Downhole production casing string
11572740 · 2023-02-07
Assignee
Inventors
Cpc classification
E21B33/1277
FIXED CONSTRUCTIONS
E21B17/1078
FIXED CONSTRUCTIONS
E21B7/20
FIXED CONSTRUCTIONS
International classification
E21B7/20
FIXED CONSTRUCTIONS
E21B17/10
FIXED CONSTRUCTIONS
Abstract
The present invention relates to a downhole production casing string for insertion in a borehole in a reservoir, the downhole production casing string having a first end nearest a top of the borehole and a second end furthest away from the top, the downhole production casing string extending along a longitudinal axis and comprising at least one opening which during production allows hydrocarbon-containing fluid from the reservoir into the downhole production casing string, a plurality of casing parts having end sections and a base section between the end sections, the base section having an outer diameter, and at least one annular projecting element having an outer face and at least one helical groove arranged in or on the outer face and having an overall outer diameter which is larger than the outer diameter of the base section. Furthermore, the invention relates to a downhole production casing string system for completing a well downhole and to a method of implementing a production casing string according to the invention.
Claims
1. A downhole production casing string for insertion in a pre-drilled borehole in a reservoir, the downhole production casing string having a first end nearest a top of the borehole and a second end furthest away from the top, the downhole production casing string extending along a longitudinal axis and comprising: at least one opening which during production allows hydrocarbon-containing fluid from the reservoir into the downhole production casing string, a plurality of casing parts having end sections and a base section between the end sections, the base section having an outer diameter, and at least one annular projecting element having an outer face and at least one helical groove arranged in or on the outer face and having an overall outer diameter which is larger than the outer diameter of the base section, wherein the at least one annular projecting element is fixed to the plurality of casing parts so as to rotate together during insertion of the string down the borehole, the helical groove being configured to act as a screw to rotatably engage one or more borehole projections remaining after drilling and tending to impede free passage of the string and to advance the string past the borehole projections, wherein the downhole production casing further comprises at least one fluid-expandable annular barrier, the annular projecting element being positioned in front of the annular barrier closer to the second end of the casing string, and wherein a diameter of the annular projecting element is larger than a diameter of the annular barrier before expansion of the annular barrier, so as to protect the annular barrier against damage when, following drilling, the annular projecting element and the annular barrier are together inserted into the borehole.
2. A downhole production casing string according to claim 1, wherein the annular projecting element is a casing collar connecting the casing parts.
3. A downhole production casing string according to claim 1, wherein the annular projecting element is arranged between two annular barriers.
4. A downhole production casing string according to claim 1, wherein the annular projecting element at least partly secures the at least one expandable annular barrier to one of the casing parts.
5. A downhole production casing string according to claim 4, wherein the annular barrier comprises a casing part , an expandable sleeve surrounding the casing part and having an inner sleeve face facing the casing part and an outer sleeve face facing the borehole, each end of the expandable sleeve being connected with the casing part in two connections, and an annular space between the inner sleeve face of the expandable sleeve and the casing part, and wherein the annular projecting element is arranged on an outer casing face adjacent at least the connection closest to the second end of the production casing string.
6. A downhole production casing string according to claim 4, wherein the annular barrier comprises a casing part, an expandable sleeve surrounding the casing part and having an inner sleeve face facing the casing part and an outer sleeve face facing the borehole, each end of the expandable sleeve being connected with the casing part in two connections, and an annular space between the inner sleeve face of the expandable sleeve and the casing part, and wherein the annular projecting element at least constitutes the one connection arranged closest to the second end of the production casing string.
7. A downhole production casing string according to claim 1, wherein the opening has an angle in relation to a radial direction transverse to the longitudinal axis so that the hydrocarbon-containing fluid is guided into the production casing string in the angle different from 90°.
8. A downhole production casing string according to claim 1, wherein the helical groove has a cutting edge.
9. A downhole production casing string according to claim 1, wherein the annular projecting element comprises several grooves forming a helix about the longitudinal axis.
10. A downhole production casing string according to claim 1, wherein the annular projecting element tapers towards the second end of the production casing string.
11. A downhole production casing string according to claim 1, wherein the outer diameter of the annular projecting element is the overall outer diameter of the production casing string.
12. A downhole production casing string according to claim 1, wherein the opening is arranged in the groove for letting fluid from the reservoir into the production casing string.
13. A downhole production casing string according to claim 12, wherein the production casing string has an inner face along which a sliding sleeve is slidably arranged for sliding between a closed position, in which the sliding sleeve blocks the opening, and an open position, in which the fluid is allowed to flow through the opening and into the production casing string.
