Source-load cooperation access method for a power distribution region, terminal and storage medium
11500341 · 2022-11-15
Assignee
- ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANY (Tianjin, CN)
- STATE GRID TIANJIN ELECTRIC POWER COMPANY (Tianjin, CN)
- State Grid Corporation Of China (Beijing, CN)
- Tianjin University (Tianjin, CN)
Inventors
- Yan Qi (Tianjin, CN)
- Xudong Wang (Tianjin, CN)
- Yunfei Mu (Tianjin, CN)
- Xuejun Shang (Tianjin, CN)
- Bofeng Luo (Tianjin, CN)
- Yi Ding (Tianjin, CN)
- Xianxu Huo (Tianjin, CN)
- Zhijun Zhang (Tianjin, CN)
- Lei Wu (Tianjin, CN)
Cpc classification
Y02E10/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E40/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G06Q10/04
PHYSICS
Y02B10/10
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
G06Q10/04
PHYSICS
Abstract
Provided is a source-load cooperation access method for a power distribution region. The method includes: establishing a timing feature model of a distributed generator and a timing feature model of a load respectively, acquiring a timing feature of the distributed generator in an access power distribution region by using maximum likelihood estimation and acquiring a timing feature of a user which accesses the power distribution region by using classification and regression trees; and inputting the timing feature of the distributed generator and the timing feature of the user which access the power distribution region into a combination optimization model, and determining a source-load access feeder through optimization.
Claims
1. A source-load cooperation access method for a power distribution region, comprising: establishing, by a terminal, a timing feature model of a distributed generator and a timing feature model of a load respectively, acquiring, by the terminal, by using a maximum likelihood estimation and the timing feature model of the distributed generator, a timing feature of the distributed generator which accesses the power distribution region, and acquiring, by the terminal, by using a classification and regression tree and the timing feature model of the load, a timing feature of the load which accesses the power distribution region; and inputting, by the terminal, the timing feature of the distributed generator which accesses the power distribution region and the timing feature of the load which accesses the power distribution region into a combination optimization model, and determining a source-load access feeder through optimization; wherein a timing feature of a new access load i is A.sub.1, wherein A.sub.1 is expressed as:
A.sub.i=[A.sub.i,1,A.sub.i,2, . . . ,A.sub.i,k, . . . ,A.sub.i,h], where h is a number of users; wherein an access optimization model is used for determining a feeder which a certain load accesses in a case where n feeders are available for access in the access power distribution region, and a decision variable of the combination optimization model is capable of being expressed by variables 0 and 1:
2. The method of claim 1, wherein establishing, by the terminal, the timing feature model of the distributed generator comprises: establishing, by the terminal, a timing feature model for photovoltaic generation:
P.sub.s=EDη, where P.sub.s denotes output power of the photovoltaic generation, E denotes a lighting intensity, D denotes an area of a photovoltaic panel and η denotes light energy conversion efficiency; and establishing, by the terminal, a timing feature model of a fan:
3. The method of claim 2, wherein solving, by the terminal, the shape parameters λ and μ of the Beta distribution of the lighting intensity by the maximum likelihood method and according to the historical data of the lighting intensity measured in the access power distribution region comprises: constructing, by the terminal, a logarithm likelihood function L(λ,μ):
4. The method of claim 3, wherein simulating, by the terminal, the lighting intensity satisfying the Beta distribution based on the shape parameters λ and μ of the Beta distribution of the lighting intensity and by the Monte Carlo method comprises: acquiring, by the terminal, a probability distribution function F(E) of the lighting intensity E based on the shape parameters λ and μ of the Beta distribution of the lighting intensity, and simulating, by the terminal, the lighting intensity satisfying the Beta distribution according to the probability distribution function F(E) of the lighting intensity E and by the Monte Carlo method; wherein
5. The method of claim 2, wherein classifying, by the terminal, the plurality of pieces of historical load data collected by the load control system by using the fuzzy C-means (FCM) clustering algorithm to obtain the plurality of classes of load data comprises: for the plurality of pieces of historical load data, classifying, by the terminal, the plurality of pieces of historical load data into L classes by using the FCM algorithm, wherein an i-th piece of historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m], where denotes active power of the load within a j-th period in the i-th piece of historical load data, m denotes a number of sampling periods in one day, and i is an integer greater than 0; a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T; a degree of membership V.sub.i,k of D.sub.i to the k-th class center X.sub.k satisfies a following condition:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L}, where max{.} denotes a maximum value function.
