VARIABLE RATIO CHARGE PUMP WITH PEAK CURRENT AND AVERAGE CURRENT LIMITING CIRCUITRY
20180120884 ยท 2018-05-03
Assignee
Inventors
Cpc classification
H02M3/07
ELECTRICITY
H02M1/32
ELECTRICITY
F04D15/0027
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F04D15/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H03K17/16
ELECTRICITY
H02M1/32
ELECTRICITY
Abstract
A method of increasing a multiplication ratio of a charge pump, the multiplication ratio defining a relationship between an output voltage of the charge pump and an input voltage of the charge pump, comprising: analyzing a first efficiency of the charge pump when the multiplication ratio is at a first ratio, calculating a second efficiency of the charge pump when the multiplication ratio is a second ratio lesser than the first ratio, and based on the first efficiency and the second efficiency, determining at least one of a target output power and a target output voltage at which to change the multiplication ratio from the second ratio to the first ratio.
Claims
1. A method of changing a multiplication ratio of a charge pump, the multiplication ratio defining a relationship between an output voltage of the charge pump and an input voltage of the charge pump, the method comprising: determining a first efficiency of the charge pump when the multiplication ratio is at a first ratio; determining a second efficiency of the charge pump existing at a point in time in which the multiplication ratio increased from the first ratio to a second ratio greater than the first ratio; and based on the first efficiency and the second efficiency, determining at least one of a target output power and a target output voltage at which to change the multiplication ratio between the first ratio and the second ratio.
2. The method of claim 1, further comprising changing the multiplication ratio when at least one of an output power of the charge pump reaches the target output power and the output voltage reaches the target output voltage in order to limit power supplied by a source of electrical energy to the charge pump.
3. The method of claim 2, further comprising limiting power supplied by the source of electrical energy by limiting an input current supplied by the source of electrical energy.
4. A method comprising, in a boosted amplifier having a charge pump: monitoring a boost output signal and a pulse width modulation output; and upon determining, based on the boost output signal and the pulse width modulation output, that the charge pump cannot sustain an output power with an efficiency greater than a threshold efficiency, changing a multiplication ratio of the charge pump, the multiplication ratio defining a relationship between an output voltage of the charge pump and an input voltage of the charge pump.
5. A method comprising: determining a boost efficiency of a charge pump; and deactivating a boosted amplifier comprising the charge pump if the boost efficiency decreases below a threshold efficiency for a time exceeding a threshold period of time.
6. A method comprising: determining an average of an input current supplied to a charge pump by a source of electrical energy; and ceasing draw of current from the source of electrical energy by the charge pump responsive to the average exceeding a threshold current level.
7. The method of claim 6, wherein determining the average comprises mathematically integrating the input current over a switching cycle of the charge pump.
8. The method of claim 6, wherein ceasing draw of current comprises disabling one or more switches of the charge pump responsive to the average exceeding a threshold current level.
9. A system comprising: a charge pump configured to operate in a plurality of modes including a first mode in which a multiplication ratio of an output voltage to an input voltage of the charge pump is a first ratio and a second mode in which the multiplication ratio is a second ratio greater than the first ratio; and a controller configured to change a multiplication ratio of the charge pump between the first ratio and the second ratio by: determining a first efficiency of the charge pump when the multiplication ratio is at the first ratio; determining a second efficiency of the charge pump existing at a point in time in which the multiplication ratio is increased from the first ratio to the second ratio; and based on the first efficiency and the second efficiency, determining at least one of a target output power and a target output voltage at which to change the multiplication ratio between the first ratio and the second ratio.
10. The system of claim 9, wherein the controller is further configured to change the ratio when at least one of an output power of the charge pump reaches the target output power and the output voltage reaches the target output voltage in order to limit power supplied by a source of electrical energy to the charge pump.
11. The system of claim 10, wherein the controller is further configured to limit power supplied by the source of electrical energy by limiting an input current supplied by the source of electrical energy.
12. A system comprising: a charge pump configured to operate in a plurality of modes including a first mode in which a ratio of an output voltage to an input voltage of the charge pump is a first ratio and a second mode in which the ratio is a second ratio greater than the first ratio; and a controller configured to: monitor a boost output signal and a pulse width modulation output; and upon determining, based on the boost output signal and the pulse width modulation output, that the charge pump cannot sustain an output power with an efficiency greater than a threshold efficiency, change a multiplication ratio of the charge pump between the first ratio and the second ratio.
