Hydraulic drive system for construction machine
10060451 ยท 2018-08-28
Assignee
Inventors
- Kiwamu Takahashi (Moriyama, JP)
- Yasutaka Tsuruga (Ryuugasaki, JP)
- Kazushige Mori (Moriyama, JP)
- Yoshifumi Takebayashi (Kouka, JP)
- Natsuki Nakamura (Kouka, JP)
- Yasuharu Okazaki (Namerikawa, JP)
- Kenji Yamada (Toyama, JP)
Cpc classification
F15B2211/20576
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/253
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/20546
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/2656
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/20507
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/50554
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B11/17
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B11/161
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/20553
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/67
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/20523
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B13/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B2211/6355
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F15B11/17
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F15B13/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
The object is to make it possible to efficiently utilize rated output torque of the prime mover by performing total torque control with high precision through precise detection of absorption torque of the other hydraulic pump by use of a purely hydraulic structure and feedback of the absorption torque to the one hydraulic pump's side. For this purpose, the hydraulic drive system is equipped with: a torque feedback circuit 112v which is supplied with delivery pressure of a main pump 202 and load sensing drive pressure, modifies the delivery pressure of the main pump 202 to achieve a characteristic simulating the absorption torque of the main pump 202, and outputs the modified pressure; and a torque feedback piston 112f which is supplied with output pressure of the torque feedback circuit and controls displacement of a main pump 102 so as to decrease the displacement of the main pump 102 and thereby decrease maximum torque T12max as the output pressure increases. The torque feedback circuit 112v includes first and second variable pressure reducing valves 112g and 112q.
Claims
1. A hydraulic drive system for a construction machine, comprising: a prime mover; a first hydraulic pump of a variable displacement type driven by the prime mover; a second hydraulic pump of the variable displacement type driven by the prime mover; a plurality of actuators driven by a hydraulic fluid delivered by the first and second hydraulic pumps; a plurality of flow control valves that control flow rates of the hydraulic fluid supplied from the first and second hydraulic pumps to the actuators; a plurality of pressure compensating valves each of which controls a differential pressure across a corresponding one of the flow control valves; a first pump control unit that controls a delivery flow rate of the first hydraulic pump, the first pump control unit including a first torque control section that controls a displacement of the first hydraulic pump in such a manner that an absorption torque of the first hydraulic pump does not exceed a first maximum torque when at least one of a delivery pressure and the displacement of the first hydraulic pump increases and the absorption torque of the first hydraulic pump increases; and a second pump control unit that controls a delivery flow rate of the second hydraulic pump, the second pump control unit including a second torque control section that controls a displacement of the second hydraulic pump in such a manner that an absorption torque of the second hydraulic pump does not exceed a second maximum torque when at least one of a delivery pressure and the displacement of the second hydraulic pump increases and the absorption torque of the second hydraulic pump increases, and a load sensing control section that controls the displacement of the second hydraulic pump in such a manner that the delivery pressure of the second hydraulic pump becomes higher by a target differential pressure than a maximum load pressure of the actuators driven by the hydraulic fluid delivered by the second hydraulic pump when the absorption torque of the second hydraulic pump is lower than the second maximum torque, wherein: the first torque control section includes a first torque control actuator that is supplied with the delivery pressure of the first hydraulic pump and controls the displacement of the first hydraulic pump in such a manner that the absorption torque of the first hydraulic pump decreases as the delivery pressure of the first hydraulic pump increases, and first biasing means that sets the first maximum torque; the second torque control section includes a second torque control actuator that is supplied with the delivery pressure of the second hydraulic pump and controls the displacement of the second hydraulic pump in such a manner that the absorption torque of the second hydraulic pump decreases as the delivery pressure of the second hydraulic pump increases, and second biasing means that sets the second maximum torque; the load sensing control section includes a control valve that changes a load sensing drive pressure in such a manner that the load sensing drive pressure decreases as a differential pressure between the delivery pressure of the second hydraulic pump and the maximum load pressure decreases below the target differential pressure, and a load sensing control actuator that controls the displacement of the second hydraulic pump in such a manner that the delivery flow rate increases as the load sensing drive pressure decreases; the first pump control unit further includes a torque feedback circuit that is supplied with the delivery pressure of the second hydraulic pump and the load sensing drive pressure, modifies the delivery pressure of the second hydraulic pump based on the delivery pressure of the second hydraulic pump and the load sensing drive pressure to achieve a characteristic simulating the absorption torque of the second hydraulic pump in both of when the second hydraulic pump operates at the second maximum torque under the control by the second torque control section and when the absorption torque of the second hydraulic pump is lower than the second maximum torque and the load sensing control section controls the displacement of the second hydraulic pump, and outputs the modified pressure, and a third torque control actuator that is supplied with an output pressure of the torque feedback circuit and controls the displacement of the first hydraulic pump so as to decrease the displacement of the first hydraulic pump and thereby decrease the first maximum torque as the output pressure of the torque feedback circuit increases; the torque feedback circuit includes a first variable pressure reducing valve that is supplied with the delivery pressure of the second hydraulic pump, outputs the delivery pressure of the second hydraulic pump without change when the delivery pressure of the second hydraulic pump is lower than or equal to a first set pressure, and reduces the delivery pressure of the second hydraulic pump to the first set pressure and outputs the reduced pressure when the delivery pressure of the second hydraulic pump is higher than the first set pressure, and a second variable pressure reducing valve that is supplied with the load sensing drive pressure and the delivery pressure of the second hydraulic pump, outputs the load sensing drive pressure without change when the load sensing drive pressure is lower than or equal to a second set pressure, and reduces the load sensing drive pressure to the second set pressure and outputs the reduced pressure when the load sensing drive pressure is higher than the second set pressure, while changing the second set pressure in such a manner that the second set pressure decreases as the delivery pressure of the second hydraulic pump increases; and the first variable pressure reducing valve includes a pressure receiving part that is supplied with an output pressure of the second variable pressure reducing valve and changes the first set pressure in such a manner that the first set pressure decreases as the output pressure of the second variable pressure reducing valve increases.
2. The hydraulic drive system for a construction machine according to claim 1, wherein the torque feedback circuit further includes a restrictor that is provided in a hydraulic line for leading the load sensing drive pressure to the second variable pressure reducing valve to absorb vibration of the load sensing drive pressure thereby to stabilize the pressure.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
MODE FOR CARRYING OUT THE INVENTION
(14) Referring now to the drawings, a description will be given in detail of a preferred embodiment of the present invention.
First Embodiment
(15) Structure
(16)
(17) Referring to
(18) The control valve unit 4 includes flow control valves 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6i and 6j, pressure compensating valves 7a, 7b, 7c, 7d, 7e, 7f, 7g, 7h, 7i and 7j, operation detection valves 8b, 8c, 8d, 8f, 8g, 8i and 8j, main relief valves 114, 214 and 314, and unloading valves 115, 215 and 315. The flow control valves 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6i and 6j are connected to the first through third hydraulic fluid supply lines 105, 205 and 305 and control the flow rates of the hydraulic fluid supplied to the actuators 3a-3h from the first and second delivery ports 102a and 102b of the main pump 102 and the third delivery port 202a of the main pump 202. Each pressure compensating valve 7a-7j controls the differential pressure across a corresponding flow control valve 6a-6j such that the differential pressure becomes equal to a target differential pressure. Each operation detection valve 8b, 8c, 8d, 8f, 8g, 8i, 8j strokes together with the spool of a corresponding one of the flow control valves 6a-6j in order to detect the switching of the flow control valve. The main relief valve 114 is connected to the first hydraulic fluid supply line 105 and controls the pressure in the first hydraulic fluid supply line 105 such that the pressure does not reach or exceed a set pressure. The main relief valve 214 is connected to the second hydraulic fluid supply line 205 and controls the pressure in the second hydraulic fluid supply line 105 such that the pressure does not reach or exceed a set pressure. The main relief valve 314 is connected to the third hydraulic fluid supply line 305 and controls the pressure in the third hydraulic fluid supply line 305 such that the pressure does not reach or exceed a set pressure. The unloading valve 115 is connected to the first hydraulic fluid supply line 105. When the pressure in the first hydraulic fluid supply line 105 becomes higher than a pressure (unloading valve set pressure) defined as the sum of the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the first delivery port 102a and a set pressure (prescribed pressure) of its own spring, the unloading valve 115 shifts to the open state and returns the hydraulic fluid in the first hydraulic fluid supply line 105 to a tank. The unloading valve 215 is connected to the second hydraulic fluid supply line 205. When the pressure in the second hydraulic fluid supply line 205 becomes higher than a pressure (unloading valve set pressure) defined as the sum of the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the second delivery port 102b and a set pressure (prescribed pressure) of its own spring, the unloading valve 215 shifts to the open state and returns the hydraulic fluid in the second hydraulic fluid supply line 205 to the tank. The unloading valve 315 is connected to the third hydraulic fluid supply line 305. When the pressure in the third hydraulic fluid supply line 305 becomes higher than a pressure (unloading valve set pressure) defined as the sum of the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the third delivery port 202a and a set pressure (prescribed pressure) of its own spring, the unloading valve 315 shifts to the open state and returns the hydraulic fluid in the third hydraulic fluid supply line 305 to the tank.