6. A terminal, comprising a processor and a memory for storing programs, wherein when executed by the processor, the programs implement the following steps: establishing a timing feature model of a distributed generator and a timing feature model of a load respectively, acquiring, by using a maximum likelihood estimation and the timing feature model of the distributed generator, a timing feature of the distributed generator which accesses the power distribution region, and acquiring, by using a classification and regression tree and the timing feature model of the load, a timing feature of the load which accesses the power distribution region; and inputting the timing feature of the distributed generator which accesses the power distribution region and the timing feature of the load which accesses the power distribution region into a combination optimization model, and determining a source-load access feeder through optimization; wherein: a timing feature of a new access load i is A.sub.i, wherein A.sub.i is expressed as:
A.sub.i=[A.sub.i,1,A.sub.i,2, . . . ,A.sub.i,k, . . . ,A.sub.i,h], where h is a number of users; an access optimization model is used for determining a feeder which a certain load accesses in a case where n feeders are available for access in the access power distribution region, and a decision variable of the combination optimization model is capable of being expressed by variables 0 and 1:
7. A non-transitory computer-readable storage medium, which is configured to store computer programs, wherein when executed by a processor, the computer programs implement following steps: establishing a timing feature model of a distributed generator and a timing feature model of a load respectively, acquiring, by using a maximum likelihood estimation and the timing feature model of the distributed generator, a timing feature of the distributed generator which accesses the power distribution region, and acquiring, by using a classification and regression tree and the timing feature model of the load, a timing feature of the load which accesses the power distribution region; and inputting the timing feature of the distributed generator which accesses the power distribution region and the timing feature of the load which accesses the power distribution region into a combination optimization model, and determining a source-load access feeder through optimization; wherein a timing feature of a new access load i is A.sub.i, wherein A.sub.i is expressed as:
A.sub.i=[A.sub.i,1,A.sub.i,2, . . . ,A.sub.i,k, . . . ,A.sub.i,h], where h is a number of users; an access optimization model is used for determining a feeder which a certain load accesses in a case where n feeders are available for access in the access power distribution region, and a decision variable of the combination optimization model is capable of being expressed by variables 0 and 1:
8. The method of claim 3, wherein classifying, by the terminal, the plurality of pieces of historical load data collected by the load control system by using the fuzzy C-means (FCM) clustering algorithm to obtain the plurality of classes of load data comprises: for the plurality of pieces of historical load data, classifying, by the terminal, the plurality of pieces of historical load data into L classes by using the FCM algorithm, wherein an i-th piece of historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m], where d.sub.i,j denotes active power of the load within a j-th period in the i-th piece of historical load data, m denotes a number of sampling periods in one day, and i is an integer greater than 0; a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T; a degree of membership V.sub.i,k of D.sub.i to the k-th class center X.sub.k satisfies a following condition:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L}, where max{.} denotes a maximum value function.
9. The method of claim 4, wherein classifying, by the terminal, the plurality of pieces of historical load data collected by the load control system by using the fuzzy C-means (FCM) clustering algorithm to obtain the plurality of classes of load data comprises: for the plurality of pieces of historical load data, classifying, by the terminal, the plurality of pieces of historical load data into L classes by using the FCM algorithm, wherein an i-th piece of historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m], where d.sub.i,j denotes active power of the load within a j-th period in the i-th piece of historical load data, m denotes a number of sampling periods in one day, and i is an integer greater than 0; a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T; a degree of membership V.sub.k of D.sub.i to the k-th class center X.sub.k satisfies a following condition:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L}, where max{.} denotes a maximum value function.
