A Remote Monitoring and Control System and Method for Improving Hydrocarbon Production Efficiency
20240352849 ยท 2024-10-24
Inventors
Cpc classification
E21B47/138
FIXED CONSTRUCTIONS
International classification
E21B47/008
FIXED CONSTRUCTIONS
Abstract
The present invention relates to a remote control and monitoring system to improve the production efficiency of a hydrocarbon well, including a choke located between a wellhead production tree and the production line of hydrocarbons, an actuator operating the choke, the actuator being in communication with a remote control and monitoring unit, a power supply source supplying power to the control and monitoring unit, and a plurality of data acquisition means including transducers arranged upstream and downstream of the choke, where the data acquisition means sends information related to the wellhead pressure, the production line pressure, and optionally, the wellhead temperature to the control and monitoring unit, where the control and monitoring unit is configured to carry out well shut-in cycles and well opening cycles determined based on compliance with a plurality of well shut-in and opening criteria by which a measured or calculated value of a parameter is compared to a preset value for the parameter, where the measured or calculated parameters are selected from wellhead pressure, production line pressure, wellhead pressure to production line pressure ratio, shut-in or opening time of the well, flow rate and critical flow rate. A method for improving the production efficiency of a hydrocarbon well employing the same is also provided.
Claims
1. A remote control and monitoring system to improve the production efficiency of a hydrocarbon well, the system characterized in that it comprises: a choke (1) located between a wellhead production tree (6) and the production line (7) of hydrocarbons, an actuator (1.8) operating said choke (1), said actuator (1.8) being in communication with a remote control and monitoring unit (3), a power supply source (4) supplying power to said control and monitoring unit (3), and a plurality of data acquisition means including transducers (16, 17, 18) arranged upstream and downstream of said choke (1), where said data acquisition means sends information related to the wellhead pressure (WHP), production line pressure (LP), and optionally, wellhead temperature (T) to the control and monitoring unit (3), where said control and monitoring unit (3) is configured to carry out well shut-in cycles and well opening cycles determined based on compliance with a plurality of well opening and shut-in criteria by which a measured or calculated value of a parameter is compared to a preset value for said parameter, where said measured or calculated parameters are selected from wellhead pressure (WHP), production line pressure (LP), wellhead pressure to production line pressure ratio (WHP)/LP), shut-in or opening time of the well, flow rate and critical flow rate.
2. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that said hydrocarbon well is a natural gas well.
3. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that said choke (1) is connected, on the one hand, to the production side valve (11) of a wellhead tree (6) and on the other hand, to the production line (7).
4. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that a safety valve (12, 19) is arranged between the production side valve (11) of a wellhead tree (6) and choke (1).
5. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that at the upper end of the wellhead production tree (6), a pressure regulating valve (14) operated by a gas instrument (15) is arranged to feed gas to the pneumatic circuit of the actuator (1.8).
6. A remote control and monitoring system for improving production efficiency of a hydrocarbon well according to claim 1, characterized in that said plurality of data acquisition means includes transducers (16, 17, 18) configured to measure pressure upstream and downstream of choke (1).
7. A remote control and monitoring system for improving production efficiency of a hydrocarbon well according to claim 6, characterized in that said plurality of data acquisition means includes transducers (16, 17, 18), wherein the transducers (16) are configured to measure pressure upstream and downstream of choke (1) and are disposed on respective block and bleed valves, or the transducers (17) are disposed on a lateral branch of the wellhead production tree (6) and the transducers (18) are disposed on the production line (7).
8. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that said actuator (1.8) comprises a hollow actuator body (1.9) configured to house a compression spring (1.11) and allow the displacement in axial direction of an actuating stem (1.10) having an actuating end and an opposite end connected to a seal (1.12), where, in response to a closing signal of choke (1), said actuating stem (1.10) moves against the spring (1.11) compressing it, while in response to an opening signal of choke (1), said actuating stem (1.10) moves in the opposite direction decompressing said spring (1.11).
9. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that said choke (1) comprises a main hollow body (1.1) having integrated connection means (1.2, 1.2), said main hollow body defining a through conduit (1.3) housing a calibrated orifice (1.4) configured to house a hollow insert (1.5).
10. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 9, characterized in that said calibrated orifice (1.4) has an elongated hollow body (1.4a) defining a through inner conduit (1.4b) inside which said hollow insert (1.5) is housed, said through inner conduit (1.4b) extends along the entire length of the calibrated orifice (1.4), and at one of its ends, it widens defining a support surface (1.4c).
11. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 9, characterized in that the calibrated orifice (1.4) has a perimeter flange (1.4d) extending radially and on which a gasket (1.4e) is seated to seal the calibrated orifice (1.4) within the through conduit (1.3) of choke (1).
12. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 9, characterized in that said insert (1.5) has a through conduit extending longitudinally.
13. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 9, characterized in that said insert (1.5) is made of a ceramic or tungsten carbide material or other material that withstands the operating conditions of high pressures, flow rates and corrosive fluids.
14. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 9, characterized in that the calibrated orifice (1.4) is inserted into the seat (1.13) of the stem (1.10) of said choke (1).
15. A remote control and monitoring system for improving the production efficiency of a hydrocarbon well according to claim 1, characterized in that said actuator (1.8) is a pneumatic actuator.
16. A method for improving the production efficiency of a hydrocarbon well employing the remote monitoring and control system according to claim 1, characterized in that said method comprises the steps of: i) acquiring data corresponding to wellhead pressure and production line pressure using data acquisition means comprising pressure transducers (16, 17, 18); ii) sending the acquired data to the control and monitoring unit (3) iii) determining from the acquired data, the operating mode of the hydrocarbon well, where the operating mode may correspond to an opening cycle or a shut-in cycle of the well, iv) if the well is in a shut-in cycle, the control and monitoring unit (3) shall actuate the choke open the well when: a) the elapsed time of well shut-in is longer than or equal to a preset time for well opening, or b) the measured wellhead pressure is equal to or greater than a preset wellhead pressure for well opening, or c) the ratio of wellhead pressure to production line pressure (WHP/LP) is greater than or equal to a predetermined ratio (WHP/LP) for the well opening, v) if the well is in an opening cycle, the control and monitoring unit (3) shall actuate the choke (1) to shut in the well when: d) the elapsed well opening time is greater than or equal to a value of the preset time for well shut-in; or e) the measured wellhead pressure (WHP) is equal to or greater than the value of the preset wellhead pressure for well shut-in; or f) the ratio of the measured wellhead pressure to the measured production line pressure (measured WHP/measured LP) is greater than or equal to a preset value of that ratio (WHP/LP) for the well shut-in; or j) the calculated gas flow rate is greater than or equal a preset value of the preset gas flow rate for well shut-in; or k) the calculated gas flow rate is greater than or equal to a value of the preset critical gas flow rate for well shut-in.
17. A method for improving the production efficiency of a hydrocarbon well according to claim 16, characterized in that the critical flow rate is determined by the Turner's Equation:
18. A method for improving the production efficiency of a hydrocarbon well according to claim 16, characterized in that the gas flow rate is calculated considering the following gas flow conditions: isingle-phase gas flow, wherein no critical or subcritical conditions exist, iisingle-phase gas flow wherein critical or subcritical conditions exist iiimultiphase gas flow wherein critical or subcritical conditions exist.
19. A method for improving the production efficiency of a hydrocarbon well according to claim 18, characterized in that when the gas flow is single phase where no critical or subcritical conditions exist, the gas flow rate is calculated according to the following Equation 1:
20. A method for improving the production efficiency of a hydrocarbon well according to claim 18, characterized in that the gas flow rate in the choke is calculated with Equation 3 when the gas flow is single phase under subcritical conditions:
21. A method for improving the production efficiency of a hydrocarbon well according to claim 18, characterized in that the gas flow rate in the choke, when the gas flow is multiphase, is determined by the mixture mass flow equation and the mixture density, wherein the downstream mixture mass flow M2 (lbm/sec) is calculated according to the following formula:
M2:G2.A G2=downstream mass flow rate (lbm/ft.sup.2/sec) A=area of choke orifice (ft.sup.2) Wherein G.sub.2 is the downstream mass flow rate (lbm/ft.sup.2/sec)
22. A method for improving the production efficiency of a hydrocarbon well according to claim 18, characterized in that the preset values for the parameters of time, wellhead pressure (WHP), line pressure (LP), wellhead pressure to production line pressure ratio (WHP/PL) and gas flow rate are established based on a periodic analysis of the actual behavior of the well to which the remote monitoring and control system is applied.
