Detection of dynamic train-to-rail shunting performance
09956972 ยท 2018-05-01
Assignee
Inventors
Cpc classification
B61L27/57
PERFORMING OPERATIONS; TRANSPORTING
B61L27/53
PERFORMING OPERATIONS; TRANSPORTING
B61L13/002
PERFORMING OPERATIONS; TRANSPORTING
B61L13/04
PERFORMING OPERATIONS; TRANSPORTING
B61L29/226
PERFORMING OPERATIONS; TRANSPORTING
International classification
B61L13/00
PERFORMING OPERATIONS; TRANSPORTING
B61L1/20
PERFORMING OPERATIONS; TRANSPORTING
B61L27/00
PERFORMING OPERATIONS; TRANSPORTING
B61L13/04
PERFORMING OPERATIONS; TRANSPORTING
Abstract
Systems and methods for detecting the dynamic train-to-rail shunting performance of a train as it is moving along the rails of a railroad track. The systems and methods use portable equipment temporarily installed at a site where it is desired to test the shunting of one or more trains or the electrical equipment installed at the track. The systems and method use sensor plates and a high speed recording system to simultaneously capture measured train-to-rail shunting characteristics and the positioning of a train's axles and any rail conditions impacting the measurements. The captured information can be used to fine tune the train, the electrical equipment installed at the track and/or to design new devices.
Claims
1. A railroad system comprising: a first sensor plate connected to a top portion of a first rail of a railroad track; a second sensor plate connected to a top portion of a second rail of the railroad track, the second sensor plate being located across from the first sensor plate; a measurement device adapted to measure a characteristic associated with a train traveling over the first and second sensor plates; and a capturing system configured to capture images of a portion of the train as the train is traveling over the first and second sensor plates and simultaneously capture measurements of the characteristic as the train is traveling over the first and second sensor plates, wherein the characteristic comprises a train-to-rail shunt impedance.
2. The system of claim 1, wherein the portion of the train comprises the train's axles.
3. The system of claim 1 wherein the capturing system is configured to capture the images and the measurement for an entire period that the train is traveling over the first and second sensor plates.
4. The system of claim 3, further comprising a device for displaying the captured images and measurements so that the characteristic's performance can be analyzed over the period by correlating the measurements to positions of the portion of the train over the first and second rails.
5. The system of claim 1 wherein the capturing system comprises: a first digital camera adapted to capture images of the portion of the train; and a second digital camera adapted to capture measurements of the characteristic.
6. A railroad system comprising: a first sensor plate connected to a top portion of a first rail of a railroad track; a second sensor plate connected to a top portion of a second rail of the railroad track, the second sensor plate being located across from the first sensor plate; a measurement device adapted to measure a characteristic associated with a train traveling over the first and second sensor plates; and a capturing system configured to capture images of a portion of the train as the train is traveling over the first and second sensor plates and simultaneously capture measurements of the characteristic as the train is traveling over the first and second sensor plates, wherein the measurement device comprises a recording ohmmeter.
7. The system of claim 6, wherein the capturing system comprises: a first digital camera adapted to capture images of the portion of the train; and a device coupled to the recording meter and being adapted to capture the measurements from the ohmmeter.
Description
BRIEF DESCRIPTION OF THE DRAWING
(1)
(2)
(3)
DETAILED DESCRIPTION
(4) In designing signal products (e.g., constant warning time devices) where a detection mechanism is based on a rail vehicle (e.g., a train) presenting a certain shunt value across the rails through the lead wheels and axle of the train, the determination of that minimum detectable shunt value becomes critical to the correct design of the product. Embodiments disclosed herein provide a portable, quick, efficient, accurate and inexpensive system and method for detecting the dynamic train-to-rail shunting performance, which can be used to ensure that these products will function properly.
(5)
(6) The system 10 includes a constant warning time device 40 that comprises a transmitter (not shown) that connects to the rails 20a, 20b at transmitter connection points T1, T2 on one side of the road 30. The constant warning time device 40 also comprises a receiver (not shown) that connects to the rails 20a, 20b at receiver connection points R1, R2 on the other side of the road 30. Those of skill in the art will recognize that the transmitter and receiver, other than the physical conductors that connect to the track 20, are often co-located in an enclosure located on one side of the road 30. The constant warning time device 40 includes a control unit (not shown) connected to the transmitter and receiver. The control unit includes logic (which may be implemented in hardware, software, or a combination thereof) for calculating train speed, distance and direction, and producing constant warning time signals for the crossing.
(7) Also shown in
(8) Typically, in existing track circuits, the shunts positioned on both sides of the road and their associated constant warning time device are tuned to the same frequency. This way, the transmitter can continuously transmit one AC signal having one frequency, the receiver can measure the voltage response of the rails and the control unit can make impedance and constant warning time determinations based on one specific frequency. When a train crosses one of the termination shunts, the train's wheels and axles act as shunts, which lowers the inductance, impedance and voltage measured by the corresponding control unit. Measuring the change in the impedance indicates the distance of the train, and measuring the rate of change of the impedance (or integrating the impedance over time) allows the speed of the train to be determined.