10. The terminal of claim 6, wherein establishing the timing feature model of the distributed generator comprises: establishing a timing feature model for photovoltaic generation:
P.sub.s=EDη, where P.sub.s denotes output power of the photovoltaic generation, E denotes a lighting intensity, D denotes an area of a photovoltaic panel and η denotes light energy conversion efficiency; and establishing a timing feature model of a fan:
11. The terminal of claim 10, wherein solving the shape parameters λ and μ of the Beta distribution of the lighting intensity by the maximum likelihood method and according to the historical data of the lighting intensity measured in the access power distribution region comprises: constructing a logarithm likelihood function L(λ,μ):
12. The terminal of claim 11, wherein simulating the lighting intensity satisfying the Beta distribution based on the shape parameters λ and μ of the Beta distribution of the lighting intensity and by the Monte Carlo method comprises: acquiring a probability distribution function F(E) of the lighting intensity E based on the shape parameters λ and μ of the Beta distribution of the lighting intensity, and simulating the lighting intensity satisfying the Beta distribution according to the probability distribution function F(E) of the lighting intensity E and by the Monte Carlo method; wherein
13. The terminal of claim 10, wherein classifying the plurality of pieces of historical load data collected by the load control system by using the fuzzy C-means (FCM) clustering algorithm to obtain the plurality of classes of load data comprises: for the plurality of pieces of historical load data, classifying the plurality of pieces of historical load data into L classes by using the FCM algorithm, wherein an i-th piece of historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m], where d.sub.i,j denotes active power of the load within a j-th period in the i-th piece of historical load data, m denotes a number of sampling periods in one day, and i is an integer greater than 0; a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T; a degree of membership V.sub.i,k of D.sub.i to the k-th class center X.sub.k satisfies a following condition:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L}, where max{.} denotes a maximum value function.
14. The storage medium of claim 7, wherein establishing the timing feature model of the distributed generator comprises: establishing a timing feature model for photovoltaic generation:
P.sub.s=EDη, where P.sub.s denotes output power of the photovoltaic generation, E denotes a lighting intensity, D denotes an area of a photovoltaic panel and η denotes light energy conversion efficiency; and establishing a timing feature model of a fan:
15. The storage medium of claim 14, wherein solving the shape parameters λ and μ of the Beta distribution of the lighting intensity by the maximum likelihood method and according to the historical data of the lighting intensity measured in the access power distribution region comprises: constructing a logarithm likelihood function L(λ,μ):
16. The storage medium of claim 15, wherein simulating the lighting intensity satisfying the Beta distribution based on the shape parameters λ and μ of the Beta distribution of the lighting intensity and by the Monte Carlo method comprises: acquiring a probability distribution function F(E) of the lighting intensity E based on the shape parameters λ and μ of the Beta distribution of the lighting intensity, and simulating the lighting intensity satisfying the Beta distribution according to the probability distribution function F(E) of the lighting intensity E and by the Monte Carlo method;
17. The storage medium of claim 14, wherein classifying the plurality of pieces of historical load data collected by the load control system by using the fuzzy C-means (FCM) clustering algorithm to obtain the plurality of classes of load data comprises: for the plurality of pieces of historical load data, classifying the plurality of pieces of historical load data into L classes by using the FCM algorithm, wherein an i-th piece of historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m], where d.sub.i,j denotes active power of the load within a j-th period in the i-th piece of historical load data, m denotes a number of sampling periods in one day, and i is an integer greater than 0; a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T; a degree of membership V.sub.i,k of D.sub.i to the k-th class center X.sub.k satisfies a following condition:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L}, where max{.} denotes a maximum value function.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
DETAILED DESCRIPTION
(14) Embodiments of the present application are further described below in conjunction with the drawings.
