Cut-to-length steel coil processing line with stretcher leveler and temper mill
10022760 ยท 2018-07-17
Assignee
Inventors
Cpc classification
B21D25/00
PERFORMING OPERATIONS; TRANSPORTING
B21B2015/0071
PERFORMING OPERATIONS; TRANSPORTING
B21B2001/228
PERFORMING OPERATIONS; TRANSPORTING
B21B15/0007
PERFORMING OPERATIONS; TRANSPORTING
B21B37/165
PERFORMING OPERATIONS; TRANSPORTING
B21B1/28
PERFORMING OPERATIONS; TRANSPORTING
International classification
B21B15/00
PERFORMING OPERATIONS; TRANSPORTING
B21B1/28
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A cut-to-length steel coil processing line has an un-coiling reel, a temper mill, a stretcher leveler, a shearer, and a stacking apparatus arranged to sequentially process a continuous length of sheet metal. The line may be configured such that the continuous length of the sheet metal is directed from the uncoiling reel through the temper mill to the stacking apparatus without processing through the stretcher leveler when a determined thickness of the continuous length of sheet metal is at or below a selected measurement criteria. In the alternative, the line may be configured such that the continuous length of the sheet metal is directed from the uncoiling reel through the stretcher leveler to the stacking apparatus without processing through the temper mill when the determined thickness of the continuous length of sheet metal is greater than the selected measurement criteria.
Claims
1. In a cut-to-length steel coil processing line having an un-coiling reel followed by a temper mill followed by a stretcher leveler followed by a shearer followed by a stacking apparatus arranged to sequentially process a continuous length of sheet metal, a method comprising: determining a thickness of the continuous length of the sheet metal; comparing the determined thickness to a selected measurement criteria; configuring the processing line in one of first and second configurations based upon the comparison of the determined thickness to the selected measurement criteria; wherein when the comparison indicates that the determined thickness is at or below the selected measurement criteria, the processing line is configured in the first configuration comprising placing the temper mill on-line and the stretcher leveler not on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the temper mill and the stacking apparatus without processing through the stretcher leveler by bypassing the stretcher leveler; and wherein when the comparison indicates the determined thickness is greater than the selected measurement criteria, the processing line is configured in the second configuration comprising placing the temper mill not on-line and the stretcher leveler on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the stretcher leveler and the stacking apparatus without processing through the temper mill by bypassing the temper mill.
2. The method of claim 1 wherein the processing line includes a roller leveler following the temper mill; and the step of configuring comprises: as to the first configuration, directing the continuous length of the sheet metal from the uncoiling reel through the temper mill and the roller leveler to the stacking apparatus without processing through the stretcher leveler; and as to the second configuration, directing the continuous length of the sheet metal from the uncoiling reel through the stretcher leveler to the stacking apparatus without processing through the temper mill or the roller leveler.
3. The method of claim 1 wherein the processing line includes a pit prior to the stretcher leveler; and the step of configuring comprises: as to the first configuration, directing the continuous length of the sheet metal from the uncoiling reel through the temper mill to the stacking apparatus without processing through the pit or the stretcher leveler; and as to the second configuration, directing the continuous length of the sheet metal from the uncoiling reel through the pit and the stretcher leveler to the stacking apparatus without processing through the temper mill.
4. The method of claim 1, wherein the comparison step comprises comparing the determined thickness to the selected measurement criteria of a 9 standard gage.
5. The method of claim 1, wherein the configuration step comprises a two high temper mill.
6. A method comprising: in a cut-to-length steel coil processing line having an un-coiling reel followed by a temper mill followed by a stretcher leveler followed by a shearer followed by a stacking apparatus arranged to sequentially process a continuous length of sheet metal, selecting one of first and second configurations for the processing line based upon a comparison of a thickness of the sheet metal and a selected measurement criteria, the first configuration comprising placing the temper mill on-line and the stretcher leveler not on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the temper mill and the stacking apparatus without processing through the stretcher leveler by bypassing the stretcher leveler when a determined thickness of the continuous length of the sheet metal is at or below the selected measurement criteria; and the second configuration comprising placing the temper mill not on-line and the stretcher leveler on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the stretcher leveler and the stacking apparatus without processing through the temper mill by bypassing the temper mill when the determined thickness of the continuous length of the sheet metal is greater than the selected measurement criteria.
7. The method of claim 6 wherein the processing line includes a roller leveler following the temper mill; and the step of selection comprises: as to the first configuration, selecting the continuous length of the sheet metal to be directed from the uncoiling reel through the temper mill and the roller leveler to the stacking apparatus without processing through the stretcher leveler; and as to the second, selecting the continuous length of the sheet metal to be directed from the uncoiling reel through the stretcher leveler to the stacking apparatus without processing through the temper mill or the roller leveler.
8. The method of claim 7 wherein the processing line includes a pit prior to the stretcher leveler; and the step of selection comprises: as to the first configuration, selecting the continuous length of the sheet metal to be directed from the uncoiling reel through the temper mill and the roller leveler to the stacking apparatus without processing through the pit and the stretcher leveler; and as to the second configuration, selecting the continuous length of the sheet metal to be directed from the uncoiling reel through the pit and the stretcher leveler to the stacking apparatus without processing through the temper mill or the roller leveler.
9. The method of claim 6 wherein the comparison step comprises comparing the determined thickness to the selected measurement criteria of a 9 standard gage.
