Method for producing a forged crankshaft
10058912 ยท 2018-08-28
Assignee
Inventors
- Kenji Tamura (Takatsuki, JP)
- Junichi Okubo (Amagasaki, JP)
- Koichiro Ishihara (Kyoto, JP)
- Ken Yoshino (Nishinomiya, JP)
- Kunihiro Yabuno (Matsubara, JP)
- Hiroyuki Kurokawa (Nishinomiya, JP)
- Tomohisa Yamashita (Suita, JP)
- Sho Takamoto (Osaka, JP)
Cpc classification
F16C3/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B23P15/00
PERFORMING OPERATIONS; TRANSPORTING
International classification
B21J5/02
PERFORMING OPERATIONS; TRANSPORTING
F16C3/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A method for producing a forged crankshaft includes a die forging step, a trimming step, and an excess projecting portion bending step. The die forging step forms a finish forged blank with flash, the finish forged blank including a shape of the crankshaft, in which crank arms have excess projecting portions at outer peripheries of side portions thereof near a crank pin, the excess projecting portions projecting from the outer peripheries. The trimming step removes the flash from the finish forged blank formed in the die forging step. The excess projecting portion bending step bends the excess projecting portions of the crank arms toward a journal-side surface of the crank arm by inserting a first die having a U-shape from a direction of eccentricity of the crank pin to the crankshaft obtained by removing the flash in the trimming step.
Claims
1. A method for producing a forged crankshaft, the crankshaft including: journals that define a center of rotation; crank pins that are eccentric with respect to the journals; and crank arms, each of the crank arms connecting a corresponding one of the journals to a corresponding one of the crank pins, the method comprising: a die forging step, including forming a finish forged blank with flash, the finish forged blank including a shape of the crankshaft, wherein the crank arm has an excess projecting portion at an outer periphery of each of side portions near the crank pin, the excess projecting portion projecting from the outer periphery; a trimming step, including removing the flash from the finish forged blank formed in the die forging step; and an excess projecting portion bending step, including inserting a first die having a U-shape to the flash-removed finish forged blank from a direction of eccentricity of the crank pin and bending the excess projecting portion of the crank arm toward a surface of the crank arm, the surface being adjacent to the journal.
2. The method for producing a forged crankshaft according to claim 1, wherein, in the excess projecting portion bending step, a second die is abutted against an area in the surface of the crank arm to hold the area, the surface being adjacent to the journal, the area not including areas of the side portions.
3. The method for producing a forged crankshaft according to claim 1, wherein the excess projecting portion of the finish forged blank is formed in the die forging step so as to project from the outer periphery within a region extending from the side portions of the crank arm to a portion of the crank arm corresponding to an eccentrically top portion of the crank pin.
4. The method for producing a forged crankshaft according to claim 1, wherein the excess projecting portion bending step is performed in a coining step in which a shape of the crankshaft is corrected by pressing using dies.
5. The method for producing a forged crankshaft according to claim 1, wherein, in the excess projecting portion bending step, a recess is formed inward of the side portions of the crank arm, in the surface of the crank arm, the surface being adjacent to the journal.
6. The method for producing a forged crankshaft according to claim 2, wherein, in the excess projecting portion bending step, a recess is formed inward of the side portions of the crank arm, in the surface of the crank arm, the surface being adjacent to the journal.
7. The method for producing a forged crankshaft according to claim 3, wherein, in the excess projecting portion bending step, a recess is formed inward of the side portions of the crank arm, in the surface of the crank arm, the surface being adjacent to the journal.
8. The method for producing a forged crankshaft according to claim 4, wherein, in the excess projecting portion bending step, a recess is formed inward of the side portions of the crank arm, in the surface of the crank arm, the surface being adjacent to the journal.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
DESCRIPTION OF EMBODIMENTS
(11) Embodiments of the method of the present invention for producing a forged crankshaft will now be described in detail.
(12) [First Embodiment]
(13) A first embodiment of the method of the present invention for producing a forged crankshaft employs the production process as shown in
(14) 1. Crank Arm Shape of Crankshaft
(15)
(16) As shown in
(17) In short, the shape of the crank arm subsequent to coining is such that a large thickness is provided at the side portions Aa, Ab of the crank arm A while a recess is formed in the journal J-side surface of the crank arm A. The forged crankshaft having the crank arm of such a shape has reduced weight by virtue of the recess in the surface of the crank arm A and also has sufficient stiffness because a large thickness is provided at the side portions Aa, Ab of the crank arm A.