(15)
(16) In step 110, a timing feature model of a distributed generator and a timing feature model of a load are established respectively, a timing feature of the distributed generator which accesses the power distribution region is acquired by using maximum likelihood estimation and the timing feature model of the distributed generator, and a timing feature of the load which accesses the power distribution region is acquired by using classification and regression trees and the timing feature model of the load.
(17) In step 120, the timing feature of the distributed generator which accesses the power distribution region and the timing feature of the load which accesses the power distribution region are inputted into a combination optimization model, and a source-load access feeder is determined through optimization.
(18) The present application provides a source-load cooperation access method for the power distribution region. A timing feature of the distributed generator and a timing feature of the load are analyzed, and the timing feature of the distributed generator and a timing feature of a user which accesses the power distribution region are acquired by using the maximum likelihood estimation and the classification and regression trees respectively. The optimization model for a source-load combination which accesses the power distribution region is proposed, which targets a maximum power supply capability of a feeder in the power distribution region, uses the source-load combination which accesses the power distribution region as a decision variable, and provides a power supply access strategy. Effectiveness of the proposed method is verified by an example. A result of the example indicates that the source-load cooperation access method based on the timing features for the power distribution region provided by the present application can reduce a construction cost of the power distribution region, improve a utilization rate of the feeder in the power distribution region, and meanwhile fully improve a capability of the power distribution region to consume clean energy resources through an optimized source-load combination which accesses the power distribution region.
(19) The source-load cooperation access method for the power distribution region provided by the present application, as shown in
(20) In step 10, the timing feature of the distributed generator and the timing feature of the load are analyzed, the timing feature model of the distributed generator and the timing feature model of the load are established respectively, and the timing feature of the distributed generator which accesses the power distribution region and the timing feature of the user which accesses the power distribution region are acquired by using the maximum likelihood estimation and the classification and regression trees respectively.
(21) Step 10 includes steps described below.
(22) (1) The timing feature of the distributed generator is analyzed.
(23) Output power P.sub.s for photovoltaic generation is expressed by formula (1):
P.sub.s=EDη (1)
(24) In the above formula, E denotes a lighting intensity of the region, D denotes an area of a photovoltaic panel, and η denotes light energy conversion efficiency.
(25) The lighting intensity E approximately follows to a Beta distribution, and a probability density function ƒ(E) and a probability distribution function F(E) of the lighting intensity E are respectively expressed by formulas (2) and (3):
(26)
(27) In the above formulas, E.sub.m denotes a maximum value of the lighting intensity, and λ and μ denote shape parameters of the Beta distribution.
(28) A simulated lighting intensity is obtained through equivalent transformation of formulas (2) and (3) and expressed by formula (4):
E=E.sub.mF.sup.−1(E) (4)
(29) Output power of a fan depends on a wind speed of a nature wind, and the output power P.sub.w is expressed by formula (5):
(30)
(31) In the above formulas, v denotes the wind speed of the nature wind, V.sub.r denotes a rated wind speed of the fan, V.sub.ci denotes a cut-in wind speed of the fan, V.sub.co denotes a cut-out wind speed of the fan, and A, B and C denote fitting coefficients of a nonlinear part of an output of the fan respectively. In the present application, v is 14 m/s, V.sub.ci is 4 m/s, and V.sub.co is 25 m/s.
(32) The wind speed v approximately follows a Weibull distribution, and a probability density function ƒ(v) and a probability distribution function F(v) of the wind speed v are respectively expressed as follows:
(33)
(34) In the above formulas, s is a shape parameter of the Weibull distribution, and l is a scale parameter of the Weibull distribution. A simulated wind speed is obtained through equivalent transformation of formulas (9) and (10):
v=−l(ln F).sup.1/s (11)
(35) (2) The timing feature of the distributed generator in the power distribution region is identified.