10. The method of claim 6 wherein the configuration step comprises a two high temper mill.
11. A method comprising: in a cut-to-length steel coil processing line having an un-coiling reel followed by a temper mill followed by a stretcher leveler followed by a shearer followed by a stacking apparatus arranged to sequentially process a continuous length of sheet metal, directing a user to configure the processing line in one of first and second configurations based upon a comparison of a thickness of the sheet metal and a selected measurement criteria, the first configuration comprising placing the temper mill on-line and the stretcher leveler not on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the temper mill and the stacking apparatus without processing through the stretcher leveler by bypassing the stretcher leveler when a determined thickness of the continuous length of the sheet metal is at or below the selected measurement criteria; and the second configuration comprising placing the temper mill not on-line and the stretcher leveler on-line followed by directing the continuous length of the sheet metal from the uncoiling reel to be processed through the stretcher leveler and the stacking apparatus without processing through the temper mill by bypassing the temper mill when the determined thickness of the continuous length of the sheet metal is greater than the selected measurement criteria.
12. The method of claim 11 wherein the processing line includes a roller leveler following the temper mill; and the step of directing the user to configure the processing line comprises: as to the first configuration, directing the continuous length of the sheet metal from the uncoiling reel through the temper mill and the roller leveler to the stacking apparatus without processing through the stretcher leveler; and as to the second, directing the continuous length of the sheet metal from the uncoiling reel through the stretcher leveler to the stacking apparatus without processing through the temper mill or the roller leveler.
13. The method of claim 12 wherein the processing line includes a pit prior to the stretcher leveler; and the step of directing the user to configure the processing line comprises: as to the first configuration, directing the continuous length of the sheet metal from the uncoiling reel through the temper mill and the roller leveler to the stacking apparatus without processing through the pit and the stretcher leveler; and as to the second configuration, directing the continuous length of the sheet metal from the uncoiling reel through the pit and the stretcher leveler to the stacking apparatus without processing through the temper mill or the roller leveler.
14. The method of claim 11 wherein the comparison step comprises comparing the determined thickness to the selected measurement criteria of a 9 standard gage.
15. The method of claim 11 wherein the configuration step comprises a two high temper mill.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION
(8) An exemplary cut-to-length and/or blanking line 10 is shown generally in
(9) As shown best in
(10) As shown best in
(11) As shown in
(12) As shown best in
(13) As shown best in
(14) A cut-to-length processing line with a stretcher leveler provides some advantages over a cut-to-length processing line having a temper mill. In particular, the stretcher leveler tends to produce flatter, continuous lengths of sheet metal when compared to a temper mill. In a stretcher leveler, the resulting product leveler tends to have no residual stresses and tends to maintain shape over time. Stretcher leveling operations generally have minimal effect on the physical and mechanical properties of the continuous length of sheet metal. A cut-to-length processing line with a stretcher leveler is generally easier to operate than a cut-to-length processing line with a temper mill. A typical stretcher leveler cut-to-length processing line includes a capital investment of approximately $7 million. This tends to be less than a temper mill cut-to-length processing line. The temper mill cut-to-length processing line generally includes a capital investment of approximately $20 million.
(15) On the other hand, a cut-to-length temper mill processing line provides some advantages over a cut-to-length stretcher leveler processing line. Generally speaking, temper mill processed material has an improved surface finish when compared to stretcher leveler processed material, which is usually desired on the thinner gage, i.e., 16 gage-9 gage, materials. Often, temper mill processing allows for faster through-put time. The temper mill also increases the yield point elongation of material which helps to prevent coil breaks often found in softer and thinner, e.g., 16 gage-9 gage, materials. Continuous lengths of sheet metal processed in a stretcher leveler cut-to-length processing line generally does very little to prevent these undesirable coil breaks.
(16) To achieve the advantages of both a traditional stretcher level cut-to-length processing line and a temper mill cut-to-length processing line, a temper mill may be incorporated into a stretcher leveler cut-to-length processing line as shown in
(17) In accordance with a method involving a cut-to-length steel coil processing line, for instance, as shown in
(18) The processing line may also include a pit prior to the stretcher leveler. When the stretcher leveler is used, the continuous length of sheet metal may be directed from the uncoiling reel through the pit to the stretcher leveler and to the stacking apparatus without passing through the temper mill. When the determined thickness of the continuous length of sheet metal is at or below the selected measurement criteria, the continuous length of sheet metal may be directed from the uncoiling reel through the temper mill to the stacking apparatus with the take-up pit in the upward position and the stretcher leveler not on-line.
(19) As shown in
(20) As shown in
(21) Referring to
(22) As to the configuration of the processing line, the operator of the line may perform the steps of configuring the line based upon the operator's determination of the coil condition, material thickness, and ultimate material requirements in the manner described above. In the alternative, the operator of the line may receive instructions from another in selecting and configuring the processing line based upon coil condition, material thickness, and ultimate material requirements. For instance, an operator of the processing line may receive instructions to configure the line in connection with the installation of a temper mill in an existing stretcher leveler line. By way of example and not in any limiting sense, a temper mill may be retrofitted in an existing stretcher leveler line and the operator of the line may receive instructions for processing the continuous length of sheet metal in the line from an integrator, a provider of the temper mill, a process improvement consultant, or a retrofitting contractor. The operator may also receive instructions from a provider of a processing line comprising the stretcher leveler equipment and temper mill.
(23) In view of the foregoing, it will be seen that the several advantages of the invention are achieved and attained. The embodiments were chosen and described in order to best explain the principles of the disclosure and their practical application to thereby enable others skilled in the art to best utilize the principles in various embodiments and with various modifications as are suited to the particular use contemplated. As various modifications could be made in the constructions and methods herein described and illustrated without departing from the scope of the invention, it is intended that all matter contained in the foregoing description or shown in the accompanying drawings shall be interpreted as illustrative rather than limiting. Thus, the breadth and scope of the present invention should not be limited by any of the above-described exemplary embodiments, but should be defined only in accordance with the following claims appended hereto and their equivalents.