(19) The control valve unit 4 further includes a first load pressure detection circuit 131, a second load pressure detection circuit 132, a third load pressure detection circuit 133, and differential pressure reducing valves 111, 211 and 311. The first load pressure detection circuit 131 includes shuttle valves 9d, 9f, 9i and 9j which are connected to load ports of the flow control valves 6d, 6f, 6i and 6j connected to the first hydraulic fluid supply line 105 in order to detect the maximum load pressure Plmax1 of the actuators 3a, 3b, 3d and 3f. The second load pressure detection circuit 132 includes shuttle valves 9b, 9c and 9g which are connected to load ports of the flow control valves 6b, 6c and 6g connected to the second hydraulic fluid supply line 205 in order to detect the maximum load pressure Plmax2 of the actuators 3b, 3c and 3g. The third load pressure detection circuit 133 includes shuttle valves 9e and 9h which are connected to load ports of the flow control valves 6a, 6e and 6h connected to the third hydraulic fluid supply line 305 in order to detect the load pressure (maximum load pressure) Plmax3 of the actuators 3a, 3e and 3h. The differential pressure reducing valve 111 outputs the difference (LS differential pressure) between the pressure P1 in the first hydraulic fluid supply line 105 (i.e., the pressure in the first delivery port 102a) and the maximum load pressure Plmax1 detected by the first load pressure detection circuit 131 (i.e., the maximum load pressure of the actuators 3a, 3b, 3d and 3f connected to the first hydraulic fluid supply line 105) as absolute pressure Pls1. The differential pressure reducing valve 211 outputs the difference (LS differential pressure) between the pressure P2 in the second hydraulic fluid supply line 205 (i.e., the pressure in the second delivery port 102b) and the maximum load pressure Plmax2 detected by the second load pressure detection circuit 132 (i.e., the maximum load pressure of the actuators 3b, 3c and 3g connected to the second hydraulic fluid supply line 205) as absolute pressure Pls2. The differential pressure reducing valve 311 outputs the difference (LS differential pressure) between the pressure P3 in the third hydraulic fluid supply line 305 (i.e., the delivery pressure of the main pump 202 or the pressure in the third delivery port 202a) and the maximum load pressure Plmax3 detected by the third load pressure detection circuit 133 (i.e., the load pressure of the actuators 3a, 3e and 3h connected to the third hydraulic fluid supply line 305) as absolute pressure Pls3. The absolute pressures Pls1, Pls2 and Pls3 outputted by the differential pressure reducing valves 111, 211 and 311 will hereinafter be referred to as LS differential pressures Pls1, Pls2 and Pls3 as needed.
(20) To the aforementioned unloading valve 115, the maximum load pressure Plmax1 detected by the first load pressure detection circuit 131 is led as the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the first delivery port 102a. To the aforementioned unloading valve 215, the maximum load pressure Plmax2 detected by the second load pressure detection circuit 132 is led as the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the second delivery port 102b. To the aforementioned unloading valve 315, the maximum load pressure Plmax3 detected by the third load pressure detection circuit 133 is led as the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the third delivery port 202a.
(21) The LS differential pressure Pls1 outputted by the differential pressure reducing valve 111 is led to the pressure compensating valves 7d, 7f, 7i and 7j connected to the first hydraulic fluid supply line 105 and to the regulator 112 of the main pump 102. The LS differential pressure Pls2 outputted by the differential pressure reducing valve 211 is led to the pressure compensating valves 7b, 7c and 7g connected to the second hydraulic fluid supply line 205 and to the regulator 112 of the main pump 102. The LS differential pressure Pls3 outputted by the differential pressure reducing valve 311 is led to the pressure compensating valves 7a, 7e and 7h connected to the third hydraulic fluid supply line 305 and to the regulator 212 of the main pump 202.
(22) The actuator 3a is connected to the first delivery port 102a via the flow control valve 6i, the pressure compensating valve 7i and the first hydraulic fluid supply line 105, and to the third delivery port 202a via the flow control valve 6a, the pressure compensating valve 7a and the third hydraulic fluid supply line 305. The actuator 3a is a boom cylinder for driving a boom of the hydraulic excavator, for example. The flow control valve 6a is used for the main driving of the boom cylinder 3a, while the flow control valve 6i is used for the assist driving of the boom cylinder 3a. The actuator 3b is connected to the first delivery port 102a via the flow control valve 6j, the pressure compensating valve 7j and the first hydraulic fluid supply line 105, and to the second delivery port 102b via the flow control valve 6b, the pressure compensating valve 7b and the second hydraulic fluid supply line 205. The actuator 3b is an arm cylinder for driving an arm of the hydraulic excavator, for example. The flow control valve 6b is used for the main driving of the arm cylinder 3b, while the flow control valve 6j is used for the assist driving of the arm cylinder 3b.
(23) The actuators 3d and 3f are connected to the first delivery port 102a via the flow control valves 6d and 6f, the pressure compensating valves 7d and 7f and the first hydraulic fluid supply line 105, respectively. The actuators 3c and 3g are connected to the second delivery port 102b via the flow control valves 6c and 6g, the pressure compensating valves 7c and 7g and the second hydraulic fluid supply line 205, respectively. The actuators 3d and 3f are, for example, a bucket cylinder for driving a bucket of the hydraulic excavator and a left travel motor for driving a left crawler of a lower track structure of the hydraulic excavator, respectively. The actuators 3c and 3g are, for example, a swing motor for driving an upper swing structure of the hydraulic excavator and a right travel motor for driving a right crawler of the lower track structure of the hydraulic excavator, respectively. The actuators 3e and 3h are connected to the third delivery port 102a via the flow control valves 6e and 6h, the pressure compensating valves 7e and 7h and the third hydraulic fluid supply line 305, respectively. The actuators 3e and 3h are, for example, a swing cylinder for driving a swing post of the hydraulic excavator and a blade cylinder for driving a blade of the hydraulic excavator, respectively.
(24)
(25) The upper part of
(26) The opening area characteristic of the flow control valve 6a for the main driving of the boom cylinder 3a has been set such that the opening area increases as the spool stroke increases beyond the dead zone 0-S1, the opening area reaches the maximum opening area A1 at an intermediate stroke S2, and thereafter the maximum opening area A1 is maintained until the spool stroke reaches the maximum spool stroke S3. The opening area characteristic of the flow control valve 6b for the main driving of the arm cylinder 3b has also been set similarly.
(27) The opening area characteristic of the flow control valve 6i for the assist driving of the boom cylinder 3a has been set such that the opening area remains at zero until the spool stroke reaches an intermediate stroke S2, increases as the spool stroke increases beyond the intermediate stroke S2, and reaches the maximum opening area A2 just before the spool stroke reaches the maximum spool stroke S3. The opening area characteristic of the flow control valve 6j for the assist driving of the arm cylinder 3b has also been set similarly.
(28) The lower part of
(29) The meter-in channel of each flow control valve 6a, 6i of the boom cylinder 3a has the opening area characteristic explained above. Consequently, the meter-in channels of the flow control valves 6a and 6i of the boom cylinder 3a have a combined opening area characteristic in which the opening area increases as the spool stroke increases beyond the dead zone 0-S1 and the opening area reaches the maximum opening area A1+A2 just before the spool stroke reaches the maximum spool stroke S3. The combined opening area characteristic of the flow control valves 6b and 6j of the arm cylinder 3b has also been set similarly.
