Hoisting rope arrangement in crane trolley

10029892 · 2018-07-24

Assignee

Inventors

Cpc classification

International classification

Abstract

A hoisting rope arrangement in a trolley moving along a main girder of a crane and driven by an outside mechanism is provided. Both sides of the trolley are provided with successive rope pulley pairs located at a distance from one another in a longitudinal direction of the trolley and, below these, sheaves situated in a hoisting member, whereby on both sides of the trolley, a first hoisting rope is led from a first end of the main girder of the crane via one rope pulley of a first rope pulley pair down to the sheave and therefrom via an other rope pulley to a second end of the main girder, and a second hoisting rope is led from the second end of the main girder via one rope pulley of a second rope pulley pair down to the sheave and therefrom via an other rope pulley to the first end of the main girder. The arrangement employs rope pulley pairs which comprise differently sized rope pulleys but which are mounted in successive fastening points of the trolley such that they are reversed in relation to one another and such that in successive pulley pairs the differently sized rope pulleys are aligned with one another as viewed in the longitudinal direction of the trolley.

Claims

1. A hoisting rope arrangement in a crane trolley, wherein: the crane trolley is arranged to move on a main girder of a crane; a lifting mechanism of the crane trolley is located outside the crane trolley; both sides of the crane trolley are provided with successive rope pulley pairs located at a distance from one another in a longitudinal direction of the crane trolley and, below the successive rope pulley pairs, at a distance, sheaves situated in a hoisting member; whereby on both sides of the crane trolley, a first hoisting rope is led from a first end of the main girder of the crane via one rope pulley of a first rope pulley pair of the crane trolley down to the sheave located therebelow and therefrom via the other rope pulley of said first rope pulley pair to a second end of the main girder; and on both sides of the crane trolley, a second hoisting rope is led from the second end of the main girder of the crane via one rope pulley of a second rope pulley pair of the crane trolley down to the sheave located therebelow and therefrom via the other rope pulley of said second rope pulley pair to the first end of the main girder, wherein each rope pulley pair comprises, arranged on the same axle, a rope pulley having a larger diameter and a rope pulley having a smaller diameter, whereby in each rope pulley pair said larger diameters correspond to one another and said smaller diameters correspond to one another; the rope pulley of the first rope pulley pair provided with the larger diameter is, as viewed in a longitudinal direction of the main girder and the crane trolley, aligned with the rope pulley of the second rope pulley pair provided with the smaller diameter; the rope pulley of the first rope pulley pair provided with the smaller diameter is, as viewed in the longitudinal direction of the main girder and the crane trolley, aligned with the rope pulley of the second rope pulley pair provided with the larger diameter; and the hoisting ropes in the crane trolley and the hoisting member being located symmetrically with respect to a transverse vertical plane passing in the middle of the crane trolley and the hoisting member and substantially in the same vertical planes in the direction of the main girder on different sides of the crane trolley at least in the vicinity of the crane trolley.

2. The hoisting rope arrangement as claimed in claim 1, wherein the rope pulleys of each rope pulley pair are formed as separate rope pulleys pivotably mounted side by side on the same axle.

3. The hoisting rope arrangement as claimed in claim 1, wherein the rope pulley pairs are identical, but when placed successively in the crane trolley, they are placed reversely in relation to one another.

4. The hoisting rope arrangement as claimed in claim 1, wherein the sheaves of the hoisting member are mutually identical.

Description

LIST OF FIGURES

(1) The invention is now described in closer detail by means of one preferred embodiment and with reference to the accompanying drawings, in which

(2) FIG. 1 shows a hoisting rope arrangement according to the invention; and

(3) FIG. 2 is a partial enlargement of FIG. 1 and particularly of rope pulley pairs.

DETAILED DESCRIPTION OF THE INVENTION

(4) The figures show a crane, of which is seen its main girder comprising two parallel rails 1 along which a trolley 2 is arranged to move whose both sides are provided with successive rope pulley pairs 3 and 4 located at a distance from one another in a longitudinal direction of the trolley 2. Below the trolley 2, at a distance, is arranged a hoisting member 5 provided with a total of four sheaves 6 below the rope pulley pairs 3 and 4. A lifting mechanism or mechanisms 20 of the trolley 2 are located outside the trolley 2. From the lifting mechanism, hoisting ropes 7 and 8 are led from a first end 1 of the main girder to its second end 1 via the rope pulley pairs 3 and 4 of the trolley 2 and the sheaves 6 of the hoisting member 5.

