the removable bolt tie sleeve 101. The bolt tie sleeve 101 is made of a Flexible Polyolefin Plastic. It has been discovered that this type of plastic does not adhere to concrete. Allowing the bolt tie 102 to be easily removed once the concrete has “Set-up” or dried. Another benefit is that the installer does NOT need to remain onsite to give the bolt tie a “Turn” with a wrench to keep the bolt from adhering to the concrete. Once the entire assembly is installed and the concrete has been poured, the installer does not need to return until it is time to remove the form once the concrete has dried. Now that the concrete has dried the bolt ties 102 can be removed with ease due to the flexible polyolefin plastic removable bolt tie sleeve 101. The walls 100 can be removed, and since the removable bolt tie sleeve 101 was cut to length long enough to extend to the exterior of the walls 103 the entire removable bolt tie sleeve 101 can be removed easily by hand as well.
[0020]
[0021] This complete figure shows how the bolt tie 105 also known as a She-Bolt, Threaded Rod, and Tapper Tie is inserted into the removable bolt tie sleeve 104 prior to being inserted into the wall forms. The Concrete Wall Form Removable Bolt Tie Sleeve 104 is made of a Flexible Polyolefin Plastic that has been discovered to not adhere to concrete as concrete “Sets-up” or dries.
[0022]
[0023] This figure shows the bolt tie 106 inserted fully into the Concrete Wall Form Removable Bolt Tie Sleeve 107 ready to be installed into the wall form. The sleeve 107 fits snug around the bolt tie 106 but still has the ability to be slid by hand. The Concrete Wall Form Removable Bolt Tie Sleeve 107 comes in all different lengths and diameter sizes to fit all of the different sizes of bolt ties 106.
[0024]
[0025] Figure four is a complete exploded view of the assembly process. The bolt tie 108 is first inserted into the Concrete Wall Form Removable Bolt Tie Sleeve 109, and then it is finally inserted into both sides of the wall form 110. Once the assembly process is complete, the liquid concrete is ready to be poured into the center of the wall forms 110. After the concrete has “Set-up” or dried, the assembly can be disassembled by removing the bolt tie 108, and removing the wall form 110, and finally removing the Concrete Wall Form Removable Bolt Tie Sleeve 109, due to the fact that the sleeve is made from a flexible polyolefin plastic that does not adhere to concrete.