Method for removing hydraulic support for solid filling coal mining

10036252 ยท 2018-07-31

Assignee

Inventors

Cpc classification

International classification

Abstract

A method for removing a hydraulic support for solid filling coal mining includes digging a support removing channel (3) in a coal body (2) in front of the hydraulic support (1), and laying a support removing track (4), then removing the hydraulic support from a coal conveying gateway (11) to a track gateway (5), temporary supporting is carried out by matching a single supporting column with a n-type steel beam before each hydraulic support is removed. A supporting roof is reinforced in time by means of erecting a crib (13) and grouting after each hydraulic support is removed, three grouting pipelines (12) are laid after the supports of the whole work surface are removed, and grouting is carried out in the whole finishing cut space. The roof of the support removing space of the work surface is stable so that the hydraulic supports on the work surface of solid filling coal mining are ensured to be safely and efficiently removed.

Claims

1. A method for removing a plurality of filling coal mining hydraulic supports for solid filling coal mining, comprising the following steps: a. excavating a support removing channel along a working face in a coal body in front of a first filling coal mining hydraulic support, and supporting an exposed roof by a conventional anchor belt net and a cable plus single prop approach; b. laying support removing rails in the support removing channel, and installing a winch in a tail entry of the removing channel; c. removing a coal mining machine, and a first section of a scraper conveyor and a first section of a filling mining conveyor in front of the first filling coal mining hydraulic support; d. providing temporary supports within a roof control scope of the first filling coal mining hydraulic support, and then removing the first filling coal mining hydraulic support and transporting the removed first filling coal mining hydraulic support along the support removing channel via the support removing rails; e. repeating steps (a) through (d) until all of the plurality of filling coal mining hydraulic supports along the entire working face in the coal body are removed; f. providing a plurality of reinforced supports for supporting the exposed roof to form a pedestrian passageway, wherein, the distance between the reinforced supports is 2.0 m; and g. clearing the working face, laying grouting pipelines in the pedestrian passageway, and grouting into the grouting pipelines.

2. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1, wherein a width of the support removing channel is between 3 m and 4 m.

3. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1, wherein the temporary supports are pi-shaped (-shaped) steel beams.

4. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1, wherein the plurality of reinforced supports are provided by erecting timber cribs, sealing the timber cribs with a bonding tape, and grouting concrete grout into the timber cribs with a grouting machine.

5. The method for removing a plurality of filling coal mining hydraulic supports according to claim 4, wherein the dimensions of the timber cribs are 2.0 m2.0 m.

6. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1, wherein the grouting pipelines are laid in the pedestrian passageway between two rows of the timber cribs, and three grouting pipelines are laid from a coal conveying gateway to the tail entry.

Description

BRIEF DESCRIPTION OF THE DRAWINGS

(1) FIG. 1 is a top view of the equipment layout and roof support at the finishing cut before the filling coal mining hydraulic supports are removed in the present invention;

(2) FIG. 2 is a top view of the layout of timber cribs and grouting pipelines at the finishing cut after the filling coal mining hydraulic supports are removed in the present invention.

(3) In the figures: 1filling coal mining hydraulic support; 2coal body ahead; 3support removing channel; 4support removing rail; 5tail entry; 6winch; 7coal mining machine; 8first filling coal mining hydraulic support; 9first section of scraper conveyor; 10first section of filling mining conveyor; 11coal conveying gateway; 12grouting pipeline; 13timber crib; 14pedestrian passageway.

DETAILED DESCRIPTION

(4) Hereunder the present invention will be further detailed in an embodiment, with reference to the accompanying drawings.

(5) The method for removing hydraulic supports for solid filling coal mining provided in the present invention comprises:

(6) a. excavating a support removing channel 3 along the working face in the coal body 2 in front of the filling coal mining hydraulic support 1, and supporting the exposed roof by a conventional anchor belt net and cable plus single prop support approach;

(7) b. laying support removing rails 4 in the support removing channel 3, and installing a winch 6 in the tail entry 5;

(8) c. removing the coal mining machine 7, and the first section of scraper conveyor 9 and the first section of filling mining conveyor 10 in front of the first filling coal mining hydraulic support 8;

(9) d. providing temporary supports within the roof control scope of the first filling coal mining hydraulic support 8, and then removing the first filling coal mining hydraulic support 8 and transporting it away via the support removing rails 4 from the coal conveying gateway 11 to the tail entry 5;

(10) e. removing the next filling coal mining hydraulic support 8, next section of scraper conveyor 9, and next section of filling mining conveyor 10, transporting them away, and providing temporary supports sequentially, till all of the filling coal mining hydraulic supports at the entire working face are removed;

(11) f. providing reinforced supports for the space roof of the filling coal mining hydraulic supports 8, scraper conveyor 9 and filling mining conveyor 10 removed sequentially to form a pedestrian passageway 14, wherein, the array pitch L of the reinforced supports is 2.0 m;

(12) g. clearing away other remaining devices at the working face, laying grouting pipelines 12 in the pedestrian passageway 14, and grouting into the space; thus, the removal work of hydraulic supports for solid filling coal mining is finished.