(30) Here, the maximum opening area A3 regarding the flow control valves 6c, 6d, 6e, 6f, 6g and 6h of the actuators 3c-3h shown in
(31) Returning to
(32) At times other than a travel combined operation for driving the actuator 3f as the left travel motor (hereinafter referred to as a left travel motor 3f as needed) and/or the actuator 3g as the right travel motor (hereinafter referred to as a right travel motor 3g as needed) and at least one of the actuators 3a, 3b, 3c and 3d other than the left and right travel motors connected to the first or second hydraulic fluid supply line 105 or 205 at the same time, the travel combined operation detection hydraulic line 53 is connected to the tank via at least one of the operation detection valves 8a, 8b, 8c, 8d, 8f, 8g, 8i and 8j, by which the pressure in the hydraulic line 53 becomes equal to the tank pressure. When the travel combined operation is performed, the operation detection valves 8f and 8g and at least one of the operation detection valves 8a, 8b, 8c, 8d, 8i and 8j stroke together with corresponding flow control valves and the communication between the travel combined operation detection hydraulic line 53 and the tank is interrupted, by which the operation detection pressure (operation detection signal) is generated in the hydraulic line 53.
(33) When the travel combined operation is not performed, the first selector valve 40 is positioned at a first position (interruption position) as the lower position in
(34) When the travel combined operation is not performed, the second selector valve 146 is positioned at a first position as the lower position in
(35) When the travel combined operation is not performed, the third selector valve 246 is positioned at a first position as the lower position in
(36) Incidentally, the left travel motor 3f and the right travel motor 3g are actuators driven at the same time and achieving a prescribed function by having supply flow rates equivalent to each other when driven at the same time. In this embodiment, the left travel motor 3f is driven by the hydraulic fluid delivered from the first delivery port 102a of the split flow type main pump 102, while the right travel motor 3g is driven by the hydraulic fluid delivered from the second delivery port 102b of the split flow type main pump 102.
(37) In
(38) The prime mover revolution speed detection valve 13 includes a flow rate detection valve 50 which is connected between the hydraulic fluid supply line 31a of the pilot pump 30 and the pilot hydraulic fluid supply line 31b and a differential pressure reducing valve 51 which outputs the differential pressure across the flow rate detection valve 50 as absolute pressure Pgr.
(39) The flow rate detection valve 50 includes a variable restrictor part 50a whose opening area increases as the flow rate therethrough (delivery flow rate of the pilot pump 30) increases. The hydraulic fluid delivered from the pilot pump 30 passes through the variable restrictor part 50a of the flow rate detection valve 50 and then flows to the pilot hydraulic line 31b's side. In this case, a differential pressure increasing with the increase in the flow rate occurs across the variable restrictor part 50a of the flow rate detection valve 50. The differential pressure reducing valve 51 outputs the differential pressure across the variable restrictor part 50a as the absolute pressure Pgr. Since the delivery flow rate of the pilot pump 30 changes according to the revolution speed of the prime mover 1, the delivery flow rate of the pilot pump 30 and the revolution speed of the prime mover 1 can be detected by the detection of the differential pressure across the variable restrictor part 50a. The absolute pressure Pgr outputted by the prime mover revolution speed detection valve 13 (differential pressure reducing valve 51) is led to the regulators 112 and 212 as target LS differential pressure. The absolute pressure Pgr outputted by the differential pressure reducing valve 51 will hereinafter be referred to as output pressure Pgr or target LS differential pressure Pgr as needed.
(40) The regulator 112 (first pump control unit) includes a low-pressure selection valve 112a, an LS control valve 112b, an LS control piston 112c, torque control (power control) pistons 112d and 112e (first torque control actuators), and a spring 112u. The low-pressure selection valve 112a selects a pressure on the low pressure side from the LS differential pressure Pls1 outputted by the differential pressure reducing valve 111 and the LS differential pressure Pls2 outputted by the differential pressure reducing valve 211. The LS control valve 112b is supplied with the selected lower LS differential pressure Pls12 and the output pressure Pgr of the prime mover revolution speed detection valve 13 as the target LS differential pressure Pgr and changes load sensing drive pressure (hereinafter referred to as LS drive pressure Px12) such that the LS drive pressure Px12 decreases as the LS differential pressure Pls12 decreases below the target LS differential pressure Pgr. The LS control piston 112c is supplied with the LS drive pressure Px12 and controls the tilting angle (displacement) of the main pump 102 so as to increase the tilting angle and thereby increase the delivery flow rate of the main pump 102 as the LS drive pressure Px12 decreases. The torque control (power control) piston 112d (first torque control actuator) is supplied with the pressure in the first delivery port 102a of the main pump 102 and controls the tilting angle of the swash plate of the main pump 102 so as to decrease the tilting angle and thereby decrease the absorption torque of the main pump 102 when the pressure in the first delivery port 102a increases. The torque control (power control) piston 112e (first torque control actuator) is supplied with the pressure in the second delivery port 102b of the main pump 102 and controls the tilting angle of the swash plate of the main pump 102 so as to decrease the tilting angle and thereby decrease the absorption torque of the main pump 102 when the pressure in the second delivery port 102b increases. The spring 112u is used as first biasing means for setting maximum torque T12max (see
(41) The low-pressure selection valve 112a, the LS control valve 112b and the LS control piston 112c constitute a first load sensing control section which controls the displacement of the main pump 102 such that the delivery pressure of the main pump 102 (delivery pressure on the high pressure side of the first and second delivery ports 102a and 102b) becomes higher by a target differential pressure (target LS differential pressure Pgr) than the maximum load pressure of the actuators driven by the hydraulic fluid delivered from the main pump 102 (pressure on the high pressure side of the maximum load pressures Plmax1 and Plmax2).
(42) The torque control pistons 112d and 112e and the spring 112u constitute a first torque control section which controls the displacement of the main pump 102 such that the absorption torque of the main pump 102 does not exceed the maximum torque T12max set by the spring 112u when the absorption torque of the main pump 102 increases due to an increase in at least one of the displacement of the main pump 102 and the delivery pressure of each delivery port 102a, 102b of the main pump 102 (the delivery pressure of main pump 102).
(43)
(44) In
(45) The first load sensing control section (the low-pressure selection valve 112a, the LS control valve 112b and the LS control piston 112c) functions when the absorption torque of the main pump 102 is lower than the maximum torque T12max and is not undergoing the limitation by the torque control by the first torque control section, and controls the displacement of the main pump 102 by means of the load sensing control.
(46) The regulator 212 (second pump control unit) includes an LS control valve 212b, an LS control piston 212c (load sensing control actuator), a torque control (power control) piston 212d (second torque control actuator), and a spring 212e. The LS control valve 212b is supplied with the LS differential pressure Pls3 outputted by the differential pressure reducing valve 311 and the output pressure Pgr of the prime mover revolution speed detection valve 13 as the target LS differential pressure Pgr and changes load sensing drive pressure (hereinafter referred to as LS drive pressure Px3) such that the LS drive pressure Px3 decreases as the LS differential pressure Pls3 decreases below the target LS differential pressure Pgr. The LS control piston 212c (load sensing control actuator) is supplied with the LS drive pressure Px3 and controls the tilting angle (displacement) of the main pump 202 so as to increase the tilting angle and thereby increase the delivery flow rate of the main pump 202 as the LS drive pressure Px3 decreases. The torque control (power control) piston 212d (second torque control actuator) is supplied with the delivery pressure P3 of the main pump 202 and controls the tilting angle of the swash plate of the main pump 202 so as to decrease the tilting angle and thereby decrease the absorption torque of the main pump 202 when the delivery pressure P3 of the main pump 202 increases. The spring 212e is used as second biasing means for setting maximum torque T3max (see
(47) The LS control valve 212b and the LS control piston 212c constitute a second load sensing control section which controls the displacement of the main pump 202 such that the delivery pressure P3 of the main pump 202 becomes higher by the target differential pressure (target LS differential pressure Pgr) than the maximum load pressure Plmax3 of the actuators driven by the hydraulic fluid delivered from the main pump 202.
(48) The torque control piston 212d and the spring 212e constitute a second torque control section which controls the displacement of the main pump 202 such that the absorption torque of the main pump 202 does not exceed the maximum torque T3max when the absorption torque of the main pump 202 increases due to an increase in at least one of the delivery pressure P3 and the displacement of the main pump 202.