13. A system comprising: a charge pump configured to operate in a plurality of modes including a first mode in which a ratio of an output voltage to an input voltage of the charge pump is a first ratio and a second mode in which the ratio is a second ratio greater than the first ratio; and a controller configured to: determine a boost efficiency of a charge pump; and deactivate a boosted amplifier comprising the charge pump if the boost efficiency decreases below a threshold efficiency for a time exceeding a threshold period of time.
14. A system comprising: a charge pump configured to operate in a plurality of modes including a first mode in which a ratio of an output voltage to an input voltage of the charge pump is a first ratio and a second mode in which the ratio is a second ratio greater than the first ratio; and a controller configured to: determine an average of an input current supplied to a charge pump by a source of electrical energy; and cause cessation of current drawn from the source by the charge pump responsive to the average exceeding a threshold current level.
15. The system of claim 14, wherein the controller is configured to determine the average by mathematically integrating the input current over a switching cycle of the charge pump.
16. The system of claim 14, wherein the controller is configured to cause cessation of current drawn by disabling one or more switches of the charge pump responsive to the average exceeding a threshold current level.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0017] A more complete understanding of the example, present embodiments and certain advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying drawings, in which like reference numbers indicate like features, and wherein:
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
DETAILED DESCRIPTION
[0026]
[0027] Personal audio device 1 may provide a display to a user and receive user input using a touch screen 2, or alternatively, a standard LCD may be combined with various buttons, sliders, and/or dials disposed on the face and/or sides of personal audio device 1. As also shown in
[0028]
[0029] A charge pump power supply 10 may provide the power supply rail inputs of a supply voltage V.sub.SUPPLY to amplifier 16 and may receive a power source input, generally from a battery 12 or other power supply, which may provide an input voltage V.sub.BATT to charge pump power supply 10. A control circuit 20 may supply a mode select signal to charge pump power supply 10 that selects an operating mode of charge pump power supply 10 so as to adjust supply voltage V.sub.SUPPLY generated by charge pump power supply 10 according to expected and/or actual signal levels at the output of amplifier 16. When low signal levels exist and/or are expected at amplifier output V.sub.OUT, mode control circuit 20 may improve the power efficiency of audio IC 9 by varying the supply voltage V.sub.SUPPLY in conformity with the output signal V.sub.OUT or a signal (e.g., digital input signal DIG_IN) indicative of the output signal V.sub.OUT. Accordingly, to maintain power efficiency, at any given time control circuit 20 may select an operating mode from a plurality of operating modes in each operating mode operating charge pump power supply 10 at a different supply voltage, V.sub.SUPPLY, wherein the supply voltage V.sub.SUPPLY in one operational mode is a rational multiple or ratio of supply voltages of other operational modes.
[0030]
[0031] Each switch 32, 34, 36, and 38 may comprise any suitable device, system, or apparatus for making a connection in an electric circuit when the switch is enabled (e.g., closed or on) and breaking the connection when the switch is disabled (e.g., open or off) in response to a control signal received by the switch. For purposes of clarity and exposition, control signals for switches 32, 34, 36, and 38 are not depicted although such control signals would be present to selectively enable and disable switches 32, 34, 36, and 38. In some embodiments, a switch 32, 34, 36, and 38 may comprise an n-type metal-oxide-semiconductor field-effect transistor. In these and other embodiments, a switch 32, 34, 36, and 38 may comprise a p-type metal-oxide-semiconductor field-effect transistor. Switch 32 may be coupled between a positive input terminal of charge pump power supply 10 and a first terminal of flying capacitor 40. Switch 34 may be coupled between the positive input terminal of charge pump power supply 10 and a second terminal of flying capacitor 40. Switch 36 may be coupled between a negative input terminal of charge pump power supply 10 and a second terminal of flying capacitor 40. Switch 38 may be coupled between the first terminal of flying capacitor 40 and a first terminal of charge pump output capacitor 42.
[0032] Flying capacitor 40 and charge pump output capacitor 42 may each comprise a passive two-terminal electrical component used to store energy electrostatically in an electric field, which may generate a current in response to a time-varying voltage across the capacitor (or vice versa). Charge pump output capacitor 42 may be coupled between the output terminals of charge pump power supply 10, and thus may store supply voltage V.sub.SUPPLY output by charge pump power supply 10.
[0033] In the first mode, charge pump power supply 10 may operate in a single phase, wherein switch 34 may be disabled and switches 32, 36, and 38 may be enabled during operation, thus charging voltage V.sub.SUPPLY on charge pump output capacitor 42 to input voltage V.sub.BATT. In the second mode, charge pump power supply 10 may sequentially operate in a charging phase in which switches 32 and 36 are enabled and switches 34 and 38 are disabled, allowing charge transfer from battery 12 to flying capacitor 40, and a transfer phase in which switches 32 and 36 are disabled and switches 34 and 38 are enabled, boosting the voltage on flying capacitor 40 and allowing charge transfer from flying capacitor 40 to charge pump output capacitor 42.