(36) On the premise that the lighting intensity follows the Beta distribution and the wind speed follows the Weibull distribution, the parameters of the Beta distribution of the lighting intensity and the parameters of the Weibull distribution of the wind speed are solved by a maximum likelihood method and according to historical data of the lighting intensity and the wind speed measured in the power distribution region. Light irradiance satisfying the Beta distribution and the wind speed satisfying the Weibull distribution are simulated based on a Monte Carlo method, and the timing feature of a photovoltaic unit and the timing feature of the fan in the power distribution region are calculated according to output model formulas (1) and (5) of the photovoltaic generation and wind power generation.
(37) In the maximum likelihood estimation, according to a principle of a maximum probability of occurrence of samples of the historical data of the wind speed and the lighting intensity in the region, estimated values of the parameters of the Beta distribution and the Weibull distribution are solved. In an example in which the parameters of the Beta distribution are solved, a logarithm likelihood function L(λ,μ) is constructed:
L(λ,μ)=i.sub.i=1.sup.n ln ƒ(E.sub.i) (12).
Let:
(38)
formulas (13) and (14) are iteratively solved by a Newton-Raphson method to obtain a corresponding correction equation:
(39)
(40) An appropriate initial value is selected according to the correction equation (15), and iterations are performed until a convergence criterion is satisfied. The parameters λ and μ of the Beta distribution can be obtained after convergence. Similarly, the parameters s and l of the Weibull distribution can also be obtained.
(41) (3) The timing feature of the load is analyzed.
(42) There is a wide variety of loads which access the power distribution region, and different types of power loads have different characteristics. In order to optimize power supply access in the power distribution region, it is necessary to analyze the characteristics and power consumption habits of multiple types of loads. In the present application, historical load data of the user collected by a load control system is classified by using a fuzzy C-means (FCM) clustering algorithm, and multiple classes of class centers are extracted as timing features of the multiple types of loads respectively. Historical load data is normalized as D.sub.i and expressed as:
D.sub.i=[d.sub.i,1,d.sub.i,2, . . . ,d.sub.i,j, . . . ,d.sub.i,m] (16).
In the formula, d.sub.i,j denotes active power of the load within a j-th period in an i-th piece of historical load data, and there are 96 sampling periods in total in one day. The historical load data is classified into L classes by the FCM algorithm, and a class center matrix X is expressed as:
X=[X.sub.1,X.sub.2, . . . ,X.sub.k, . . . ,X.sub.L].sup.T (17).
(43) A degree of membership V.sub.i,k of any one sample of the historical load data D.sub.i to a k-th class center X.sub.k satisfies:
(44)
(45) In the formula, N denotes a number of samples of the historical load data.
(46) An objective function of the FCM is a minimum Euclidean distance from D.sub.i to the corresponding class center X.sub.k, and may be expressed as:
(47)
(48) Formula (19) is solved through a lagrange transformation to obtain:
(49)
(50) In the FCM, X and a degree-of-membership matrix V are updated by iterating formulas (20) and (21), and F in formula (19) is calculated until F no longer changes. An attribution timing feature of sample data is determined according to a maximum degree-of-membership principle, and if D.sub.i belongs to X.sub.k, the degree of membership satisfies:
V.sub.i,k=max{V.sub.i,1,V.sub.i,2, . . . ,V.sub.i,k, . . . ,V.sub.i,L} (22),
where max{.} denotes a maximum value function.
(51) (4) The timing feature of the load in the power distribution region is identified.
(52) The timing feature of the load which accesses the power distribution region is accurately identified to provide a basis for optimized source-load access to the power distribution region. The present application identifies the timing feature of the load in the power distribution region through a decision tree model. The decision tree model is a widely used non-parametric classifier. A sample dataset is formed, and each sample has a set of attributes and corresponding categories which are determined in advance. Then a classifier may be obtained through learning. Finally, a new object can be correctly classified through the classifier.