(49)
(50) In
(51) The second load sensing control section (the LS control valve 212b and the LS control piston 212c) functions when the absorption torque of the main pump 202 is lower than the maximum torque T3max and is not undergoing the limitation by the torque control by the second torque control section, and controls the displacement of the main pump 202 by means of the load sensing control.
(52) Returning to
(53) In
(54) Details of Torque Feedback Circuit
(55) The details of the torque feedback circuit 112v will be explained below.
(56) Circuit Structure
(57) The torque feedback circuit 112v includes a first variable pressure reducing valve 112g and a second variable pressure reducing valve 112q.
(58) The delivery pressure P3 of the main pump 202 is led to the input port of the first variable pressure reducing valve 112g via a hydraulic line 112j. The first variable pressure reducing valve 112g outputs the delivery pressure P3 of the main pump 202 without change when the delivery pressure P3 of the main pump 202 is lower than or equal to a first set pressure. When the delivery pressure P3 of the main pump 202 is higher than the first set pressure, the first variable pressure reducing valve 112g reduces the delivery pressure P3 of the main pump 202 to the first set pressure and outputs the reduced pressure. The LS drive pressure Px3 of the regulator 212 is led to the input port of the second variable pressure reducing valve 112q via a hydraulic line 112k. The second variable pressure reducing valve 112q outputs the LS drive pressure Px3 without change when the LS drive pressure Px3 is lower than or equal to a second set pressure. When the LS drive pressure Px3 is higher than the second set pressure, the second variable pressure reducing valve 112q reduces the LS drive pressure Px3 to the second set pressure and outputs the reduced pressure.
(59) The first variable pressure reducing valve 112g has a spring 112t working in an opening direction and setting the initial value of the first set pressure and a pressure receiving part 112h situated on a side of the valve 112g opposite to the spring 112t. The pressure receiving part 112h is supplied with the output pressure of the second variable pressure reducing valve 112q via a hydraulic line 112n. The first variable pressure reducing valve 112g is configured such that the first set pressure decreases as the output pressure of the second variable pressure reducing valve 112q increases. The second variable pressure reducing valve 112q has a spring 112s working in an opening direction and setting the initial value of the second set pressure and a pressure receiving part 112i situated on a side of the valve 112q opposite to the spring 112s. The pressure receiving part 112i is supplied with the delivery pressure P3 of the main pump 202 via the hydraulic line 112j. The second variable pressure reducing valve 112q is configured such that the second set pressure decreases as the delivery pressure P3 of the main pump 202 increases.
(60) The output pressure of the first variable pressure reducing valve 112g is led to the torque feedback piston 112f as the output pressure of the torque feedback circuit 112v.
(61) The hydraulic line 112k for leading the LS drive pressure Px3 to the input port of the second variable pressure reducing valve 112q is equipped with a restrictor (fixed restrictor) 112r for absorbing vibration of the LS drive pressure Px3 and stabilizing the pressure when the LS drive pressure Px3 is vibrational.
(62) Output Characteristic of Circuit
(63) Second Variable Pressure Reducing Valve 112q
(64)
(65) The LS drive pressure Px3 is led to the input port of the second variable pressure reducing valve 112q via the restrictor 112r.
(66) Meanwhile, the delivery pressure P3 of the main pump 202 is led to the pressure receiving part 112i on the side of the second variable pressure reducing valve 112q opposite to the spring 112s for setting the initial value of the second set pressure of the second variable pressure reducing valve 112q. When the delivery pressure P3 of the main pump 202 is at a minimum pressure P3min, the second set pressure of the second variable pressure reducing valve 112q is set at the pressure determined by the spring 112s (initial value). The second set pressure of the second variable pressure reducing valve 112q decreases as the delivery pressure P3 of the main pump 202 increases. Therefore, the LS drive pressure Px3 inputted to the second variable pressure reducing valve 112q changes depending on the delivery pressure P3 of the main pump 202, and the output pressure of the second variable pressure reducing valve 112q displays the characteristic shown in
(67) In
(68) When the LS drive pressure Px3 is lower than or equal to the second set pressure of the second variable pressure reducing valve 112q, the LS drive pressure Px3 is directly outputted without being reduced. The straight line Q0 indicates the characteristic in this case.
(69) First Variable Pressure Reducing Valve 112g
(70)
(71) The delivery pressure P3 of the main pump 202 is led to the input port of the first variable pressure reducing valve 112g.
(72) Meanwhile, the output pressure P3out of the second variable pressure reducing valve 112q is led to the pressure receiving part 112h on the side of the first variable pressure reducing valve 112g opposite to the spring 112t for setting the initial value of the first set pressure of the first variable pressure reducing valve 112g. When the output pressure P3out of the second variable pressure reducing valve 112q is at the tank pressure as the minimum pressure, the first set pressure of the first variable pressure reducing valve 112g is set at the pressure determined by the spring 112t (initial value). The first set pressure of the first variable pressure reducing valve 112g decreases as the output pressure P3out of the second variable pressure reducing valve 112q increases (first pressure reducing characteristic). Meanwhile, as mentioned above, the output pressure P3out of the second variable pressure reducing valve 112q changes depending on the delivery pressure P3 of the main pump 202, and the first set pressure of the first variable pressure reducing valve 112g also changes depending on the delivery pressure P3 of the main pump 202 (second pressure reducing characteristic). As above, the first set pressure of the first variable pressure reducing valve 112g changes depending on the LS drive pressure Px3 and the delivery pressure P3 of the main pump 202, and the output pressure of the first variable pressure reducing valve 112g displays the characteristic shown in
(73) In
(74) When the LS drive pressure Px3 is lower than or equal to the second set pressure and is not reduced in the second variable pressure reducing valve 112q, as the LS drive pressure Px3 increases, the second set pressure of the first variable pressure reducing valve 112g decreases like P3e, P3j, P3i, P3b and P3a and the first pressure reducing characteristic of the first variable pressure reducing valve 112g changes like the straight lines G1, G2, G3, G4 and G5. Consequently, the output pressure P3out of the first variable pressure reducing valve 112g in the case where the delivery pressure P3 of the main pump 202 is higher than the second set pressure of the first variable pressure reducing valve 112g decreases like P3e, P3jc, P3i, P3b and P3a as the LS drive pressure Px3 increases.
(75) When the LS drive pressure Px3 is higher than the second set pressure and is reduced to the second set pressure in the second variable pressure reducing valve 112q, the output pressure Px3out of the second variable pressure reducing valve 112q decreases like Px3a, Px3g, Px3h and Px3i as the delivery pressure P3 of the main pump 202 increases as shown in
(76) When the delivery pressure P3 of the main pump 202 is lower than or equal to the second set pressure of the first variable pressure reducing valve 112g, the delivery pressure P3 of the main pump 202 is directly outputted without being reduced. The straight line G0 indicates the characteristic in this case.
(77) Simulation of Absorption Torque
(78) Next, an explanation will be given of the function of the torque feedback circuit 112v correcting the delivery pressure P3 of the main pump 202 to achieve a characteristic simulating the absorption torque of the main pump 202 and outputting the modified pressure.
(79) When the main pump 202 performs the displacement control by means of the load sensing control, the position of the displacement changing member (swash plate) of the main pump 202, that is, the displacement (tilting angle) of the main pump 202, is determined by the equilibrium between resultant force of two pushing forces applied to the swash plate from the LS control piston 212c on which the LS drive pressure acts and from the torque control piston 212d on which the delivery pressure P3 of the main pump 202 acts and pushing force applied to the swash plate in the opposite direction from the spring 212e serving as the biasing means for setting the maximum torque. Therefore, the tilting angle of the main pump 202 during the load sensing control changes not only depending on the LS drive pressure but also due to the influence of the delivery pressure P3 of the main pump 202.