[0034] Although
[0035] As shown in
[0036]
[0037]
[0038] In addition to limiting average current, control circuit 20 may also be configured to limit peak current of current I.sub.IN. For example, to control a maximum peak current of current IN, a simple technique of dividing a switch of charge pump power supply 10 into multiple smaller (and higher resistance) switches may be employed. Using such approach, the resistance that is provided on the activation of a switching phase of charge pump power supply 10 may be determined by a maximum voltage across the switch and a maximum peak current that battery 12 can deliver. In order to determine when additional sections of the switch may be activated, a simple self-timing mechanism may measure the voltage across the switch and as the voltage drops below a threshold, an additional section of the switch may be activated while still maintaining current I.sub.IN below the maximum peak current limit. This process of comparing the voltage across the parallel switches and activating when the voltage is below a threshold is repeated until all available parallel switches are activated. An additional approach for determining when the parallel switches are activated is by simply using timers to activate each of the switches in the parallel combination. A time threshold can be created for each of the individual switches used in the parallel configuration where each switch is activated after a predetermined time has transpired (where each switch has an individual time thresholdall thresholds can be equal or different from all other time thresholds).
[0039] Other methods of controlling the peak current of current I.sub.IN may also be utilized. For example, varying a switching frequency of charge pump power supply 10 to decrease an effective output impedance of the charge pump power supply 10 may result in lower peak currents of current I.sub.IN being drawn from battery 12. Other approaches for limiting peak current may be described in U.S. patent application Ser. No. 15/783,506, filed Oct. 13, 2017, and incorporated by reference herein.
[0040] One problem that may arise from limiting of input current I.sub.IN is that it may restrict charge pump power supply 10 from outputting a desired boosted output supply voltage V.sub.SUPPLY. For example, when transitioning from a first multiplication ratio (wherein the multiplication ratio defines a relationship between output voltage V.sub.SUPPLY generated by charge pump power supply 10 and input voltage V.sub.BATT of charge pump power supply 10) to a second multiplication ratio higher than the first multiplication ratio, an average current limit applied to charge pump power supply 10 (e.g., by average current limiting circuitry 22) may restrict charge pump power supply 10 from obtaining the desired multiplication at the second multiplication ratio and deliver a required amount of output power at its output. Such restriction may occur as a result of an instantaneous decrease in an efficiency of charge pump power supply 10. To illustrate, if charge pump power supply 10 was operating at 100% efficiency with the first multiplication ratio, the transition to the second multiplication ratio would immediately drop the efficiency of charge pump power supply 10, the new efficiency being approximately equal to the second multiplication ratio divided by the first multiplication ratio. Thus, because the input power delivered by battery 12 is limited due to the input average current limitation, charge pump power supply 10 cannot simultaneously increase the multiplication ratio and deliver the required output power to amplifier 16, resulting in charge pump power supply 10 operating at a much reduced efficiency and being unable to deliver the required output power even though battery 12 is capable of delivering such output power.
[0041] To reduce or minimize this problem, control circuit 20 may be configured to select a multiplication ratio based on a required power to be delivered by charge pump power supply 10 and a power headroom based on efficiency of charge pump power supply 10. As a result, transition from a first multiplication ratio to a larger second multiplication ratio may occur at a lower output power (and thus, lower amplifier output voltage V.sub.OUT) than if input current limiting were not present.
[0042] When an output of charge pump power supply 10 is unable to sustain an adequate charge, its output voltage V.sub.SUPPLY may collapse, thus resulting in a decrease of an efficiency of charge pump power supply 10. When such a decrease of efficiency occurs, control circuit 20 may cause charge pump power supply 10 to operate at a minimum ratio that can sustain the resulting output voltage V.sub.SUPPLY. Such decrease may be performed as a protection mechanism to ensure that charge pump power supply 10 is operating at a best possible efficiency under the circumstances while ensuring that charge is still delivered from battery 12 to the output of charge pump power supply 10.
[0043]
[0044] At step 62, control circuit 20 may determine a first efficiency of charge pump power supply 10 when its multiplication ratio is a first multiplication ratio. At step 64, control circuit 20 may determine a second efficiency of charge pump power supply 10 existing at a point in time in which the multiplication ratio of charge pump power supply 10 increases from the first ratio to a second ratio greater than the first ratio.
[0045] At step 66, control circuit 20 may, based on the first efficiency and the second efficiency, determine at least one of a target output power and a target output voltage at which to change the multiplication ratio between the first multiplication ratio and the second multiplication ratio.