14. A downhole production casing string according to claim 12, wherein the opening is arranged closer to the first end of the production casing string than to the second end of the production casing string, or closer to the second end of the production casing string than to the first end of the production casing string.
15. A downhole production casing string system for completing a well downhole, comprising: a production casing string according to claim 1, and a rotation equipment for rotating the production casing string about the axis as the production casing string is inserted into the borehole.
16. A method of implementing a production casing string according to claim 1 in a borehole downhole, comprising: connecting casing parts and the at least one annular projecting element for forming the production casing string, following drilling, entering the production casing string into the borehole as the casing parts are assembled, and rotating the production casing string and the at least one annular projecting element about the axis as the production casing string enters the borehole, the helical groove acting as a screw to engage the borehole projections and advance the string past the borehole projections as a result of rotation of the helical groove.
17. A method according to claim 16, further comprising detaching part of a wall of the borehole from the wall by cutting in or hitting against the borehole wall by means of the annular projecting element.
18. A method according to claim 16, further comprising allowing fluid to flow from the borehole, in through an opening in the annular projecting element and into the downhole production casing string.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention and its many advantages will be described in more detail below with reference to the accompanying schematic drawings, which for the purpose of illustration show some non-limiting embodiments and in which
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13) All the figures are highly schematic and not necessarily to scale, and they show only those parts which are necessary in order to elucidate the invention, other parts being omitted or merely suggested.
DETAILED DESCRIPTION OF THE INVENTION
(14)
(15) The downhole production casing string 1 comprises an opening 7 through which hydrocarbon-containing fluid is let into the downhole production casing string from the reservoir in order to produce oil or gas. The downhole production casing string is mounted from a plurality of casing parts 8. The casing parts have end sections 9 and a base section 10 between the end sections forming one pipe section. An annular projecting element 11 is arranged between the casing parts 8 connecting two adjacent casing parts. Each annular projecting element 11 has an outer face 12 and at least one helical groove 14a arranged in the outer face. The base section has an outer diameter D.sub.o, and each annular projecting element 11 has an overall outer diameter D.sub.oo which is larger than the outer diameter of the base section, so that when the production casing string is inserted in the borehole, the annular projecting elements 11 are the elements hitting against the wall of the borehole. The string is rotated as indicated by the arrows, and since each annular projecting element 11 has helical grooves, the annular projecting elements 11 function as a screw easing the implementation of the production casing string in the borehole. When drilling a borehole, the wall has a lot of rock projections which may prevent free passage of known production casing strings. By having annular projecting elements 11 with a helical groove, the production casing string can easily be screwed past these borehole projections, and thus the risk of the production casing string getting stuck in the borehole during insertion is substantially reduced. Furthermore, when inserting the production casing string, the annular projecting elements 11 may hit against the borehole projections and in this way release the tip of the borehole projection from the remaining part, easing the passage of the production casing string further down the borehole. In this way, the annular projecting elements function to even out some of the irregularities of the borehole during the insertion of the downhole production casing string. As the production casing string is inserted and the annular projecting elements hit against the rock projections, the annular projecting elements 11 of the production casing string also protect other completion components in the production casing string by clearing the path.
(16) The downhole production casing string system 100 shown in
(17) In
(18) As shown in
(19) As can be seen in
(20) The annular projecting element 11 has an internal groove 31 in which a sliding sleeve 32 is arranged, as shown in
(21) In
(22) The angled opening may also be part of an insert 51 which is inserted in an opening in the annular projecting element 11 as shown in
(23) As can be seen in
(24) In
(25) In
(26) The annular projecting element 11 and the connection 22 or connection part 22 may also be two separate elements as shown in
(27)
(28) As shown in the right side of
(29) By fluid or well fluid is meant any kind of fluid that may be present in oil or gas wells downhole, such as natural gas, oil, oil mud, crude oil, water, etc. By gas is meant any kind of gas composition present in a well, completion, or open hole, and by oil is meant any kind of oil composition, such as crude oil, an oil-containing fluid, etc. Gas, oil, and water fluids may thus all comprise other elements or substances than gas, oil, and/or water, respectively.
(30) By a casing is meant any kind of pipe, tubing, tubular, liner, string etc. used downhole in relation to oil or natural gas production.
(31) Although the invention has been described in the above in connection with preferred embodiments of the invention, it will be evident for a person skilled in the art that several modifications are conceivable without departing from the invention as defined by the following claims.