(80)
(81) When any one of the control levers of the actuators 3a, 3e and 3h related to the main pump 202 is operated by the full operation and the delivery flow rate of the main pump 202 saturates and the LS drive pressure Px3 becomes equal to the tank pressure (e.g., boom raising full operation (c) which will be explained later), as the delivery pressure P3 of the main pump 202 increases, the tilting angle q3 of the main pump 202 changes like the characteristic Hq (Hqa, Hqb) shown in
(82) When any one of the control levers of the actuators 3a, 3e and 3h related to the main pump 202 is operated by a fine operation and the LS drive pressure Px3 increases to an intermediate pressure between the tank pressure and the pilot primary pressure Ppilot (e.g., boom raising fine operation (b) and horizontally leveling work (f) which will be explained later), as the LS drive pressure Px3 increases like Px3-1, Px3-2 and Px3-3, the tilting angle q3 of the main pump 202 changes like the curves Iq, Jq and Kq in
(83) In other words, when the delivery pressure P3 of the main pump 202 rises, the tilting angle q3 of the main pump 202 decreases like the curve Iq due to the influence of the increase in the delivery pressure P3 as mentioned above even if the LS drive pressure Px3 is constant at Px3b, for example. Thus, in a high pressure range of the delivery pressure P3, the tilting angle q3 becomes smaller than the tilting angle situated on the curve Hqb of T3max (
(84) The same goes for the cases where the LS drive pressure Px3 is Px3-2 or Px3-3. The tilting angle q3 decreases like the curves Jq and Kq due to the influence of the increase in the delivery pressure P3, and becomes even smaller than the tilting angle on the curve Iq in a high pressure range of the delivery pressure P3 (
(85) When all the control levers of the actuators 3a, 3e and 3h related to the main pump 202 are at the neutral positions and when any one of these control levers is operated but its operation amount is extremely small and the demanded flow rate of the flow control valve is lower than a minimum flow rate obtained at the minimum tilting angle q3min of the main pump 202 (e.g., (a) operation when all control levers are at the neutral positions and (g) boom raising fine operation in load lifting work which will be explained later), the tilting angle q3 of the main pump 202 is maintained at the minimum tilting angle q3min determined by the structure of the main pump 202 as indicated by the straight line Lq in
(86) Returning to
(87) As is clear from the comparison between
(88) As explained above, the torque feedback circuit 112v modifies the delivery pressure P3 of the main pump 202 to achieve a characteristic simulating the absorption torque of the main pump 202 in both of when the main pump 202 (second hydraulic pump) undergoes the limitation by the torque control and operates at the maximum torque T3max of the torque control and when the main pump 202 does not undergo the limitation by the torque control and performs the displacement control by means of the load sensing control, and outputs the modified pressure. Also when the main pump 202 is at the minimum tilting angle q3min, the torque feedback circuit 112v modifies the delivery pressure P3 of the main pump 202 to achieve a characteristic simulating the absorption torque of the main pump 202 and outputs the modified pressure.
(89) Hydraulic Excavator
(90)
(91) Referring to
(92) The upper swing structure 109 is provided with a cab 108 of the canopy type. Arranged in the cab 108 are a cab seat 121, left and right front/swing operating devices 122 and 123 (only the left side is shown in
(93) Operation
(94) Next, the operation of this embodiment will be explained below.
(95) First, the hydraulic fluid delivered from the fixed displacement pilot pump 30 driven by the prime mover 1 is supplied to the hydraulic fluid supply line 31a. The hydraulic fluid supply line 31a is equipped with the prime mover revolution speed detection valve 13. By using the flow rate detection valve 50 and the differential pressure reducing valve 51, the prime mover revolution speed detection valve 13 outputs the differential pressure across the flow rate detection valve 50 corresponding to the delivery flow rate of the pilot pump 30 as the absolute pressure Pgr (target LS differential pressure). The pilot relief valve 32 connected downstream of the prime mover revolution speed detection valve 13 generates the constant pressure (the pilot primary pressure Ppilot) in the pilot hydraulic fluid supply line 31b.
(96) (a) When All Control Levers are at Neutral Positions
(97) All the flow control valves 6a-6j are positioned at their neutral positions since the control levers of all the operating devices are at their neutral positions. Since all the flow control valves 6a-6j are at the neutral positions, the first load pressure detection circuit 131, the second load pressure detection circuit 132 and the third load pressure detection circuit 133 detect the tank pressure as the maximum load pressures Plmax1, Plmax2 and Plmax3, respectively. These maximum load pressures Plmax1, Plmax2 and Plmax3 are led to the unloading valves 115, 215 and 315 and the differential pressure reducing valves 111, 211 and 311, respectively.
(98) Due to the maximum load pressure Plmax1, Plmax2, Plmax3 led to each unloading valve 115, 215, 315, the pressure P1, P2, P3 in each of the first, second and third delivery ports 102a, 102b and 202a is maintained at a minimum pressure P1min, P2min, P3min as a pressure (unloading valve set pressure) obtained as the sum of the maximum load pressure Plmax1, Plmax2, Plmax3 and the set pressure of the spring of each unloading valve 115, 215, 315. Assuming that the set pressure of the spring of each unloading valve 115, 215, 315 equals Punsp, the set pressure Punsp is generally set at a value slightly higher than the output pressure Pgr of the prime mover revolution speed detection valve 13 defined as the target LS differential pressure (Punsp>Pgr).
(99) Each differential pressure reducing valve 111, 211, 311 outputs the differential pressure (LS differential pressure) between the pressure P1, P2, P3 in each of the first, second and third hydraulic fluid supply lines 105, 205 and 305 and the maximum load pressure Plmax1, Plmax2, Plmax3 (tank pressure) as the absolute pressure Pls1, Pls2, Pls3. The maximum load pressures Plmax1, Plmax2 and Plmax3 equal the tank pressure as mentioned above. Assuming that the tank pressure is Ptank, the following relationships hold:
Pls1=P1Plmax1=(Ptank+Punsp)Ptank=Punsp>Pgr
Pls2=P2Plmax2=(Ptank+Punsp)Ptank=Punsp>Pgr
Pls3=P3Plmax3=(Ptank+Punsp)Ptank=Punsp>Pgr
(100) The LS differential pressures Pls1 and Pls2 are led to the low-pressure selection valve 112a of the regulator 112, while the LS differential pressure Pls3 is led to the LS control valve 212b of the regulator 212.
(101) In the regulator 112, the low pressure side is selected from the LS differential pressures Pls1 and Pls2 led to the low-pressure selection valve 112a and the selected lower pressure is led to the LS control valve 112b as the LS differential pressure Pls12. In this case, Pls12>Pgr holds irrespective of which of Pls1 or Pls2 is selected, and thus the LS control valve 112b is pushed leftward in
(102) Meanwhile, the LS differential pressure Pls3 is led to the LS control valve 212b of the regulator 212. Since Pls3>Pgr holds, the LS control valve 212b is pushed rightward in
(103) (a-1) Operation of Torque Feedback Circuit 112v
(104)
(105) When all the control levers are at the neutral positions, the delivery pressure P3 of the main pump 202 (pressure in the third hydraulic fluid supply line 305) is maintained at the minimum delivery pressure P3min as the sum of the tank pressure and the set pressure of the spring of the unloading valve 315 as mentioned above. The pressure is assumed to be P3a.
(106) In the second variable pressure reducing valve 112q, the second set pressure decreases from the initial value due to the delivery pressure P3a of the main pump 202 at that time. Since P3a=P3min holds, the first variable pressure reducing valve 112q displays the characteristic indicated by the straight line Q1 in
(107) Meanwhile, the LS drive pressure Px3 led to the LS control piston 212c of the main pump 202 at that time has reached the constant pilot primary pressure Ppilot of the pilot hydraulic fluid supply line 31b (maximum) as mentioned above. This value is assumed to be Px3max. The LS drive pressure Px3max is led to the input port of the second variable pressure reducing valve 112q via the restrictor 112r and is reduced by the second variable pressure reducing valve 112q to the pressure Px3a of the point a.