[0046] At step 68, in order to limit power supplied by battery 12 to charge pump power supply 10, control circuit 20 may change the multiplication ratio between the first multiplication ratio and the second multiplication ratio when either an output power of charge pump power supply 10 reaches the target output power or an output voltage of charge pump power supply 10 reaches the target output voltage. In addition, to further limit power supplied by battery 12 to charge pump power supply 10, control circuit 20 may limit input current, as described elsewhere in this disclosure.
[0047] Although
[0048] Method 60 may be implemented using control circuit 20 or any other system operable to implement method 60. In certain embodiments, method 60 may be implemented partially or fully in software and/or firmware embodied in computer-readable media.
[0049] As an example application of method 60, referring to charge pump power supply 10 as shown in
[0050] A target power level P.sub.TGT for switching between multiplication ratios may be given as P.sub.TGT=V.sub.TGT.sup.2/R or alternatively as:
[0051] Thus, target voltage V.sub.TGT and/or target power P.sub.TGT may set a threshold lower than battery voltage V.sub.BATT for changing between multiplication ratios of charge pump power supply 10, such that amplifier 16 is able to supply power to its load while a change in ratio to charge pump power supply 10 occurs.
[0052]
[0053] At step 72, control circuit 20 may monitor a boost output signal (e.g., supply voltage V.sub.SUPPLY in
[0054] At step 76, control circuit 20 may determine, based on the boost output signal and the pulse width modulation output, if there exists excess power to allow a multiplication ratio change such that charge pump power supply 10 can support its output load and any excess charge needed for a charge pump output capacitor (e.g., capacitor 42 of
[0055] If charge pump power supply 10 can sustain the output power greater than the threshold efficiency, method 70 may return to step 72. Otherwise, if charge pump power supply 10 cannot sustain the output power greater than the threshold efficiency, method 70 may proceed to step 78, in which control circuit 20 may cause a decrease in the multiplication ratio of charge pump power supply 10. After completion of step 78, method 70 may return to step 70.
[0056] Although
[0057] Method 70 may be implemented using control circuit 20 or any other system operable to implement method 70. In certain embodiments, method 70 may be implemented partially or fully in software and/or firmware embodied in computer-readable media.
[0058]
[0059] At step 82, control circuit 20 may determine a boost efficiency of charge pump power supply 10. The boost efficiency may be calculated by dividing actual supply voltage V.sub.SUPPLY by a target supply voltage wherein the target supply voltage is equal to battery voltage V.sub.BATT multiplied by the multiplication ratio of charge pump power supply 10. At step 84, control circuit 20 may determine if the boost efficiency is below a threshold efficiency. If the boost efficiency is above the threshold efficiency, method 80 may proceed again to step 82. Otherwise, if the boost efficiency is below the threshold efficiency, method 80 may proceed to step 86. At step 86, control circuit 20 may start a timer, and if the boost efficiency remains below the threshold efficiency for a threshold duration, method 80 may proceed to step 88. Otherwise, if the boost efficiency rises above the threshold efficiency before expiration of the threshold duration, method 80 may proceed again to step 82. At step 88, responsive to the boost efficiency remaining below the threshold efficiency for the threshold duration, control circuit 20 may deactivate amplifier 16.
[0060] Although
[0061] Method 80 may be implemented using control circuit 20 or any other system operable to implement method 80. In certain embodiments, method 80 may be implemented partially or fully in software and/or firmware embodied in computer-readable media.
[0062] This disclosure encompasses all changes, substitutions, variations, alterations, and modifications to the exemplary embodiments herein that a person having ordinary skill in the art would comprehend. Similarly, where appropriate, the appended claims encompass all changes, substitutions, variations, alterations, and modifications to the exemplary embodiments herein that a person having ordinary skill in the art would comprehend. Moreover, reference in the appended claims to an apparatus or system or a component of an apparatus or system being adapted to, arranged to, capable of, configured to, enabled to, operable to, or operative to perform a particular function encompasses that apparatus, system, or component, whether or not it or that particular function is activated, turned on, or unlocked, as long as that apparatus, system, or component is so adapted, arranged, capable, configured, enabled, operable, or operative.
[0063] All examples and conditional language recited herein are intended for pedagogical objects to aid the reader in understanding this disclosure and the concepts contributed by the inventor to furthering the art, and are construed as being without limitation to such specifically recited examples and conditions. Although embodiments of the present disclosure have been described in detail, it should be understood that various changes, substitutions, and alterations could be made hereto without departing from the spirit and scope of the disclosure.