(5) To be more precise, on both sides of the trolley 2, a first hoisting rope 7 is led from the first end of the main girder 1 of the crane via one rope pulley 3a of a first rope pulley pair 3 of the trolley 2 down to the sheave 6 located therebelow and therefrom via the other rope pulley 3b of the rope pulley pair 3 to the second end of the main girder 1.

(6) Correspondingly, on both sides of the trolley 2, a second hoisting rope 8 is led from the second end of the main girder 1 of the crane via one rope pulley 4a of a second rope pulley pair 4 of the trolley 2 down to the sheave 6 located therebelow and therefrom via the other rope pulley 4b of the rope pulley pair 4 to the first end of the main girder 1.

(7) An essential point in this arrangement is that each rope pulley pair 3 and 4 comprises, arranged on the same axis, a rope pulley 3b and 4b having a larger diameter and a rope pulley 3a and 4a having a smaller diameter, whereby in each rope pulley pair 3 and 4 the larger diameters correspond to one another and the smaller diameters correspond to one another.

(8) In such a case, the rope pulley 3b of the first rope pulley pair 3 provided with the larger diameter is, as viewed in a longitudinal direction of the main girder 1 and the trolley 2, aligned with the rope pulley 4a of the second rope pulley pair 4 provided with the smaller diameter.

(9) Correspondingly, the rope pulley 3a of the first rope pulley pair 3 provided with the smaller diameter is, as viewed in the longitudinal direction of the main girder 1 and the trolley 2, aligned with the rope pulley 4a of the second rope pulley pair 4 provided with the larger diameter.

(10) Thus, the hoisting ropes 7 and 8 in the trolley 2 and the hoisting member 5 are located symmetrically with respect to a transverse vertical plane passing in the middle of the trolley 2 and the hoisting member 5 and substantially in the same vertical planes in the direction of the main girder 1 on different sides of the trolley 2 at least in the vicinity of the trolley 2.

(11) The rope pulleys 3a, 3b and 4a, 4b of each rope pulley pair 3 and 4 may be formed as separate rope pulleys pivotably mounted side by side on the same axle, preferably by using similar bearings.

(12) Alternatively, the rope pulleys 3a, 3b and 4a, 4b of each rope pulley pair 3 and 4 may be formed as separate rope pulleys arranged in one another into one entity such that their mutual rotation is possible. An option is also to form the rope pulleys 3a, 3b and 4a, 4b of each rope pulley pair 3 and 4 as a uniform entity having two rope groove structures which have differently sized diameters and which may rotate with respect to one another. In these alternative embodiments, intermediate bearing is arranged between the parts rotating with respect to one another.

(13) The rope pulleys 3a, 3b, and 4a, 4b, respectively, located on the same axle rotate in the same direction of rotation when the trolley 2 is driven in a direction parallel to the main girder 1. When, again, the hoisting member 5 is lifted or lowered, the rope pulleys 3a, 3b, and 4a, 4b, respectively, rotate in mutually opposite directions.

(14) It is functional that the rope pulley pairs 3 and 4 are identical, but when placed successively in the trolley 2, they are placed reversely in relation to one another. The identical rope pulley pairs 3 and 4 enable all rope pulley pairs to be mutually replaceable, with only their mounting directions in the trolley 2 varying. Further advantages include benefits of manufacture: axle journals are mutually similar, and bearings preferably of one type may be used for all rope pulleys. All axles or projections supporting the axles may be made shorter, in which case the moments loading them at the base are smaller. Owing to the symmetry and the load being evenly distributed among the ropes, the hoisting ropes 7 and 8 may also be expected to wear down evenly.

(15) The above description of the invention is only intended to illustrate the basic idea of the invention. A person skilled in the art may thus vary its details within the scope of the attached claims.