(108) The pressure of the point a as the result of the pressure reduction to Px3a is led to the pressure receiving part 112h of the first variable pressure reducing valve 112g as the output pressure Px3out of the second variable restrictor 112q. Since the pressure Px3a is the reduced pressure, the first variable pressure reducing valve 112g displays the characteristic (second pressure reducing characteristic) indicated by the straight line Z in
(109) The delivery pressure P3a (P3min) of the main pump 202 led to the input port of the first variable pressure reducing valve 112g is reduced to P3j by the pressure reducing characteristic of the first variable pressure reducing valve 112g indicated by the straight line Z. This state is represented by the point A in
(110) The pressure reduced to P3j is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. In the torque feedback piston 112f, force determined by the product of P3j and the pressure receiving area of the torque feedback piston 112f works in a direction for reducing the displacement (tilting angle) of the main pump 102. However, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(111) (b) When Boom Control Lever is Operated (Fine Operation)
(112) When the control lever of the boom operating device (boom control lever) is operated in the direction of expanding the boom cylinder 3a (i.e., boom raising direction), for example, the flow control valves 6a and 6i for driving the boom cylinder 3a are switched upward in
(113) When the operation on the boom control lever is a fine operation and the strokes of the flow control valves 6a and 6i are within S2 shown in
(114) As above, in the boom raising fine operation, even if the flow control valve 6i for the assist driving is switched upward in
(115) In contrast, when the flow control valve 6a is switched upward in
(116) Just after the control lever is operated at the start of the boom raising operation, the load pressure of the boom cylinder 3a is transmitted to the third hydraulic fluid supply line 305 and the pressure difference between two lines becomes almost zero, and thus the LS differential pressure Pls3 becomes almost equal to zero. Since the relationship Pls3<Pgr holds, the LS control valve 212b switches leftward in
(117) (b-1) Operation of Torque Feedback Circuit 112v (1)
(118) When the displacement (tilting angle) of the main pump 202 is at an intermediate level between the maximum level and the minimum level in the boom raising fine operation, the LS drive pressure Px3 led to the LS control piston 212c of the main pump 202 is maintained at a certain value between the tank pressure and the constant pilot primary pressure Ppilot (maximum) of the pilot hydraulic fluid supply line 31b. This value is indicated as Px3b in
(119) Assuming that the delivery pressure of the main pump 202 at that time equals P3g in
(120) On the other hand, since the LS drive pressure Px3b in
(121) The pressure reduced to P3b is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. In the torque feedback piston 112f, force determined by the product of P3b and the pressure receiving area of the torque feedback piston 112f works in the direction for reducing the displacement (tilting angle) of the main pump 102. However, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(122) (b-2) Operation of Torque Feedback Circuit 112v (2)
(123) Next, a case of gradually increasing the amount of input to the boom control lever in the boom raising fine operation performed with the delivery pressure of the main pump 202 maintained at P3g will be considered below.
(124) In this case, the LS drive pressure Px3 led to the LS control piston 212c of the main pump 202 decreases gradually. A certain value of the decreased LS drive pressure Px3 is indicated as Px3c in
(125) As mentioned above, the second variable pressure reducing valve 112q has the characteristic indicated by the straight line Q2 in
(126) On the other hand, since the LS drive pressure Px3c in
(127) In this state, the delivery pressure P3g of the main pump 202 is led to the torque feedback piston 112f without being reduced by the first variable pressure reducing valve 112g. However, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(128) (b-3) Operation of Torque Feedback Circuit 112v (3)
(129) Next, a case where the delivery pressure P3 of the main pump 202 rises further from the state of the point C in
(130) In this case, when the delivery pressure P3 of the main pump 202 rises to P3k in
(131) The pressure reduced to P3g is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. However, also in this case, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(132) (b-4) Operation of Torque Feedback Circuit 112v (4)
(133) Next, consideration will be given to a case where the delivery pressure P3 of the main pump 202 increases from the state of the point B in
(134) When the delivery pressure P3 of the main pump 202 rises from P3g to P3h in
(135) Meanwhile, the first variable pressure reducing valve 112g still has the characteristic (first pressure reducing characteristic) of the straight line G4 in
(136) The pressure reduced to P3b is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. However, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(137) (b-5) Operation of Torque Feedback Circuit 112v (5)
(138) Next, consideration will be given to a case where the delivery pressure P3 of the main pump 202 rises to the maximum delivery pressure P3max in the boom raising fine operation performed with the LS drive pressure remaining at the same value Px3b with respect to the point B in
(139) When the delivery pressure of the main pump 202 rises to the maximum delivery pressure P3max in
(140) On the other hand, since the pressure Px3i is the reduced pressure in
(141) The pressure reduced to P3i is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. However, the displacement (tilting angle) of the main pump 102 has already been maintained at the minimum level by the LS control piston 112c as mentioned above, and thus this state is maintained.
(142) (c) When Boom Control Lever is Operated (Full Operation)
(143) When the boom control lever is operated by the full operation in the direction of expanding the boom cylinder 3a (i.e., boom raising direction), for example, the flow control valves 6a and 6i for driving the boom cylinder 3a are switched upward in
(144) As mentioned above, the load pressure of the boom cylinder 3a is detected by the third load pressure detection circuit 133 as the maximum load pressure Plmax3 via the load port of the flow control valve 6a. According to the maximum load pressure Plmax3, the delivery flow rate of the main pump 202 is controlled such that Pls3 becomes equal to Pgr, and the hydraulic fluid is supplied from the main pump 202 to the bottom side of the boom cylinder 3a.
(145) Meanwhile, the load pressure on the bottom side of the boom cylinder 3a is detected by the first load pressure detection circuit 131 as the maximum load pressure Plmax1 via the load port of the flow control valve 6i and is led to the unloading valve 115 and the differential pressure reducing valve 111. Due to the maximum load pressure Plmax1 led to the unloading valve 115, the set pressure of the unloading valve 115 rises to a pressure as the sum of the maximum load pressure Plmax1 (the load pressure on the bottom side of the boom cylinder 3a) and the set pressure Punsp of the spring, by which the hydraulic line for discharging the hydraulic fluid in the first hydraulic fluid supply line 105 to the tank is interrupted. Further, due to the maximum load pressure Plmax1 led to the differential pressure reducing valve 111, the differential pressure (LS differential pressure) between the pressure P1 in the first hydraulic fluid supply line 105 and the maximum load pressure Plmax1 is outputted by the differential pressure reducing valve 111 as the absolute pressure Pls1. The pressure Pls1 is led to the low-pressure selection valve 112a of the regulator 112 and the low pressure side is selected from Pls1 and Pls2 by the low-pressure selection valve 112a.
(146) Just after the control lever is operated at the start of the boom raising operation, the load pressure of the boom cylinder 3a is transmitted to the first hydraulic fluid supply line 105 and the pressure difference between two lines becomes almost zero, and thus the LS differential pressure Pls1 becomes almost equal to zero. On the other hand, the LS differential pressure Pls2 has been maintained at a level higher than Pgr in this case (Pls2=P2Plmax2=(Ptank+Punsp)Ptank=Punsp>Pgr) similarly to the case where the control lever is at the neutral position. Thus, the LS differential pressure Pls1 is selected by the low-pressure selection valve 112a as the LS differential pressure Pls12 on the low pressure side and is led to the LS control valve 112b. The LS control valve 112b compares the LS differential pressure Pls1 with the target LS differential pressure Pgr. In this case, the LS differential pressure Pls1 is almost equal to zero as mentioned above and the relationship Pls1<Pgr holds. Therefore, the LS control valve 112b switches rightward in
(147) In this case, the second hydraulic fluid supply line 205 is supplied with the hydraulic fluid at the same flow rate as the hydraulic fluid supplied to the first hydraulic fluid supply line 105. However, the hydraulic fluid supplied to the first hydraulic fluid supply line 105 is returned to the tank as a surplus flow via the unloading valve 215. In this case, the second load pressure detection circuit 132 is detecting the tank pressure as the maximum load pressure Plmax2, and thus the set pressure of the unloading valve 215 becomes equal to the set pressure Punsp of the spring and the pressure P2 in the second hydraulic fluid supply line 205 is maintained at the low pressure Punsp. Accordingly, the pressure loss occurring in the unloading valve 215 when the surplus flow returns to the tank is reduced and operation with less energy loss is made possible.
(148) (c-1) Operation of Torque Feedback Circuit 112v
(149) When the boom raising full operation is under way, the displacement (tilting angle) of the main pump 202 is at the maximum, and thus the LS drive pressure Px3 led to the LS control piston 212c of the main pump 202 becomes almost equal to the tank pressure. This state is represented by the point d in
(150) In this case, irrespective of the value of the delivery pressure P3 of the main pump 202, the LS drive pressure Px3d (=tank pressure Ptank) is directly outputted to the first variable pressure reducing valve 112g without being reduced by the second variable pressure reducing valve 112q.
(151) Since the pressure Px3d led to the first variable pressure reducing valve 112g is the tank pressure Ptank, the first set pressure of the first variable pressure reducing valve 112g becomes equal to the pressure determined by the spring 112t (initial value) and the first variable pressure reducing valve 112g displays the characteristic (first pressure reducing characteristic) indicated by the straight line G1 in
(152) The pressure reduced to P3e is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. In the torque feedback piston 112f, force determined by the product of P3e and the pressure receiving area of the torque feedback piston 112f works in the direction for reducing the displacement (tilting angle) of the main pump 102.