23. A method for improving the production efficiency of a hydrocarbon well according to claim 18, characterized in that the remote control and monitoring system is configured to automatically collect well production data, generate well profiles based on the data, and self-adjust to maintain a well production rate at a desirable level.
Description
BRIEF DESCRIPTION OF THE FIGURES
[0052]
[0053]
[0054]
[0055]
[0056]
[0057]
[0058]
[0059]
[0060]
[0061]
[0062]
[0063]
[0064]
[0065]
[0066]
DETAILED DESCRIPTION OF THE INVENTION
[0067] To optimize the production of a hydrocarbon well, particularly, of a natural gas well, the present invention provides an automated remote control and monitoring system and methods employing the cyclic shut-in and opening methodology of the hydrocarbon well, by means of the actuation of a choke arranged between the production tree and the production line comprising logics installed in an automatic control and monitoring unit and a plurality of data acquisition means arranged in the production tree and in the production line for the acquisition of data which are sent to said remote control and monitoring unit by means of the execution of a determined algorithm which actuates said choke opening or shutting in the well at the required time with the purpose of improving the production efficiency thereof and extending the productive life thereof. Thus, the control and monitoring system of the present invention automates the shut-in and opening cycles of the well, becoming independent of the human factor, improving the efficiency of the well control operations and reducing the time and costs associated with such operations taking into account the extensive distances that must be traveled by authorized personnel to the facilities for manual operation of the well, the fuel required, the production valve maintenance and the carbon footprint associated with these tasks.
[0068] Hydrocarbon wells, particularly natural gas wells, that can be intervened by cyclic shut-in and opening to improve the production efficiency thereof, may be low permeability stimulated vertical wells, ultra-low permeability multi-fractured horizontal wells (shale) or layered no-crossflow gas wells that develop differential depletion before reaching the liquid-loading gas rate.
[0069] Therefore, the present invention provides an automated remote control and monitoring system for improving the production efficiency of a hydrocarbon well, preferably, a natural gas well, including a conventional production tree, wherein the control and monitoring system comprises a choke comprising an orifice disposed between the wellhead tree and the production line, an actuator for said choke, remote control and monitoring unit being connected to a power supply source, and a plurality of data acquisition means disposed downstream and upstream of said choke, which send information relating to the various measured production and environmental parameters (transducers) to said remote control and monitoring unit to which they are wired or wirelessly connected, so that said remote control and monitoring unit uses this data sent by the plurality of data acquisition means to execute a specific algorithm, by means of which the moment in which the choke is actuated is determined in order to carry out in a completely automated manner the shut-in and opening cycles of the hydrocarbon well, thus improving the production efficiency of the gas well, avoiding problems associated with the accumulation of liquids and consequently, premature dead wells.
[0070] The plurality of data acquisition means comprises at least one line pressure transducer, at least one wellhead pressure (WHP) transducer, and optionally, at least one wellhead temperature transducer.
[0071] Additionally, the control and monitoring system includes a timekeeper for timing.
[0072] Another object of the invention is to provide a choke to be installed between the production tree, preferably, in a lateral branch, and the production line, comprising an actuator, preferably, a pneumatic actuator. Said choke has been specifically developed by the present inventors for the implementation of the remote control and monitoring system of the present invention and will be described in detail below. The data acquired by the plurality of data acquisition means are sent to the control and monitoring unit for the execution of a specific algorithm determining the start and completion of the shut-in and opening cycles of the hydrocarbon well by actuating in an automated manner a choke through an actuator according to two modes of operation, a well shut-in cycle mode and a well opening cycle mode. Said modes of operation require the accurate measurement of at least the wellhead pressure (WHP), and the production line pressure (LP), whereby it is possible, by means of a specific algorithm, to calculate the relationship between both pressures, the wellhead pressure (WHP) and the production line pressure (PL), as well as the gas flow rate and the critical gas flow rate as described below.
[0073] The algorithm uses a mathematical model for each gas flow condition to predict an estimated gas flow rate value and a critical gas flow rate value. For this purpose, the algorithm further requires other parameters such as the inner diameter of the orifice, the specific gravity of the gas, the ratio of heat capacity at constant pressure and heat capacity at constant volume: K=Cp/Cv.
