Milling machine, in particular surface miner, and method for mining milled material of an open cast surface
10077655 · 2018-09-18
Assignee
Inventors
Cpc classification
E21C47/00
FIXED CONSTRUCTIONS
E21C25/68
FIXED CONSTRUCTIONS
International classification
E21C47/00
FIXED CONSTRUCTIONS
E01C23/12
FIXED CONSTRUCTIONS
E21C25/68
FIXED CONSTRUCTIONS
Abstract
In a method for milling an opencast mining surface or for milling off layers of an asphalt or concrete traffic surface with a milling machine removing the ground surface, by milling the ground surface along a predetermined milling track and by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, a relative position between the container and the conveying device is automatically controlled to regulate the loading of the container.
Claims
1. A method of milling a ground surface, comprising: (a) milling the ground surface along a milling track with a milling machine; (b) loading a container of a truck that travels adjacent to the milling machine by transporting milled material via a conveying device directly from a milling drum of the milling machine to the container; and (c) regulating the loading of step (b) by automatically generating one or more commanded speeds and positions for the truck as a function of at least a current discharge position of the conveying device.
2. The method of claim 1, further comprising: interrupting steps (a), (b) and (c) when a maximum loading volume of the truck has been reached; replacing the fully loaded truck with an unloaded truck; and repeating steps (a), (b) and (c) with the unloaded truck.
3. The method of claim 1, wherein: step (c) further comprises mapping a conveyor device position onto a truck position.
4. The method of claim 1, wherein: step (c) further comprises measuring an absolute conveyor device position and an absolute truck position.
5. The method of claim 1, further comprising: temporarily stopping the milling of step (a) and the loading of step (b), after the container is fully loaded; then replacing the container with a new container; and then resuming steps (a)-(c) to load the new container.
6. The method of claim 1, wherein: step (b) is performed continuously during step (a).
7. The method of claim 1, wherein: in step (b) the milled material is transported directly from the milling drum to the container without being stored in the milling machine.
8. A method of milling a ground surface, comprising: (a) milling the ground surface along a milling track with a milling machine having a milling drum and a conveyor extending from the milling drum to a conveyor discharge position; (b) during step (a), continuously loading a container of a truck that travels adjacent to the milling machine by transporting milled material via the conveyor from a milling drum of the milling machine to the container; and (c) regulating the loading of step (b) by automatically generating one or more commanded speeds and positions for the truck as a function of at least the conveyor discharge position.
9. The method of claim 8, wherein: in step (b) the milled material is transported from the milling drum to the container without being stored in the milling machine.
10. The method of claim 8, further comprising: temporarily stopping the milling of step (a) and the loading of step (b), after the container is fully loaded; then replacing the container with a new container; and then resuming steps (a)-(c) to load the new container.
11. A method of milling a ground surface, comprising: (a) milling the ground surface along a milling track with a milling machine having a milling drum and a conveyor extending from the milling drum to a conveyor discharge position; (b) during step (a), loading a container of a truck that travels adjacent to the milling machine by transporting milled material via the conveyor from a milling drum of the milling machine to the container without storing the milled material on the milling machine; and (c) regulating the loading of step (b) by automatically generating one or more commanded speeds and positions for the truck as a function of at least the conveyor discharge position.
12. The method of claim 11, further comprising: temporarily stopping the milling of step (a) and the loading of step (b), after the container is fully loaded; then replacing the container with a new container; and then resuming steps (a)-(c) to load the new container.
Description
(1) In the following, one embodiment of the invention is explained in greater detail with reference to the drawings.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12) An opencast pit has a size of, for example, approx. 100 m in width and approx. 500 m in length.
(13) As can be seen from
(14)
(15) The ground surface is removed along a predetermined milling track having a predetermined length.
(16) The milled material is conveyed via a conveying device, for instance, a transport conveyor 2, to at least one container of a truck 1 that travels along next to the milling machine, said truck 1 having a predetermined maximum loading volume per load.
(17) A fully loaded truck is replaced with an unloaded truck when the maximum loading volume of a truck load has been reached.
(18) The control unit 12 of the milling machine 3 calculates the maximum total loading volume resulting over the length of the current milling track as a function of the current effective working width and a milling depth that has been optimized in relation to a predetermined, preferably maximum milling power, the number of truck loads required for the maximum total loading volume of a milling track, and determines an effective total loading volume of the current milling track, which results from the nearest whole number of loads.