(153) In this case, the main pump 202 increases its absorption torque by delivering the hydraulic fluid at a flow rate according to the demanded flow rate of the flow control valve 6a. When the absorption torque reaches T3max represented by the curve 602 in
(154) With such features, the total torque control, controlling the tilting angle of the main pump 102, is performed such that the absorption torque of the main pump 102 does not exceed T12maxT3max, by which the sum of the absorption torque of the main pump 102 and the absorption torque of the main pump 202 is inhibited from exceeding the maximum torque T12max. Consequently, the stoppage of the prime mover 1 (engine stall) can be prevented.
(155) (d) When Arm Control Lever is Operated (Fine Operation)
(156) When the control lever of the arm operating device (arm control lever) is operated in the direction of expanding the arm cylinder 3b (i.e., arm crowding direction), for example, the flow control valves 6b and 6j for driving the arm cylinder 3b are switched downward in
(157) When the operation on the arm control lever is a fine operation and the strokes of the flow control valves 6b and 6j are within S2 shown in
(158) When the flow control valve 6b is switched downward in
(159) Just after the control lever is operated at the start of the arm crowding operation, the load pressure of the arm cylinder 3b is transmitted to the second hydraulic fluid supply line 205 and the pressure difference between two lines becomes almost zero, and thus the LS differential pressure Pls2 becomes almost equal to zero. On the other hand, the LS differential pressure Pls1 has been maintained at a level higher than Pgr in this case (Pls1=P1Plmax1=(Ptank+Punsp)Ptank=Punsp>Pgr) similarly to the case where the control lever is at the neutral position. Thus, the LS differential pressure Pls2 is selected by the low-pressure selection valve 112a as the LS differential pressure Pls12 on the low pressure side and is led to the LS control valve 112b. The LS control valve 112b compares the LS differential pressure Pls2 with the output pressure Pgr of the prime mover revolution speed detection valve 13 as the target LS differential pressure. In this case, the LS differential pressure Pls2 is almost equal to zero as mentioned above and the relationship Pls2<Pgr holds. Therefore, the LS control valve 112b switches rightward in
(160) In this case, the first hydraulic fluid supply line 105 is supplied with the hydraulic fluid at the same flow rate as the hydraulic fluid supplied to the second hydraulic fluid supply line 205, and the hydraulic fluid supplied to the first hydraulic fluid supply line 105 is returned to the tank as a surplus flow via the unloading valve 115. At that time, the first load pressure detection circuit 131 detects the tank pressure as the maximum load pressure Plmax1, and thus the set pressure of the unloading valve 115 becomes equal to the set pressure Punsp of the spring and the pressure P1 in the first hydraulic fluid supply line 105 is maintained at the low pressure Punsp. Accordingly, the pressure loss occurring in the unloading valve 115 when the surplus flow returns to the tank is reduced and operation with less energy loss is made possible.
(161) Further, since no actuator related to the main pump 202 is driven in this case, similarly to the case where all the control levers are at the neutral positions, the second variable pressure reducing valve 112q is set in the state of the point a in
(162) (e) When Arm Control Lever is Operated (Full Operation)
(163) When the arm control lever is operated by the full operation in the direction of expanding the arm cylinder 3b (i.e., arm crowding direction), for example, the flow control valves 6b and 6j for driving the arm cylinder 3b are switched downward in
(164) As explained in the above chapter (d), the load pressure on the bottom side of the arm cylinder 3b is detected by the second load pressure detection circuit 132 as the maximum load pressure Plmax2 via the load port of the flow control valve 6b, and the unloading valve 215 interrupts the hydraulic line for discharging the hydraulic fluid in the second hydraulic fluid supply line 205 to the tank. Since the maximum load pressure Plmax2 is led to the differential pressure reducing valve 211, the LS differential pressure Pls2 is outputted and is led to the low-pressure selection valve 112a of the regulator 112.
(165) Meanwhile, the load pressure on the bottom side of the arm cylinder 3b is detected by the first load pressure detection circuit 131 as the maximum load pressure Plmax1 (=Plmax2) via the load port of the flow control valve 6i and is led to the unloading valve 115 and the differential pressure reducing valve 111. Due to the maximum load pressure Plmax1 led to the unloading valve 115, the hydraulic line for discharging the hydraulic fluid in the first hydraulic fluid supply line 105 to the tank is interrupted by the unloading valve 115. Further, since the maximum load pressure Plmax1 is led to the differential pressure reducing valve 111, the LS differential pressure Pls1 (=Pls2) is led to the low-pressure selection valve 112a of the regulator 112.
(166) Just after the control lever is operated at the start of the arm crowding operation, the load pressure of the arm cylinder 3b is transmitted to the first and second hydraulic fluid supply lines 105 and 205 and the pressure difference between two lines becomes almost zero in regard to each hydraulic fluid supply line, and thus both of the LS differential pressures Pls1 and Pls2 become almost equal to zero. Thus, Pls1 or Pls2 is selected by the low-pressure selection valve 112a as the LS differential pressure Pls12 on the low pressure side and the LS differential pressure Pls12 is led to the LS control valve 112b. In this case, both of Pls1 and Pls2 are almost equal to zero as mentioned above and the relationship Pls12<Pgr holds. Therefore, the LS control valve 112b switches rightward in
(167) Further, since no actuator related to the main pump 202 is driven also in this case, similarly to the case where all the control levers are at the neutral positions, the second variable pressure reducing valve 112q is set in the state of the point a in
(168) With such features, the first torque control section controls the tilting angle of the main pump 102 such that the absorption torque of the main pump 102 does not exceed the maximum torque T12max, by which the stoppage of the prime mover 1 (engine stall) can be prevented at times of increase in the load on the arm cylinder 3b.
(169) (f) When Horizontally Leveling Work is Performed
(170) The horizontally leveling work is a combination of the boom raising fine operation and the arm crowding full operation. As for the movement of the actuators, the horizontally leveling operation is implemented by expansion of the arm cylinder 3b and expansion of the boom cylinder 3a.
(171) In the horizontally leveling work, the boom raising is a fine operation. Thus, as explained in the chapter (b), the opening area of the meter-in channel of the flow control valve 6a for the main driving of the boom cylinder 3a becomes smaller than or equal to A1 and the opening area of the meter-in channel of the flow control valve 6i for the assist driving of the boom cylinder 3a is maintained at zero. The load pressure of the boom cylinder 3a is detected by the third load pressure detection circuit 133 as the maximum load pressure Plmax3 via the load port of the flow control valve 6a, and the hydraulic line for discharging the hydraulic fluid in the third hydraulic fluid supply line 305 to the tank is interrupted by the unloading valve 315. Further, the maximum load pressure Plmax3 is fed back to the regulator 212 of the main pump 202, the displacement (flow rate) of the main pump 202 increases according to the demanded flow rate (opening area) of the flow control valve 6a, the hydraulic fluid at the flow rate corresponding to the input to the boom control lever is supplied from the third delivery port 202a of the main pump 202 to the bottom side of the boom cylinder 3a, and the boom cylinder 3a is driven in the expanding direction by the hydraulic fluid from the third delivery port 202a.
(172) In contrast, the arm control lever is operated by the full operation or full input. Thus, as explained in the above chapter (e), the opening areas of the meter-in channels of the flow control valves 6b and 6j for the main driving and the assist driving of the arm cylinder 3b reach A1 and A2, respectively. The load pressure of the arm cylinder 3b is detected by the first and second load pressure detection circuits 131 and 132 respectively as the maximum load pressures Plmax1 and Plmax2 (Plmax1=Plmax2) via the load ports of the flow control valves 6b and 6j, the hydraulic line for discharging the hydraulic fluid in the first hydraulic fluid supply line 105 to the tank is interrupted by the unloading valve 115, and the hydraulic line for discharging the hydraulic fluid in the second hydraulic fluid supply line 205 to the tank is interrupted by the unloading valve 215. Further, the maximum load pressures Plmax1 and Plmax2 are fed back to the regulator 112 of the main pump 102, the displacement (flow rate) of the main pump 102 increases according to the demanded flow rates of the flow control valves 6b and 6j, the hydraulic fluid at the flow rate corresponding to the input to the arm control lever is supplied from the first and second delivery ports 102a and 102b of the main pump 102 to the bottom side of the arm cylinder 3b, and the arm cylinder 3b is driven in the expanding direction by the merged hydraulic fluid from the first and second delivery ports 102a and 102b.