Modes of Operation
[0074]
[0075] The remote control and monitoring system of the present invention has two modes of operation: 1shut-in cycle mode and 2opening cycle mode (see
[0076] 1For the mode of operation corresponding to the shut-in cycle, the algorithm considers the following parameters: well shut-in time, wellhead pressure and production line pressure.
[0077] For the mode of operation corresponding to the opening cycle, the algorithm considers the following parameters: well opening time, wellhead pressure (WHP), production line pressure (LP), and calculates the ratio of wellhead pressure to production line pressure (WHP/LP), gas flow rate (using various mathematical models for each gas flow condition), and critical flow rate using Turner's mathematical model. In both modes of operation, the remote control and monitoring system of the present invention executes an algorithm that considers, in addition to the measured parameters indicated above, other parameters such as the diameter of the orifice of the choke, the specific gravity of the gas, and the ratio between the heat capacity at constant pressure and the heat capacity at constant volume: K=Cp/Cv. These parameters will make it possible to calculate the gas flow rate and the critical gas flow rate.
[0078] Then, based on the various measured and calculated parameters, the remote control and monitoring unit performs iterative comparisons between said set of measured and calculated parameters and the respective preset values for each of said measured and calculated parameters according to production requirements, so that, once a certain condition is met, it actuates the choke to carry out the opening and shut-in cycles of the gas well in a controlled manner.
[0079] The following describes various iterative comparison criteria performed by the control and monitoring unit according to each mode of operation.
[0080] The mode corresponding to a shut-in cycle can be performed using the following criteria:
[0081] According to a first criterion, it is iteratively compared whether the elapsed time for well shut-in is greater than or equal to a preset time for well opening; if this condition is met, the control and monitoring unit actuates the choke via its actuator for well opening.
[0082] According to a second criterion, it is iteratively compared whether the measured wellhead pressure (WHP) is equal or greater than a preset wellhead pressure for well opening; if this condition is met, the control and monitoring unit actuates the choke via its actuator for well opening.
[0083] According to a third criterion, the remote control and monitoring unit iteratively compares whether the ratio between wellhead pressure and production line pressure (WHP/LP) is greater than or equal to a predetermined WHP/LP ratio for the well opening; if this condition is met, the control and monitoring unit actuates the choke via its actuator for well opening.
[0084] In the mode corresponding to a well opening cycle, in the same way as in the well shut-in cycle mode, iterative comparisons are executed between a measured or calculated value of a given parameter and a preset value for that same parameter to determine the well shut-in. These iterative comparisons are made between the parameters of opening time, wellhead pressure (WHP), wellhead pressure/line pressure ratio (WHP/LP), gas flow rate calculated according to various flow conditions and critical gas flow rate calculated according to Turner's model.
[0085] Thus, the opening cycle is carried out pursuant to the following criteria: According to a first criterion, it is iteratively compared whether the elapsed time for well opening is greater than or equal to a value of the preset time for well shut-in; if this condition is met, the control and monitoring unit actuates the choke via the actuator to cause the well shut-in.
[0086] According to a second criterion, it is iteratively compared whether the measured wellhead pressure (WHP) is equal to or greater than the preset wellhead pressure value for well shut-in; if this condition is met, the control and monitoring unit actuates the choke via its actuator to cause the well shut-in.
[0087] According to a third criterion, it is iteratively compared whether the ratio between the measured wellhead pressure and the measured production line pressure (measured WHP/measured LP) is greater than or equal to a preset value of said ratio (WHP/LP) for well shut-in; if this condition is met, the control and monitoring unit actuates the choke via its actuator to cause the well shut-in.
[0088] According to a fourth criterion, it is iteratively compared whether the calculated gas flow rate is greater than or equal to a value of the preset gas flow rate for well shut-in; if this condition is met, the control and monitoring unit actuates the choke via its actuator to cause the well shut-in.
[0089] Finally, according to a fifth criterion, during the well opening cycle, it is iteratively compared whether the calculated gas flow rate is greater than or equal to a value of the preset critical gas flow rate for well shut-in; if this condition is met, the control and monitoring unit actuates the choke via its actuator to cause the well shut-in.