(18) In contrast, as shown in
(19) This shape of the crank arm prior to coining is finally formed by finish forging in the die forging step and retained in the trimming step.
(20) 2. Method for Producing Forged Crankshaft
(21) As described above, the production method according to the present embodiment includes the preforming step, the die forging step, the trimming step, and the coining step, each being performed sequentially by hot working. When adjustment of the placement angle for the crank pins is necessary, a twisting step is incorporated subsequent to the trimming step and prior to the coining step.
(22) In the production method according to the present embodiment, similarly to the conventional production method shown in
(23) Next, the die forging step (block forging and finish forging) is performed to form a finish forged blank with flash from the bent blank, the finish forged blank including the shape of the crankshaft in which the crank arm has the shape shown in
(24) It should be noted that the shape of the crankshaft included in the finish forged blank is such that a recess has been formed in the journal J-side surface of the crank arm A and the plate-shaped excess projecting portions Aaa, Aba have been formed on the outer peripheries of the side portions Aa, Ab of the crank arm A as described above. The recess smoothly extends to the areas of the side portions Aa, Ab of the crank arm A, and the excess projecting portions Aaa, Aba have thicknesses substantially equal to the thicknesses of the side portions Aa, Ab or smaller than those. The dies used in the die forging carry impressions reflecting the shapes of them, and the drafts of the dies do not become reverse drafts either at the site corresponding to the recess in the surface of the crank arm or at the sites corresponding to the excess projecting portions Aaa, Aba on the outer peripheries of the crank arm. As a result, the die forging can be carried out without difficulty.
(25) Subsequently, the trimming step is performed to trim the flash from the finish forged blank with flash, thereby obtaining the forged crankshaft. The crankshaft obtained by the trimming step has the crank arm shape shown in
(26) Then, the process proceeds to the coining step.
(27)
(28) In the coining step, paired upper and lower dies are used as with typical conventional coining steps. In
(29) In particular, in the coining step of the present embodiment, a first die 10 and a second die 20 are used as shown in
(30) The first die 10 has a U-shape symmetrical with respect to the crank arm centerline of the crank arm A of the crankshaft. The first die 10 is movable back and forth along the crank arm centerline of the crank arm A of the crankshaft (the direction of eccentricity of the crank pin P). The back and forth movement of the first die 10 is carried out by a hydraulic cylinder coupled to the first die 10 or by another means. Inner surfaces 11a, 11b, 11c of a base portion 11 of the first die 10 carry impressions corresponding to the outer peripheral geometry of the crank arm A of the crankshaft shown in
(31) The second die 20 carries an impression having a shape corresponding to that of the recess in the surface of the crank arm. The second die 20 is movable back and forth so as to be in contact with or away from the recess in the surface of the crank arm. The back and forth movement of the second die 20 is carried out by a hydraulic cylinder coupled to the second die 20 or another means.
(32) The coining step of the present embodiment using such coining dies, first die 10, and second die 20 is carried out in the following manner. Firstly, the crankshaft after trimming is placed in the impressions of the lower coining die. During this time, the first die 10 and the second die 20 are both in a state in which they are withdrawn away from the crankshaft, and the crank arm A, including the excess projecting portions Aaa, Aba on the outer peripheries of the crank arm, is not constrained by the dies at all as shown in
(33) In this state, the upper coining die is moved toward the lower coining die. In this manner, the shaft components of the crankshaft (e.g., the journals J, the crank pins P, the front part Fr, and the flange Fl), and further the counterweights W are slightly pressed and corrected to the size and shape of the end product.
