WIRE-GUIDED AUTOMATIC PAY-OFF DEVICE AND METHOD
20240351820 ยท 2024-10-24
Assignee
Inventors
- Zhonghai ZHANG (Jiangsu, CN)
- Ming Li (Jiangsu, CN)
- Genying LI (Jiangsu, CN)
- Ming YANG (Jiangsu, CN)
- Xiang WANG (Jiangsu, CN)
- Zhen HAN (Jiangsu, CN)
- Mengci ZHANG (Jiangsu, CN)
- Chengming SHAN (Jiangsu, CN)
- Xiaobo NIU (Jiangsu, CN)
- Shuai Wang (Jiangsu, CN)
- Wendeng LI (Jiangsu, CN)
- Zuoshuai SUN (Jiangsu, CN)
Cpc classification
B65H49/06
PERFORMING OPERATIONS; TRANSPORTING
E21B47/12
FIXED CONSTRUCTIONS
International classification
B65H49/06
PERFORMING OPERATIONS; TRANSPORTING
Abstract
Disclosed are a wire-guided automatic pay-off device and method. The wire-guided automatic pay-off device is installed on a horizontal directional drilling rig and comprises a conductive ring assembly, a brush assembly, a winding device, a guide device and a guide wire. The conductive ring assembly fixed to a main shaft of a carriage assembly rotates together with the main shaft, the brush assembly fixed to a body of the carriage assembly does not rotate with the main shaft, and a conductive end of the brush assembly is in contact with the conductive ring assembly. The guide wire wound on the winding device has one end connected to the conductive ring assembly and the other end passing through the guide device, penetrating into a central hole in a drill pipe from a rear end of the drill pipe.
Claims
1. A wire-guided automatic pay-off device, being installed on a horizontal directional drilling rig, the horizontal directional drilling rig comprising a carriage assembly, a short joint and a drill pipe, a rear end of the short joint being fixedly connected to a main shaft of the carriage assembly and rotating together with the main shaft, and a front end of the short joint being connected to the drill pipe, wherein the wire-guided automatic pay-off device comprises a conductive ring assembly, a brush assembly, a winding device, a guide device and a guide wire, the conductive ring assembly is fixed to the main shaft of the carriage assembly and rotates together with the main shaft, the brush assembly is fixed to a body of the carriage assembly and does not rotate with the main shaft, and a conductive end of the brush assembly is in contact with the conductive ring assembly; the guide device and the winding device are fixedly connected to the short joint and rotate together with the short joint; the guide wire is wound on the winding device, and has one end connected to the conductive ring assembly and the other end passing through the guide device, then penetrating into a central hole in the drill pipe from a rear end of the drill pipe, and finally extending out from a front end of the drill pipe to be connected to a guide wire in a drill pipe that has been pushed into a working face, thus forming a complete and tight guide wire.
2. The wire-guided automatic pay-off device according to claim 1, wherein the conductive ring assembly comprises a conductive ring, an insulation ring, fixing nuts and fixing screws, the insulation ring is located on an inner side of the conductive ring, and the conductive ring comprises two semicircular rings which are connected by means of the fixing nuts and the fixing screws.
3. The wire-guided automatic pay-off device according to claim 2, wherein an end of the guide wire is pressed against joints of the two semicircular rings by means of the fixing nuts and the fixing screws.
4. The wire-guided automatic pay-off device according to claim 1, wherein the winding device and the guide device are fixedly connected to the short joint by means of hoops.
5. The wire-guided automatic pay-off device according to claim 4, wherein the winding device comprises a wire reel, two side supports I, a connecting shaft and a hoop I, the wire reel is arranged between the two side supports I and supported by the connecting shaft, and the wire reel is rotatable with respect to the connecting shaft, and the side supports I are fixed to the hoop I.
6. The wire-guided automatic pay-off device according to claim 4, wherein the guide device comprises two guide wheels and two side supports II, the two guide wheels are installed between the two side supports II, and a gap is formed between the two guide wheels.
7. A pay-off method for the wire-guided automatic pay-off device according to claim 1, comprising the following steps: Step 1, pushing, by the carriage assembly, the drill pipe directly connected to the carriage assembly to the front, and then separating the drill pipe from the carriage assembly; Step 2, allowing the carriage assembly to retreat by a distance greater than a length of one drill pipe, and automatically paying off, by the winding device, the guide wire by a length equal to the distance to keep the guide wire in a tight state; and Step 3, cutting off the guide wire at a rear end of the drill pipe in Step 1, providing a new drill pipe, allowing the guide wire to penetrate into a central hole of the new drill pipe and then extend out from an end of the new drill pipe, connecting a rear end of the new drill pipe to the short joint, connecting the guide wire to the guide wire at the rear end of the drill pipe in Step 1, and then connecting a front end of the new drill pipe to the drill pipe in front.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
[0015]
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025] In the FIGS.: 1, conductive ring assembly; 11, conductive ring; 12, insulation ring: 13, fixing nut; 14, fixing screw; 2, brush assembly; 3, winding device; 31, wire reel; 32, side support I; 33, connecting shaft; 34, hoop I; 4, guide device; 41, guide wheel: 42, side support II: 43, hoop II; 5, guide wire; 6, carriage assembly; 7, short joint; 8, drill pipe.
DETAILED DESCRIPTION OF THE INVENTION
[0026] The invention is described in further detail below in conjunction with accompanying drawings and specific embodiments.
[0027] As shown in
[0028] As shown in
[0029] The winding device 3 and the guide device 4 are fixedly connected to the short joint 7 by means of hoops, or the winding device 3 and the guide device 4 are fixed to the short joint 7 by welding. The hoop is formed by two connected semicircular rings or is formed by a circular ring. In this embodiment, the hoop is formed by two connected semicircular rings.
[0030] As shown in
[0031] As shown in
[0032] As shown in
[0033] Step 1, the carriage assembly 6 pushes the drill pipe 8 directly connected thereto to the front, and then the drill pipe 8 is separated from the carriage assembly 6;
[0034] Step 2, the carriage assembly 6 retreats by a distance greater than the length of one drill pipe, and the winding device 3 automatically pays off the guide wire 5 by a length equal to the distance to keep the guide wire 5 in a tight state; and
[0035] Step 3, the guide wire 5 is cut off at a rear end of the drill pipe in Step 1, a new drill pipe 8 is provided, the guide wire 5 penetrates into a central hole of the new drill pipe 8 and then extends out from an end of the new drill pipe 8, a rear end of the new drill pipe 8 is connected to the short joint 7, the guide wire 5 is connected to the guide wire at the rear end of the drill pipe in Step 1, and then a front end of the new drill pipe 8 is connected to the drill pipe in front.
[0036] The pay-off method can reduce the labor cost and realize automatic pay-off, and can still keep the whole guide wire (overground and underground) in a tight state after the new drill pipe is added.
[0037] The embodiments of the invention are described in detail above in conjunction with the accompanying drawings, but the invention is not limited to the above embodiments. Various modifications can be made by those skilled in the art within their knowledge scope without departing from the concept of the invention, and all these modifications should also fall within the protection scope of the claims of the invention.