(13) The width of the support removing channel 3 is 3 m4 m.

(14) Temporary supports are provided within the roof control scope of the first filling coal mining hydraulic support 8 by a single prop plus -shaped steel beam approach.

(15) The reinforced supports are provided by erecting timber cribs 13, sealing the timber cribs 13 with bonding tapes, and then grouting concrete grout into the timber cribs 13 with a grouting machine.

(16) The dimensions of the timber crib 13 are 2.0 m2.0 m.

(17) The grouting pipelines 12 are laid in the pedestrian passageway 14 between two rows of timber cribs 13, and three grouting pipelines 12 are laid from the coal conveying gateway 11 to the tail entry 5.

Embodiment 1: Working Face III644 in Yangzhuang Coal Mine of Huaibei Mining Group as an Example

(18) The working seam at the working face III644 is coal seam 6#, the average coal thickness is 2.7 m, the average inclination is 18, the coal seam structure is simple, and the burial depth is 360 m515 m; the length of the working face is 340 m, the inclination width is 110 m, and fully-mechanized solid filling mining is used; The finishing cut at the working face has a rectangular cross section, with widthheight=10.5 m2.8 m, and length=110 m. The method for removing hydraulic supports for solid filling coal mining comprises the following steps:

(19) a. excavating a support removing channel 3 having a width of 3 m along the working face III644 in the coal body 2 in front of the filling coal mining hydraulic support 1, and supporting the exposed roof by an anchor belt net and cable plus single prop approach;

(20) b. laying support removing rails 4 in the support removing channel 3, and installing a winch 6 in the tail entry 5 of the working face III644;

(21) c. removing the coal mining machine 7, and the first section of scraper conveyor 9 and the first section of filling mining conveyor 10 in front of the first filling coal mining hydraulic support 8;

(22) d. providing temporary supports within the roof control scope of the first filling coal mining hydraulic support 8 by a single prop plus -shaped steel beams approach, and then removing the first filling coal mining hydraulic support 8 and transporting it away via the support removing rails 4 from the coal conveying gateway 11 of III644 to the tail entry 5 of III644;

(23) e. providing reinforced supports for the space roof where the first filling coal mining hydraulic support 8 is removed by erecting two rows of timber cribs 13, sealing the timber cribs 13 with bonding tapes, and then grouting concrete grout into the timber cribs 13 with a grouting machine, wherein, the dimensions of the timber crib (13) are 2.0 m2.0 m, and the array pitch L is 2.0 m;

(24) f. repeating step c, d and e, till all of the filling coal mining hydraulic supports at the entire working face are removed;

(25) g. clearing away other remaining devices at the working face, laying three grouting pipelines 12 in the space of finishing cut at the working face III644 at the upper part, middle part, and lower part of the finishing cut respectively, and grouting into the finishing cut at the working face, to form permanent support for the overlying strata above the space. Thus, the hydraulic supports for solid filling coal mining at the working face are removed safely and efficiently, the overlying strata movement and surface subsidence at the finishing cut is effectively controlled.

(26) a. excavating a support removing channel (3) along the working face in the coal body (2) in front of the filling coal mining hydraulic support (1), and supporting the exposed roof by an anchor belt net and cable plus single prop approach;

(27) b. laying support removing rails (4) in the support removing channel (3), and installing a winch (6) in the tail entry (5);

(28) c. removing the coal mining machine (7), and the first section of scraper conveyor (9) and the first section of filling mining conveyor (10) in front of the first filling coal mining hydraulic support (8);

(29) d. providing temporary supports within the roof control scope of the first filling coal mining hydraulic support (8), and then removing the first filling coal mining hydraulic support (8) and transporting it away via the support removing rails (4) from the coal conveying gateway (11) to the tail entry (5);

(30) e. providing reinforced supports for the space roof where the first filling coal mining hydraulic support (8) is removed;

(31) f. repeating step c, d and e, till all of the filling coal mining hydraulic supports at the entire working face are removed;

(32) g. clearing away other remaining devices at the working face, laying grouting pipelines (12) in the at the working face space, and grouting into the finishing cut space at the working face; thus, the removal work of hydraulic supports for solid filling coal mining is finished.

(33) The width of the support removing channel (3) is 3 m4 m; temporary supports are provided within the roof control scope of the first filling coal mining hydraulic support (8) by a single prop plus -shaped steel beam approach; reinforced supports are provided for the space roof where the first filling coal mining hydraulic support (8) is removed by erecting timber cribs (13), sealing the timber cribs (13) with bonding tapes, and then grouting concrete grout into the timber cribs (13) with a grouting machine, wherein, the dimensions of the timber crib (13) are 2.0 m2.0 m, and the array pitch L is 2.0 m; grouting pipelines (12) are laid in the finishing cut space at the working face in the pedestrian passageway (14) between two rows of timber cribs, and three grouting pipelines (12) are laid from the coal conveying gateway (11) to the tail entry (5) at the upper part, middle part, and lower part of the finishing cut at the working face respectively.