1. A method to repair an electric shovel bucket which saves time in maintenance operations comprising the steps of: cutting the bucket into two parts, an upper part which is maintained, and an original lower part which is removed and replaced by a new lower part after completion of repairs on the upper part; making repairs on upper part which has been maintained and that includes repairing damaged areas and a connection area and after completion of said repairs welding the upper part to the new lower part; replacing an original door with a new door or a door previously repaired; mounting accessory parts and the new door or the door previously repaired and running corresponding tests to obtain a new reconditioned bucket; and making repairs outside a bucket repair line with the original door and the original lower part that have been removed.

2. The method of claim 1, wherein making repairs outside the bucket repair line includes, on the lower part: changing at least part of an original floor with a new floor made of laminated steel; changing an original beadband with a new beadband made of laminated steel; changing an original flow stopper with new flow stopper formed by anti-abrasive steel straps; changing an original lip with a new laminated lip or repairing the original lip; installing a shield formed by a plurality of anti-abrasive steel parts; and changing an original latch eye with a new laminated latch eye if it is damaged.

3. The method of claim 1, wherein making repairs outside the bucket repair line includes, in the original door: installing a new base plate and making repairs in the connection area using high-strength structural steel; and installing shielding sheets and slabs made of anti-abrasive steel.

Description

BRIEF DESCRIPTION OF THE DRAWINGS

(1) FIG. 1A shows the arrival of a door for maintenance task.

(2) FIG. 1B shows the arrival of a bucket with the door disassembled for maintenance.

(3) FIG. 2A shows the door once unloaded from the truck in a first position to repair its inner part (upper area).

(4) FIG. 2B shows the door once unloaded from the truck in a second inverted position to repair the outer part (upper area).

(5) FIG. 3A shows a first position to repair the inner and outer areas of the bucket.

(6) FIG. 3B shows a second position to repair the external sides and lip of the bucket.

(7) FIG. 3C shows a third position in which the bucket is reversed to repair the outer floor.

(8) FIG. 3D shows a new reversion of the bucket to repair the connection area.

(9) FIG. 4 shows a finished bucket for the process with all its accessories.

(10) FIG. 5 shows the new door and the lower part of the new bucket which are not repaired and removed from stock once repaired.

(11) FIG. 6 shows the steps of the invention.

(12) FIG. 7 shows a lower part unshielded.

(13) FIG. 8 shows the elements changed on the lower part.

(14) FIG. 9 shows the shield applied to the lower part.

(15) FIG. 10A shows the separation of used parts.

(16) FIG. 10B shows the repair of the used upper part.

(17) FIG. 10C shows the attachment of the repaired upper part with the previously repaired lower part.

(18) FIG. 11A shows the outer part of the lid.

(19) FIG. 11B shows the inner part of the lid.

DETAILED DESCRIPTION OF THE INVENTION

(20) A method is detailed to repair a bucket for electric shovel. As shown in FIG. 6, the bucket (1) and the door (2) arrive separately to be repaired (E1, E2). The method of the proposed invention comprises the steps of: (E3) The bucket (1) is cut by separating it into two parts, an upper part (4) which is maintained and repaired, and a lower part (3), which is removed replacing it after completion of repairs to the upper part (4) by a new lower part (14). (E4A) Repairs are made on the upper part (4) which has been maintained and once said repairs are finished (E4B) the upper part (4) is welded to the new lower part (14). (E5) The original door (2) is removed and replaced by a new door or one previously repaired (5) which is kept in stock. (E6) Accessory parts and the new door (5) are mounted and corresponding tests are done to obtain a new reconditioned bucket (10).

(21) According to the above, it is estimated that repairing the bucket requires 4 welders, one boiler operator, one assistant and 3 turners, and a total of 24 working days.

(22) As shown in FIGS. 7, 8, 9 and 10, operations are performed both on the upper part (4) which is maintained, as well as on the two removed elements, that is, the original lower part (3) and the original door (2), it should be noted that repair of these two removed elements (3, 2) does not generate operation times in the bucket reconditioning, since these removed elements (3, 2) are repaired outside the bucket repair line and kept in stock once repaired. The operation performed in more detail are: 1) On the upper part (4) maintained, repairs are made in the damaged areas (20) and in the connection area (9). 2) On the original lower part (3) removed used to be kept in stock as a new lower part (14), the following repairs are made to obtain a new lower part (14): Changing the original floor (8), or part of it, which is usually melted by a new floor (6), or part of it, made of laminated steel. Changing the original bead band which is usually melted by a new bead band (15) made of laminated steel. Changing the original flow stoppers (11) usually melted and of high cost by new flow stoppers (23) formed by anti-abrasive steel straps. If the lip is damaged, changing the original lip (21) melted by a new laminated lip (22) or repairing the original. Running tests on compatibility and correcting positioning of the cutting or attack tools in the new installed lip or the repaired lip. Installing a shield (13) formed of a plurality of parts made of anti-abrasive steel. Changing the original latch eye by a new laminated latch eye (12) if it is damaged, otherwise the original is repaired. 3) In the original door (2) removed and to keep in stock as a new door (5), the following repairs are done to obtain a new door (5): Installing a new base plate (17) and making repairs in the connection area (16) using high-strength structural steel. Installing shielding sheets and slabs (18) made of anti-abrasive steel.