Method for operating a steam turbine plant
09982569 ยท 2018-05-29
Assignee
Inventors
Cpc classification
F01K23/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K23/101
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K7/22
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K3/008
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K7/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K3/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K3/004
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E20/16
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K7/22
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K3/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K7/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K23/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K23/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A method for operating a steam turbine plant including a steam turbine and a steam generator allows a power reserve to be provided whilst simultaneously maintaining a high level of efficiency in the normal mode of operation. The steam turbine plant includes a heat reservoir which is associated with the steam turbine, from which the steam is removed and is fed to the steam turbine. The steam is fed to the steam turbine when the steam generator is not in operation.
Claims
1. A method for operating a steam turbine plant with a steam turbine and a steam generator, the steam turbine plant comprising a heat store associated with the steam turbine, the method comprising: removing steam from the heat store and feeding to the steam turbine, wherein the steam is fed to the steam turbine whilst the steam generator is idle, and loading the heat store with saturated water from a steam drum of the steam generator whilst a power demand on the steam turbine plant from a power grid is below a preset threshold value.
2. The method as claimed in claim 1, wherein the heat store is loaded with superheated steam from the steam generator or the steam turbine.
3. The method as claimed in claim 2, wherein the heat store is loaded via a heat exchanger.
4. The method as claimed in claim 1, wherein the steam turbine plant comprises a high-pressure part, a medium-pressure part, and a low-pressure part, and wherein the heat store is loaded from the high-pressure part of the steam generator, and the steam is fed to the medium-pressure part of the steam turbine.
5. The method as claimed in claim 1, wherein the steam turbine plant comprises a high-pressure part, a medium-pressure part, and a low-pressure part, and wherein the heat store is loaded from the medium-pressure part of the steam generator, and the steam is fed to the low-pressure part of the steam turbine.
6. A steam turbine plant comprising: a steam turbine, a steam generator, a heat store associated with the steam turbine from which steam is removed and fed to the steam turbine, wherein the heat store is adapted such that the steam is fed to the steam turbine whilst the steam generator is idle, and the heat store is loaded with saturated water from a steam drum of the steam generator whilst a power demand on the steam turbine plant from a power grid is below a preset threshold value.
7. The steam turbine plant as claimed in claim 6, wherein the heat store is designed as a Ruths steam accumulator.
8. A gas-and-steam turbine plant comprising: a steam turbine plant as claimed in claim 6.
9. The method as claimed in claim 1, further comprising feeding the steam from the heat store to the steam generator whilst the steam generator is idle.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention is explained in detail with the aid of the drawings, in which:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
DETAILED DESCRIPTION OF INVENTION
(10) Identical parts are provided with the same reference numerals in all the drawings.
(11)
(12) Attempts are made in an electricity grid, using a power station management approach, to balance power obtained in power stations with power removed by consumers and losses during transportation. If the expected power requirement does not correspond to the power supply, the discrepancy must be compensated for. This follows from the physical necessity that electricity power grids cannot store energy and that therefore at any point in time the fed-in power must correspond to the sum of the removed power and the power lost as a result of transportation. In alternating current grids, deviations result in a change in the grid frequency f which is uniform (synchronous) across the whole alternating current grid: when there is an excess supply of power, a deviation in the grid frequency f above the nominal frequency occurs, and when there is a shortage of supply a so-called underfrequency occurs. Control power PRL is required for compensation purposes when the actual temporary power demand does not correspond with the expected power supply.
(13) The task of maintaining the frequency is divided into different control stages which can be understood in
(14) At the point in time 0 s, the level of consumption 1 is greater than the generator power 2. There is therefore a power deficit 4. As a result of this deviation, primary control power 6 is activated in every participating power station (usually all power stations with a nominal output greater than 100 MW) according to the controller characteristic and the grid frequency f is thus boosted.
(15) It must be possible for the power stations involved in the primary control to provide, in the event of a quasi-stationary frequency deviation of 200 mHz, the whole primary control power 6 within 30 seconds, i.e. to increase or reduce the power output linearly and to maintain this power for up to 15 minutes. The primary control power which is thus available, the so-called primary control range, must thus correspond to at least 2% of the nominal power of the plant.