[0090] With respect to the critical flow rate parameter, the algorithm developed by the present invention uses Turner's model for the estimation thereof:
[0091] Turner et al. proposed two physical models for the removal of liquids: [0092] 1. Liquids form a continuous film on the tubing inner wall, moving upwards due to interfacial forces. [0093] 2. Liquid droplets appear in the tubing as free particles moving upwards due to a high gas rate. After developing these two methods, Turner et al. independently compared actual field data with the models to find which is closer and which mechanism controls liquid removal.
[0094] In this regard, Turner's studies dictate that the existence of liquid droplets in the gas stream presents a different problem, which is based on determining the flow rate required to lift the liquid droplets and transport them to the surface. According to the study, a free-falling particle reaches a final rate which is the maximum rate it can achieve vs. gravity (
[0095] In this model, the droplet weight is a downward force (gravity), and the gas rate is an upward force (drag). When the drag is equal to the weight, the particle is suspended in the gas stream (critical rate); therefore, a gas rate greater than the critical rate is required to transport the liquids to the surface.
[0096] Consequently, the Critical Rate is the minimum rate that a liquid droplet must have in order to be lifted by the gas. For the calculation thereof, the following Turner's Equation is used.
[0101] From the critical rate, it is possible to calculate the critical flow rate (Q.sub.critical) with the following formula:
[0108] Therefore, it is sufficient to use the tubing diameter d.sub.ti to calculate the critical flow rate using the above equation.
[0109] According to the present invention, the following fixed values are adopted for the following parameters assuming a condition as conservative as possible, that is, that the type of liquid is water (worst condition), which involves: [0110] Surface tension=60 dyne/cm [0111] Density=67 lbm/(ft.sup.3) [0112] Z=0.9 [0113] T=84.2 degrees Fahrenheit ( F.).
[0114] Thus, the critical flow rate will only depend on the wellhead pressure (P) and the tubing internal diameter (d.sub.ti).
[0115] To estimate the gas flow rate, various gas flow conditions must be considered as shown in the block diagram in
Single-Phase Gas Flow
[0116] For a first ideal situation, where the gas flow is single phase with no critical or subcritical conditions, the following Equation 1 is used according to the modified ISO-5167 Standard, since the present invention uses an orifice to cause a differential gas pressure instead of an orifice plate as determined according to said Standard. This leads to Equation 1 making it possible to calculate the gas flow rate with an error of less than 10% which constitutes an acceptable error in the gas extraction industry.
[0120] Typically, the gas has high concentrations of methane, ethane, and propane, estimated between 0.6 and 0.62 to simplify the calculation. [0121] T: is the wellhead gas temperature in C., upstream of the choke. [0122] h.sub.w: is the differential pressure in C. at the orifice (in inches of water). [0123] Pf: is the line pressure, downstream of the choke. [0124] F.sub.b: is the correction factor.
[0125] The F.sub.b factor depends on the dimensions of the casing and the diameter of the orifice (choke).
[0126] For practical purposes, it is assumed that the gas temperature at the wellhead is 25 C. (77 F.), since temperature variations have a negligible impact on the gas flow calculation.
[0127] Given that the orifice diameter varies over time as gas well production declines, the F.sub.b factor can be determined by well-known correlations for those with average knowledge in the field, which consider the internal diameter of the casing pipe and the orifice diameter used at the time the gas flow rate is calculated.
[0128] Typically, in the first 12 months of the well productive life, the orifice diameter may be the smallest orifice diameter used in the industry, i.e., it may range from 4 mm to 2.54 cm (1 in). After this period, as production declines, the orifice may increase up to 2 inches, particularly within the first 24 months.
[0129] Once said F.sub.b factor is determined, it is possible to calculate the gas flow rate according to Equation 1 above. This equation allows estimating the gas flow rate with an error of less than 10%.
[0130] However, it may be necessary to adjust the equation to further reduce the error, preferably to 0. Therefore, it will be necessary to perform a well control to know an actual accurate value of gas flow rate in the well, corresponding to a given differential pressure in the orifice (h.sub.w) and a line pressure (Pf), all of them measured at the same timepoint. With these instant data, Equation 1 can be rewritten as follows:
[0133] Finally, Equation 1, adjusted to reduce the gas flow calculation error, is defined according to Equation 2 below:
[0134] This equation reduces the estimation error by using the actual well production conditions determined by instant well control (which is called history matching in the technical field of the invention).