(34) After the pressing by the coining die, the second die 20 is advanced and the second die 20 is abutted against the journal J-side surface of the crank arm A as shown in
(35) Next, the first die 10 is advanced and the first die 10 is inserted to the crank arm A from the direction of eccentricity of the crank pin P of the crankshaft. As the first die 10 is inserted, the inner surfaces 12Aa, 12Ba of the end portions 12A, 12B of the first die 10 are first brought into contact with the excess projecting portions Aaa, Aba on the outer peripheries of the side portions Aa, Ab of the crank arm A, respectively. The excess projecting portions Aaa, Aba are gradually bent toward the journal J-side surface by the inner surfaces 12Aa, 12Ba of the end portions 12A, 12B of the first die 10, with the inner surfaces 12Aa, 12Ba contacting the excess projecting portions Aaa, Aba, respectively. Then, as shown in
(36) Consequently, the side portions Aa, Ab of the crank arm A protrude to the journal J-side surface by amounts corresponding to the volumes of the excess projecting portions Aaa, Aba. In this manner, the crankshaft, which has a large thickness at the side portions Aa, Ab of the crank arm A and has the recess formed in the journal J-side surface of the crank arm A as shown in
(37) Furthermore, during the insertion of the first die 10, the crank arm A is constrained by the second die 20 abutted against the recess area As in the journal J-side surface, and therefore the shape of the recess area As is stabilized. Moreover, the side portions Aa, Ab of the crank arm A protrude to the journal J-side as a result of the insertion of the first die 10, and the shape of the protrusions is precisely formed by the second die 20.
(38) After completion of the insertion of the first die 10, the first die 10 and the second die 20 are retracted to be withdrawn from the crank arm A, and thereafter, the upper coining die is raised to take out the crankshaft.
(39) As described above, with the production method of the present embodiment, it is possible to form the recess in the journal J-side surface of the crank arm A while ensuring the large thickness at the side portions Aa, Ab of the crank arm A, so that a forged crankshaft having reduced weight in combination with sufficient stiffness can be produced. With this production method, it suffices merely to form the excess projecting portions Aaa, Aba on the outer peripheries of the side portions Aa, Ab of the crank arm A such that the excess projecting portions locally project therefrom, and to bend the locally projecting excess projecting portions Aaa, Aba by inserting the U-shaped first die from the direction of eccentricity of the crank pins. Accordingly, the crankshaft production of the present embodiment can be performed conveniently without the need for a large force.
(40) In particular, in the present embodiment, although the second die 20 is abutted against the surface of the crank arm A, the second die 20 is not pressed into the surface any further, and therefore merely a small force is sufficient to hold the second die 20. Furthermore, according to the present embodiment, the formation of the final shape of the crank arm A is accomplished simply by bending the excess projecting portions Aaa, Aba, and therefore the deformation has little influence on the other components such as the journals.
(41) Furthermore, according to the present embodiment, the bending of the excess projecting portions Aaa, Aba on the outer peripheries of the crank arm is carried out in the coining step, and therefore modification to the conventional production method is not necessary. It is noted, however, that the bending of the excess projecting portions Aaa, Aba on the outer peripheries of the crank arm may be performed in a separate step distinct from the coining step as long as it is performed after the trimming step.
(42) [Second Embodiment]
(43) The second embodiment is based on the above first embodiment, with modification made to the shape of the crank arm of the forged crankshaft.
(44) 1. Crank Arm Shape of Crankshaft
(45)
(46) As shown in
(47) In short, the shape of the crank arm subsequent to coining is such that a large thickness is continuously provided at the region from the side portions Aa, Ab of the crank arm A to the pin top portion Ac thereof while a recess is formed in the journal J-side surface of the crank arm A. The forged crankshaft having the crank arm of such a shape has reduced weight by virtue of the recess in the surface of the crank arm A and also has sufficient stiffness because a large thickness is provided at the side portions Aa, Ab of the crank arm A.
(48) It should be noted that the pin fillet portion, which is a joint connecting the crank pin P to the crank arm A, is prone to stress concentration and therefore that quenching using high frequency induction heating is often applied thereto to improve the fatigue strength. In this process, the pin top portion Ac of the crank arm A may experience quench cracking since it is contiguous with the pin fillet portion, which is subjected to quenching, unless the portion has a certain degree of thickness. To guard against such a case, the pin top portion Ac of the crank arm A of the present embodiment has a large thickness and therefore has high resistance to quench cracking.
(49) In contrast, as shown in
(50) This shape of the crank arm prior to coining is finally formed by finish forging in the die forging step and retained in the trimming step as with the above first embodiment.