(173) In the horizontally leveling work, the load pressure of the arm cylinder 3b is generally low and the load pressure of the boom cylinder 3a is generally high in many cases. In this embodiment, actuators differing in the load pressure are driven by separate pumps, namely, the boom cylinder 3a is driven by the main pump 202 and the arm cylinder 3b is driven by the main pump 102, in the horizontally leveling work. Therefore, the wasteful energy consumption caused by the pressure loss in the pressure compensating valve 7b on the low load side, occurring in the conventional one-pump load sensing system which drives multiple actuators differing in the load pressure by use of one pump, does not occur in the hydraulic drive system of this embodiment.
(174) (f-1) Operation of Torque Feedback Circuit 112v
(175) Assuming that the LS drive pressure Px3 equals Px3b of the point b1 in
(176) The pressure reduced to P3b is led to the torque feedback piston 112f as the output pressure P3out of the first variable pressure reducing valve 112g. In the torque feedback piston 112f, force determined by the product of P3b and the pressure receiving area of the torque feedback piston 112f works in the direction for reducing the displacement (tilting angle) of the main pump 102.
(177) Here, assuming that the main pump 202 is operating at the point X2 in
(178) With such features, even when the arm control lever is operated by the full operation in the horizontally leveling work, the total torque control, controlling the tilting angle of the main pump 102, is performed such that the absorption torque of the main pump 102 does not exceed T12maxT3gs, by which the sum of the absorption torque of the main pump 102 and the absorption torque of the main pump 202 is inhibited from exceeding the maximum torque T12max. Consequently, the stoppage of the prime mover 1 (engine stall) can be prevented.
(179) (g) When Boom Raising Fine Operation is Performed in Load Lifting Work
(180) The load lifting work is a type of work in which a wire is attached to a hook formed on the bucket and a load is lifted with the wire and moved to a different place. Also when the boom raising fine operation is performed in the load lifting work, the hydraulic fluid is supplied from the third delivery port 202a of the main pump 202 to the bottom side of the boom cylinder 3a by the load sensing control performed by the regulator 212 and the boom cylinder 3a is driven in the expanding direction as explained in the chapter (b). However, the boom raising in the load lifting work is work that needs extreme care, and thus the operation amount of the control lever is extremely small and there are cases where the minimum flow rate obtained by the minimum tilting angle q3min of the main pump 202 is sufficient for the demanded flow rate of the flow control valve. In such cases, Pls3>Pgr holds, the LS control valve 212b is positioned at the left-hand position in
(181) Here, the load in the load lifting work is heavy and the delivery pressure P3 of the main pump 202 becomes high like the pressure P31 in
(182) If the torque feedback circuit 112v is not equipped with the second variable pressure reducing valve 112q in this embodiment, the output pressure of the torque feedback circuit 112v is limited to the output pressure P3a of the first variable pressure reducing valve 112g as indicated by the straight line G5 in
(183) In this embodiment, the torque feedback circuit 112v is equipped with the second variable pressure reducing valve 112q. Thus, even when the delivery pressure P3 of the main pump 202 becomes high like P31 in
(184) Effect
(185) In this embodiment configured as above, not only when the main pump 202 (second hydraulic pump) is in the operational state of undergoing the limitation by the torque control and operating at the maximum torque T3max of the torque control like the point X1 in
(186)
(187) In the comparative example shown in
(188) In this comparative example, when the main pump 202 is operating at the point X1 on the curve 602 of the maximum torque T3max in
(189) However, when the main pump 202 is operating at the point X2 in
(190) In this embodiment, when the main pump 202 is operating at the point X2 in
(191) As above, in this embodiment, the total horsepower control for preventing the stoppage of the prime mover 1 (engine stall) can be performed precisely and the output torque Terate of the prime mover 1 can be utilized efficiently by having the torque feedback circuit 112v precisely feed back the absorption torque T3max or T3g of the main pump 202 to the main pump 102's side.
(192) Further, in this embodiment in which the torque feedback circuit 112v is equipped with the second variable pressure reducing valve 112q, even when the delivery pressure P3 of the main pump 202 becomes high like P31 in
Other Examples
(193) The embodiment described above is just an example for illustration and a variety of modifications are possible within the spirit of the present invention.
(194) For example, while the hydraulic line 112k for leading the LS drive pressure Px3 to the input port of the second variable pressure reducing valve 112q is equipped with the restrictor 112r for absorbing vibration of the LS drive pressure Px3 and stabilizing the pressure when the LS drive pressure Px3 is vibrational in the above embodiment, the restrictor 112r is employed assuming cases where the LS drive pressure Px3 is vibrational. The restrictor 112r can be left out in cases where the vibration of the LS drive pressure Px3 is within an extent not significantly affecting the stability of the outputs of the first and second variable pressure reducing valves 112g and 112q.
(195) While the hydraulic line 112j for leading the delivery pressure of the main pump 202 to the first and second variable pressure reducing valves 112g and 112q is equipped with no restrictor in the above embodiment, the hydraulic line 112j may also be equipped with a restrictor in cases where the outputs of the first and second variable pressure reducing valves 112g and 112q cannot be stabilized by just providing the hydraulic line 112k with the restrictor 112r.
(196) While the description of the above embodiment has been given of a case where the first hydraulic pump is the split flow type hydraulic pump 102 having the first and second delivery ports 102a and 102b, the first hydraulic pump can also be a variable displacement hydraulic pump having a single delivery port.
(197) Further, while the first pump control unit has been assumed to be the regulator 112 including the load sensing control section (the low-pressure selection valve 112a, the LS control valve 112b and the LS control piston 112c) and the torque control section (the torque control pistons 112d and 112e and the spring 112u), the load sensing control section in the first pump control unit is not essential. Other types of control methods such as the so-called positive control or negative control may also be employed as long as the displacement of the first hydraulic pump can be controlled according to the operation amount of a control lever (the opening area of a flow control valvethe demanded flow rate).
(198) Furthermore, the load sensing system in the above embodiment is just an example and can be modified in various ways. For example, while a differential pressure reducing valve outputting a pump delivery pressure and a maximum load pressure as absolute pressures is employed, and the target compensation pressure is set by leading the output pressure of the differential pressure reducing valve to a pressure compensating valve, and the target differential pressure of the load sensing control is set by leading the output pressure of the differential pressure reducing valve to an LS control valve in the above embodiment, it is also possible to lead the pump delivery pressure and the maximum load pressure to a pressure control valve or an LS control valve through separate hydraulic lines.
DESCRIPTION OF REFERENCE CHARACTERS
(199) 1: Prime mover 102: Main pump of variable displacement type (first hydraulic pump) 102a, 102b: first and second delivery ports 112: Regulator (first pump control unit) 112a: Low-pressure selection valve 112b: LS control valve 112b 112c: LS control piston 112d, 112e: Torque control pistons (first torque control actuators) 112f: Torque feedback piston (third torque control actuator) 112g: First variable pressure reducing valve 112h, 112i: Pressure receiving parts 112j, 112k: Hydraulic lines 112n, 112p: Hydraulic lines 112r: Restrictor 112q: Second variable pressure reducing valve 112s, 112t: Springs 112u: Spring (first biasing means) 112v: Torque feedback circuit 202: Main pump of variable displacement type (second hydraulic pump) 202a: Third delivery port 212: Regulator (second pump control unit) 212b: LS control valve 212c: LS control piston (load sensing control actuator) 212d: Torque control piston (second torque control actuator) 212e: Spring (second biasing means) 115: Unloading valve 215: Unloading valve 315: Unloading valve 111, 211, 311: Differential pressure reducing valves 146, 246: Second and third selector valves 3a-3h: Actuators 4: Control valve unit 6a-6j: Flow control valves 7a-7j: Pressure compensating valves 8a-8j: Operation detection valves 9b-9j: Shuttle valves 13: Prime mover revolution speed detection valve 24: Gate lock lever 30: Pilot pump 31a, 31b, 31c: Pilot hydraulic fluid supply line 32: Pilot relief valve 40: Third selector valve 53: Travel combined operation detection hydraulic line 43: Restrictor 100: Gate lock valve 122, 123, 124a, 124b: Operating devices 131, 132, 133: First, second, and third load pressure detection circuits