Single-Phase Gas Flow at Critical and Subcritical Conditions
[0135] The following gas flow condition considered by the algorithm of the present invention for gas flow rate estimation corresponds to a single-phase gas flow under flow conditions which may be critical and subcritical. In this condition, the pressure drop in the choke (orifice) is considered, so that when the wellhead pressure (pressure upstream of the choke) is more than twice the line pressure (pressure downstream of the choke), the gas rate in the choke is the speed of sound, and the condition that occurs is the critical flow condition. Under this critical or sonic flow condition, pressure changes downstream of the choke caused by various dynamics (e.g., a compressor shutdown) would not affect the pressure upstream of the choke (i.e., the wellhead pressure). In other words, the flow rate is independent of line pressure under critical conditions.
[0136] If the line pressure continues to increase due to other dynamics occurring downstream of the choke, (for example the shutdown of another compressor), the ratio between wellhead pressure and line pressure may be less than 2, which determines that the gas rate is less than the speed of sound (subsonic rate) and in such a case, subcritical or subsonic flow conditions occur.
[0137] Both conditions are limitations (critical flow and subcritical flow) that the algorithm of the present invention considers for the correct calculation of the gas flow rate.
[0138] Therefore, under subcritical or subsonic flow conditions, Equation 3 is used for the calculation of the gas flow rate in the choke:
[0160] As can be seen, C.sub.D depends on the Reynolds number which in turn depends on the gas flow rate and the viscosity and specific gravity of the gas. This implies that the gas flow rate must be calculated by cycles of iterations using Equation 3.
Multiphase Flow
[0161] When the upstream pressure is lower than the oil bubble point pressure, there is free gas in the fluid stream flowing through the downhole control valve.
[0162] The behavior of the fluid at the downhole control valve will depend on the gas content and whether the flow regime is sonic or subsonic.
[0163] The mathematical modeling of multiphase flow through the choke has been subject of controversy for decades. As such, the Sachdeva and Perkins models are currently of particular interest in the industry and have been coded in commercial network modeling software to characterize flow behavior for both surface and downhole chokes. The first step in the application of these models is to predict the downstream/upstream pressure relationship at the critical flow transition. Both Sachdeva and Perkins developed equations to estimate this relationship. Sachdeva's work assumed that the derivative of the mass flow rate of the mixture with respect to the pressure downstream of the choke orifice is zero at the critical flow transition, meaning that the mass flow reaches a maximum with respect to the downstream pressure. Assuming that the gas phase at the choke inlet contracts isentropically, but expands polytrophically, equations were developed to predict the critical pressure ratio and mass flow rate at critical and subcritical conditions.
[0164] Perkins' work derives from the general energy equation assuming polytrophic processes, and an important feature is that Perkins assumed the gas compressibility factors at both the upstream and downstream choke orifice were the same. This assumption may be reasonable at low differential pressures, but is not applicable at high differential pressures. Assuming that the derivative of the mixture mass flow rate with respect to the downstream/upstream pressure ratio is zero, which is similar to Sachdeva's work (1986), an equation was developed to predict the critical pressure ratio.
[0165] Both models used a constant discharge coefficient (Cd) to correct for errors resulting from various assumptions. However, downhole control valves typically operate at high temperatures and pressures, and the shape of the control-valve choke varies with different choke positions. Therefore, these models must be modified by incorporating downhole pressure and temperature conditions, correlated choke discharge coefficients, and upstream/downstream completion geometries. With this in mind, the algorithm of the present invention uses the Sachdeva and Perkins model in order to calculate gas flow at critical and subcritical conditions according to the following equations.
[0166] Firstly, it is necessary to determine the multiphase flow conditions, i.e., whether the multiphase flow is at critical or subcritical conditions based on the following Equation 4:
[0175] In addition, the Sachteva model contemplates the following ratio: [0176] Wherein
[0180] Then, if y.sub.a<y.sub.c, there are critical flow conditions, therefore, y.sub.c should be used to calculate the mass flow (y=y.sub.c) using Equation 5.
[0181] Otherwise, subcritical flow conditions exist and consequently, y=y.sub.a=p.sub.1/p.sub.2 should be considered.