(53) A core of the decision tree model is construction of the classifier. In the present application, the classifier is constructed through the classification and regression trees (CART). A current node of the classifier is supposed to be t, a current sample dataset is S, the sample dataset is composed of M samples, and the M samples belong to L timing features. If a number of samples belonging to X.sub.k in t is s.sub.k, a Gini index (GINI) characterizing an impurity degree of the current node is expressed as:
(54)
(55) In the above formula, p(X.sub.k|t)=s.sub.k/M denotes a proportion of the samples belonging to X.sub.k in S. t is split by using a load characteristic index to generate two subnodes t.sub.R and t.sub.L, where GINI of the subnodes are GINI(t.sub.R) and GINI(t.sub.L) and a reduction amount of the impurity degree in the splitting is:
Φ(t)=GINI(t)−p.sub.RGINI(t.sub.R)−p.sub.LGINI(t.sub.L) (24).
(56) In the above formula, p.sub.LGINI(t.sub.L) denotes a probability of assigning samples in t to t.sub.L, and p.sub.RGINI(t.sub.R) denotes a probability of assigning samples in t to t.sub.R. A load characteristic index with a maximum impurity reduction amount is selected as a classification attribute.
(57) The preceding process is repeated and the classification attribute is continuously selected until a minimum GINI is satisfied, to obtain a final classifier. Combining an installation requisition parameter of a new access user, the classifier can instruct the identification of the timing feature of the load in the power distribution region.
(58) In an embodiment, the load characteristic index includes a load rate, a daily minimum load rate, a daily peak-valley rate, a peak load rate, a plateau load rate and a valley load rate.
(59) In the embodiment of the present application, the user has the same meaning as the load, and the installation requisition parameter has the same meaning as the load characteristic index.
(60) In step 20, the timing features of the distributed generator and the user in the power distribution region are inputted into the combination optimization model, and the source-load access feeder is determined through optimization thereby obtaining a power supply scheme.
(61) The method of step 20 is described below.
(62) After the source-load timing features in the access power distribution region are effectively identified, the present application provides the source-load cooperation access optimization model based on the timing features for the power distribution region to input the timing features of the distributed generator and the user in the power distribution region into the combination optimization model, and determine the source-load access feeder through optimization by a heuristic algorithm thereby obtaining the power supply scheme.
(63) Supposing that a timing feature of a user i before access is identified as A.sub.i, A.sub.i may be expressed as:
A.sub.i=[A.sub.i,1,A.sub.i,2, . . . ,A.sub.i,k, . . . ,A.sub.i,24] (25).
(64) As shown in
(65)
(66) A load of a k-th feeder before the user accesses the k-th feeder is l.sub.k, and after the new user accesses, a load L.sub.k of the feeder may be updated as:
(67)
(68) The combination optimization model targets the maximum power supply capability of the feeder:
(69)
(70) In the formula, n denotes a number of optional feeders, P.sub.k,N denotes an upper limit of an active transmission capacity of the k-th feeder, and P.sub.k,max denotes a maximum load of the k-th feeder.
(71) Considering the safety of the power distribution region, it is also required that the daily peak load of each feeder is less than a rated transmission capacity of the feeder in the power distribution region, and the feeders have the following constraint:
P.sub.k,max≤P.sub.k,N (29).
(72) Formula (25) to formula (29) constitute a source-load cooperation optimization access model provided by the present application, and an optimized result is solved through a particle swarm algorithm, so that a feeder access scheme in the power distribution region in the engineering is obtained.
(73) An operation principle of the present application is described below.
(74) Only an installation requisition value of the load or the distributed generator is considered for formulating a traditional power supply access scheme, and the access scheme is obtained through a sum of installation requisition values, which is quite different from the actual situation. For example, if a sum of installation requisition values of loads is greater than a sum of outputs of DGs, when the loads are at the peak and the outputs of the DGs are at the valley, a tidal current in the power distribution region is not reversed, but in some periods, when the outputs of the DGs are at the peak and the loads which access the power distribution region are smaller, the tidal current may be reversed. Considering the time distribution difference between a load demand and a DG output, an optimization space is provided for the source-load cooperation access. For example, two-shift and three-shift loads match with a photovoltaic output, and wind power generation matches with a night output. The wind power generation and the photovoltaic generation present complementary characteristics in time sequences. An output of the wind power generation is smaller, and an output of the photovoltaic generation is larger during the day, and the output of the wind power generation is larger, and the output of the photovoltaic generation is smaller at night. To sum up, only by comprehensively considering the timing features of the load and the DG, and utilizing the complementarity between timing power of the DG and the load, a load balance of the feeder in the power distribution region can be ensured in a planning stage through the optimized combination of the DG and the load, thereby achieving the economic operation of the power distribution region.