(16)
(17) The primary control power 6 and partly also the secondary control power 10 are considered below. As described, every grid operator within the electricity grid must be able to make 2% of its temporary generation available, within 30 seconds, for 15 minutes as a primary control reserve. In a power station 18 shown schematically in
(18) The steam turbine plant 20 in
(19) As already explained, the waste gas from the gas turbine (not shown) is conducted into the waste gas boiler 22. The waste gas boiler 22 comprises, in the direction of the direction of flow of the waste gas A, in succession, a reheater 26, a superheater 28, an evaporator 30, and an economizer 32. The steam generated in the waste heat boiler 22 is collected and used to drive the steam turbine 24. The steam turbine 24 is arranged in the steam turbine plant 20 in
(20) The steam turbine plant 20 is designed as a three-pressure plant, i.e. the steam turbine 24 has a high-pressure turbine 38, a medium-pressure turbine 40, and a low-pressure turbine 42. The design described below can, however, also be achieved with more complex structures. Each turbine 38, 40, 42 of the steam turbine 24 has stator blades and rotor blades (not shown in detail) alternating inside a housing in an axial direction. The stator blades are arranged so that they form a circle along the circumference of the shaft 34. Such a circle of stator blades is also referred to as a stator blade wheel. The rotor blades are likewise arranged in a circle, so that they can rotate, as a rotor blade wheel on the respective shaft 34. A stator blade wheel, together with the downstream adjacent rotor blade wheel, is referred to as a turbine stage.
(21) The expanded steam from the steam turbine 24 is conducted into a condenser 44 and the liquefied medium is conducted by a condensate pump 46 via multiple low-pressure preheaters 48 into a feed water tank 50 with a degasser. From here the medium is fed by a feed pump 52 via multiple preheaters 54 to the waste heat boiler 22. Here it arrives first at the economizer 32 and enters a steam drum 56. In the waste heat boiler 22, the steam drum 56 forms a circuit with the evaporator 30 so that liquid, preheated medium is fed continuously to the evaporator 26. Evaporated medium thus leaves at the upper end of the steam drum 56 and enters the superheater 28 and is lastly fed to the high-pressure turbine 38.
(22) The steam is expanded in the high-pressure turbine 38 and conducted at its outlet to the reheater 26, where it is superheated again in the waste gas flow. The steam is then conducted into the medium-pressure turbine 40, further expanded there, and conducted to the low-pressure turbine 42. After the expansion in the low-pressure turbine 42, the steam is conducted into the condenser 44.
(23) The generator 36 of the steam turbine plant 20 can be connected in parallel to the generator (not shown) of the gas turbine, or alternatively the gas-and-steam power station is designed as a single-shaft plant so that the gas turbine is likewise connected to the shaft 34. In each case, the generator 36 is connected to the external electricity grid via a transformer.
(24) A heat store 58 is associated with the steam turbine plant 20 in order to hold the 2% control reserve in readiness. The heat store 58 consists of multiple pressure drum stores which are designed as Ruths steam accumulators. Liquid medium is at high pressure in the Ruths steam accumulators. In the exemplary embodiment in
(25) Alternatively, an initial amount of cold water can also be situated in the pressure drum stores of the heat store 58 and heat is stored in the form of steam. This embodiment is shown in
(26) Loading with superheated steam is also possible. The corresponding embodiment is shown in
(27) If superheated steam at a high pressure level is used (for example, live steam direct from the superheater 28, not shown in the drawings), there is no need for indirect heat transfer and the superheated steam can be conducted directly into the heat store 58. Equally, during removal of heat from the store, it is also possible for steam to be fed into the low-pressure turbine 42 (likewise not shown).
(28) The heat store 58 is loaded when the temperature or pressure level in the heat store 58 reaches the level of the loaded steam. Loading takes place at a period of low power demand in the grid. As a result of the loading process, the output of the steam turbine 24 and hence of the power station 18 falls slightly for a short period of time. If the heat store 58 is loaded, the power station 18 continues to operate in grid-driven power mode. There is now no longer a need to throttle the steam turbine 24 and the efficiency of the power station 18 is superior to the current operating design.
(29) The heat store 58 makes the steam turbine plant 20 considerably more flexible. Moreover, the heat store 58 can also be loaded in different manners, for example be heated electrically or using heat pumps. Excess electricity from fluctuating energy sources (wind, sun) could thus be taken from the grid.
(30) Different operating modes, explained below, are conceivable for removing heat from the store.
(31) Firstly, the steam turbine 24 can be operated in principle only using steam from the heat store 58. The steam turbine 24 can be driven by steam from the heat store 58.
(32) As a result, power can be provided in a very short period of time. However, a disadvantage of this design is that the steam turbine 24 needs to be driven and operated using saturated steam or only slightly superheated steam, which can give rise to technical risks (water droplets from condensation: the impact of droplets and erosion).
(33) It is, however, possible to provide primary control power, as design calculations show. A gas-and-steam power station using a three-pressure reheating process based on a Siemens SGT5-4000F gas turbine is used for the calculations. It is assumed that hot water at the pressure level of the live steam (approximately 140 bar, 340 C.) is saved in the pressure drum stores of the heat store 58. It is furthermore assumed that thirty pressure drums with a volume of approximately 20 m.sup.3 each are installed as a heat store 58.