[0182] Then, the gas mass flow rate is calculated using Equation 5
[0192] Then, knowing the area of the choke orifice, it is possible to calculate the mass flow of the multiphase mixture and, with the density of the mixture, the volume flow can be calculated, as follows:
M2:G2.A [0193] M.sub.2: is the mass flow rate of the downstream mixture (lbm/sec) [0194] G.sub.2=downstream mass flow rate (lbm/ft.sup.2/sec) [0195] A=area of choke orifice (ft.sup.2)
[0196] Then, knowing M2, it is possible to know the gas flow rate under multiphase flow conditions, either at critical or subcritical conditions. Then, with the calculation of gas flow rate using Equations 1 to 4 described above according to each of the four detailed flow conditions (
[0197] As can be seen, the automated control and monitoring system of the present invention dispenses with the use of flowmeters when calculating the gas flow rate by means of the algorithm developed by the present inventors, which contemplates the various gas flow conditions in the well, representing a clear operational and economic advantage over other well control systems that do require the use of flowmeters.
[0198] On the other hand, the preset values for the time parameters (set point), wellhead pressure, line pressure (LP), ratio (WHP/PL) and flow rate are established based on a periodic analysis of the well actual behavior to which the remote control and monitoring system of the present invention is applied.
[0199] The remote control and monitoring system of the present invention is further configured to automatically collect well production data, generate well profiles based on the data, and self-adjust to maintain a well production rate at a desirable level.
Choke On-Off
[0200] The gas well production control and monitoring system according to the present invention is based on the implementation of gas well shut-in and opening cycles by means of the actuation of choke 1 (see
[0201] The choke 1 according to the present invention (
[0202] The choke body 1.1 is hollow and defines a through conduit 1.3 within which a calibrated orifice 1.4 is housed. Said calibrated orifice 1.4 is configured to house a hollow insert 1.5 (
[0203] The calibrated orifice 1.4 has an elongated hollow body 1.4a with a through inner conduit 1.4b extending along the entire length thereof, and at one of its ends, it widens defining a bearing surface 1.4c. Conveniently, the external surface of the calibrated orifice 1.4 presents a perimeter flange 1.4d extending radially and on which sits a gasket 1.4e that allows sealing the calibrated orifice within the through conduit 1.3 of choke 1. In a preferred embodiment, the calibrated orifice 1.4 is inserted into a seat 1.13 of stem 1.10 of a conventional choke 1 (
[0204] The choke body 1.1 comprises an upper end sealed with a plug 1.6 and a quick-connect nut 1.7 configured to receive an actuator 1.8, preferably a pneumatic actuator.
[0205] Said actuator 1.8 comprises a hollow actuator body 1.9 configured to house a compression spring 1.11 and to allow displacement in the direction of the axial axis of an actuating stem 1.10, which, in response to a pneumatic signal of choke 1 closing, moves against the spring 1.11 compressing it, while, in response to a pneumatic signal of choke 1 opening, it moves in the opposite direction decompressing said spring 1.11. Said actuating stem 1.10 has two ends: an actuating end and an opposite sealing end connected to a seal 1.12, so that when the actuating stem 1.8 moves in the direction of the axial axis towards the calibrated orifice, it partially or completely seals the calibrated orifice, acting as a choke or closing means (valve). The main objective of the configuration of choke 1 is to allow the conversion of a conventional positive choke into a choke on-off (see
Description of the Control and Monitoring System
[0206] As above indicated, the invention provides a remote control and monitoring system for improving the production efficiency of a hydrocarbon well, comprising a choke 1 (orifice), an actuator 1.8, an automatic control and monitoring unit 3, a power supply source 4, preferably a solar panel or a battery, and a plurality of data acquisition components including transducers 16, 17, 18 arranged on the production tree 6 or on tubing 7 which send coded information relating to various measured parameters to the control and monitoring unit 3 which by means of a given algorithm actuates the choke to execute fully automated shut-in and shut-out cycles of the gas well improving the production efficiency of the well and avoiding the problems associated with fluid accumulation and eventually, dead wells.
[0207] The plurality of data acquisition components 16, 17, 18 comprises at least one line pressure transducer, at least one wellhead pressure (WHP) transducer, and optionally, at least one wellhead temperature transducer located on the wellhead tree (not shown).