(75) For this purpose, the source-load cooperation access method for the power distribution region provided by the present application fully takes into account the complementary characteristics of the timing features of the distributed generator and the user load as far as possible. The photovoltaic generation and the wind power generation, as representatives of distributed clean energy resources, generally distributedly access a low-voltage power distribution region and are consumed locally. Therefore, the DG in the present application refers to the photovoltaic generation and the wind power generation of the DG type. For the power distribution region shown in
(76) In order to verify the effectiveness of the method proposed by the present application, a design of an actual power supply access scheme in the power distribution region of a certain company is used as an example for verification. In a certain power distribution region, there are 12 users, 2 photovoltaic units with same specifications and 2 fans with same specifications to be accessed, and there are two feeders available for access in the power distribution region. An original power supply scheme formulated by the power enterprise is shown in Table 1.
(77) Firstly, according to the historical data of the lighting intensity and the wind measured in the power distribution region, the parameters λ=0.61 and μ=2.63 of the Beta distribution and the parameters s=2.43 and l=8.46 of the Weibull distribution are obtained by using the maximum likelihood method. Then the light irradiance and the wind speed are simulated by the Monte Carlo method, and the timing feature of the photovoltaic unit and the timing feature of the fan are calculated according to formulas (1) and (5). On the other hand, 456 users are selected and classified into L=6 classes by the FCM algorithm to acquire load timing features, thereby acquiring source-load timing features of the power distribution region which are shown in
(78) The power enterprise identifies an access user load among the existing load timing features by using the classifier mined by using the classification and regression trees (CART) in conjunction with the installation requisition parameter of the user. An identification situation of the user load is shown in Table 1. A load of a feeder in the power distribution region before access may be obtained by the load control system, models of feeder 1 and feeder 2 are YJV22−8.7/15 kV−3*25, and upper limits of the active transmission capacities of feeder1 and feeder 2 both are 1500 kW. Load data of the feeders in the power distribution region before the access is shown in
(79) TABLE-US-00001 TABLE 1 Comparison of access schemes Feeder 1 Feeder 2 Traditional 1-5, fan #1, 6-14, photovoltaic unit #1, method fan #2 photovoltaic unit #2 Optimization 2, 10, 13, 1, 3-9, 11, 12, 14, method in the photovoltaic unit #1, fan #1, present application photovoltaic unit #2 fan #2
(80) Daily load curves of the feeders are calculated according to formula (27) for the traditional method and the optimization method, and are shown in
(81) In this embodiment, the loads of the feeder before and after the optimization are further examined through the daily load rate, the daily minimum load rate, and the daily peak-valley rate, and indexes of feeders 1 and 2 before and after the optimization are calculated and shown in Table 2.
(82) TABLE-US-00002 TABLE 2 Calculation results of load characteristic indexes of feeders Load Daily Minimum Daily Peak-Valley Feeder Method Rate Load Rate Rate Feeder 1 Traditional method 74.22% 63.55% 47.35% Optimization method 92.14% 85.72% 14.28% Feeder 2 Traditional method 85.94% 77.03% 29.55% Optimization method 92.20% 84.67% 15.33%
(83) Many indexes of the optimized access considering the source-load features are superior to those of the traditional method. Taking feeder 1 as an example, compared with the traditional method, by adopting the optimization method, the daily load rate of the feeder is increased by 18%, the daily minimum load rate is increased by 22%, and the daily peak-valley rate is reduced by 33%.