(34) The medium-pressure turbine 40 has a normal steam mass flow of approximately 90 kg/s and is operated with reheated steam (approximately 30 bar, 560 C.). If only steam with 90 kg/s is now fed from the abovementioned pressure drums to the medium-pressure turbine 40 (approximately 35 bar, 242 C.), power of approximately 75 MW can be expected. The drop in pressure of the store pressure 66 in the heat store 58, and the fill level 68 of the store are shown in
(35) Similarly, it is also possible to store hot water at a medium pressure level (approximately 35 bar, 242 C.) and remove it into the low-pressure turbine 42 (approximately 5 bar, 150 C.). The low-pressure turbine 42 has a normal steam mass flow of approximately 110 kg/s and is operated with steam slightly superheated by expansion (approximately 4 bar, 270 C.). The achievable control power is thus less as a result of the lower storage capacity of the heat store 58 at medium pressure level (lower temperature difference between the full and unloaded store). It has been shown that, when heat is removed at 110 kg/s, approximately 60 MW can be provided for 12 min, if 30 pressure drums are again used as the heat store 58. The store pressure 66 and fill level 68 of the heat store 58 in this case are shown in
(36) Because, as described above, the steam turbine 24 can be operated in a technically problematical fashion with saturated steam or only slightly superheated steam, it is conceivable as an operating design for the heat store 58 to be used in order to keep the steam turbine 24 connected to the grid even when no heat is provided in the steam generator 22 (for example, when the gas turbine in the gas-and-steam power station is switched off). The steam turbine 24 is therefore provided with a small amount of steam from the heat store 58 in order to maintain the rotating mass connected to the grid. The amount of steam is here chosen such that friction and other losses of the steam turbine 24 are compensated by the supply of steam.
(37) In a design calculation, it is again assumed that 30 high-pressure drums, each with approximately 20 m.sup.3, are available as a heat store 58. It is furthermore assumed that approximately 5% of the normal steam mass flow at a medium pressure level is sufficient as the saturated steam in order to compensate for the friction losses and maintain the steam turbine 24 connected to the grid. Based on these assumptions, the steam turbine 24 is then maintained connected to the grid for approximately 5 to 8 hours without any fuel being consumed in the power station 18.
(38) In addition, the steam mass flow from the heat store can be increased for a short period of time, as a result of which primary control power can be provided. However, this results, depending on the steam consumed and the size of the store, in a shortened possible operating period. In parallel with the steam turbine 24, the waste heat boiler 22 can also be kept warm. This is achieved by continuously supplying a small amount of steam to the waste heat boiler 22 from the heat store 58. The amount of steam is chosen such that the heat energy of the steam compensates the heat losses from the waste heat boiler 22. The waste heat boiler 22 thus remains at a relatively high temperature and can be quickly restored to full-load mode, for example if the gas turbine is operated in a gas-and-steam turbine.
(39) Lastly, it is also possible for steam to be added from the heat store 58 at full power mode of the steam turbine 24. The additional supply of steam from the heat store 58 is hereby used to provide extra power or primary and secondary control power for a short period of time. It is thus then possible to dispense with the throttling of the steam turbine 24 in normal operation because the primary control can be provided by the heat store 58. The efficiency of the power station 18 is thus higher in base load mode.
(40) Only small amounts of extra steam are hereby added as saturated steam from the store. As a result, a slight decrease in temperature occurs at the inlet of the steam turbine 24. The steam turbine is, however, also operated with superheated steam and the tendency for condensation inside the turbines 38, 40, 42 is less.
(41) The results of a design calculation for a gas-and-steam power station using a three-pressure reheating process are again shown. The effect of adding extra steam to the medium-pressure turbine 40 is shown in
(42) Primary control power can also be provided with this design. As shown in
(43) The amounts of steam required are hereby small, which reduces the required storage volume. Only four high-pressure drums, each with a volume of approximately 20 m.sup.3, are necessary as a heat store 58 to provide primary control power in the case of a gas-and-steam power station based on a Siemens SGT5-4000F gas turbine. These four drums allow a control energy reserve of 2% of the power station output to be provided for approximately 15 min. Installing a larger number of drums alone allows control energy in the region of a minute reserve to be provided.
(44) Assuming medium-pressure drums are installed as a heat store 58 to provide steam for the low-pressure turbine 42 at 5 bar, the required steam mass flow increases because only the increase in output at the low-pressure turbine 42 is used. It is necessary to increase the steam mass flow to the low-pressure turbine 42 by approximately 17% for a similar two-percent increase in output of the power station 18. Six medium-pressure drums, each with 20 m.sup.3, are required to maintain the increased output for approximately 15 min.