(51) 2. Method for Producing Forged Crankshaft
(52) The production method of the present embodiment is similar to that of the above first embodiment. That is, the crankshaft having the crank arm shape shown in
(53)
(54) The coining step employs the coining dies, the first die 10, and the second die 20 employed in the above first embodiment. As with the above first embodiment, after the pressing by the coining dies, the second die 20 is advanced and the second die 20 is abutted against the journal J-side surface of the crank arm A as shown in
(55) Next, in the state shown in
(56) Consequently, the side portions Aa, Ab of the crank arm A and the excess projecting portion Aca of the pin top portion Ac protrude from the journal J-side surface by amounts corresponding to the volumes of the respective excess projecting portions Aaa, Aba, Aca. In this manner, the crankshaft, which has a large thickness over the continuous region from side portions Aa, Ab of the crank arm A to the pin top portion Ac thereof and has the recess formed in the journal J-side surface of the crank arm A as shown in
(57) As described above, with the production method of the present embodiment, it is possible to ensure a large thickness over the continuous region from the side portions Aa, Ab of the crank arm A to the pin top portion Ac thereof while forming the recess in the journal J-side surface of the crank arm A. Hence, it is possible to produce a forged crankshaft having reduced weight in combination with sufficient stiffness and in addition having high resistance to quench cracking. With this production method, it suffices merely to foam the excess projecting portions Aaa, Aba, Aca on the outer peripheries of the side portions Aa, Ab and pin top portion Ac of the crank arm A such that the excess projecting portions locally project therefrom, and to bend the locally projecting excess projecting portions Aaa, Aba, Aca by inserting the U-shaped first die from the direction of eccentricity of the crank pins. Accordingly, the crankshaft production of the present embodiment can be performed conveniently without the need for a large force.
(58) As will be appreciated, the production method of the present embodiment provides similar advantages to those of the above first embodiment.
(59) The present invention is not limited to the embodiments described above, but may be modified in various ways without departing from the spirit and scope of the present invention. For example, the second die 20 may not be necessary. This is because, when precise dimensional accuracy of the crank arm A is not required, the second die 20 may not be necessary because the bending of the excess projecting portions Aaa, Aba on the outer peripheries of the crank arm using the first die 10 can form the recess in the journal J-side surface of the crank arm A while ensuring a large thickness of the side portions Aa, Ab of the crank arm A.
(60) The production method of the present embodiment is applicable not only to production of a crankshaft to be mounted in a 4-cylinder engine but also to production of crankshafts to be mounted in a 3-cylinder engine, an inline 6-cylinder engine, a V-type 6-cylinder engine, and other types of engines (hereinafter referred to as 3-cylinder and other types of crankshafts). In 3-cylinder and other types of crankshafts, the positions of the crank pins are equidistantly varied about the rotation axis (journals) at an angle of 120 or 60. Thus, in the process of producing 3-cylinder and other types of crankshafts, a twisting step may be incorporated subsequent to the trimming step and prior to the coining step depending on the shape of the counterweight. When the production method of the present embodiment is employed for production of 3-cylinder and other types of crankshafts, the insertion of the first die in the excess projecting portion bending step described above may be performed from the direction of eccentricity of the crank pins.
INDUSTRIAL APPLICABILITY
(61) The present invention is capable of being effectively utilized in production of forged crankshafts to be mounted in a variety of reciprocating engines.
REFERENCE SIGNS LIST
(62) 1: forged crankshaft
(63) J, J1 to J5: journal
(64) P, P1 to P4: crank pin
(65) Fr: front part
(66) Fl: flange
(67) A, A1 to A8: crank arm
(68) W, W1 to W8: counterweight
(69) Aa, Ab: side portion of crank arm
(70) Ac: pin top portion of crank arm
(71) As: area inward of side portions in journal-side surface of crank arm
(72) Aaa, Aba, Aca: excess projecting portion
(73) 10: first die
(74) 11: base portion of first die
(75) 11a, 11b, 11c: inner surface of base portion of first die
(76) 12A, 12B: end portion of first die
(77) 12Aa, 12Ba: inner surface of end portion of first die
(78) 20: second die