(9) The system 10 also includes a shunt performance detection system 50 located on one side of the track 20. In the illustrated embodiment, the shunt performance detection system 50 is located on the left side of the island 32 between the first shunt S1 and transmitter connection points T1, T2, but is should be appreciated that the system 50 could be located on the right side of the island 32 between the second shunt S2 and receiver connection points R1, R2, if desired. In fact, the shunt performance detection system 50 is portable (i.e., not permanently installed) and can be installed at any point between the two shunts S1, S2.
(10) The shunt performance detection system 50 comprises a first sensor plate 60 connected to at least the top portion of the first rail 20a by clamping devices 72a, 72b, 74a, 74b. In
(11) In one embodiment, the sensor plates 60, 62 are the same size as each other and are positioned directly across from each other as shown in
(12) The sensor plates 60, 62 are connected to a recording meter 80 positioned away from the vibration of the track 20 so as not to disturb the calibration of the meter 80. In one embodiment, the recording meter 80 is a recording ohmmeter or micro-ohmmeter capable of measuring small impedances such as e.g., 0.06 ohms as mentioned above. In the illustrated embodiment, a high speed digital camera 82 is positioned next to the track 20 and set up to capture a train's axles as they cross the sensor plates 60, 62. High speed digital cameras in today's market often record and store video images at 1,000 frames per second. The images can then be played back in slow and stop motion to aid in seeing what was recorded. Playback can occur on the cameras themselves or the images can be downloaded on one or more devices such as e.g., a computer, laptop, tablet, etc. and then played-backed on the one or more device. The illustrated embodiment includes a second high speed digital camera 84 positioned next to the meter 80 and set up to capture the display of the meter 80 at the same time that the first camera 82 is capturing the train's axles crossing the sensor plates 60, 62.
(13) As will be explained below in more detail with respect to
(14)
(15) The illustrated sensor plate 60 comprises a soft metal sheet 100 that can be wrapped around at least the top portion of the rail 20a. In one embodiment, the metal sheet 100 is a thin aluminum sheet. It should be appreciated, however, that the embodiments disclosed herein are not limited to aluminum and that any soft, malleable metal sheet can be used. As shown in
(16)
(17) The sensor plates 60, 62 will be attached to the rails 20a, 20b of the track 20 and trains will be operated over the system 50 with the meter 80 logging the effective shunting values that are being seen by the plates 60, 62. In the embodiment illustrated in
(18) The observed behavior and impedance measurements can be used to modify the crossing warning time device and/or the train's shunting as appropriate (step 208). As mentioned above, the method 200 can be repeated for different trains, operations of the trains, and different conditions of the track, which will also aid in analyzing the train and constant warding time device.
(19) As can be appreciated, the disclosed embodiments provide several advantages over existing railroad systems. Initially, it should be appreciated that the disclosed embodiments will be able to determine dynamic train-to-rail shunting performance is a relatively easy and highly accurate manner. Because the disclosed shunt performance detection system 50 is portable and non-destructively connected to the rails, the system 50 could be set up at a specific customer field location to test customer trains and constant warning time devices under their normal operating conditions. It should be appreciated, however, that if more detailed analysis is desired, the system 50 could be set up at a testing facility such as e.g., the AAR (Association of American Railroads)/TTC (Transportation Technology Center) testing center in Pueblo, Colo. The testing center could include a loop track that would allow for repeated testing of a train and constant warning time devices, with changes being made between test runs, without having to relocate the system 50 or components of the system 50.
(20) Moreover, the ability to know a rail vehicle's shunting performance will allow railroad personnel to more accurately design new products that maximize the performance of the systems they will be used in. The ability to know a rail vehicle's shunting performance will also allow for the optimization of existing equipment to work in those same electrical environments, which should lead to a decrease in the number of field failures.
(21) The foregoing examples are provided merely for the purpose of explanation and are in no way to be construed as limiting. Further areas of applicability of the present disclosure will become apparent from the detailed description, drawings and claims provided hereinafter. While reference to various embodiments is made, the words used herein are words of description and illustration, rather than words of limitation. Further, although reference to particular means, materials, and embodiments are shown, there is no limitation to the particulars disclosed herein. Rather, the embodiments extend to all functionally equivalent structures, methods, and uses, such as are within the scope of the appended claims.
(22) Additionally, the purpose of the Abstract is to enable the patent office and the public generally, and especially the scientists, engineers and practitioners in the art who are not familiar with patent or legal terms or phraseology, to determine quickly from a cursory inspection the nature of the technical disclosure of the application. The Abstract is not intended to be limiting as to the scope of the present inventions in any way.