(19) The control unit 12 then adjusts the adjustable total milling volume of the milling machine over the length of the milling track to match the effective total loading volume that results in a whole number of loads.
(20) For the purpose of setting and adjusting the total milling volume, the control unit 12 can calculate the effective total loading volume which results from the nearest lower whole number of loads.
(21) For the purpose of adjusting the adjustable total milling volume to match the specified effective total loading volume, the control unit 12 can alter, preferably reduce, the milling depth.
(22) For the purpose of adjusting the adjustable total milling volume to match the specified effective total loading volume, the control unit 12 can alternatively alter the effective working width by selecting a different overlap of adjoining milling tracks.
(23) The control unit 12 can set the advance speed of the milling machine to a preselected milling power, preferably maximum milling power.
(24) In addition, the control unit 12 can control the travel speed of the truck as a function of the advance speed of the milling machine in such a fashion that the loading space of the at least one container is loaded evenly and fully over the length up to the maximum loading volume.
(25) The control unit 12 can regulate the loading process of at least one container by controlling the travel speed of the truck as a function of the advance speed of the milling machine and of the measured loading condition of the container.
(26) The control unit 12 can control the travel speed or the current position of the truck as a function of the advance speed of the milling machine, or of the distance travelled by the milling machine in the current milling track, or of the current discharge position of the transport device in relation to the truck.
(27) In this arrangement, the control unit 12 can control the travel speed or the current position of the truck in such a fashion that the discharge position of the conveying device above the at least one container moves from a front or rear end position inside the container to an end position that is opposite in longitudinal direction.
(28) Preferably, the control unit can control the travel speed of the truck in such a fashion that the travel speed of the truck is higher than or equal to the advance speed of the milling machine.
(29) The control unit 12 can increase the travel speed of the truck only after a sufficiently high initial fill has been reached at the front or rear end position.
(30) The containers may be arranged on several trailers connected to one another in an articulated fashion, in which case the adjacent upper end edges of the opposite end walls overlap.
(31) The adjacent end walls of the containers on the several trailers connected to one another in an articulated fashion may be provided with a mutually adapted curvature about an axis orthogonal to the ground surface in such a fashion that the end walls have a smallest possible mutual distance but enable a lateral turning movement of the trailers nonetheless.
(32) The containers may be curved in a convex manner at the front end wall side and be provided, preferably at the front end edge, with a projecting collar that covers a driver's cabin of the truck and/or the rear upper concavely curved end edge of the end wall of a container travelling ahead.
(33) A dimensioning and control concept for automated opencast mining is described in the following. The procedure comprises the following steps: calculation/dimensioning of the cutting depth for each layer (as a function of a vertical opencast mining process, assuming that the pit dimensions are known) to achieve optimal truck loading for each layer, application of a control concept for the opencast mining/loading process to achieve optimal truck loading at minimized control and communication efforts.
(34) The fundamental advantage of the following control concept lies in the fact that a continuous loading process between truck and opencast milling machine, where both machines travel at a constant speed, is especially easy to realize with regard to the control concept and requires almost no communication between the milling machine and the truck (except at the beginning and at the end of the loading process).
(35) The principle of the present invention consists in controlling the truck speed and direction as a function of the actual position and speed of the milling machine (or of the position and speed of the conveyor belt of the milling machine respectively), the cutting depth and cutting width of the milling machine and other process parameters known in advance, such as the maximum payload of the truck, the equivalent loading length of the truck and the density of the milled material.
(36) Calculation of the optimal cutting depth as a function of the vertically progressing layer mining process:
(37) General Definitions And Relations:
(38) Known Process Parameters And Variables: l.sub.min e,max in [m]: maximum total horizontal distance to be mined without the milling machine turning back (including the ramp and the flat part; see
(39) Unknown process variables to be determined (in the sequence of clarification): l.sub.min e,act in [m]: actual total horizontal distance to be mined without the milling machine turning back (including the ramp and the flat part; see
(40)
(41) Calculation procedure: Start at the top of the pit by adjusting l.sub.min e, act to the beginning of the track length and by adjusting the cutting depth to the maximum cutting depth Calculate the number of trucks required by means of the cited procedure Reduce the number of trucks required to the next smaller whole number Recalculate the cutting depth and the actual horizontal distance on the flat part l.sub.flat,act Set l.sub.flat,act as the starting value for l.sub.min e, act to calculate the next cutting depth
(42) The material volume that needs to be loaded on a ramp can be calculated from
(43)
(44) In a similar fashion, the material volume that needs to be loaded on the flat part can be derived from
Q.sub.flat,act=l.sub.flat,act.Math.F.sub.T,act.Math.F.sub.B.Math.L.