[0208]
[0209] As shown in
[0210] In a preferred embodiment, a safety valve 12 is arranged between the production side valve 11 and the choke 1, as shown in
[0211] In a preferred embodiment, the pressure gauge 13 usually located in the upper bore of the wellhead production tree 6, is replaced by a pressure regulating valve 14 which is operated by a gas instrument 15, which has been connected to the control and monitoring unit 3. The gas instrument 15 is connected to the well to feed gas in the actuation circuit. This gas pressurizes the actuator keeping it open. Should the control and monitoring unit 3 determine to close the well, a solenoid valve (not shown) will relieve the circuit pressure, shutting in the well. Additionally, block and bleed valves 16 are provided where pressure transducers are located upstream and downstream of the choke 1 (choke on-off) as shown in
[0212] In the embodiment shown in
[0213] All pressure transducers 16, 17, and 18 are in wired or wireless communication with the control and monitoring unit 3.
[0214] In another preferred embodiment, between the production side valve 11 and choke 1, a surface safety valve 19 is provided which is of hydraulic type and has the same function as safety valve 12 (see
EMBODIMENT EXAMPLES
EXAMPLES
[0215] Specific examples of application of the control and monitoring system of the present invention are described below, where different criteria are applied in combination to establish the timing of shut-in and opening of a mature gas well.
Example 1: Shut-In Cycle Based on Wellhead Pressure (WHP)/Opening Cycle Based on Wellhead Pressure (WHP)
[0216] The time interval during which the opening and shut-in cycle is performed is generally the same as the time interval during which the user performed manual controls. In Illustrative Example 1, the monitoring and control system for cyclic shut-in and opening of a gas well was run for a period of approximately 31 hours. In this example, preset WHP values were set at 17.2 kg/cm.sup.2 (minimum acceptable for shut-in) and 54.5 km/cm.sup.2 (maximum acceptable for opening) according to production requirements (
Example 2: Shut-In Cycle Based on Time/Opening Cycle Based on Time
[0217] In Illustrative Example 2, the monitoring and control system for cyclic shut-in and opening of a gas well was run for a period of approximately 31 hours. In this example, the elapsed time to shut in the well was 14 hours and the elapsed time to open the well was 10 hours according to production requirements and well trend analysis (see
[0218] As fluid accumulation takes place, the wellhead pressure progressively decreased, when it reached the lower limit of wellhead pressure, which occurred after approximately 14 hours of well opening, the control and monitoring unit actuated choke 1 to shut in the gas well until the wellhead pressure increased and reached an acceptable upper limit (approximately 78 kg/cm.sup.2), which corresponded to a shut-in period of 10 hours, starting a fresh well opening cycle.
Example 3: Shut-In Cycle Based on Time/Opening Cycle Based on Wellhead Pressure (WHP)
[0219] In Illustrative Example 3, the monitoring and control system for cyclic shut-in and opening of a gas well was run for a period of approximately 31 hours. In this example, the elapsed time for well shut-in was 15 hours and the preset pressure for well opening was 74.1 kg/cm.sup.2 according to production requirements (see
Example 4: Shut-In Cycle Based on Flow Rate/Opening Cycle Based on Wellhead Pressure (WHP)
[0220] In Illustrative Example 4, the monitoring and control system for the cyclic shut-in and opening of a gas well was run over a period of approximately 31 hours on a mature well. In this example, the flow rate preset for well shut-in was 10 km.sup.3/day and the wellhead pressure preset for well opening was 67 kg/cm.sup.2 according to production requirements (see
Example 5: Shut-In Cycle Based on Wellhead Pressure to Line Pressure Ratio/Opening Cycle Based on Wellhead Pressure to Line Pressure Ratio
[0221] In Illustrative Example 5, the monitoring and control system for the cyclic shut-in and opening of a gas well was run over a period of approximately 31 hours on a mature well. As liquid accumulation takes place, the gas wellhead pressure progressively decreased, while the line pressure was maintained with small fluctuations (between 12 and 16 kg/cm.sup.2) as shown in
Example 6: Shut-In Cycle Based on Wellhead Pressure (WHP)/Opening Cycle Based on Time
[0222] In Illustrative Example 6, the monitoring and control system for cyclic shut-in and opening of a gas well was run for a period of approximately 31 hours. In this example, the preset pressure for well shut-in was 17.5 kg/cm.sup.2 and the elapsed time for well opening was 11 hours according to production requirements (see