(45) The total material that needs to be loaded for the entire track is simply
Q.sub.total,act=Q.sub.flat,act+2.Math.Q.sub.ramp,act.
(46) Substituting the material volume of the ramp and the flat part results in
(47)
which can be further simplified to
(48)
(49) The total weight to be loaded is
M.sub.total,act=Q.sub.total,act.Math..sub.mat
(50) The number of truck loads required for the total load is
n.sub.trucks=M.sub.total,act/M.sub.pay .
(51) A recalculation of the required cutting depth can now be performed quite easily by solving the aforementioned equations for the cutting depth, which results in
(52)
(53) The current total horizontal distance of the flat part can be determined by initially calculating the distance of the ramp
(54)
(55) The remaining distance of the flat part l.sub.flat,act can then be calculated from (
l.sub.flat,act=l.sub.min e,act2.Math.l.sub.ramp,act.
(56) The total horizontal distance l.sub.min e,act for calculation of the next layer equals the last calculated distance of the flat part
l.sub.min e,act=l.sub.flat,act,
with the exception of the first calculation, where said length needs to be set to the maximum initial horizontal distance l.sub.min e,max.
(57)
(58) Control Law For The Truck Speed:
(59) General Definitions And Relations
(60) Known Process Parameters And Variables: F.sub.T in [m]: cutting depth F.sub.B in [m]: cutting width .sub.SM in [m/min]: advance speed of the milling machine M.sub.pay in [t]: payload of the truck L in []: loosening factor, relation between the density of the cut material and the density of the loaded material .sub.mat in [t/m.sup.3]: density of the mined material l.sub.lc in [m]: equivalent loading length of the truck
(61) Unknown process variables to be determined (in the sequence of clarification): t.sub.lc in [min]: truck loading time Q.sub.lc in [m.sup.3]: material volume for one loading cycle {dot over (q)} in [m.sup.3/min]: material flow rate from the milling machine A.sub.tray,cr in [m.sup.2]: loadable cross-sectional area of the truck tray .sub.Truck in [m/min]: truck speed in forward direction Where: [min]: minutes [m]: meters [m.sup.3/min]: cubic meters per minute
(62) The truck-loading cross-sectional area as a function of the surface milling machine speed, the cutting depth, the cutting width and the truck speed can be calculated by using the following simple assumptions and relations: The material can be loaded onto the truck without any angle of repose (see
(63) The material delivered by the milling machine 3 during a specific loading time t.sub.lc can be calculated from
Q.sub.lc=F.sub.T.Math.F.sub.B.Math..sub.SM.Math.L.Math.t.sub.lc={dot over (q)}.Math.t.sub.lc.
(64) The resulting cross-sectional loading area of the truck tray can be calculated from
A.sub.tray,cr=Q.sub.lc/l.sub.lc
where l.sub.lc represents an equivalent loading length assuming that the load deposited on the truck resembles a cuboid.
(65) By substituting the material volume and the loading length one obtains
(66)
which means that for a given cutting depth, a given cutting width and a given loosening factor the cross-sectional loading area is a function of the milling machine speed and the difference of milling machine speed and truck speed. This relation can be verified quite easily. Assuming that the truck is stationary (V.sub.truck=0), it results from the aforementioned relation that
A.sub.tray,cr=F.sub.T.Math.F.sub.B.Math.L,
which means that the material cross-section to be cut by the milling machine, multiplied by the loosening factor, needs to be stored in the truck 1.
(67) To be able to obtain a particular cross-sectional loading area of the truck tray, equation (1) produces a control law for adjusting the truck speed and/or the milling machine speed for a given cutting depth and cutting width. In practice, the loading area is subject to a limitation that is due to the maximum payload of the truck tray. With a given maximum payload of the truck tray, the maximum material volume that can be loaded during one loading cycle is defined by
Q.sub.lc,max=M.sub.pay/.sub.mat.
(68) The maximum material volume can then be translated into a maximum cross-sectional loading area
A.sub.tray,cr,max=Q.sub.lc,max/l.sub.lc(2).
(69) Inserting (2) into (1) and solving (1) for the truck speed produces a feedforward control law for the truck speed:
(70)
(71) The basic structure of a truck control unit is depicted in